OPERATING DATA REPORT DOCKET NO. 50-369 DATE 04/15/86 COMPLETED BY     TA. Raavis TELEPilONE N -373-7567 OPERATING STATUS
OPERATING DATA REPORT DOCKET NO.
: 1. Unit Name:               McGuire 1                                 Notes a Nameplate Rating
50-369 DATE 04/15/86 COMPLETED BY TA.
: 2. Reporting Period: March 1, 1986-March 31. 1986                       (Gross MWe) calculated as 3411                          1450.000 MVA x .90 power
Raavis TELEPilONE N -373-7567 OPERATING STATUS
: 1. Unit Name:
McGuire 1 Notes a Nameplate Rating
: 2. Reporting Period: March 1, 1986-March 31. 1986 (Gross MWe) calculated as
: 3. Licensed Thermal Power (MWt):
: 3. Licensed Thermal Power (MWt):
1305*                         factor per Page 111,
3411 1450.000 MVA x.90 power 1305*
factor per Page 111,
: 4. Nameplate Rating (Gross MWe):
: 4. Nameplate Rating (Gross MWe):
NUREG-0020.
NUREG-0020.
: 5. Design Electrical Rating (Net MWe):       1150
: 5. Design Electrical Rating (Net MWe):
1150
: 6. Maximum Dependable Capacity (Gross MWe):
: 6. Maximum Dependable Capacity (Gross MWe):
: 7. Maximum Dependable Capacity (Net MWe):               1150
: 7. Maximum Dependable Capacity (Net MWe):
1150
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
None
None None
: 9. Power Level To Which Restricted,if Any (Net MWe):           None
: 9. Power Level To Which Restricted,if Any (Net MWe):
: 10. Reasons For Restrictions.lf Any:
: 10. Reasons For Restrictions.lf Any:
^i This Mon:h             Yr. to Date         Cumulative
^i This Mon:h Yr. to Date Cumulative
: 11. Hours In Reporting Period                             744.0               2 160.0             17 96R.0
: 11. Hours In Reporting Period 744.0 2 160.0 17 96R.0
: 12. Number Of Hours Reactor Was Critical                 642.6               2 047.0             27 052.9         ,
: 12. Number Of Hours Reactor Was Critical 642.6 2 047.0 27 052.9
: 13. Reactor Reserve Shutdown Hours                                               ---                  ---
: 13. Reactor Reserve Shutdown Hours 14; Hours Generator On Line 633.1 2 035.6 26 747.1
14; Hours Generator On Line                               633.1               2 035.6             26 747.1
: 15. Unit Reserse Shutdown Hours
: 15. Unit Reserse Shutdown Hours                                                   ---                  ---
: 16. Gross Thermal Energy Generated (MWH) 2 089 263 6 583 461 73 950 036
: 16. Gross Thermal Energy Generated (MWH)               2 089 263               6 583 461           73 950 036
. 17. Gross Electrical Energy Generated (MWH) 729 796 2 305 395 25 616 628
        . 17. Gross Electrical Energy Generated (MWH)                 729 796             2 305 395           25 616 628
: 18. Net Electrical Energy Generated (MWH) 698 647 2 214 122 24 366 116
: 18. Net Electrical Energy Generated (MWH)                 698 647             2 214 122           24 366 116       ,
: 19. Unit Service Factor 85.1 94.2 70.5
: 19. Unit Service Factor                                     85.1                   94.2               70.5
: 20. Unit Availability Factor 85.1 94.2 70.5
: 20. Unit Availability Factor                                 85.1                   94.2               70.5
: 21. Unit Capacity Factor (Using MDC Net) 81.7 89.1 54.5
: 21. Unit Capacity Factor (Using MDC Net)                     81.7                   89.1               54.5
: 22. Unit Capacity Factor (Using DER Net) 81.7 89.1 s4.5
: 22. Unit Capacity Factor (Using DER Net)                     81.7                   89.1               s4.5
: 23. Unit Forced Outage Rate 14.9 5.8 13.7
: 23. Unit Forced Outage Rate                                 14.9                     5.8             13.7
: 24. Shutdowns Scheduled Over Next 6 Months (Type.Date.and Duration of Each1:
: 24. Shutdowns Scheduled Over Next 6 Months (Type.Date.and Duration of Each1:
Refuelinn - May 31, 1986 - 11 weeks
Refuelinn - May 31, 1986 - 11 weeks
: 25. If Shut Down At End Of Report Paino t;stimod Date of Startup:
: 25. If Shut Down At End Of Report Paino t;stimod Date of Startup:
: 26. Units in Test Status iPrior to Commercial Operatio. l:                       Forecast           Achieved
: 26. Units in Test Status iPrior to Commercial Operatio. l:
;                                  INITIA1. CRITICA LITY INITIAL ELECTRICITY COSIMERCIAL OPER ATION r
Forecast Achieved INITIA1. CRITICA LITY INITIAL ELECTRICITY COSIMERCIAL OPER ATION r
8604220447 860331                     *_
8604220447 860331 (n L' PDR ADOCK 05000369 F
ADOCK 05000369 (nFL'
(9/77)
  !                PDR                                                                                                  (9/77)
R PDR i
  ;                R                       PDR i


    ,      . . - ,                  .    ~ .. .                          .          -                        . .          . . .      .-                - .-                - ..                                .- -.
~...
AVERAGE DALLY UNIT POWER LEVEL DOCKET NO.                         50-369 UNIT                     Menntre 1 DATE                     04/15/86
AVERAGE DALLY UNIT POWER LEVEL DOCKET NO.
,                                                                                                                                                                        COMPLETED BY                           J.A. Reavis TELEPHONE                       704-373-7567 MONTH               March, 1986 DAY.                 AVERAGE DAILY POWER LEVEL                                                                     DAY AVERAGE DAILY POWER LEVEL (MWe-Net)                                                                                                             (MWe-Ne t) 1 1 iso                                                                         17
50-369 UNIT Menntre 1 DATE 04/15/86 COMPLETED BY J.A. Reavis TELEPHONE 704-373-7567 MONTH March, 1986 DAY.
_c-                                                                                                                                                                       1 153                                                            ,
AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
j                   2                                 1 159                                                                         18                                   1 153 3
(MWe-Ne t) 1 1 iso 17 1 153
3                                 1 159                                                                         19                                   1 153
_c-j 2
;                  4                                  1 159                                                                         20                                   1 152 5                                 1 159 f
1 159 18 1 153 3
21                                   l'152                                                             '
3 1 159 19 1 153 4
F 6                                 1 159                                                                         22                                 1 151 7                                       646                                                                     23                                 1 152
1 159 20 1 152 5
                '8                                         ---
1 159 21 l'152 f
24                                 1 152 9                                       --
F 6
25                                     847 10                                         ___                                                                      26                                       42 11                                         262 i-27                                      925 12                                   1 144                                                                           28                                 1 143
1 159 22 1 151 7
,              13                                   1 148                                                                           29                                 1 151                                                               '
646 23 1 152
t              14                                   1 145                                                                           30                                 1 149 15                                   1 153 3                                                                                                                                  31                                 1 149
'8 24 1 152 9
25 847 10 26 42 11 262 27 925 i-12 1 144 28 1 143 13 1 148 29 1 151 t
14 1 145 30 1 149 15 1 153 31 1 149 3
16 1 153
+
+
16                                  1 153 i
i 4
4 1
1 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day j
INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day j             in the reportir.g month. Compute to the nearest whole megawatt.
in the reportir.g month.
Compute to the nearest whole megawatt.
i
i
  -    +,           ..., . . . - ,            - . . . . , . . . . . . - . , - . - . . - - . . . , . . . - . . . . - - . ,                - , - - . . . . - . . , - . -            . . - - , . . . . - , . - . -              . - - - -
+,


UNIT SHUTDOWNS AND POWER REDUCTIONS           DOCKET NO. 50-369 UNIT NAME McGuire 1             '
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-369 UNIT NAME McGuire 1 DATE 4/15/86 REPORT M) NTH March, 1986 COMPLETED BY J. A. Reavis TELEPHONE 704-373-7567 "s.o o o,y License Cause & Corrective y
DATE 4/15/86 REPORT M) NTH March, 1986           COMPLETED BY     J. A. Reavis TELEPHONE 704-373-7567 "s.
eS2 "c
o e            o o,y     License                 y                      Cause & Corrective S2      "co  v52                   a
v52 a
* No. Date   ~
No.
o a
Date
                          %5;
%5; yy Event h
                          'o        e yy umf Event       h my g                           Action to N 55         E   $5S                               gy Report #     &O         v8                     Prevent Recurrence 2   86-03-07   F     47.53   A       1                   CB     PUMPXX     Investigate Reactor Coolant Fiap Oil Level Alarms 3   86-03-09   F     41.50   A     -
g Action to
CB     HTEXCH     Repair Steam Generator Sludge Manway Leak ll-p 86-03-11   F     --
~
B     -
o o
IB       INSTRU   Adjust Nuclear Instrumentation 4   86-03-25   F     21.87   A       1                   CH     VALVEX     Feedwater Containment Isol. to Steam Generator Closed Due to Bad Fuse 12-p 86-03-26   F     --
umf a
F     -
'o e
XX     ZZZZZZ     Hold for Secondary Chemistry 13-p 86-03-27   F     --
my gy N 55 E
A     -
$5S Report #
PC     VALVEX     Xenon Gas Leak from Chemical Volume &
&O v8 Prevent Recurrence 2
Control System Valve (NV-483) 1           2                                               3                         4 F  ced        Reason:                                       Method:                   Exhibit G - Instmetions e uld     A-Equipment Failure (Explain)                   1-Manual                 for Preparation of Data B-Maintenance or Test                           2-Manual Scram           Entry Sheets for Licensee C-Refueling                                     3-Automatic Scram         Event Report (LER)
86-03-07 F
D-Regulatory Restriction                       4-Other (Explain)         File (NIREG-0161)
47.53 A
E-Operator Training 4 License Examination F-Administrative                                                       S G-Operational Error (Explain)                                             Exhibit I - Same Source II-Other (Explain) ro tm
1 CB PUMPXX Investigate Reactor Coolant Fiap Oil Level Alarms 3
86-03-09 F
41.50 A
CB HTEXCH Repair Steam Generator Sludge Manway Leak ll-p 86-03-11 F
B IB INSTRU Adjust Nuclear Instrumentation 4
86-03-25 F
21.87 A
1 CH VALVEX Feedwater Containment Isol. to Steam Generator Closed Due to Bad Fuse 12-p 86-03-26 F
F XX ZZZZZZ Hold for Secondary Chemistry 13-p 86-03-27 F
A PC VALVEX Xenon Gas Leak from Chemical Volume &
Control System Valve (NV-483) 1 2
3 4
Reason:
Method:
Exhibit G - Instmetions F
ced e uld A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER)
D-Regulatory Restriction 4-Other (Explain)
File (NIREG-0161)
E-Operator Training 4 License Examination F-Administrative S
G-Operational Error (Explain)
Exhibit I - Same Source II-Other (Explain) ro tm


DOCKET NO: 50-369 UNIT: McGuire 1 DATE: 4/15/86 NARRATIVE  
DOCKET NO:
50-369 UNIT: McGuire 1 DATE:
4/15/86 NARRATIVE  


==SUMMARY==
==SUMMARY==
 
Month:
Month:   March, 1986 The unit began March'at 100% but shutdown on March 7, 1986 after receiving indications of an oil leak on a Reactor Coolant pump. A leaking Steam Generator Manway was discovered and repaired while the unit was of t -line.
March, 1986 The unit began March'at 100% but shutdown on March 7, 1986 after receiving indications of an oil leak on a Reactor Coolant pump. A leaking Steam Generator Manway was discovered and repaired while the unit was of t -line.
The unit returned to service on March 11. On March 25 the unit trippid from 100% when a Feedwater Isolation valve failed closed. The unit returned to service on March 26 and was back to 100% on March 28.
The unit returned to service on March 11.
On March 25 the unit trippid from 100% when a Feedwater Isolation valve failed closed. The unit returned to service on March 26 and was back to 100% on March 28.
l l
l l
l
l


l MONTHLY REFUELING INFORMATION REQUEST
l MONTHLY REFUELING INFORMATION REQUEST 1.
: 1. Facility name: McGuire, Unit 1
Facility name: McGuire, Unit 1 2.
: 2. Scheduled next refueling shutdown: May, 1986
Scheduled next refueling shutdown: May, 1986 3.
: 3. Scheduled restart following refueling: August, 1986
Scheduled restart following refueling: August, 1986 4.
: 4. Will refueling or resumption of operation thereaf ter require a technical specification change or other license amendment? Yes If yes, what will these be? Technical Specification Revision If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions? N/A
Will refueling or resumption of operation thereaf ter require a technical specification change or other license amendment? Yes If yes, what will these be? Technical Specification Revision If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions? N/A 5.
: 5. Scheduled date(s) for submitting proposed licensing action and supporting information: N/A
Scheduled date(s) for submitting proposed licensing action and supporting information: N/A 6.
: 6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
: 7. Number of fuel assemblies (a) in the core: 193 (b) in the spent fuel pool: 152
7.
: 8. Present licensed fuel pool capacity: 1463 Size of requested or planned increase:     ---
Number of fuel assemblies (a) in the core: 193 (b) in the spent fuel pool: 152 8.
: 9. Projected date of last refueling which can be accommodated by present licensed capacity: August, 2010 DUKE POWER COMPANY                         DATE: April 15, 1986 Name of
Present licensed fuel pool capacity: 1463 Size of requested or planned increase:
9.
Projected date of last refueling which can be accommodated by present licensed capacity: August, 2010 DUKE POWER COMPANY DATE: April 15, 1986 Name of


==Contact:==
==Contact:==
J. A. Reavis           Phone: 704-373-7567
J. A. Reavis Phone:
704-373-7567


,                                                                  OPERATLNG DATA REPORT DOCKET NO. 50-370 DATE         04/15/86 COMPLETED BY .J.A. Reavis
OPERATLNG DATA REPORT DOCKET NO.
!                                                                                                                              TELEPHONE vna-373-7567 OPERATING STATUS
50-370 DATE 04/15/86 COMPLETED BY
: 1. Unit Name:                         McGuire 2                                                 Notes '* Nameplate Rating                                       ,
.J.A. Reavis TELEPHONE vna-373-7567 OPERATING STATUS
: 2. Reporting Period: March 1. 1986-March 31. 1986                                                   (Gross MWe) calculated as
: 1. Unit Name:
: 3. Licensed Thennal Power (MWt):                   3411                                             1450.000 MVA x .90 power i                                                             1305                                            factor per Page lii,
McGuire 2 Notes '* Nameplate Rating
: 2. Reporting Period: March 1. 1986-March 31. 1986 (Gross MWe) calculated as
: 3. Licensed Thennal Power (MWt):
3411 1450.000 MVA x.90 power i
: 4. Nameplate Rating (Gross MWe):
: 4. Nameplate Rating (Gross MWe):
NUREG-0020.
1305 factor per Page lii, NUREG-0020.
5         5. Design Electrical Rating (Net MWe): __ 1150
5
: 5. Design Electrical Rating (Net MWe): __ 1150
: 6. Maximum Dependable Capacity (Gross MWe):
: 6. Maximum Dependable Capacity (Gross MWe):
: 7. Maximum Dependable Capacity (Net MWe):                   1150
: 7. Maximum Dependable Capacity (Net MWe):
1150
: 8. If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report. Give Reasons:
: 8. If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report. Give Reasons:
None
None None
: 9. Power Level To Which Restricted,if Any (Net MWe):                                 None
: 9. Power Level To Which Restricted,if Any (Net MWe):
: 10. Rcasons For Restrictions. lf Any:
: 10. Rcasons For Restrictions. lf Any:
This Month                           Yr to-Date               Cumulative
This Month Yr to-Date Cumulative
      - II. Hours in Reporting Period                                             744.0                       2 160.0                   18 264.0
- II. Hours in Reporting Period 744.0 2 160.0 18 264.0
      - 12. Number Of Houn Reactor Was Critical                                   315.6                         1 685.1                 13 313.7
- 12. Number Of Houn Reactor Was Critical 315.6 1 685.1 13 313.7
: 13. Reactor Reserve Shutdown Hours                                                                         ---                          ---
: 13. Reactor Reserve Shutdown Hours
: 14. Hours Generator On Line                                             315.1                         1 680.4                 12 946.0
: 14. Hours Generator On Line 315.1 1 680.4 12 946.0
: 15. Unit Resene Shutdown Hours                                           ---                                ---                          ---
: 15. Unit Resene Shutdown Hours
;        16. Gross Thermal Energy Generated (MWH)                         1 070 655                           5 617 497               41 767 874
: 16. Gross Thermal Energy Generated (MWH) 1 070 655 5 617 497 41 767 874
: 17. Gross Electrical Energy Generated (MWH)                               377 348                       1 982 876               14 683 443
: 17. Gross Electrical Energy Generated (MWH) 377 348 1 982 876 14 683 443
: 18. Net Electrical Energy Generated (MWH)                                 359 712                       1 906 172               14 059 825
: 18. Net Electrical Energy Generated (MWH) 359 712 1 906 172 14 059 825
: 19. Unit Service Factor                                                     42.4                             77.8                       70.9
: 19. Unit Service Factor 42.4 77.8 70.9
: 20. Unit Availability Factor                                               42.4                               77.8                       70.9                   -
: 20. Unit Availability Factor 42.4 77.8 70.9
!        21. Unit Capacity Factor (Using MDC Net)                   .              42.0                               76.7                     65.4
: 21. Unit Capacity Factor (Using MDC Net) 42.0 76.7 65.4
: 22. Unit Capacity Factor (Using DER Net)                                   42.0                               76.7                     65.4
: 22. Unit Capacity Factor (Using DER Net) 42.0 76.7 65.4
: 23. Unit Forced Outage Rate                                                     0.0                             2.9                     20.3               .
: 23. Unit Forced Outage Rate 0.0 2.9 20.3
: 24. Shutdowns Scheduled Over Next 6 Months IType.Date.and Duration of Eacht:
: 24. Shutdowns Scheduled Over Next 6 Months IType.Date.and Duration of Eacht:
Currently Refuelina 1
Currently Refuelina 1
: 25. If Shut Down At End Of Report Period. Estimated Date of Startup:                                 May 17, 1986
: 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
: 26. Units in Test Status (Prior to Commercial 0peration):                                               Forecast               Achieved i
May 17, 1986
: 26. Units in Test Status (Prior to Commercial 0peration):
Forecast Achieved i
INITIA L CRITICALITY j
INITIA L CRITICALITY j
INITIA L ELECTRICITY COMMERCIAL OPERATION f
INITIA L ELECTRICITY COMMERCIAL OPERATION f
(9/77)
(9/77)


F AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-370 UNIT McGuire 2 DATE 04/15/86 COMPLETED BY       J.A. Reavis TELEPHONE 704-373-7567 MONTH   March, 1986 DAY AVERAGE DAILY POWER LEVEL           DAY (MWe-Net)                            /.VERAGE DAILY POWER LEVEL (MWe-Ne t) 1 1 162                       17                   ---
F AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
2            1 162                       18                   ---
50-370 UNIT McGuire 2 DATE 04/15/86 COMPLETED BY J.A. Reavis TELEPHONE 704-373-7567 MONTH March, 1986 DAY AVERAGE DAILY POWER LEVEL DAY
3            1 163                       19                   ---
/.VERAGE DAILY POWER LEVEL (MWe-Net)
4            1 162                       20   __
(MWe-Ne t) 1 1 162 17 2
5            1 162                       21                   ---
1 162 18 3
6            1 163                       22                   ---
1 163 19 4
7            1 161                       23                 ---
1 162 20 5
8            1 159                       24                 ---
1 162 21 6
9            1 160                       25                 ---
1 163 22 7
10             i iso                       26                 --_
1 161 23 8
11             1 160                       27                 ---
1 159 24 9
12             1 161                       28                 ---
1 160 25 10 i iso 26 11 1 160 27 12 1 161 28 13 1 162 29 14 41 30 15 31 16 INSTRUCTIONS On this format, list in the reporting month.the average daily unit power level in MWe-Net for each day Compute to the nearest whole megawatt.
13             1 162                       29                 ---
14                   41                   30                 ---
15                 ---
31                 ---
16                 ---
INSTRUCTIONS On this format, list in the reporting month.the average daily unit power level in MWe-Net for each day Compute to the nearest whole megawatt.


UNIT SHUTDOWNS AND POWER REDUCTIONS             DOCKET NO. 50-370 UNIT NAME Mccuire 2             '
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-370 UNIT NAME Mccuire 2 DATE 4/15/86 REPORT MONTH March, 1986 COMPLETED BY J. A. Reavis TELEPHONE 704-373-7567
DATE 4/15/86 REPORT MONTH March, 1986             COMPLETED BY   J. A. Reavis TELEPHONE 704-373-7567
.m O
                                              .m O
Cause & Corrective o e, u License y
c              o e, u   License                 y                       Cause & Corrective 37      "cg    oSE
c37 "c
* g Action to No. Date     %a  %h           jg         Event       ,&r,       g
oSE g
                            'O       =   usE                    my N SE         E   $ dis     Report #     uTO       $y8                   Prevent Recurrence 2   86-03-14   S   478.88 C       1                     RL     FUELXX   End of Cycle 2 Refueling Outage 4
No.
Date
%h g
jg Event
,&r, g
Action to usE a
'O
=
my N SE E
$ dis Report #
uTO
$y8 Prevent Recurrence 2
86-03-14 S
478.88 C
1 RL FUELXX End of Cycle 2 Refueling Outage 4
4
4
                                                                                          ;w .
;w 1
1            2                                               3                       4 Reason:                                         Method:                 Exhibit G - Instructions S     ed     A-Equipment Failure (Explain)                   1-Manual                 for Preparation of Data B-Maintenance or Test                           2-Manual Scram           Entry Sheets for Licensee C-Refueling                                     3-Autmatic Scram         Event Report (LER)
2 3
D-Regulatory Restriction                       4-Other (Explain)       File (NLREG-0161)
4 Reason:
E-Operator Training 4 License Examination F-Adninistrative                                                       S G-Operational Error (Explain)                                           Exhibit I - Same Sourte H-Other (Explain)
Method:
Exhibit G - Instructions S
ed A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Autmatic Scram Event Report (LER)
D-Regulatory Restriction 4-Other (Explain)
File (NLREG-0161)
E-Operator Training 4 License Examination F-Adninistrative S
G-Operational Error (Explain)
Exhibit I - Same Sourte H-Other (Explain)
(4/77)
(4/77)


DOCKET NO: 50-370           l UNIT: McGuire 2 DATE: 4/15/86 NARRATIVE SUletARY Month:   March. 1986 The unit operated at 100% until it was shutdown on March 14, 1986 and entered its End of Cycle 2 refueling outage.                                         .
DOCKET NO: 50-370 l
UNIT: McGuire 2 DATE: 4/15/86 NARRATIVE SUletARY Month:
March. 1986 The unit operated at 100% until it was shutdown on March 14, 1986 and entered its End of Cycle 2 refueling outage.
e


MONTHLY REFUELING INFORMATION REQUEST
MONTHLY REFUELING INFORMATION REQUEST 1.
: 1. Facility name: McGuire, Unit 2
Facility name: McGuire, Unit 2 2.
: 2. Scheduled next refueling shutdown: Currently Refueling
Scheduled next refueling shutdown: Currently Refueling 3.
: 3. Scheduled restart following refueling: ---
Scheduled restart following refueling: ---
: 4. Will refueling or resumption of operation thereafter require a
4.
          -technical specification change or other license amendment? Yes If yes, what will these be? Technical Specification Revision If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions? N/A
Will refueling or resumption of operation thereafter require a
: 5. Scheduled date(s) for submitting proposed licensing action and supporting information: N/A
-technical specification change or other license amendment? Yes If yes, what will these be? Technical Specification Revision If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions? N/A 5.
: 6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methcfa, significant changes in design or-new operating procedures).
Scheduled date(s) for submitting proposed licensing action and supporting information: N/A 6.
: 7. Number of fuel assemblies (a)     in the core: 193 (b) in the spent fuel pool: 150
Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methcfa, significant changes in design or-new operating procedures).
: 8. Present licensed fuel pool capacity: 1463 Size of requested or planned increase:   ---
7.
: 9. Projected date of last refueling which can be accommodated by present licensed capacity: August, 2010 DUKE POWER COMPANY                         DATE: April 15, 1986 Name of
Number of fuel assemblies (a) in the core: 193 (b) in the spent fuel pool: 150 8.
Present licensed fuel pool capacity: 1463 Size of requested or planned increase:
9.
Projected date of last refueling which can be accommodated by present licensed capacity: August, 2010 DUKE POWER COMPANY DATE: April 15, 1986 Name of


==Contact:==
==Contact:==
J. A. Reavis           Phones 704-373-7567
J. A. Reavis Phones 704-373-7567


f:
f:
l       .e McGUIRE NOCLEAR STATION Monthly Operating Status Report l
l
: 1. Personnel Exposure For the month of February, no individual (s) exceeded 10 percent of                     >
.e McGUIRE NOCLEAR STATION Monthly Operating Status Report l
their allowable annual radiation dose limit.
1.
: 2. The total station liquid release for February has been compared with the Technical Specifications maximum annual dose commitment and was less than 10 percent of this limit.
Personnel Exposure For the month of February, no individual (s) exceeded 10 percent of their allowable annual radiation dose limit.
2.
The total station liquid release for February has been compared with the Technical Specifications maximum annual dose commitment and was less than 10 percent of this limit.
The total station gaseous release for February has been compared with the Technical Specifications maximum annual dose commitment and was less than 10 percent of this limit.
The total station gaseous release for February has been compared with the Technical Specifications maximum annual dose commitment and was less than 10 percent of this limit.
4
4
 
:A DUKE POWER GOMPANY P.O. HOX 33180 CHAMLOTTE, N.C. 28242 HAL B. TUCKER NNN
:A     .
: m...
DUKE POWER GOMPANY P.O. HOX 33180 CHAMLOTTE, N.C. 28242 HAL B. TUCKER                                                               NNN
(704) amaan N13Dt..AB PaomeCT904 April 15, 1986 Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.
: m. ..       ,                                                          (704) amaan N13Dt..AB PaomeCT904 April 15, 1986 Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Attention: Document Control Desk Re: McGuire Nuclear Station Dockat No. 50-369 and 50-370
20555 Attention: Document Control Desk Re: McGuire Nuclear Station Dockat No. 50-369 and 50-370


==Dear Sir:==
==Dear Sir:==
Please find attached information concerning the performance and operating status of the McGuire Nuclear Station for the month of March, 1986.
Please find attached information concerning the performance and operating status of the McGuire Nuclear Station for the month of March, 1986.
Very truly yours, A
Very truly yours, A
Hal B. Tucker JAR: sib Attachment xc       Dr. J. Nelson Grace, Regional Administrator l                       U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 i
Hal B. Tucker JAR: sib Attachment xc Dr. J. Nelson Grace, Regional Administrator l
l-                       Mr. Phil Ross U. S. Nuclear Regulatory Commission i                       MNBB-5715
U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 i
,                        Washington, D. C. 20555 American Nuclear Insurers e/o Dottie Sherman, ANI Library The Exchange, Suite 245 270 Farmington Avenue l                       Farmington, CT 06032 l
l-Mr. Phil Ross U. S. Nuclear Regulatory Commission i
MNBB-5715 Washington, D. C.
20555 American Nuclear Insurers e/o Dottie Sherman, ANI Library The Exchange, Suite 245 270 Farmington Avenue l
Farmington, CT 06032 l
o
o
* 9 Dirait r April 15, 1986 Page Two xc: INPO Records Center Suite 1500 1100 circle 75 Parkway Atlanta, Georgia 30323 Mr. Darl Hood, Project Manager Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Mr. W. T. Orders NRC Senior Resident Inspector McGuire Nuclear Station Ms. Judy Dovers Nuclear Assurance Corporation 5720 Peachtree Parkway Norcross, Georgia 30092 Mr. Richard G. Oehl, NE-44 U. S. Department of Energy 19901 Germantown Road Germantown, Maryland 20874
 
                                                                                                                                                                              \
9 Dirait r April 15, 1986 Page Two xc: INPO Records Center Suite 1500 1100 circle 75 Parkway Atlanta, Georgia 30323 Mr. Darl Hood, Project Manager Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C.
              . _ . - - . , . . . _ . , _ , . _ , _ _ _ - _ _ - . . ~ . , _ , - . _ , , _ - - - . _ _ . . . . . . .,_.m_. ~ _ - . - _ _ . -. - _. . - ... - - . . .._ - - . .}}
20555 Mr. W. T. Orders NRC Senior Resident Inspector McGuire Nuclear Station Ms. Judy Dovers Nuclear Assurance Corporation 5720 Peachtree Parkway Norcross, Georgia 30092 Mr. Richard G. Oehl, NE-44 U. S. Department of Energy 19901 Germantown Road Germantown, Maryland 20874
\\
.,... _., _,. _, _ _ _ - _ _ -.. ~., _, -. _,, _ - - -. _ _......
.,_.m_.
~ _ -. - _ _. -. - _.. -... - -...._ - -.
.}}

Latest revision as of 15:20, 11 December 2024

Monthly Operating Repts for Mar 1986
ML20141F026
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 03/31/1986
From: Reavis J, Tucker H
DUKE POWER CO.
To:
NRC OFFICE OF ADMINISTRATION (ADM), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
NUDOCS 8604220447
Download: ML20141F026 (13)


Text

.

?.

OPERATING DATA REPORT DOCKET NO.

50-369 DATE 04/15/86 COMPLETED BY TA.

Raavis TELEPilONE N -373-7567 OPERATING STATUS

1. Unit Name:

McGuire 1 Notes a Nameplate Rating

2. Reporting Period: March 1, 1986-March 31. 1986 (Gross MWe) calculated as
3. Licensed Thermal Power (MWt):

3411 1450.000 MVA x.90 power 1305*

factor per Page 111,

4. Nameplate Rating (Gross MWe):

NUREG-0020.

5. Design Electrical Rating (Net MWe):

1150

6. Maximum Dependable Capacity (Gross MWe):
7. Maximum Dependable Capacity (Net MWe):

1150

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

None None

9. Power Level To Which Restricted,if Any (Net MWe):
10. Reasons For Restrictions.lf Any:

^i This Mon:h Yr. to Date Cumulative

11. Hours In Reporting Period 744.0 2 160.0 17 96R.0
12. Number Of Hours Reactor Was Critical 642.6 2 047.0 27 052.9
13. Reactor Reserve Shutdown Hours 14; Hours Generator On Line 633.1 2 035.6 26 747.1
15. Unit Reserse Shutdown Hours
16. Gross Thermal Energy Generated (MWH) 2 089 263 6 583 461 73 950 036

. 17. Gross Electrical Energy Generated (MWH) 729 796 2 305 395 25 616 628

18. Net Electrical Energy Generated (MWH) 698 647 2 214 122 24 366 116
19. Unit Service Factor 85.1 94.2 70.5
20. Unit Availability Factor 85.1 94.2 70.5
21. Unit Capacity Factor (Using MDC Net) 81.7 89.1 54.5
22. Unit Capacity Factor (Using DER Net) 81.7 89.1 s4.5
23. Unit Forced Outage Rate 14.9 5.8 13.7
24. Shutdowns Scheduled Over Next 6 Months (Type.Date.and Duration of Each1:

Refuelinn - May 31, 1986 - 11 weeks

25. If Shut Down At End Of Report Paino t;stimod Date of Startup:
26. Units in Test Status iPrior to Commercial Operatio. l:

Forecast Achieved INITIA1. CRITICA LITY INITIAL ELECTRICITY COSIMERCIAL OPER ATION r

8604220447 860331 (n L' PDR ADOCK 05000369 F

(9/77)

R PDR i

~...

AVERAGE DALLY UNIT POWER LEVEL DOCKET NO.

50-369 UNIT Menntre 1 DATE 04/15/86 COMPLETED BY J.A. Reavis TELEPHONE 704-373-7567 MONTH March, 1986 DAY.

AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Ne t) 1 1 iso 17 1 153

_c-j 2

1 159 18 1 153 3

3 1 159 19 1 153 4

1 159 20 1 152 5

1 159 21 l'152 f

F 6

1 159 22 1 151 7

646 23 1 152

'8 24 1 152 9

25 847 10 26 42 11 262 27 925 i-12 1 144 28 1 143 13 1 148 29 1 151 t

14 1 145 30 1 149 15 1 153 31 1 149 3

16 1 153

+

i 4

1 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day j

in the reportir.g month.

Compute to the nearest whole megawatt.

i

+,

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-369 UNIT NAME McGuire 1 DATE 4/15/86 REPORT M) NTH March, 1986 COMPLETED BY J. A. Reavis TELEPHONE 704-373-7567 "s.o o o,y License Cause & Corrective y

eS2 "c

v52 a

No.

Date

%5; yy Event h

g Action to

~

o o

umf a

'o e

my gy N 55 E

$5S Report #

&O v8 Prevent Recurrence 2

86-03-07 F

47.53 A

1 CB PUMPXX Investigate Reactor Coolant Fiap Oil Level Alarms 3

86-03-09 F

41.50 A

CB HTEXCH Repair Steam Generator Sludge Manway Leak ll-p 86-03-11 F

B IB INSTRU Adjust Nuclear Instrumentation 4

86-03-25 F

21.87 A

1 CH VALVEX Feedwater Containment Isol. to Steam Generator Closed Due to Bad Fuse 12-p 86-03-26 F

F XX ZZZZZZ Hold for Secondary Chemistry 13-p 86-03-27 F

A PC VALVEX Xenon Gas Leak from Chemical Volume &

Control System Valve (NV-483) 1 2

3 4

Reason:

Method:

Exhibit G - Instmetions F

ced e uld A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER)

D-Regulatory Restriction 4-Other (Explain)

File (NIREG-0161)

E-Operator Training 4 License Examination F-Administrative S

G-Operational Error (Explain)

Exhibit I - Same Source II-Other (Explain) ro tm

DOCKET NO:

50-369 UNIT: McGuire 1 DATE:

4/15/86 NARRATIVE

SUMMARY

Month:

March, 1986 The unit began March'at 100% but shutdown on March 7, 1986 after receiving indications of an oil leak on a Reactor Coolant pump. A leaking Steam Generator Manway was discovered and repaired while the unit was of t -line.

The unit returned to service on March 11.

On March 25 the unit trippid from 100% when a Feedwater Isolation valve failed closed. The unit returned to service on March 26 and was back to 100% on March 28.

l l

l

l MONTHLY REFUELING INFORMATION REQUEST 1.

Facility name: McGuire, Unit 1 2.

Scheduled next refueling shutdown: May, 1986 3.

Scheduled restart following refueling: August, 1986 4.

Will refueling or resumption of operation thereaf ter require a technical specification change or other license amendment? Yes If yes, what will these be? Technical Specification Revision If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions? N/A 5.

Scheduled date(s) for submitting proposed licensing action and supporting information: N/A 6.

Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).

7.

Number of fuel assemblies (a) in the core: 193 (b) in the spent fuel pool: 152 8.

Present licensed fuel pool capacity: 1463 Size of requested or planned increase:

9.

Projected date of last refueling which can be accommodated by present licensed capacity: August, 2010 DUKE POWER COMPANY DATE: April 15, 1986 Name of

Contact:

J. A. Reavis Phone:

704-373-7567

OPERATLNG DATA REPORT DOCKET NO.

50-370 DATE 04/15/86 COMPLETED BY

.J.A. Reavis TELEPHONE vna-373-7567 OPERATING STATUS

1. Unit Name:

McGuire 2 Notes '* Nameplate Rating

2. Reporting Period: March 1. 1986-March 31. 1986 (Gross MWe) calculated as
3. Licensed Thennal Power (MWt):

3411 1450.000 MVA x.90 power i

4. Nameplate Rating (Gross MWe):

1305 factor per Page lii, NUREG-0020.

5

5. Design Electrical Rating (Net MWe): __ 1150
6. Maximum Dependable Capacity (Gross MWe):
7. Maximum Dependable Capacity (Net MWe):

1150

8. If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report. Give Reasons:

None None

9. Power Level To Which Restricted,if Any (Net MWe):
10. Rcasons For Restrictions. lf Any:

This Month Yr to-Date Cumulative

- II. Hours in Reporting Period 744.0 2 160.0 18 264.0

- 12. Number Of Houn Reactor Was Critical 315.6 1 685.1 13 313.7

13. Reactor Reserve Shutdown Hours
14. Hours Generator On Line 315.1 1 680.4 12 946.0
15. Unit Resene Shutdown Hours
16. Gross Thermal Energy Generated (MWH) 1 070 655 5 617 497 41 767 874
17. Gross Electrical Energy Generated (MWH) 377 348 1 982 876 14 683 443
18. Net Electrical Energy Generated (MWH) 359 712 1 906 172 14 059 825
19. Unit Service Factor 42.4 77.8 70.9
20. Unit Availability Factor 42.4 77.8 70.9
21. Unit Capacity Factor (Using MDC Net) 42.0 76.7 65.4
22. Unit Capacity Factor (Using DER Net) 42.0 76.7 65.4
23. Unit Forced Outage Rate 0.0 2.9 20.3
24. Shutdowns Scheduled Over Next 6 Months IType.Date.and Duration of Eacht:

Currently Refuelina 1

25. If Shut Down At End Of Report Period. Estimated Date of Startup:

May 17, 1986

26. Units in Test Status (Prior to Commercial 0peration):

Forecast Achieved i

INITIA L CRITICALITY j

INITIA L ELECTRICITY COMMERCIAL OPERATION f

(9/77)

F AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-370 UNIT McGuire 2 DATE 04/15/86 COMPLETED BY J.A. Reavis TELEPHONE 704-373-7567 MONTH March, 1986 DAY AVERAGE DAILY POWER LEVEL DAY

/.VERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Ne t) 1 1 162 17 2

1 162 18 3

1 163 19 4

1 162 20 5

1 162 21 6

1 163 22 7

1 161 23 8

1 159 24 9

1 160 25 10 i iso 26 11 1 160 27 12 1 161 28 13 1 162 29 14 41 30 15 31 16 INSTRUCTIONS On this format, list in the reporting month.the average daily unit power level in MWe-Net for each day Compute to the nearest whole megawatt.

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-370 UNIT NAME Mccuire 2 DATE 4/15/86 REPORT MONTH March, 1986 COMPLETED BY J. A. Reavis TELEPHONE 704-373-7567

.m O

Cause & Corrective o e, u License y

c37 "c

oSE g

No.

Date

%h g

jg Event

,&r, g

Action to usE a

'O

=

my N SE E

$ dis Report #

uTO

$y8 Prevent Recurrence 2

86-03-14 S

478.88 C

1 RL FUELXX End of Cycle 2 Refueling Outage 4

4

w 1

2 3

4 Reason:

Method:

Exhibit G - Instructions S

ed A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Autmatic Scram Event Report (LER)

D-Regulatory Restriction 4-Other (Explain)

File (NLREG-0161)

E-Operator Training 4 License Examination F-Adninistrative S

G-Operational Error (Explain)

Exhibit I - Same Sourte H-Other (Explain)

(4/77)

DOCKET NO: 50-370 l

UNIT: McGuire 2 DATE: 4/15/86 NARRATIVE SUletARY Month:

March. 1986 The unit operated at 100% until it was shutdown on March 14, 1986 and entered its End of Cycle 2 refueling outage.

e

MONTHLY REFUELING INFORMATION REQUEST 1.

Facility name: McGuire, Unit 2 2.

Scheduled next refueling shutdown: Currently Refueling 3.

Scheduled restart following refueling: ---

4.

Will refueling or resumption of operation thereafter require a

-technical specification change or other license amendment? Yes If yes, what will these be? Technical Specification Revision If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions? N/A 5.

Scheduled date(s) for submitting proposed licensing action and supporting information: N/A 6.

Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methcfa, significant changes in design or-new operating procedures).

7.

Number of fuel assemblies (a) in the core: 193 (b) in the spent fuel pool: 150 8.

Present licensed fuel pool capacity: 1463 Size of requested or planned increase:

9.

Projected date of last refueling which can be accommodated by present licensed capacity: August, 2010 DUKE POWER COMPANY DATE: April 15, 1986 Name of

Contact:

J. A. Reavis Phones 704-373-7567

f:

l

.e McGUIRE NOCLEAR STATION Monthly Operating Status Report l

1.

Personnel Exposure For the month of February, no individual (s) exceeded 10 percent of their allowable annual radiation dose limit.

2.

The total station liquid release for February has been compared with the Technical Specifications maximum annual dose commitment and was less than 10 percent of this limit.

The total station gaseous release for February has been compared with the Technical Specifications maximum annual dose commitment and was less than 10 percent of this limit.

4

A DUKE POWER GOMPANY P.O. HOX 33180 CHAMLOTTE, N.C. 28242 HAL B. TUCKER NNN
m...

(704) amaan N13Dt..AB PaomeCT904 April 15, 1986 Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.

20555 Attention: Document Control Desk Re: McGuire Nuclear Station Dockat No. 50-369 and 50-370

Dear Sir:

Please find attached information concerning the performance and operating status of the McGuire Nuclear Station for the month of March, 1986.

Very truly yours, A

Hal B. Tucker JAR: sib Attachment xc Dr. J. Nelson Grace, Regional Administrator l

U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 i

l-Mr. Phil Ross U. S. Nuclear Regulatory Commission i

MNBB-5715 Washington, D. C.

20555 American Nuclear Insurers e/o Dottie Sherman, ANI Library The Exchange, Suite 245 270 Farmington Avenue l

Farmington, CT 06032 l

o

9 Dirait r April 15, 1986 Page Two xc: INPO Records Center Suite 1500 1100 circle 75 Parkway Atlanta, Georgia 30323 Mr. Darl Hood, Project Manager Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C.

20555 Mr. W. T. Orders NRC Senior Resident Inspector McGuire Nuclear Station Ms. Judy Dovers Nuclear Assurance Corporation 5720 Peachtree Parkway Norcross, Georgia 30092 Mr. Richard G. Oehl, NE-44 U. S. Department of Energy 19901 Germantown Road Germantown, Maryland 20874

\\

.,... _., _,. _, _ _ _ - _ _ -.. ~., _, -. _,, _ - - -. _ _......

.,_.m_.

~ _ -. - _ _. -. - _.. -... - -...._ - -.

.