| title = Ack Receipt of 880201 Ltr Informing NRC of Implementation Schedule for Mod of Perimeter Security Sys Using Design Basis Study,In Response to Violations Noted in Insp Repts 50-313/87-31 & 50-368/87-31.Encl to 871221 Ltr Withheld
| title = Ack Receipt of Informing NRC of Implementation Schedule for Mod of Perimeter Security Sys Using Design Basis Study,In Response to Violations Noted in Insp Repts 50-313/87-31 & 50-368/87-31.Encl to Withheld
| author name = Callan L
| author name = Callan L
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Line 11: Line 11:
| contact person =  
| contact person =  
| document report number = NUDOCS 8803080492
| document report number = NUDOCS 8803080492
| title reference date = 02-01-1988
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE
| page count = 2
| page count = 2
Line 17: Line 18:


=Text=
=Text=
{{#Wiki_filter:. - _ _ _ _ _ _ _ _ _ - _ _ _       _ _ - _ _
{{#Wiki_filter:. - _ _ _ _ _ _ _ _ _ - _ _ _
    4           .:
_ _ - _ _
          s
4
                                                          MAR    4 M
.:
MAR
4 M
s
~
~
                    'In-Reply Refer To:                                             Document Contains
'In-Reply Refer To:
                      Dockets:     50-313/87-31-                                 SAFEGUARDS INFORMATION
Document Contains
                                    50-368/87-31
Dockets:
  o                 v
50-313/87-31-
                    ' Arkansas Power & Light; Company
SAFEGUARDS INFORMATION
                      ATTN: Mr. Gene Campbell                                                                                                           '}
50-368/87-31
                              -Vice President, Nuclear
o
                                  Operations
v
                      P.O.-Box 551
' Arkansas Power & Light; Company
                      Little' Rock, Arkansas- 72203
'}
                      Gentlemen:
ATTN: Mr. Gene Campbell
                            Thank you for your letter of February 1,1988, informing NRC of your
-Vice President, Nuclear
                      implementation schedule to modify the. perimeter security system using a design
Operations
                      basis study to determine a comprehensive perimeter security system.               This
P.O.-Box 551
                      response supplements your response of December 21, 1987, to our letter and'
Little' Rock, Arkansas- 72203
                      Notice of Violation dated November 19, 1987. We have reviewed your imple-
Gentlemen:
                    mentation schedule and have no questions at this time. We will review the
Thank you for your letter of February 1,1988, informing NRC of your
                      proposed modifications to your perimeter security system during a future
implementation schedule to modify the. perimeter security system using a design
                      inspection to determine that the implementation schedule is being achieved and
basis study to determine a comprehensive perimeter security system.
                    will be maintained.       Until the perimeter security system is upgraded, we will
This
                    -expect effective compensatory measures to be utilized as required.
response supplements your response of December 21, 1987, to our letter and'
                                                                  Sincerely,
Notice of Violation dated November 19, 1987. We have reviewed your imple-
                                                                    Citical Signed By:
mentation schedule and have no questions at this time. We will review the
                                                                    L. J. CALLAN
proposed modifications to your perimeter security system during a future
                                                                  L. J. Callan, Director
inspection to determine that the implementation schedule is being achieved and
                                                                  Division of Reactor Projects
will be maintained.
                    cc:
Until the perimeter security system is upgraded, we will
l            $     Arkansas Nuclear One
-expect effective compensatory measures to be utilized as required.
              M E'   ATTN:     J. M. Levine, Director
Sincerely,
      !*8 '
Citical Signed By:
      '
L. J. CALLAN
        '
L. J. Callan, Director
                                  Site Nuclear Operations
Division of Reactor Projects
      :@             P.O. Box 608
cc:
  _
$
            CD:3      Russellville, Arkansas 72801                                         ;ct.o URE coNTAINS
M E'
Arkansas Nuclear One
l
!*8 '
ATTN:
J. M. Levine, Director
'
Site Nuclear Operations
'
:@
P.O. Box 608
_
Russellville, Arkansas 72801
CD:3
;ct.o URE coNTAINS
I
I
f
i,piscRMATION.
~
e.
.
Arkansas Radiation Control Program Director
g
l
l
      .
g 7agg
          f        Arkansas Radiation Control Program Director
@#
                                                                                        e.
bec:
                                                                                        g
(see next page)
                                                                                                      ~
PAG 2 13 DECETRC'lE0*
                                                                                                    i,piscRMATION.
-m
                                                                                                        g 7agg
1
          @#       bec:     (see next page)                                           PAG 2 13 DECETRC'lE0*
0 0:
      -m
RIV:
1         0 0:
:RPSB
                *    RIV:     :RPSB         C:P   RPSB     C:RPSB             D   [         D:DRP
C:P
                      RACa     ell /jt       RJE     tt     LAYandef                           LJCallan
RPSB
                      S/t/88                   1/t/88         '3/)/88     an,ns
C:RPSB
                                                                                g g /88           $ /.) /88                                 f
D
                                                          Document Con.                                                                   Q
[
                                                      SAFEGUARDS INFORMATION                                                           /y
D:DRP
*
RACa
ell /jt
RJE
tt
LAYandef
LJCallan
S/t/88
1/t/88
'3/)/88
g g /88
$ /.) /88
f
Document Con. an,ns
Q
SAFEGUARDS INFORMATION
/y


        .
.
                .
.
                        - - . - . - - _ - - - _ .
- - . - . - - _ - -
                                                              -
- _ .
                                                                        .
-
    - .                 ,
.
          :  V.':..
- .
                  '
,
    R
V.':..
    s                    > Arkansas Power and Lish't Company.           -2-
:
_.                                                                               .
'
                                                                                    .
R
                                                            '
> Arkansas Power and Lish't Company.
                                  ~
-2-
                        - bec w/ copy of-licensee's response w/ safeguards:
s
                                      -RIV Security File-
_.
  '
.
                                      -P. A.'Starcher, RSGB/NRR
.
                                        Resident; Inspector
'
                                        R. D.'. Martin, RA.
- bec w/ copy of-licensee's response w/ safeguards:
                                        R.-L._Bangart, 0RSS
~
                                      Security Inspector
-RIV Security File-
                                        RPSB Security File
-P. A.'Starcher, RSGB/NRR
                      .
'
                        -
Resident; Inspector
                              c-w/ copy of licensee's response w/o safeguards:
R. D.'. Martin, RA.
                    -
R.-L._Bangart, 0RSS
                              B'IE-04-
Security Inspector
                            ORP             '\
RPSB Security File
                            Lisa Shea, R /ALF-
.
                            Section Chief, ORP/A
c-w/ copy of licensee's response w/o safeguards:
                            RIV File
-
                          MIS
-
                            RSTS Operator
B'IE-04-
                        -RPSB'
ORP
                          DRS
'\\
                            R. E. Hall, DRSS                                       -
Lisa Shea, R /ALF-
                            Project Engineer, 0RP/A .
Section Chief, ORP/A
                        - G. Dick, NRR Project. Inspector
RIV File
              .I
MIS
                                                                                    r
RSTS Operator
                                                                                    ,
-RPSB'
DRS
R. E. Hall, DRSS
-
Project Engineer, 0RP/A
.
- G. Dick, NRR Project. Inspector
.I
r
,
r
r
.
.
  \       ?
\\
                                                          ENCLOSURE CONTAINS
?
                                                          .S/JEGU/M3 INFORMAT10N.
ENCLOSURE CONTAINS
!                                                         UPON SEPARAYlON THIS
.S/JEGU/M3 INFORMAT10N.
                                                          PAGE IS DECONTROLLED.
!
UPON SEPARAYlON THIS
PAGE IS DECONTROLLED.


                                                                                  _ _ _ _ _ _ _
.
      .            .
.
    ,,
_ _ _ _ _ _ _
    :
n
            <
,4
            i
<
                                                      n                                                                  ,4    -
,,
                                                                                                                                                .mn
i
    !.                                                                                                    <                    .
-
                                                                                                                                  ' .:...!:, p;3 9 6
.. , p;3 9 6
                                                                                                                        h   i li M A TIO N
:
.mn
' .:. !:
!.
<
.
l.
h
i li M A TIO N
'
'
    l.
ARKANSAS POWER & LIGHT COMPANY
                                          ARKANSAS POWER & LIGHT COMPANY
December 21, 1987
                                                                                                      December 21, 1987
g
    {
g
    ,
{
                                                                                                                          g      g            ......,
. . . . . . ,
    ,                                                                                                                               .
,
                                                                                                                                                        0.
,
                                                                                                                                                        .
.
    !                                                                                                                             DEC 2 41987             f.
0.
        s                                                                                                                 .                               h
.
                      BCAN128707
!
    1
DEC 2 41987
    !
f.h
    :               L. J. Callan, Director
s
    ;               Division of Reactor Projects
.
                      U. S. Nuclear Regulatory Commission
BCAN128707
    '
1
    *
!
                      Region IV
:
    j               611 Ryan Plaza Drive, Suite 1000
L. J. Callan, Director
    i                 Arlington, Texas 76011
;
    ,
Division of Reactor Projects
    ,
U. S. Nuclear Regulatory Commission
                                    SUBJECT:                       Arkansas Nuclear One - Units 1 and 2
'
    g                                                              Docket Nos. 50-313/50-368
*
    i                                                               License No. 2 R-51 and NPF-6
Region IV
    i                                                               Respcose to Inspcction Report
j
    j                                                               50-313/37-31 and 50-368/87-31
611 Ryan Plaza Drive, Suite 1000
    :                 Dear Mr. Callan:
i
    1
Arlington, Texas 76011
    l                 Pursuant to the provisions of 10CFR2.201, a response to the
,
    !               violations identified in the subject inspection report is
SUBJECT:
                      submitted.
Arkansas Nuclear One - Units 1 and 2
                      The attached material contains Safeguards Information as defined by
,
                      10CFR73.21 and should be handled appropriately.
Docket Nos. 50-313/50-368
                                                                                                    Sincerely,
g
    ,
i
                                                                                                    ,,
License No. 2 R-51 and NPF-6
                                                                                                                  M
i
    ;                                                                                             J. H. Lev ne
Respcose to Inspcction Report
                                                                                                    Executive Director,
j
    .
50-313/37-31 and 50-368/87-31
                                                                                                    ANO Site Operations
:
    i
Dear Mr. Callan:
    j                 JHL:J0J:djm
1
                      enclosure - Safeguards Information
l
    i
Pursuant to the provisions of 10CFR2.201, a response to the
    i
!
                                                                                                                        ENCLOSl?.m c m \;ys         .
violations identified in the subject inspection report is
                                                                                                                        SAT:EGUA'         c .
submitted.
                                                                                                                                                  r j,g7;og
The attached material contains Safeguards Information as defined by
                                      (;-.-,,,                                                        .
10CFR73.21 and should be handled appropriately.
                                                                                                                        UPO N C '.\!.i;.             ' Ti a 3
Sincerely,
                                      t/, [ ' i', d ,' ; . .,4j                                      ..,,3,          P/,CE p, prp;ym ; , . .cy ,           ,
,,
                                                                      ,.                              :7 ?
,
                                    ,'O 3,'
M
                                        a4 r.f,'!,
;
                                              t U Eff ** lb                                      * 5 'i 'h* h i,f h
J. H. Lev ne
                # O- #   4, _1         ,,                 MEMSER p.* DOLE SoutM utsLitaES SYSTEM
Executive Director,
          _0hYbN&
ANO Site Operations
                                ..
.
                            J  "I     Y             f
i
  t                                               - - _ - - - - - - - - - - - - - - _               _
j
JHL:J0J:djm
enclosure - Safeguards Information
i
i
ENCLOSl?.m c m \\;ys
.
SAT:EGUA'
.
r j,g7;og
c
UPO N C '.\\!.i;.
' Ti a 3
(;-.-,,,
.
P/,CE p, prp;ym ; , . .cy ,
t/, [ ' i', d ,' ; . ., ..,, ,
4j 3
,
,' 3,' r.f,'!, f * * 5 'i 'h* h i,f h
O a4 t U Ef * lb
:7 ?
,.
#
O- #
4, _1
..
,,
MEMSER p.* DOLE SoutM utsLitaES SYSTEM
_0hYbN&
J
"I
Y
f
t
- - _ - - - - - - - - - - - - - - _
_


  ,
,
    ,. p
,.
          ,
p
                                              r
@@20W N
                                              :.  .
r
                                                                              @@20W dN
d
                                              p    -'
,
                                                                                            %
:.
    ''
.
                                            l                                N~3%        N !.
%
                              ARKANSAS POWER & LIGHT COMPANY
p
                                                                      *
-'
                                                                          .
' '
                                                                            ,
                                                                                          \$
                                            February 1,1988
                OCAN028801
                L. J. Callan, Director
                Division of Reactor Projects
                U. S. Nuclear Regulatory Commission
                Region IV
                611 Ryan Plaza Drive, Suite 1000
                Arlington, TX 76011
                            SUBJECT: Arkansas Nuclear One - Units 1 and 2
                                    Docket Nos. 50-313/50-368
                                    License No. DPR-51 and NPF-6
                                    Followup to Response to
                                    Inspection Raport 50-313/87-31; 50-368/87-31
l
l
              Dear Mr. Calian:
N~3%
              Ouring the inspection conducted by Mr. R. A. Caldwell of your office during
N ! .$
              the period September 21 - 25, 1987 (Inspection Report 50-313/87-31;
\\
              50-368/87-31), a violation was identified concerning a deficiency in the
,
              E-field perimeter alarm system.
.
              In response to this violation, Arkansas Power and Light stated that a proposed
ARKANSAS POWER & LIGHT COMPANY
              modification was being tested and would be installed on the majority of the
*
              E-field if determined to be satisfactory.    This modification did prove
February 1,1988
              adequate and has been installed where applicable.
OCAN028801
!              However, certain sections of the E-field perimeter alarm system did not lend
L. J. Callan, Director
Division of Reactor Projects
U. S. Nuclear Regulatory Commission
Region IV
611 Ryan Plaza Drive, Suite 1000
Arlington, TX 76011
SUBJECT:
Arkansas Nuclear One - Units 1 and 2
Docket Nos. 50-313/50-368
License No. DPR-51 and NPF-6
Followup to Response to
Inspection Raport 50-313/87-31; 50-368/87-31
l
l
              themselves to this particular modification. Arkansas Power and Light
Dear Mr. Calian:
I              initially proposed evaluating these sections on a case-by-case basis and
Ouring the inspection conducted by Mr. R. A. Caldwell of your office during
l             submitting to the NRC a schedule for the completion of modifications to these
the period September 21 - 25, 1987 (Inspection Report 50-313/87-31;
              sections. However, it has been recognized that the approach to resolving
50-368/87-31), a violation was identified concerning a deficiency in the
E-field perimeter alarm system.
In response to this violation, Arkansas Power and Light stated that a proposed
modification was being tested and would be installed on the majority of the
E-field if determined to be satisfactory.
This modification did prove
adequate and has been installed where applicable.
!
However, certain sections of the E-field perimeter alarm system did not lend
l
themselves to this particular modification.
Arkansas Power and Light
initially proposed evaluating these sections on a case-by-case basis and
I
l
submitting to the NRC a schedule for the completion of modifications to these
'
'
              deficiencies with the perimeter security system has historically been on a
sections.
              case-by-cas9 basis, dealing only with the specific problem that has been
However, it has been recognized that the approach to resolving
!             identified. Therefore, rather than simply devising a fix for the immediate
deficiencies with the perimeter security system has historically been on a
l             problem with the E-field perimeter alarm system, Arkansas Power and Light
case-by-cas9 basis, dealing only with the specific problem that has been
I             has chosen to take a more comprehensive approach to the entire perimeter
!
l             security system, which includes the intrusion detection system (E-field and
identified. Therefore, rather than simply devising a fix for the immediate
              microwave), the surveillance equipment, and the physical barrier associated
l
              with the perimeter. The objective of this Perimeter Security System
problem with the E-field perimeter alarm system, Arkansas Power and Light
              Improvement Project is improvement of the system using a programmatic approach
I
            q instead of a problem-oriented approach,
has chosen to take a more comprehensive approach to the entire perimeter
              %ap9y75?e.                    dborem. ...,~                              ^
l
security system, which includes the intrusion detection system (E-field and
microwave), the surveillance equipment, and the physical barrier associated
with the perimeter.
The objective of this Perimeter Security System
Improvement Project is improvement of the system using a programmatic approach
q
instead of a problem-oriented approach,
yc-
yc-
%ap9y75?e.
dborem. ...,~
^


  $'Y   * OCAN028801
$'Y
            February 1, 1988
* OCAN028801
      *
February 1, 1988
            Page 2
*
  .
Page 2
          The first step towards accomplishing this objective will be the development
.
          of a design basis for this portion of the security program. This proposed
The first step towards accomplishing this objective will be the development
          document will contain a compilation of the design criteria to be used for
of a design basis for this portion of the security program.
          the E-field, microweve, cameras, fence and certain special areas. These
This proposed
          special areas include loading docks, major personnel entrances into the
document will contain a compilation of the design criteria to be used for
          plant, and vehicular entrance points. It will also include major design
the E-field, microweve, cameras, fence and certain special areas.
          criteria on support systems for the above, for example, power distribution
These
          systems and lighting levels in the isolation zone. To aid in the
special areas include loading docks, major personnel entrances into the
          development of this basis, past inspection reports and reviews of other
plant, and vehicular entrance points.
It will also include major design
criteria on support systems for the above, for example, power distribution
systems and lighting levels in the isolation zone.
To aid in the
development of this basis, past inspection reports and reviews of other
utility programs will be used as well as internal and external security
,
,
          utility programs will be used as well as internal and external security
experts.
          experts.
Upon approval of the design basis, the next step will be to conduct a review
          Upon approval of the design basis, the next step will be to conduct a review
of the perimeter security system.
          of the perimeter security system. The existing systems will be compared to
The existing systems will be compared to
          the new design basis and deviations identified, grouped, and prioritized.
the new design basis and deviations identified, grouped, and prioritized.
          The resolution may include modifications and/or revision to the industrial
The resolution may include modifications and/or revision to the industrial
          security plan. At this stage past problems will be factored in and resolved,
security plan. At this stage past problems will be factored in and resolved,
          including the existing deficiency in the E-field perimeter alarm system.
including the existing deficiency in the E-field perimeter alarm system.
          After this review an action plan to accomplish the necessary modifications
After this review an action plan to accomplish the necessary modifications
          will be developed. Resolutions will be accomplished in a timely
will be developed.
          manner consistent with their individual significance and complexity.
Resolutions will be accomplished in a timely
          The following schedule has been developed for implementing this project:
manner consistent with their individual significance and complexity.
                      Design Basis Document (Draft)     February 15, 1988
The following schedule has been developed for implementing this project:
                      Approval of Design Basis           March 7, 1988
Design Basis Document (Draft)
                      System Review                     March 31, 1988
February 15, 1988
                      Action Plan Developed             April 18, 1988
Approval of Design Basis
                      Approval of Action Plan           June 2, 1988
March 7, 1988
          The action plan and inplementation schedule will be provided for your
System Review
          information by June 17, 1988.
March 31, 1988
          Until the E-field perimeter alarm system deficiency is corrected for the
Action Plan Developed
!         entire system, sections that are deficient will remain posted.
April 18, 1988
Approval of Action Plan
June 2, 1988
The action plan and inplementation schedule will be provided for your
information by June 17, 1988.
Until the E-field perimeter alarm system deficiency is corrected for the
!
entire system, sections that are deficient will remain posted.
l
l
                                      Very truly your
Very truly your
                                                        .
.
                                      J mes M. Lev ne
J mes M. Lev ne
                                      xecutive Director
xecutive Director
                                      ANO Site Operations
ANO Site Operations
          DRH:JDJ:djm                                       -
DRH:JDJ:djm
i         cc:   AP&L Prompt Distribution                                               ,
-
i
cc:
AP&L Prompt Distribution
j
j
i                U. S. Nuclear Regulatory Commission
,
                Document Control Desk
U. S. Nuclear Regulatory Commission
                Washington, DC 20555
i
Document Control Desk
Washington, DC 20555
l
l
}}
}}

Latest revision as of 12:42, 11 December 2024

Ack Receipt of Informing NRC of Implementation Schedule for Mod of Perimeter Security Sys Using Design Basis Study,In Response to Violations Noted in Insp Repts 50-313/87-31 & 50-368/87-31.Encl to Withheld
ML20147H461
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 03/04/1988
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Campbell G
ARKANSAS POWER & LIGHT CO.
References
NUDOCS 8803080492
Download: ML20147H461 (2)


See also: IR 05000313/1987031

Text

. - _ _ _ _ _ _ _ _ _ - _ _ _

_ _ - _ _

4

.:

MAR

4 M

s

~

'In-Reply Refer To:

Document Contains

Dockets:

50-313/87-31-

SAFEGUARDS INFORMATION

50-368/87-31

o

v

' Arkansas Power & Light; Company

'}

ATTN: Mr. Gene Campbell

-Vice President, Nuclear

Operations

P.O.-Box 551

Little' Rock, Arkansas- 72203

Gentlemen:

Thank you for your letter of February 1,1988, informing NRC of your

implementation schedule to modify the. perimeter security system using a design

basis study to determine a comprehensive perimeter security system.

This

response supplements your response of December 21, 1987, to our letter and'

Notice of Violation dated November 19, 1987. We have reviewed your imple-

mentation schedule and have no questions at this time. We will review the

proposed modifications to your perimeter security system during a future

inspection to determine that the implementation schedule is being achieved and

will be maintained.

Until the perimeter security system is upgraded, we will

-expect effective compensatory measures to be utilized as required.

Sincerely,

Citical Signed By:

L. J. CALLAN

L. J. Callan, Director

Division of Reactor Projects

cc:

$

M E'

Arkansas Nuclear One

l

!*8 '

ATTN:

J. M. Levine, Director

'

Site Nuclear Operations

'

@

P.O. Box 608

_

Russellville, Arkansas 72801

CD:3

ct.o URE coNTAINS

I

f

i,piscRMATION.

~

e.

.

Arkansas Radiation Control Program Director

g

l

g 7agg

@#

bec:

(see next page)

PAG 2 13 DECETRC'lE0*

-m

1

0 0:

RIV:

RPSB

C:P

RPSB

C:RPSB

D

[

D:DRP

RACa

ell /jt

RJE

tt

LAYandef

LJCallan

S/t/88

1/t/88

'3/)/88

g g /88

$ /.) /88

f

Document Con. an,ns

Q

SAFEGUARDS INFORMATION

/y

.

.

- - . - . - - _ - -

- _ .

-

.

- .

,

V.':..

'

R

> Arkansas Power and Lish't Company.

-2-

s

_.

.

.

'

- bec w/ copy of-licensee's response w/ safeguards:

~

-RIV Security File-

-P. A.'Starcher, RSGB/NRR

'

Resident; Inspector

R. D.'. Martin, RA.

R.-L._Bangart, 0RSS

Security Inspector

RPSB Security File

.

c-w/ copy of licensee's response w/o safeguards:

-

-

B'IE-04-

ORP

'\\

Lisa Shea, R /ALF-

Section Chief, ORP/A

RIV File

MIS

RSTS Operator

-RPSB'

DRS

R. E. Hall, DRSS

-

Project Engineer, 0RP/A

.

- G. Dick, NRR Project. Inspector

.I

r

,

r

.

\\

?

ENCLOSURE CONTAINS

.S/JEGU/M3 INFORMAT10N.

!

UPON SEPARAYlON THIS

PAGE IS DECONTROLLED.

.

.

_ _ _ _ _ _ _

n

,4

<

,,

i

-

.. , p;3 9 6

.mn

' .:. !:

!.

<

.

l.

h

i li M A TIO N

'

ARKANSAS POWER & LIGHT COMPANY

December 21, 1987

g

g

{

. . . . . . ,

,

,

.

0.

.

!

DEC 2 41987

f.h

s

.

BCAN128707

1

!

L. J. Callan, Director

Division of Reactor Projects

U. S. Nuclear Regulatory Commission

'

Region IV

j

611 Ryan Plaza Drive, Suite 1000

i

Arlington, Texas 76011

,

SUBJECT:

Arkansas Nuclear One - Units 1 and 2

,

Docket Nos. 50-313/50-368

g

i

License No. 2 R-51 and NPF-6

i

Respcose to Inspcction Report

j

50-313/37-31 and 50-368/87-31

Dear Mr. Callan:

1

l

Pursuant to the provisions of 10CFR2.201, a response to the

!

violations identified in the subject inspection report is

submitted.

The attached material contains Safeguards Information as defined by

10CFR73.21 and should be handled appropriately.

Sincerely,

,,

,

M

J. H. Lev ne

Executive Director,

ANO Site Operations

.

i

j

JHL:J0J:djm

enclosure - Safeguards Information

i

i

ENCLOSl?.m c m \\;ys

.

SAT:EGUA'

.

r j,g7;og

c

UPO N C '.\\!.i;.

' Ti a 3

(;-.-,,,

.

P/,CE p, prp;ym ; , . .cy ,

t/, [ ' i', d ,' ; . ., ..,, ,

4j 3

,

,' 3,' r.f,'!, f * * 5 'i 'h* h i,f h

O a4 t U Ef * lb

7 ?

,.

O- #

4, _1

..

,,

MEMSER p.* DOLE SoutM utsLitaES SYSTEM

_0hYbN&

J

"I

Y

f

t

- - _ - - - - - - - - - - - - - - _

_

,

,.

p

@@20W N

r

d

,

.

.

%

p

-'

' '

l

N~3%

N ! .$

\\

,

.

ARKANSAS POWER & LIGHT COMPANY

February 1,1988

OCAN028801

L. J. Callan, Director

Division of Reactor Projects

U. S. Nuclear Regulatory Commission

Region IV

611 Ryan Plaza Drive, Suite 1000

Arlington, TX 76011

SUBJECT:

Arkansas Nuclear One - Units 1 and 2

Docket Nos. 50-313/50-368

License No. DPR-51 and NPF-6

Followup to Response to

Inspection Raport 50-313/87-31; 50-368/87-31

l

Dear Mr. Calian:

Ouring the inspection conducted by Mr. R. A. Caldwell of your office during

the period September 21 - 25, 1987 (Inspection Report 50-313/87-31;

50-368/87-31), a violation was identified concerning a deficiency in the

E-field perimeter alarm system.

In response to this violation, Arkansas Power and Light stated that a proposed

modification was being tested and would be installed on the majority of the

E-field if determined to be satisfactory.

This modification did prove

adequate and has been installed where applicable.

!

However, certain sections of the E-field perimeter alarm system did not lend

l

themselves to this particular modification.

Arkansas Power and Light

initially proposed evaluating these sections on a case-by-case basis and

I

l

submitting to the NRC a schedule for the completion of modifications to these

'

sections.

However, it has been recognized that the approach to resolving

deficiencies with the perimeter security system has historically been on a

case-by-cas9 basis, dealing only with the specific problem that has been

!

identified. Therefore, rather than simply devising a fix for the immediate

l

problem with the E-field perimeter alarm system, Arkansas Power and Light

I

has chosen to take a more comprehensive approach to the entire perimeter

l

security system, which includes the intrusion detection system (E-field and

microwave), the surveillance equipment, and the physical barrier associated

with the perimeter.

The objective of this Perimeter Security System

Improvement Project is improvement of the system using a programmatic approach

q

instead of a problem-oriented approach,

yc-

%ap9y75?e.

dborem. ...,~

^

$'Y

  • OCAN028801

February 1, 1988

Page 2

.

The first step towards accomplishing this objective will be the development

of a design basis for this portion of the security program.

This proposed

document will contain a compilation of the design criteria to be used for

the E-field, microweve, cameras, fence and certain special areas.

These

special areas include loading docks, major personnel entrances into the

plant, and vehicular entrance points.

It will also include major design

criteria on support systems for the above, for example, power distribution

systems and lighting levels in the isolation zone.

To aid in the

development of this basis, past inspection reports and reviews of other

utility programs will be used as well as internal and external security

,

experts.

Upon approval of the design basis, the next step will be to conduct a review

of the perimeter security system.

The existing systems will be compared to

the new design basis and deviations identified, grouped, and prioritized.

The resolution may include modifications and/or revision to the industrial

security plan. At this stage past problems will be factored in and resolved,

including the existing deficiency in the E-field perimeter alarm system.

After this review an action plan to accomplish the necessary modifications

will be developed.

Resolutions will be accomplished in a timely

manner consistent with their individual significance and complexity.

The following schedule has been developed for implementing this project:

Design Basis Document (Draft)

February 15, 1988

Approval of Design Basis

March 7, 1988

System Review

March 31, 1988

Action Plan Developed

April 18, 1988

Approval of Action Plan

June 2, 1988

The action plan and inplementation schedule will be provided for your

information by June 17, 1988.

Until the E-field perimeter alarm system deficiency is corrected for the

!

entire system, sections that are deficient will remain posted.

l

Very truly your

.

J mes M. Lev ne

xecutive Director

ANO Site Operations

DRH:JDJ:djm

-

i

cc:

AP&L Prompt Distribution

j

,

U. S. Nuclear Regulatory Commission

i

Document Control Desk

Washington, DC 20555

l