OPERATING DATA REPORT DOCKET NO.
50-369 DATE 04/15/86 COMPLETED BY TA.
Raavis TELEPilONE N -373-7567 OPERATING STATUS
- 1. Unit Name:
McGuire 1 Notes a Nameplate Rating
- 2. Reporting Period: March 1, 1986-March 31. 1986 (Gross MWe) calculated as
- 3. Licensed Thermal Power (MWt):
3411 1450.000 MVA x.90 power 1305*
factor per Page 111,
- 4. Nameplate Rating (Gross MWe):
- 5. Design Electrical Rating (Net MWe):
1150
- 6. Maximum Dependable Capacity (Gross MWe):
- 7. Maximum Dependable Capacity (Net MWe):
1150
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
- 9. Power Level To Which Restricted,if Any (Net MWe):
- 10. Reasons For Restrictions.lf Any:
^i This Mon:h Yr. to Date Cumulative
- 11. Hours In Reporting Period 744.0 2 160.0 17 96R.0
- 12. Number Of Hours Reactor Was Critical 642.6 2 047.0 27 052.9
- 13. Reactor Reserve Shutdown Hours 14; Hours Generator On Line 633.1 2 035.6 26 747.1
- 15. Unit Reserse Shutdown Hours
- 16. Gross Thermal Energy Generated (MWH) 2 089 263 6 583 461 73 950 036
. 17. Gross Electrical Energy Generated (MWH) 729 796 2 305 395 25 616 628
- 18. Net Electrical Energy Generated (MWH) 698 647 2 214 122 24 366 116
- 19. Unit Service Factor 85.1 94.2 70.5
- 20. Unit Availability Factor 85.1 94.2 70.5
- 21. Unit Capacity Factor (Using MDC Net) 81.7 89.1 54.5
- 22. Unit Capacity Factor (Using DER Net) 81.7 89.1 s4.5
- 23. Unit Forced Outage Rate 14.9 5.8 13.7
- 24. Shutdowns Scheduled Over Next 6 Months (Type.Date.and Duration of Each1:
Refuelinn - May 31, 1986 - 11 weeks
- 25. If Shut Down At End Of Report Paino t;stimod Date of Startup:
- 26. Units in Test Status iPrior to Commercial Operatio. l:
Forecast Achieved INITIA1. CRITICA LITY INITIAL ELECTRICITY COSIMERCIAL OPER ATION r
8604220447 860331 (n L' PDR ADOCK 05000369 F
(9/77)
R PDR i
~...
AVERAGE DALLY UNIT POWER LEVEL DOCKET NO.
50-369 UNIT Menntre 1 DATE 04/15/86 COMPLETED BY J.A. Reavis TELEPHONE 704-373-7567 MONTH March, 1986 DAY.
AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Ne t) 1 1 iso 17 1 153
_c-j 2
1 159 18 1 153 3
3 1 159 19 1 153 4
1 159 20 1 152 5
1 159 21 l'152 f
F 6
1 159 22 1 151 7
646 23 1 152
'8 24 1 152 9
25 847 10 26 42 11 262 27 925 i-12 1 144 28 1 143 13 1 148 29 1 151 t
14 1 145 30 1 149 15 1 153 31 1 149 3
16 1 153
+
i 4
1 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day j
in the reportir.g month.
Compute to the nearest whole megawatt.
i
+,
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-369 UNIT NAME McGuire 1 DATE 4/15/86 REPORT M) NTH March, 1986 COMPLETED BY J. A. Reavis TELEPHONE 704-373-7567 "s.o o o,y License Cause & Corrective y
eS2 "c
v52 a
No.
Date
%5; yy Event h
g Action to
~
o o
umf a
'o e
my gy N 55 E
$5S Report #
&O v8 Prevent Recurrence 2
86-03-07 F
47.53 A
1 CB PUMPXX Investigate Reactor Coolant Fiap Oil Level Alarms 3
86-03-09 F
41.50 A
CB HTEXCH Repair Steam Generator Sludge Manway Leak ll-p 86-03-11 F
B IB INSTRU Adjust Nuclear Instrumentation 4
86-03-25 F
21.87 A
1 CH VALVEX Feedwater Containment Isol. to Steam Generator Closed Due to Bad Fuse 12-p 86-03-26 F
F XX ZZZZZZ Hold for Secondary Chemistry 13-p 86-03-27 F
A PC VALVEX Xenon Gas Leak from Chemical Volume &
Control System Valve (NV-483) 1 2
3 4
Reason:
Method:
Exhibit G - Instmetions F
ced e uld A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER)
D-Regulatory Restriction 4-Other (Explain)
File (NIREG-0161)
E-Operator Training 4 License Examination F-Administrative S
G-Operational Error (Explain)
Exhibit I - Same Source II-Other (Explain) ro tm
DOCKET NO:
50-369 UNIT: McGuire 1 DATE:
4/15/86 NARRATIVE
SUMMARY
Month:
March, 1986 The unit began March'at 100% but shutdown on March 7, 1986 after receiving indications of an oil leak on a Reactor Coolant pump. A leaking Steam Generator Manway was discovered and repaired while the unit was of t -line.
The unit returned to service on March 11.
On March 25 the unit trippid from 100% when a Feedwater Isolation valve failed closed. The unit returned to service on March 26 and was back to 100% on March 28.
l l
l
l MONTHLY REFUELING INFORMATION REQUEST 1.
Facility name: McGuire, Unit 1 2.
Scheduled next refueling shutdown: May, 1986 3.
Scheduled restart following refueling: August, 1986 4.
Will refueling or resumption of operation thereaf ter require a technical specification change or other license amendment? Yes If yes, what will these be? Technical Specification Revision If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions? N/A 5.
Scheduled date(s) for submitting proposed licensing action and supporting information: N/A 6.
Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
7.
Number of fuel assemblies (a) in the core: 193 (b) in the spent fuel pool: 152 8.
Present licensed fuel pool capacity: 1463 Size of requested or planned increase:
9.
Projected date of last refueling which can be accommodated by present licensed capacity: August, 2010 DUKE POWER COMPANY DATE: April 15, 1986 Name of
Contact:
J. A. Reavis Phone:
704-373-7567
OPERATLNG DATA REPORT DOCKET NO.
50-370 DATE 04/15/86 COMPLETED BY
.J.A. Reavis TELEPHONE vna-373-7567 OPERATING STATUS
- 1. Unit Name:
McGuire 2 Notes '* Nameplate Rating
- 2. Reporting Period: March 1. 1986-March 31. 1986 (Gross MWe) calculated as
- 3. Licensed Thennal Power (MWt):
3411 1450.000 MVA x.90 power i
- 4. Nameplate Rating (Gross MWe):
1305 factor per Page lii, NUREG-0020.
5
- 5. Design Electrical Rating (Net MWe): __ 1150
- 6. Maximum Dependable Capacity (Gross MWe):
- 7. Maximum Dependable Capacity (Net MWe):
1150
- 8. If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report. Give Reasons:
- 9. Power Level To Which Restricted,if Any (Net MWe):
- 10. Rcasons For Restrictions. lf Any:
This Month Yr to-Date Cumulative
- II. Hours in Reporting Period 744.0 2 160.0 18 264.0
- 12. Number Of Houn Reactor Was Critical 315.6 1 685.1 13 313.7
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator On Line 315.1 1 680.4 12 946.0
- 15. Unit Resene Shutdown Hours
- 16. Gross Thermal Energy Generated (MWH) 1 070 655 5 617 497 41 767 874
- 17. Gross Electrical Energy Generated (MWH) 377 348 1 982 876 14 683 443
- 18. Net Electrical Energy Generated (MWH) 359 712 1 906 172 14 059 825
- 19. Unit Service Factor 42.4 77.8 70.9
- 20. Unit Availability Factor 42.4 77.8 70.9
- 21. Unit Capacity Factor (Using MDC Net) 42.0 76.7 65.4
- 22. Unit Capacity Factor (Using DER Net) 42.0 76.7 65.4
- 23. Unit Forced Outage Rate 0.0 2.9 20.3
- 24. Shutdowns Scheduled Over Next 6 Months IType.Date.and Duration of Eacht:
Currently Refuelina 1
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
May 17, 1986
- 26. Units in Test Status (Prior to Commercial 0peration):
Forecast Achieved i
INITIA L CRITICALITY j
INITIA L ELECTRICITY COMMERCIAL OPERATION f
(9/77)
F AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-370 UNIT McGuire 2 DATE 04/15/86 COMPLETED BY J.A. Reavis TELEPHONE 704-373-7567 MONTH March, 1986 DAY AVERAGE DAILY POWER LEVEL DAY
/.VERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Ne t) 1 1 162 17 2
1 162 18 3
1 163 19 4
1 162 20 5
1 162 21 6
1 163 22 7
1 161 23 8
1 159 24 9
1 160 25 10 i iso 26 11 1 160 27 12 1 161 28 13 1 162 29 14 41 30 15 31 16 INSTRUCTIONS On this format, list in the reporting month.the average daily unit power level in MWe-Net for each day Compute to the nearest whole megawatt.
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-370 UNIT NAME Mccuire 2 DATE 4/15/86 REPORT MONTH March, 1986 COMPLETED BY J. A. Reavis TELEPHONE 704-373-7567
.m O
Cause & Corrective o e, u License y
c37 "c
oSE g
No.
Date
%h g
jg Event
,&r, g
Action to usE a
'O
=
my N SE E
$ dis Report #
uTO
$y8 Prevent Recurrence 2
86-03-14 S
478.88 C
1 RL FUELXX End of Cycle 2 Refueling Outage 4
4
- w 1
2 3
4 Reason:
Method:
Exhibit G - Instructions S
ed A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Autmatic Scram Event Report (LER)
D-Regulatory Restriction 4-Other (Explain)
File (NLREG-0161)
E-Operator Training 4 License Examination F-Adninistrative S
G-Operational Error (Explain)
Exhibit I - Same Sourte H-Other (Explain)
(4/77)
DOCKET NO: 50-370 l
UNIT: McGuire 2 DATE: 4/15/86 NARRATIVE SUletARY Month:
March. 1986 The unit operated at 100% until it was shutdown on March 14, 1986 and entered its End of Cycle 2 refueling outage.
e
MONTHLY REFUELING INFORMATION REQUEST 1.
Facility name: McGuire, Unit 2 2.
Scheduled next refueling shutdown: Currently Refueling 3.
Scheduled restart following refueling: ---
4.
Will refueling or resumption of operation thereafter require a
-technical specification change or other license amendment? Yes If yes, what will these be? Technical Specification Revision If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions? N/A 5.
Scheduled date(s) for submitting proposed licensing action and supporting information: N/A 6.
Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methcfa, significant changes in design or-new operating procedures).
7.
Number of fuel assemblies (a) in the core: 193 (b) in the spent fuel pool: 150 8.
Present licensed fuel pool capacity: 1463 Size of requested or planned increase:
9.
Projected date of last refueling which can be accommodated by present licensed capacity: August, 2010 DUKE POWER COMPANY DATE: April 15, 1986 Name of
Contact:
J. A. Reavis Phones 704-373-7567
f:
l
.e McGUIRE NOCLEAR STATION Monthly Operating Status Report l
1.
Personnel Exposure For the month of February, no individual (s) exceeded 10 percent of their allowable annual radiation dose limit.
2.
The total station liquid release for February has been compared with the Technical Specifications maximum annual dose commitment and was less than 10 percent of this limit.
The total station gaseous release for February has been compared with the Technical Specifications maximum annual dose commitment and was less than 10 percent of this limit.
4
- A DUKE POWER GOMPANY P.O. HOX 33180 CHAMLOTTE, N.C. 28242 HAL B. TUCKER NNN
- m...
(704) amaan N13Dt..AB PaomeCT904 April 15, 1986 Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.
20555 Attention: Document Control Desk Re: McGuire Nuclear Station Dockat No. 50-369 and 50-370
Dear Sir:
Please find attached information concerning the performance and operating status of the McGuire Nuclear Station for the month of March, 1986.
Very truly yours, A
Hal B. Tucker JAR: sib Attachment xc Dr. J. Nelson Grace, Regional Administrator l
U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 i
l-Mr. Phil Ross U. S. Nuclear Regulatory Commission i
MNBB-5715 Washington, D. C.
20555 American Nuclear Insurers e/o Dottie Sherman, ANI Library The Exchange, Suite 245 270 Farmington Avenue l
Farmington, CT 06032 l
o
9 Dirait r April 15, 1986 Page Two xc: INPO Records Center Suite 1500 1100 circle 75 Parkway Atlanta, Georgia 30323 Mr. Darl Hood, Project Manager Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C.
20555 Mr. W. T. Orders NRC Senior Resident Inspector McGuire Nuclear Station Ms. Judy Dovers Nuclear Assurance Corporation 5720 Peachtree Parkway Norcross, Georgia 30092 Mr. Richard G. Oehl, NE-44 U. S. Department of Energy 19901 Germantown Road Germantown, Maryland 20874
\\
.,... _., _,. _, _ _ _ - _ _ -.. ~., _, -. _,, _ - - -. _ _......
.,_.m_.
~ _ -. - _ _. -. - _.. -... - -...._ - -.
.