4-April 18, 1977 | |||
~ | |||
PRELIMINARY NOTIFICATION OF EVENT OR UNUSUAL 0CCURRENCE--PNO-77-58 This preliminary notification constitutes EARLY notice of an event of POSSIBLE safety or public interest significance. The information | PRELIMINARY NOTIFICATION OF EVENT OR UNUSUAL 0CCURRENCE--PNO-77-58 This preliminary notification constitutes EARLY notice of an event of POSSIBLE safety or public interest significance. The information | ||
{ | { | ||
{ | presented is as initially received without verification or evaluation | ||
Facility: | { | ||
Philadelphia Electric Company | and is basically all that is known by IE staff on this date. | ||
Facility: | |||
Peach Bottom Unit No. 3 l-Philadelphia Electric Company | |||
==Subject:== | ==Subject:== | ||
SMALL FIRE IN RELAY CABINET Following logic testing at 11:00 a.m. on April 18, 1977, a small fire of less than one minute duration was extinguished in a relay cabinet in the cable spreading room using a hand held CO2 extinguicher. Preliminary l | SMALL FIRE IN RELAY CABINET Following logic testing at 11:00 a.m. on April 18, 1977, a small fire of less than one minute duration was extinguished in a relay cabinet in the cable spreading room using a hand held CO2 extinguicher. Preliminary l | ||
extinguishing system did not reach the actuation point. Three relays were damaged and several others subjected to smoke damage. Relays involved included drywell torus vent valve, shutdown cooling, RHR pump trip, and cleanup system flow monitoring. The reactor was operating at 300 MW. A shutdown is in progress to permit replacement of relays. | information indicates that a relay malfunctioned. The automatic fire l | ||
extinguishing system did not reach the actuation point. Three relays were damaged and several others subjected to smoke damage. Relays involved included drywell torus vent valve, shutdown cooling, RHR pump trip, and cleanup system flow monitoring. The reactor was operating at 300 MW. | |||
A shutdown is in progress to permit replacement of relays. | |||
Media interest is not expected. The State of Pennsylvania has been informed. A press release is not planned. | Media interest is not expected. The State of Pennsylvania has been informed. A press release is not planned. | ||
NRC, Region I, (Philadelphia) received notification of this occurrence lg by telephone from the Plant Superintendent at 1:16 p.m. on April 18, | NRC, Region I, (Philadelphia) received notification of this occurrence lg by telephone from the Plant Superintendent at 1:16 p.m. on April 18, 1977. | ||
1977. | |||
==Contact:== | ==Contact:== | ||
FADreher, IE x27261 GWRoy, IE x27261 DThompson, IE x27541 Distribution: | FADreher, IE x27261 GWRoy, IE x27261 DThompson, IE x27541 Distribution: | ||
Transmitted H St 31 3 b Chairman Rowden C. C. Kammerer, CA G. F. Murphy, JCAE Commissioner Gilinsky S. J. Chilk, SECY H. H. Whiteside, SCNR H. R. Myers, HCEE Transmitted: | |||
l | MNBB 3,*3 D P B1dg l'.2 7 ; | ||
l | SS Bldg *t ' t/ / ; | ||
R. G. Ryan, OSP | l L. V. Gossick, EDO B. C. Rusch ~e, NRR K. R. Chapman, NMSS - | ||
PRELIMINARY NOTIFICATION | l S. H. Hanauer, EDO H. K. Shapar, ELD J. A. Harris, PA o | ||
y [a 2.- | j W. G. Mcdonald, MIPC Luge (mail); | ||
a w | E. Volggnau. IE R. G. Ryan, OSP T. J. McTiernan, OIA Region,.e,..%* t/3 ; | ||
PRELIMINARY NOTIFICATION y [a 2.- | |||
9 a | |||
PNO-77-058 | w i | ||
I}} | 9809110015 770418 PDR 15cE l | ||
PNO-77-058 PDR I}} | |||
Latest revision as of 04:58, 11 December 2024
| ML20151U467 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 04/18/1977 |
| From: | Dreher F, Roy G, Thompson D NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| To: | |
| References | |
| PNO-77-058, PNO-77-58, NUDOCS 9809110015 | |
| Download: ML20151U467 (1) | |
Text
'
p i gj p v t
\\
[
p.w PRELIMINARY NOTIFICATION i
4-April 18, 1977
~
PRELIMINARY NOTIFICATION OF EVENT OR UNUSUAL 0CCURRENCE--PNO-77-58 This preliminary notification constitutes EARLY notice of an event of POSSIBLE safety or public interest significance. The information
{
presented is as initially received without verification or evaluation
{
and is basically all that is known by IE staff on this date.
Facility:
Peach Bottom Unit No. 3 l-Philadelphia Electric Company
Subject:
SMALL FIRE IN RELAY CABINET Following logic testing at 11:00 a.m. on April 18, 1977, a small fire of less than one minute duration was extinguished in a relay cabinet in the cable spreading room using a hand held CO2 extinguicher. Preliminary l
information indicates that a relay malfunctioned. The automatic fire l
extinguishing system did not reach the actuation point. Three relays were damaged and several others subjected to smoke damage. Relays involved included drywell torus vent valve, shutdown cooling, RHR pump trip, and cleanup system flow monitoring. The reactor was operating at 300 MW.
A shutdown is in progress to permit replacement of relays.
Media interest is not expected. The State of Pennsylvania has been informed. A press release is not planned.
NRC, Region I, (Philadelphia) received notification of this occurrence lg by telephone from the Plant Superintendent at 1:16 p.m. on April 18, 1977.
Contact:
FADreher, IE x27261 GWRoy, IE x27261 DThompson, IE x27541 Distribution:
Transmitted H St 31 3 b Chairman Rowden C. C. Kammerer, CA G. F. Murphy, JCAE Commissioner Gilinsky S. J. Chilk, SECY H. H. Whiteside, SCNR H. R. Myers, HCEE Transmitted:
MNBB 3,*3 D P B1dg l'.2 7 ;
SS Bldg *t ' t/ / ;
l L. V. Gossick, EDO B. C. Rusch ~e, NRR K. R. Chapman, NMSS -
l S. H. Hanauer, EDO H. K. Shapar, ELD J. A. Harris, PA o
j W. G. Mcdonald, MIPC Luge (mail);
E. Volggnau. IE R. G. Ryan, OSP T. J. McTiernan, OIA Region,.e,..%* t/3 ;
PRELIMINARY NOTIFICATION y [a 2.-
9 a
w i
9809110015 770418 PDR 15cE l
PNO-77-058 PDR I