ENS 53118: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 16: | Line 16: | ||
| event date = 12/12/2017 17:57 CST | | event date = 12/12/2017 17:57 CST | ||
| last update date = 12/12/2017 | | last update date = 12/12/2017 | ||
| title = Unplanned Loss | | title = Unplanned Loss of Emergency Response Equipment | ||
| event text = At 1757 CST on December 12, 2017, South Texas Project Electric Generating Station (STPEGS) Unit 1 and Unit 2 experienced an unplanned partial loss of the Integrated Computer System (ICS). The partial loss of Unit 1 and Unit 2 ICS resulted in a major loss of emergency assessment capability to STPEGS Unit 1 and Unit 2 Technical Support Center (TSC) for greater than 75 minutes. Assessment capability has been verified to be available in the Emergency Operations Facility (EOF). | | event text = At 1757 CST on December 12, 2017, South Texas Project Electric Generating Station (STPEGS) Unit 1 and Unit 2 experienced an unplanned partial loss of the Integrated Computer System (ICS). The partial loss of Unit 1 and Unit 2 ICS resulted in a major loss of emergency assessment capability to STPEGS Unit 1 and Unit 2 Technical Support Center (TSC) for greater than 75 minutes. Assessment capability has been verified to be available in the Emergency Operations Facility (EOF). | ||
This report is being made pursuant to 10 CFR 50.72(b)(3)(xiii), any event that results in a major loss of emergency assessment capability, off site response capability, or off site communications ability. | This report is being made pursuant to 10 CFR 50.72(b)(3)(xiii), any event that results in a major loss of emergency assessment capability, off site response capability, or off site communications ability. |
Latest revision as of 21:41, 1 March 2018
Where | |
---|---|
South Texas Texas (NRC Region 4) | |
Reporting | |
10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness | |
Time - Person (Reporting Time:+-0.88 h-0.0367 days <br />-0.00524 weeks <br />-0.00121 months <br />) | |
Opened: | Robert Tatro 23:04 Dec 12, 2017 |
NRC Officer: | Steven Vitto |
Last Updated: | Dec 12, 2017 |
53118 - NRC Website
| |