ENS 45903
From kanterella
Jump to navigation
Jump to search
ENS Event | |
|---|---|
22:10 May 5, 2010 | |
| Title | Injured Individual Hospitalized |
| Event Description | On May 5, 2010 at approximately 1510 PDT, a notification was made to the Washington State Department of Labor and Industries regarding an in-patient hospitalization of an Energy Northwest employee as required by Washington Administrative Code.
On May 3, 2010 high wind conditions were occurring at the plant site. While this individual was outside, a high gust of wind occurred resulting in the individual falling and injuring himself. The individual received treatment from a local medical facility and was released that day. On May 5, the individual identified additional symptoms and was admitted to a local hospital which resulted in in-patient hospitalization and treatment. The licensee notified the NRC Resident Inspector. |
| Where | |
|---|---|
| Columbia Washington (NRC Region 4) | |
| Reporting | |
| 10 CFR 50.72(b)(2)(xi), Notification to Government Agency or News Release | |
| Time - Person (Reporting Time:+-2.73 h-0.114 days <br />-0.0162 weeks <br />-0.00374 months <br />) | |
| Opened: | Nick Rullman 19:26 May 5, 2010 |
| NRC Officer: | Pete Snyder |
| Last Updated: | May 5, 2010 |
| 45903 - NRC Website
Loading map... {"minzoom":false,"maxzoom":false,"mappingservice":"leaflet","width":"350px","height":"250px","centre":false,"title":"","label":"","icon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"zoom":6,"defzoom":14,"layers":["OpenStreetMap"],"image layers":[],"overlays":[],"resizable":false,"fullscreen":false,"scrollwheelzoom":true,"cluster":false,"clustermaxzoom":20,"clusterzoomonclick":true,"clustermaxradius":80,"clusterspiderfy":true,"geojson":"","clicktarget":"","imageLayers":[],"locations":[{"text":"\u003Cb\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003E\u003Ca class=\"mw-selflink selflink\"\u003EENS 45903\u003C/a\u003E - \u003Ca href=\"/Columbia\" title=\"Columbia\"\u003EColumbia\u003C/a\u003E\n\u003C/p\u003E\u003C/div\u003E\u003C/b\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003EInjured Individual Hospitalized\n\u003C/p\u003E\u003C/div\u003E","title":"ENS 45903 - Columbia\n","link":"","lat":46.55068333333333,"lon":-119.488975,"icon":"/w/images/7/7c/Energy_Northwest_icon.png"}],"imageoverlays":null} | |
Unit 2 | |
|---|---|
| Reactor critical | Critical |
| Scram | No |
| Before | Power Operation (100 %) |
| After | Power Operation (100 %) |
Retrieved from "https://kanterella.com/w/index.php?title=ENS_45903&oldid=88507"