ML20150E922: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot change |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter:.. | {{#Wiki_filter:.. | ||
? | |||
4 MF T-Log # TXX 88545 File # 10119 n | |||
Ref. # NRCB 88-03 illELECTRIC July 11, 1988 William G. Counsil Executive Vke President V. S. Nuclear Regulatory Conunission Attn: | |||
Ref. # NRCB 88-03 illELECTRIC July 11, 1988 William G. Counsil Executive Vke President V. S. Nuclear Regulatory Conunission Attn: | Document Control Desk Washington, D.C. | ||
20555 | |||
==SUBJECT:== | ==SUBJECT:== | ||
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES) | COMANCHE PEAK STEAM ELECTRIC STATION (CPSES) | ||
DOCKET N05. 50-445 AND 50-446 RESPONSE TO NRC BULLETIN 88-03: INADEQUATE LATCH ENGAGEMENT IN HFA TYPE LATCHING RELAYS MANUFACTURED BY GENERAL ELECTRIC (GE) COMPANY Gentlemen: | DOCKET N05. 50-445 AND 50-446 RESPONSE TO NRC BULLETIN 88-03: | ||
INADEQUATE LATCH ENGAGEMENT IN HFA TYPE LATCHING RELAYS MANUFACTURED BY GENERAL ELECTRIC (GE) COMPANY Gentlemen: | |||
The following information is given in response to NRC Bulletin 88-03, "Inadequate Latch Engagement in HFA Type Latching Relays Manufactured by General Electric (GE) ',ompany" : | The following information is given in response to NRC Bulletin 88-03, "Inadequate Latch Engagement in HFA Type Latching Relays Manufactured by General Electric (GE) ',ompany" : | ||
NRC Request: | NRC Request: | ||
Perform inspections to ensure that all GE latching-type HFA relays installed in Class IE (safety-related) applications have adequate latch engagement and that those relays which fail to meet acceptance criteria be repaired or replaced, if you do not have HFA latching-type relays subject'to this bulletin, provide a letter stating this fact. | Perform inspections to ensure that all GE latching-type HFA relays installed in Class IE (safety-related) applications have adequate latch engagement and that those relays which fail to meet acceptance criteria be repaired or | ||
: replaced, if you do not have HFA latching-type relays subject'to this bulletin, provide a letter stating this fact. | |||
TV Electric Response: | TV Electric Response: | ||
At CPSES, HFA relays are not used in Class 1E (safety-related) applications. | At CPSES, HFA relays are not used in Class 1E (safety-related) applications. | ||
Additional Requested Information: | Additional Requested Information: | ||
1. | |||
Staff time to perform the requested inspections and corrective actions. | |||
TXX-88545 July 11, 1988 Page 2 of 2 | ===Response=== | ||
NA i | |||
2. | |||
Staf f time to prepare the requested dr:umentation. | |||
Response: 40 hours 8807180052 880711 PDR ADOCK 05000445 G | |||
PNV u | |||
khI[ | |||
j | |||
/ | |||
l 0 M*o North Olin Street LB81 Dallas, Texas 73201 | |||
TXX-88545 July 11, 1988 Page 2 of 2 3. | |||
Additional cost incurred as a result of the inspection findings (e.g., | |||
cists of corrective actions, cost of down time). | cists of corrective actions, cost of down time). | ||
Response: NA Very truly yours, s | Response: NA Very truly yours, s | ||
#ffdw. | |||
W. G. Counsil VPC/grr c - Mr. R. D. Martin, Region IV Residentinspectors,CPSES(3) | W. G. Counsil VPC/grr c - Mr. R. D. Martin, Region IV Residentinspectors,CPSES(3) | ||
Attachment to 1XX-88545 July 11, 1988 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of | |||
NUCLEAR REGULATORY COMMISSION | ) | ||
In the Matter of | ) | ||
Texas Utilities Electric Company | |||
Texas Utilities Electric Company | ) | ||
Docket Nos. 50-445 | |||
Station, Units 1 & 2) | ) | ||
50-446 (Comanche Peak Steam Electric | |||
) | |||
Station, Units 1 & 2) | |||
) | |||
VFIDAVIT W. G. Counsil.being duly sworn, hereby deposes and says that he is Executive Vice President, Nuclear Engineering and Operations of TV Electric, the Applicant herein; that he is duly authorized to sign and file with the Nv'. lear Regulator;; Commission this response to NRC Bulletin 88-03; that he is | VFIDAVIT W. G. Counsil.being duly sworn, hereby deposes and says that he is Executive Vice President, Nuclear Engineering and Operations of TV Electric, the Applicant herein; that he is duly authorized to sign and file with the Nv'. lear Regulator;; Commission this response to NRC Bulletin 88-03; that he is | ||
'amiliar with the content thereof; and that the matters set forth therein are true and correct to the best of his knowledge, information and belief. | |||
Yldtab W . G . ' C'ou n s i ' | Yldtab W. G. ' C'ou n s i ' | ||
Executive Vice President, Nuclear Engineering and Operations STATE OF TEXAS COUNTY OF DALLAS Subscribed and sworn to before me, a Notary Public in and for | Executive Vice President, Nuclear Engineering and Operations STATE OF TEXAS COUNTY OF DALLAS Subscribed and sworn to before me, a Notary Public in and for | ||
. A)/# | |||
V- | on this | ||
// d day of V #t h | |||
, 1988. | |||
v V-O c aA4 dmw Notary /Public My commission exp{res: | |||
3 / A /40 t | |||
it | |||
. - ~ ~ - - - | |||
- -, -}} | |||
Latest revision as of 07:29, 11 December 2024
| ML20150E922 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 07/11/1988 |
| From: | Counsil W TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| References | |
| IEB-88-003, IEB-88-3, TXX-88545, NUDOCS 8807180052 | |
| Download: ML20150E922 (3) | |
Text
..
?
4 MF T-Log # TXX 88545 File # 10119 n
Ref. # NRCB 88-03 illELECTRIC July 11, 1988 William G. Counsil Executive Vke President V. S. Nuclear Regulatory Conunission Attn:
Document Control Desk Washington, D.C.
20555
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
DOCKET N05. 50-445 AND 50-446 RESPONSE TO NRC BULLETIN 88-03:
INADEQUATE LATCH ENGAGEMENT IN HFA TYPE LATCHING RELAYS MANUFACTURED BY GENERAL ELECTRIC (GE) COMPANY Gentlemen:
The following information is given in response to NRC Bulletin 88-03, "Inadequate Latch Engagement in HFA Type Latching Relays Manufactured by General Electric (GE) ',ompany" :
NRC Request:
Perform inspections to ensure that all GE latching-type HFA relays installed in Class IE (safety-related) applications have adequate latch engagement and that those relays which fail to meet acceptance criteria be repaired or
- replaced, if you do not have HFA latching-type relays subject'to this bulletin, provide a letter stating this fact.
TV Electric Response:
At CPSES, HFA relays are not used in Class 1E (safety-related) applications.
Additional Requested Information:
1.
Staff time to perform the requested inspections and corrective actions.
Response
NA i
2.
Staf f time to prepare the requested dr:umentation.
Response: 40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br /> 8807180052 880711 PDR ADOCK 05000445 G
PNV u
khI[
j
/
l 0 M*o North Olin Street LB81 Dallas, Texas 73201
TXX-88545 July 11, 1988 Page 2 of 2 3.
Additional cost incurred as a result of the inspection findings (e.g.,
cists of corrective actions, cost of down time).
Response: NA Very truly yours, s
- ffdw.
W. G. Counsil VPC/grr c - Mr. R. D. Martin, Region IV Residentinspectors,CPSES(3)
Attachment to 1XX-88545 July 11, 1988 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of
)
)
Texas Utilities Electric Company
)
Docket Nos. 50-445
)
50-446 (Comanche Peak Steam Electric
)
Station, Units 1 & 2)
)
VFIDAVIT W. G. Counsil.being duly sworn, hereby deposes and says that he is Executive Vice President, Nuclear Engineering and Operations of TV Electric, the Applicant herein; that he is duly authorized to sign and file with the Nv'. lear Regulator;; Commission this response to NRC Bulletin 88-03; that he is
'amiliar with the content thereof; and that the matters set forth therein are true and correct to the best of his knowledge, information and belief.
Yldtab W. G. ' C'ou n s i '
Executive Vice President, Nuclear Engineering and Operations STATE OF TEXAS COUNTY OF DALLAS Subscribed and sworn to before me, a Notary Public in and for
. A)/#
on this
// d day of V #t h
, 1988.
v V-O c aA4 dmw Notary /Public My commission exp{res:
3 / A /40 t
it
. - ~ ~ - - -
- -, -