ENS 53092: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 16: Line 16:
| event date = 11/26/2017 12:25 EST
| event date = 11/26/2017 12:25 EST
| last update date = 11/26/2017
| last update date = 11/26/2017
| title = Unplanned Emergency Core Cooling System (Eccs) Injection During A Planned Safety Injection Test
| title = Unplanned Emergency Core Cooling System (Eccs) Injection During a Planned Safety Injection Test
| event text = On November 26, 2017, at 1225 Eastern Standard Time (EST), the Watts Bar Nuclear Plant (WBN) Unit 2 experienced an unplanned ECCS discharge to the Unit 2 Reactor Coolant System (RCS) while de-pressurized, in Mode 5, with the Pressurizer vented to the Pressurizer Relief Tank.  ECCS injection via the Boron Injection flow path occurred during planned Safety Injection system Engineered Safety Features Actuation System (ESFAS) testing.  The Boron Injection flow path should have been isolated and should not have resulted in any injection flow to the Unit 2 RCS.  Since the injection was not a part of the pre-planned test this is reportable under 10 CFR 50.72(b)(2)(iv), System Actuation.   
| event text = On November 26, 2017, at 1225 Eastern Standard Time (EST), the Watts Bar Nuclear Plant (WBN) Unit 2 experienced an unplanned ECCS discharge to the Unit 2 Reactor Coolant System (RCS) while de-pressurized, in Mode 5, with the Pressurizer vented to the Pressurizer Relief Tank.  ECCS injection via the Boron Injection flow path occurred during planned Safety Injection system Engineered Safety Features Actuation System (ESFAS) testing.  The Boron Injection flow path should have been isolated and should not have resulted in any injection flow to the Unit 2 RCS.  Since the injection was not a part of the pre-planned test this is reportable under 10 CFR 50.72(b)(2)(iv), System Actuation.   
All other systems responded as expected in accordance with the ESFAS testing procedure.  The unintended ECCS injection flow was isolated and flow through the Boron Injection path was verified to be stopped at 1232 EST.  The Unit 2 Pressurizer level and pressure remained below any limits and no safety limits were challenged.
All other systems responded as expected in accordance with the ESFAS testing procedure.  The unintended ECCS injection flow was isolated and flow through the Boron Injection path was verified to be stopped at 1232 EST.  The Unit 2 Pressurizer level and pressure remained below any limits and no safety limits were challenged.

Latest revision as of 21:41, 1 March 2018

ENS 53092 +/-
Where
Watts Bar Tennessee Valley Authority icon.png
Tennessee (NRC Region 2)
Reporting
10 CFR 50.72(b)(2)(iv)(A), System Actuation - ECCS Discharge
Time - Person (Reporting Time:+-1.15 h-0.0479 days <br />-0.00685 weeks <br />-0.00158 months <br />)
Opened: Brian Mcilnay
16:16 Nov 26, 2017
NRC Officer: Michael Bloodgood
Last Updated: Nov 26, 2017
53092 - NRC Website
Loading map...