ML20147E633: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 2: Line 2:
| number = ML20147E633
| number = ML20147E633
| issue date = 11/08/1978
| issue date = 11/08/1978
| title = Forwards IE Inspec Repts#50-460/78-07 & #50-513/78-07 on 781010-13 & Notice of Violation
| title = Forwards IE Inspec Repts 50-460/78-07 & 50-513/78-07 on 781010-13 & Notice of Violation
| author name = Spencer G
| author name = Spencer G
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
Line 19: Line 19:
=Text=
=Text=
{{#Wiki_filter:_ _ _ _ _ _ _ . -
{{#Wiki_filter:_ _ _ _ _ _ _ . -
  .
&
                  o-
\\
                      pn McW 4
o-
                                \                  ,
,
                                                            UNITdD STATES
pn McW
                                                                                            &
UNITdD STATES
                                  g             NUCLEAR REGULATORY COMMISSION
.
                                                              HEG10N V
4
    s
g
    Dj        c /<* gn j,
NUCLEAR REGULATORY COMMISSION
                      ,4                           SUITE 202, W ALNUT CHEEK PLAZ A
c /<* gn j,
                          %#   o'                 1990 N. C ALIFORNI A DOULEVA RD
s
                        4e,++                     WALNUT CREEK, C ALIFORNI A 94596
HEG10N V
                                                            liGd   8%
D
                          Docket Nos. 50-460
,4
                                        50-513
SUITE 202, W ALNUT CHEEK PLAZ A
                            Washington Public Power Supply System
j
                            P. O. Box 968
%#
                            Richland, Washington 99352
o'
                            Attention: Mr. N. O. Strand, Managing Director
1990 N. C ALIFORNI A DOULEVA RD
                            Gentlemen:
4e,++
                            Subject:   NRC Inspection - WNP 1 and 4
WALNUT CREEK, C ALIFORNI A 94596
                            This refers to the inspection conducted by Messrs. W. Albert, D. Kirsch,
liGd
                            J. Eckhardt and T. Hutson of this office on October 10-13, 1978 of
8%
Docket Nos. 50-460
50-513
Washington Public Power Supply System
P. O. Box 968
Richland, Washington 99352
Attention: Mr. N. O. Strand, Managing Director
Gentlemen:
Subject:
NRC Inspection - WNP 1 and 4
This refers to the inspection conducted by Messrs. W. Albert, D. Kirsch,
J. Eckhardt and T. Hutson of this office on October 10-13, 1978 of
i
i
                            activities authorized by NRC Construction Permit Nos. CPPR-134 and CPPR-
activities authorized by NRC Construction Permit Nos. CPPR-134 and CPPR-
                            174, and to the discussion of our findings held by Mr. Albert with
174, and to the discussion of our findings held by Mr. Albert with
                            Mr. Renberger and other members of your staff at the conclusion of the
Mr. Renberger and other members of your staff at the conclusion of the
                            inspection.
inspection.
                            Areas examined during this inspection are described in the enclosed
Areas examined during this inspection are described in the enclosed
                            inspection report. Within these areas, the inspection consisted of
inspection report. Within these areas, the inspection consisted of
                            selective examinations of prc 3dures and representative records, in-
selective examinations of prc 3dures and representative records, in-
                            terviews with personnel, and observations by the inspectors.
terviews with personnel, and observations by the inspectors.
                            Based on the results of this inspection, it appears that certain of your
Based on the results of this inspection, it appears that certain of your
                            activities were not conducted in full compliance with NRC requ.rements,
activities were not conducted in full compliance with NRC requ.rements,
                            as set forth in the Notice of Violation, enclosed herewith as Appendix A.
as set forth in the Notice of Violation, enclosed herewith as Appendix A.
                            These items of noncompliance have been categorized into a level as
These items of noncompliance have been categorized into a level as
                            described in our correspondence to all NRC licensees dated December 31,
described in our correspondence to all NRC licensees dated December 31,
                            1974.
1974.
                            This notice is sent to you pursuant to the provisions of Section 2.201,
This notice is sent to you pursuant to the provisions of Section 2.201,
                            of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal
of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal
                            Regulations. Section 2.201 requires you to submit to this office,
Regulations.
                            within thirty (30) days of your receipt of this notice, a written state-
Section 2.201 requires you to submit to this office,
                            ment or explanation in reply including (1) corrective steps which have
within thirty (30) days of your receipt of this notice, a written state-
                            been taken by you and the results achieved; (2) corrective steps which
ment or explanation in reply including (1) corrective steps which have
                            will be taken to avoid further violations; and (3) the date when full
been taken by you and the results achieved; (2) corrective steps which
                            compliance will be achieved.
will be taken to avoid further violations; and (3) the date when full
                                                        781221oW3
compliance will be achieved.
                                                                                                      9
781221oW3
9


                  _
_
          ,
,
    ,,
,,
  .                                                                                                              NOV U 1978
NOV
      Washington Public Power Supply System         -2-
U 1978
    .
.
      In accordance with Section 2.790 of the NRC's " Rules of Practice,"
Washington Public Power Supply System
      Part 2, Title 10, Code of Federal Regulations, a copy of this letter and
-2-
      the enclosed inspection report will be placed in the NRC's Public
.
      Document Room.     If this report contains any information that you believe
In accordance with Section 2.790 of the NRC's " Rules of Practice,"
      to be proprietary, it is necessary that you submit a written application
Part 2, Title 10, Code of Federal Regulations, a copy of this letter and
      to this office, within 30 days of the date of this letter, requesting
the enclosed inspection report will be placed in the NRC's Public
      that such information be withheld from public disclosure. The application
Document Room.
      must include a full statement of the reasons why it is claimed that the
If this report contains any information that you believe
      information is proprietary. The application should be prepared so that
to be proprietary, it is necessary that you submit a written application
      any proprietary information identified is contained in an enclosure to
to this office, within 30 days of the date of this letter, requesting
      the application, since the application without the enclosure will also
that such information be withheld from public disclosure.
      be placed in the Public Document Room. If we do not hear from you in
The application
      this regard within the specified period, the report will be placed in
must include a full statement of the reasons why it is claimed that the
      the Public Document Room.
information is proprietary.
      Should you have any questions concerning this inspection, we will be
The application should be prepared so that
      glad to discuss them with you.
any proprietary information identified is contained in an enclosure to
                                              Sincerely,
the application, since the application without the enclosure will also
                                                      '12M
be placed in the Public Document Room.
If we do not hear from you in
this regard within the specified period, the report will be placed in
the Public Document Room.
Should you have any questions concerning this inspection, we will be
glad to discuss them with you.
Sincerely,
'12M
'
'
                                              G. S. S encer, Chief
G. S. S encer, Chief
                                              Reactor Construction and
Reactor Construction and
                                                Engineering Support Branch
Engineering Support Branch
      Enclosures:
Enclosures:
      A.   Appendix A - Notice of Violation
A.
      B.     IE Inspection Report
Appendix A - Notice of Violation
            Nos. 50-460/78-07
B.
                  50-513/78-07
IE Inspection Report
      cc w/o enclosure B:
Nos. 50-460/78-07
      M. E. Witherspoon, Division Manager, WPPSS
50-513/78-07
      J. P. Thomas, Project Manager, WPPSS
cc w/o enclosure B:
M. E. Witherspoon, Division Manager, WPPSS
J. P. Thomas, Project Manager, WPPSS
1
1
                                                                                                                            ,
,
                                                            _ _ _ _ - _ - - . - _ _ _ _ _ . _ _ _ . . _ - . _ - -             ~
_ _ _ _ - _ - - . - _ _ _ _ _ . _ _ _ . . _ - . _ - -
~
}}
}}

Latest revision as of 14:06, 11 December 2024

Forwards IE Inspec Repts 50-460/78-07 & 50-513/78-07 on 781010-13 & Notice of Violation
ML20147E633
Person / Time
Site: Washington Public Power Supply System
Issue date: 11/08/1978
From: Spencer G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Strand N
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML20147E638 List:
References
NUDOCS 7812210143
Download: ML20147E633 (2)


See also: IR 05000460/1978007

Text

_ _ _ _ _ _ _ . -

&

\\

o-

,

pn McW

UNITdD STATES

.

4

g

NUCLEAR REGULATORY COMMISSION

c /<* gn j,

s

HEG10N V

D

,4

SUITE 202, W ALNUT CHEEK PLAZ A

j

%#

o'

1990 N. C ALIFORNI A DOULEVA RD

4e,++

WALNUT CREEK, C ALIFORNI A 94596

liGd

8%

Docket Nos. 50-460

50-513

Washington Public Power Supply System

P. O. Box 968

Richland, Washington 99352

Attention: Mr. N. O. Strand, Managing Director

Gentlemen:

Subject:

NRC Inspection - WNP 1 and 4

This refers to the inspection conducted by Messrs. W. Albert, D. Kirsch,

J. Eckhardt and T. Hutson of this office on October 10-13, 1978 of

i

activities authorized by NRC Construction Permit Nos. CPPR-134 and CPPR-

174, and to the discussion of our findings held by Mr. Albert with

Mr. Renberger and other members of your staff at the conclusion of the

inspection.

Areas examined during this inspection are described in the enclosed

inspection report. Within these areas, the inspection consisted of

selective examinations of prc 3dures and representative records, in-

terviews with personnel, and observations by the inspectors.

Based on the results of this inspection, it appears that certain of your

activities were not conducted in full compliance with NRC requ.rements,

as set forth in the Notice of Violation, enclosed herewith as Appendix A.

These items of noncompliance have been categorized into a level as

described in our correspondence to all NRC licensees dated December 31,

1974.

This notice is sent to you pursuant to the provisions of Section 2.201,

of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal

Regulations.

Section 2.201 requires you to submit to this office,

within thirty (30) days of your receipt of this notice, a written state-

ment or explanation in reply including (1) corrective steps which have

been taken by you and the results achieved; (2) corrective steps which

will be taken to avoid further violations; and (3) the date when full

compliance will be achieved.

781221oW3

9

_

,

,,

NOV

U 1978

.

Washington Public Power Supply System

-2-

.

In accordance with Section 2.790 of the NRC's " Rules of Practice,"

Part 2, Title 10, Code of Federal Regulations, a copy of this letter and

the enclosed inspection report will be placed in the NRC's Public

Document Room.

If this report contains any information that you believe

to be proprietary, it is necessary that you submit a written application

to this office, within 30 days of the date of this letter, requesting

that such information be withheld from public disclosure.

The application

must include a full statement of the reasons why it is claimed that the

information is proprietary.

The application should be prepared so that

any proprietary information identified is contained in an enclosure to

the application, since the application without the enclosure will also

be placed in the Public Document Room.

If we do not hear from you in

this regard within the specified period, the report will be placed in

the Public Document Room.

Should you have any questions concerning this inspection, we will be

glad to discuss them with you.

Sincerely,

'12M

'

G. S. S encer, Chief

Reactor Construction and

Engineering Support Branch

Enclosures:

A.

Appendix A - Notice of Violation

B.

IE Inspection Report

Nos. 50-460/78-07

50-513/78-07

cc w/o enclosure B:

M. E. Witherspoon, Division Manager, WPPSS

J. P. Thomas, Project Manager, WPPSS

1

,

_ _ _ _ - _ - - . - _ _ _ _ _ . _ _ _ . . _ - . _ - -

~