| number = ML20154H400
| number = ML20154H400
| issue date = 09/30/1998
| issue date = 09/30/1998
| title = Monthly Operating Repts for Sept 1998 for North Anna Power Station,Units 1 & 2.With 981009 Ltr
| title = Monthly Operating Repts for Sept 1998 for North Anna Power Station,Units 1 & 2.With
| author name = Matthews W
| author name = Matthews W
| author affiliation = VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
| author affiliation = VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
Line 11: Line 11:
| contact person =  
| contact person =  
| document report number = 98-608, NUDOCS 9810140166
| document report number = 98-608, NUDOCS 9810140166
| title reference date = 10-09-1998
| document type = MONTHLY OPERATING ANALYSIS REPORT, TEXT-SAFETY REPORT
| document type = MONTHLY OPERATING ANALYSIS REPORT, TEXT-SAFETY REPORT
| page count = 10
| page count = 10
Line 16: Line 17:


=Text=
=Text=
{{#Wiki_filter:. _                            .                ._    __
{{#Wiki_filter:.
VINGINIA ELECTRIC AND POWER COMPANY Ricitwonn,VIHOINIA 20201 October 9,1998 United States Nuclear Regulatory Commission '               Serial No. 98-608             i Attention: Document Control Desk                             NAPS /JHL Washington, D. C. 20555                                     Docket Nos. 50-338 50-339 License Nos. NPF-4 NPF-7 Gentlemen:
VINGINIA ELECTRIC AND POWER COMPANY Ricitwonn,VIHOINIA 20201 October 9,1998 United States Nuclear Regulatory Commission '
VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNIT NOS.1 AND 2 MONTHLY OPERATING REPORT Enclosed is the September 1998 Monthly Operating Report for North Anna Power                   -
Serial No.
Station Units 1 and 2.
98-608 i
Attention: Document Control Desk NAPS /JHL Washington, D. C. 20555 Docket Nos.
50-338 50-339 License Nos. NPF-4 NPF-7 Gentlemen:
VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNIT NOS.1 AND 2 MONTHLY OPERATING REPORT Enclosed is the September 1998 Monthly Operating Report for North Anna Power Station Units 1 and 2.
i i
i i
Very truly yours, tuAW W. R. Matthews Site Vice President                                                                             i Enclosure 1
Very truly yours, tuAW W. R. Matthews Site Vice President Enclosure 1
Commitments made in this letter: None.                                                           l cc:   U. S. Nuclear Regulatory Commission Region ll                                                                     l Atlanta Federal Center                                                           .
Commitments made in this letter: None.
61 Forsyth St., SW, Suite 23T85 Atlanta, Georgia 30303                                                                   '
cc:
Mr. M. J. Morgan                                                               b NRC Senior Resident inspector
U. S. Nuclear Regulatory Commission l
                                                                                              /y North Anna Power Station 9810140166 990930 '~
Region ll Atlanta Federal Center 61 Forsyth St., SW, Suite 23T85 Atlanta, Georgia 30303
PDR R      ADOCK 05000338 pgg
/y b
Mr. M. J. Morgan NRC Senior Resident inspector North Anna Power Station 9810140166 990930 '~
PDR ADOCK 05000338 R
pgg


VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION MONTHLY OPERATING REPORT SEPTEMBER 1998 Approved:                            b                           e>                     -
VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION MONTHLY OPERATING REPORT SEPTEMBER 1998 b
2     /d 29[ '
e>
Site Vice President                                 Date I
2
/d 29[
Approved:
Site Vice President Date I
l l
l l
l w                               -
w


r   .    .                                                                                                                                                  l i
l r
I-                                                             OPERATING DATA REPORT Docket No : Sc 338                                     l Date:   10/05/98
i I-OPERATING DATA REPORT Docket No : Sc 338 Date:
10/05/98


==Contact:==
==Contact:==
W. R. Matthews l-                                                                                                   Telephone: (540) 894-2101 l
W. R. Matthews l-Telephone: (540) 894-2101 1.
: 1. Unit Name: . .      .. . . -                      .      North Anna Unit 1                                                           '
Unit Name:
: 2. Reporting Period:.           .. .              .          September,1998                                                             )
North Anna Unit 1 2.
i:           3. . Licensed Thermal Power (MWt): .                   .    .          2,893                                                                 ;
Reporting Period:.
: 4. Nameplate Rating (Gross MWe): .                                   979.74
September,1998
                                                                                                                                                            )
)
: 5. Design Electrical Rating (Net MWe):         .                    907                                                                 l
i:
;            6. - Maximum Dependable Capacity (Gross MWe):                   .        940                                                                 i
3.
: l.           7. Maximum Dependable Capacity (Net MWe): .                           893 8; if Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
. Licensed Thermal Power (MWt):.
2,893 4.
Nameplate Rating (Gross MWe):.
979.74
)
5.
Design Electrical Rating (Net MWe):
907
: 6. - Maximum Dependable Capacity (Gross MWe):
940 i
l.
7.
Maximum Dependable Capacity (Net MWe):.
893 8; if Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
N/A 9.
Power Level To Which Restricted, if Any (Net MWe): N/A 10; Reasons For Restrictions, if Any:
N/A This Month Year-To-Date Cumulative
: 11. Hours in Reporting Period 720.0 6.551.0 177,731.0
: 12. Hours Reactor Was Critical 289.3 6,120.3 139,375.3
: 13. Reactor Reserve Shutdown Hours 14.0 14.9 7,109.9
: 14. Hours Generator On-Line 288.6 6,061.6 136,229.0
: 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
: 16. Gross Thermal Energy Generated (MWH) 829,075.8 17,414,868.1 367,949,340.6
: 17. Gross Electrical Energy Generated (MWH) 269,615.0 5,674,967.0 157,845,620.0
: 18. Net Electrical Energy Generated (MWH) 256,230.0 5,396,315.0 114,540,498.0
: 19. Unit Service Factor 40.1 %
92.5 %
76.6%
: 20. Unit Availability Factor 40.1 %
92.5 %
76.6 %
: 21. Unit Capacity Factor (Using MDC Net) 39.9%
92.2%
72.1 %
i
: 22. Unit Capacity Factor (Using DER Net) 39.2 %
90.8 %
71.1 %
: 23. Unit Forced Outege Rate 0.0%
1.0%
8.0%
24.
Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
N/A
N/A
: 9. Power Level To Which Restricted, if Any (Net MWe): N/A 10; Reasons For Restrictions, if Any:              N/A This Month            Year-To-Date          Cumulative
: 25. If Shut Down at End of Report Period, Estimated Date of Start-up:
: 11. Hours in Reporting Period                                                        720.0              6.551.0                  177,731.0
October 7,1998
: 12. Hours Reactor Was Critical                                                      289.3              6,120.3                  139,375.3
: 13. Reactor Reserve Shutdown Hours                                                    14.0                  14.9                  7,109.9
: 14. Hours Generator On-Line                                                          288.6              6,061.6                  136,229.0
: 15. Unit Reserve Shutdown Hours                                                        0.0                        0.0                  0.0
: 16. Gross Thermal Energy Generated (MWH)                                      829,075.8            17,414,868.1        367,949,340.6
: 17. Gross Electrical Energy Generated (MWH)                                    269,615.0            5,674,967.0        157,845,620.0
: 18. Net Electrical Energy Generated (MWH)                                      256,230.0            5,396,315.0        114,540,498.0
: 19. Unit Service Factor                                                            40.1 %                92.5 %                    76.6%
: 20. Unit Availability Factor                                                        40.1 %                92.5 %                    76.6 %
: 21. Unit Capacity Factor (Using MDC Net)                                            39.9%                92.2%                      72.1 %      i
: 22. Unit Capacity Factor (Using DER Net)                                            39.2 %                90.8 %                    71.1 %
: 23. Unit Forced Outege Rate                                                          0.0%                  1.0%                      8.0%
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
N/A                                                                      ,
: 25. If Shut Down at End of Report Period, Estimated Date of Start-up:                                 October 7,1998
: 26. Unit in Test Status (Prior to Commercial Operation):
: 26. Unit in Test Status (Prior to Commercial Operation):
FORECAST                   ACHIEVED                           I INITIAL CRITICALITY INITIAL ELECTRICITY l
FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY l
COMMERCIAL OPERATION l
COMMERCIAL OPERATION l
I-I-
I-I-
i,
i,


AVERAGE DAILY UNIT POWER LEVEL Docket No.: 50-338 Unit Name: North Anna Unit 1 Date: 10/05/98 Contact W. R. Matthews Telephone: (540) 894-2101 MONTH:     September,1998
AVERAGE DAILY UNIT POWER LEVEL Docket No.: 50-338 Unit Name: North Anna Unit 1 Date: 10/05/98 Contact W. R. Matthews Telephone: (540) 894-2101 MONTH:
September,1998
{
{
Average Daily Power Level                       Average Daily Power Level Day                 (MWe - Net)                 Day                 (MWe - Net) -
Average Daily Power Level Average Daily Power Level Day (MWe - Net)
1                       892                     17                       000                               !
Day (MWe - Net) -
2                        892                     18                       000                               ;
1 892 17 000 2
i 3                       893                     19                       000 4                       893                     20                         000 5-                     894                     21                         000                               i l.
892 18 000 i
6                        893                     22                         000 l
3 893 19 000 4
7'                     893                     23                         000 8                       894                     24                         000                               -
893 20 000 5-894 21 000 i
9                      895                     25                         000                               !
l 6
10                     '898                     26                         000 f
893 22 000 l
11                       898                     27                         000                               l 1
7' 893 23 000 8
12                       841                     28                         000 13                       001                     29         _
894 24 000 9
000 14                       000                     30                         000 15                       000 16                       000 f
895 25 000 f
J INSTRUCTIONS =
10
'898 26 000 11 898 27 000 l
1 12 841 28 000 13 001 29 000 14 000 30 000 15 000 f
16 000 J
INSTRUCTIONS =
On this format, list the average daily unit power level in MWe - Net for each day in the reporting month. Compute to the nearest whole megawatt.-
On this format, list the average daily unit power level in MWe - Net for each day in the reporting month. Compute to the nearest whole megawatt.-


                                                          .                                                            .    . . - ~ . .  . . .~
.. - ~.
                                                                                                                                                  )
..~
'                                                                                                            Docket No.: 50-338 Unit Name: North Anna Unit 1 Date: 10/05/98 Contact W. R. Matthews Telephone: (540)894-2101 I
)
NORTH ANNA POWER STATION UNIT NO.:_j, MONTH: September 1998 -
Docket No.: 50-338 Unit Name: North Anna Unit 1 Date: 10/05/98 Contact W. R. Matthews Telephone: (540)894-2101 NORTH ANNA POWER STATION UNIT NO.:_j, MONTH: September 1998 -


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE Page 1 of 1                                                       ,
OF OPERATING EXPERIENCE Page 1 of 1 l
l
. Usted below in chronological sequence is a summary of operating expenences for this month which required load reductions or resulted in significant non-load related incidents.
                  . Usted below in chronological sequence is a summary of operating expenences for this month which required load                 -
i Edf E!DS 988 i
reductions or resulted in significant non-load related incidents.
September 01,1998 0000 Began month in Mode 1, at 100% power, 933 MWe.
i Edf                       E!DS                           988 i
j September 12,1998 2015 Commenced ramping Unit 1 off-line for a refueling outage.
September 01,1998 0000               Began month in Mode 1, at 100% power, 933 MWe.                               j September 12,1998             2015               Commenced ramping Unit 1 off-line for a refueling outage.                   I September 13,1998             0038               Opened G-12 breaker. Unit 1 is off-line.
I September 13,1998 0038 Opened G-12 breaker. Unit 1 is off-line.
September 21,1998             1745               Unit 1 is defueled.
September 21,1998 1745 Unit 1 is defueled.
September 28,1998             0214               Unit 1 core on-load is complete.                                             l September 30,1998             2400               Ended the month in Mode 5.
September 28,1998 0214 Unit 1 core on-load is complete.
l 1
September 30,1998 2400 Ended the month in Mode 5.
l I
1 I
J
J


    . .                  __        __      --_    _. _ ~.____         .m.   . _ . _ . .        . . . . . . . _ . _ _        . _ . . - . _        _ _ . _ _
_. _ ~.____
l                                                                                                                       Docket No.: 50-338 l                                                                                                                       Unit Name: North Anna Unit 1 Date: 10/05/98
.m.
l Docket No.: 50-338 l
Unit Name: North Anna Unit 1 Date: 10/05/98


==Contact:==
==Contact:==
W. R. Matthews
W. R. Matthews Telephone: (540) 894-2101 UNIT SHUTDOWN AND POWER REDUCTION (EQUAL To on GREATER THAN 20%)
;                                                                                                                        Telephone: (540) 894-2101 UNIT SHUTDOWN AND POWER REDUCTION (EQUAL To on GREATER THAN 20%)
REPORT MONTH: September,1998 (1)
REPORT MONTH: September,1998 (1)                   (2)           (3)                         (4)               (5)
(2)
Method Duration                       of       LER No.       System     Component               Cause & Corrective Action           l Date       Type     Hours     Reason       Shutting                     Code             Code             to Prevent Recurrence Down Reactor 9-13-98       S   430 hrs.         C             1           NA             NA               NA             1998 scheduled refueling utage.
(3)
(4)
(5)
Method Duration of LER No.
System Component Cause & Corrective Action l
Date Type Hours Reason Shutting Code Code to Prevent Recurrence Down Reactor 9-13-98 S
430 hrs.
C 1
NA NA NA 1998 scheduled refueling utage.
40 min.
40 min.
(1)                           (2)                                                                     (3)
(1)
F: Forced                       REASON:                                                               METHOD:
(2)
S: Scheduled                   A- Equipment Failure (Explain)                                       1 - Manual B- Maintenance or Test                                               2-     Manual Scram C- Refueling                                                         3-     Automatic Scram D- Regulatory Restriction                                             4-     Other (Explain)
(3)
E- Operator Training & Licensing Examination F- Administrative G- Operational Error (Explain)
F: Forced REASON:
(4)                                                                                                   (5)
METHOD:
Exhibit G Instructions for Preparation of Data Entry Sheets                                           Exhibit 1 - Same Source for Licensee Event Report (LER) File (NUREG 0161) f i
S: Scheduled A-Equipment Failure (Explain) 1 - Manual B-Maintenance or Test 2-Manual Scram C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Other (Explain)
E-Operator Training & Licensing Examination F-Administrative G-Operational Error (Explain)
(4)
(5)
Exhibit G Instructions for Preparation of Data Entry Sheets Exhibit 1 - Same Source for Licensee Event Report (LER) File (NUREG 0161) f i


      ..                  .              ______,m               ..  . _ _ _ _ _      . _ . .      _ _ . _ . ___ . . _ . . _ _ . . ..                -    . _ _ .__
______,m
      =                                                                                                                                                                 1
=
                                                                                                                                                                        }
1
OPERATING DATA REPORT                                                                                           ;
}
Docket No.: 50-339 Date:           10/05/98
OPERATING DATA REPORT Docket No.: 50-339 Date:
10/05/98


==Contact:==
==Contact:==
W. R. Matthews                             l Telephone: (540) 894-2101                                           '
W. R. Matthews Telephone: (540) 894-2101 1,
1,   Unit Name:       ..          . .        .              North Anna Unit 2
Unit Name:
: 2. Reporting Period:.             ..          .    . September,1998
North Anna Unit 2 2.
: 3. Licensed Thermal Power (MWt): .                               2,893
Reporting Period:.
: 4. Nameplate Rating (Gross MWe): ..                                979
September,1998 3.
: 5. Design Electrical Rating (Net MWe): .         .                907
Licensed Thermal Power (MWt):.
: 6. Maximum Dependable Capacity (Gross MWe): ..                     944                                                                                   1
2,893 4.
: 7. Maximum Dependable Capacity (Net MWe): .                         897
Nameplate Rating (Gross MWe):
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
979 5.
N/A
Design Electrical Rating (Net MWe):.
: 9. Power Level To Which Restricted, if Any (Net MWe): N/A
907 6.
: 10. Reasons For Restrictions, if Any:         N/A This Month                 Year-To-Date                   Cumulative
Maximum Dependable Capacity (Gross MWe):..
: 11. Hours in Reporting Period                                                     720.0                         6,551.0           155,999.0
944 1
        .12. Hours Reactor Was Critical                                                     703.2                           5,864.8           131,579.2
7.
: 13. Reactor Reserve Shutdown Hours                                                 16.4                               57.3           7,241.5
Maximum Dependable Capacity (Net MWe):.
: 14. Hours Generator On-Line                                                       699.5                         5,842.1           130,364.3
897 8.
: 15. Unit Reserve Shutdown Hours                                                     0.0                                   0.0               0.0
If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
: 16. Gross Thermal Energy Generated (MWH)                               2,011,445.1                     16,544,902.6             357,338,082.6
N/A 9.
: 17. Gross Electrical Energy Generated (MWH)                             648,867.0                       5,372,031.0           118,874,545.0
Power Level To Which Restricted, if Any (Net MWe): N/A 10.
: 18. Net Electrical Energy Generated (MWH)                               616,337.0                       5,103,782.0           111,631,750.0
Reasons For Restrictions, if Any:
: 19. Unit Service Factor                                                           97.1 %                             89.2 %             83.6 %
N/A This Month Year-To-Date Cumulative 11.
: 20. Unit Availability Factor                                                     97.1 %                             89.2 %             83.6 %
Hours in Reporting Period 720.0 6,551.0 155,999.0
: 21. Unit Capacity Factor (Using MDC Net)                                         95.4 %                             86.9 %             79.6%
.12.
: 22. Unrt Capacity Factor (Using DER Net)                                         94.4 %                             85.9 %             78.9 %
Hours Reactor Was Critical 703.2 5,864.8 131,579.2 13.
: 23. Unrt Forced Outage Rate                                                       2.9%                               0.3%             4.9%               ,
Reactor Reserve Shutdown Hours 16.4 57.3 7,241.5 14.
Hours Generator On-Line 699.5 5,842.1 130,364.3 15.
Unit Reserve Shutdown Hours 0.0 0.0 0.0 16.
Gross Thermal Energy Generated (MWH) 2,011,445.1 16,544,902.6 357,338,082.6 17.
Gross Electrical Energy Generated (MWH) 648,867.0 5,372,031.0 118,874,545.0 18.
Net Electrical Energy Generated (MWH) 616,337.0 5,103,782.0 111,631,750.0 19.
Unit Service Factor 97.1 %
89.2 %
83.6 %
20.
Unit Availability Factor 97.1 %
89.2 %
83.6 %
21.
Unit Capacity Factor (Using MDC Net) 95.4 %
86.9 %
79.6%
22.
Unrt Capacity Factor (Using DER Net) 94.4 %
85.9 %
78.9 %
23.
Unrt Forced Outage Rate 2.9%
0.3%
4.9%
i
i
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
None 25, if Shut Down at End of Report Period, Estimated Date of Start-up:                                                   N/A
None 25, if Shut Down at End of Report Period, Estimated Date of Start-up:
N/A
: 26. Unit in Test Status (Prior to Commercial Operation):
: 26. Unit in Test Status (Prior to Commercial Operation):
1 FORECAST                                 ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION                                                                                                       ,
FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION n
I n                       -


AVERAGE DAILY UNIT POWER LEVEL Docket No.: 50-339 Unit Name: North Anna Unit 2 Date: 10/05/98
AVERAGE DAILY UNIT POWER LEVEL Docket No.: 50-339 Unit Name: North Anna Unit 2 Date: 10/05/98
Line 164: Line 246:
==Contact:==
==Contact:==
W. R. Matthews Telephone: (540) 894-2101 l
W. R. Matthews Telephone: (540) 894-2101 l
month:     September,1998
month:
                                                                                                                            ')
September,1998
Average Daily Power Level                       Average Daily Power Level Day                 (MWe - Net)                 Day                 (MWe - Net)
')
                        '1                       886                       17                     759 2                       887                     18                       089                     l 3                       386                     19                       867 4                       887                     20                       884 5                     888                     21                       886 6                       887                     22                       886 7                       887                     23                       886 8                     889                     24                       890                     i 9                       890                     25                       889 10                     887                     20                       888 11                     888                     27                       888 12                     890                     28                       890                     l 1
Average Daily Power Level Average Daily Power Level Day (MWe - Net)
13                     887                     29.                     890 14                     887                     30-                     890                     ,
Day (MWe - Net)
l 15                     886 16                     -885 INSTRUCTIONS On this format, list the average daily unit power level in MWe - Net for each day in the reporting month. Compute to the nearest whole megawatt.
'1 886 17 759 2
887 18 089 3
386 19 867 4
887 20 884 5
888 21 886 6
887 22 886 7
887 23 886 8
889 24 890 i
9 890 25 889 10 887 20 888 11 888 27 888 12 890 28 890 1
13 887 29.
890 14 887 30-890 l
15 886 16
-885 INSTRUCTIONS On this format, list the average daily unit power level in MWe - Net for each day in the reporting month. Compute to the nearest whole megawatt.


l l
l Docket No.: 50-339 Unit Name: North Anna Unit 2 Date:
Docket No.: 50-339               I Unit Name: North Anna Unit 2     I Date:       10/05/98
10/05/98


==Contact:==
==Contact:==
Line 179: Line 273:
==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE Page 1 of 1
OF OPERATING EXPERIENCE Page 1 of 1
            ' Listed below in chronolo;ical sequence is a summary of operating experiences for the month which required load reductions or resulted in significant non-load related incidents.                                                       I ggig -                 Time                           Qala September.1,1998 0000                 Began the month in Mode 1,100% power,933 MWe.                                   j September 17,1998 2032                 Unit 2 reactor trip due to lightning strike.                                     j September 18,1998 0000                 Unit stable in Mode 3. Reactor trip recovery in progress.                       l l
' Listed below in chronolo;ical sequence is a summary of operating experiences for the month which required load reductions or resulted in significant non-load related incidents.
1236          ' Commenced reactor startup.                                                       '
ggig -
1321           Reactor critical.-
Time Qala September.1,1998 0000 Began the month in Mode 1,100% power,933 MWe.
1404           Entered Mode 1.
j September 17,1998 2032 Unit 2 reactor trip due to lightning strike.
1705           Unit 2 is on-line.
j September 18,1998 0000 Unit stable in Mode 3. Reactor trip recovery in progress.
2127           Started 2-FW-P-1A. Commenced ramp to 100% power.
l 1236
September 19,1998 0410                 Unit 2 at 100% power,933 Mwe.
' Commenced reactor startup.
September 30,1998 2400                 Ended the month in Mode 1,100% power, 935 MWe.
1321 Reactor critical.-
                                                                                                                                      )
1404 Entered Mode 1.
I i
1705 Unit 2 is on-line.
1
2127 Started 2-FW-P-1A. Commenced ramp to 100% power.
* i l
September 19,1998 0410 Unit 2 at 100% power,933 Mwe.
September 30,1998 2400 Ended the month in Mode 1,100% power, 935 MWe.
)
i
 
i l
Docket No.: 50-339 Unit Name: North Anna Unit 2 Date: 10/05/98
Docket No.: 50-339 Unit Name: North Anna Unit 2 Date: 10/05/98


==Contact:==
==Contact:==
W. R. Matthews Telephone: (540) 894-2101 UNIT SHUTDOWN AND POWER REDUCTION (EcuAL To oR GREATEN THAN 20%)
W. R. Matthews Telephone: (540) 894-2101 UNIT SHUTDOWN AND POWER REDUCTION (EcuAL To oR GREATEN THAN 20%)
Report MONTH: September,1998 I                               (1)                       (2)               (3)                 (4)           (5) i Method Duration                               of     LER No. System       Component         Cause & Corrective Action Date       Type       Hours         Reason           Shutting             Code           Code           to Prevent Recurrence Down Rx I
Report MONTH: September,1998 I
l                   9-17 98       F     20 hrs.           H                 3       N2                                 Lightning strike caused 004-00                                 automatic reactor trip.
(1)
33 min.
(2)
(3)
(4)
(5) i Method Duration of LER No.
System Component Cause & Corrective Action Date Type Hours Reason Shutting Code Code to Prevent Recurrence Down Rx I
l 9-17 98 F
20 hrs.
H 3
N2 Lightning strike caused 004-00 33 min.
automatic reactor trip.
i I
i I
i.
i.
l I
l I
                      -(1)                                   (2)                                                           (3)
-(1)
:                F: Forced                       REASON:.                                                         METHOD:
(2)
S: Scheduled                   A- Equipment Failure (Explain)                                     1 - Manual B- Maintenance or Test                                           2-       Manual Scram
(3)
                                                -C- Refueling                                                     3-     Automatic Scram D- Regulatory Restriction                                       4-     Other (Explain) l-                                               E- Operator Training & Licensing Examination F-         Administrative G-         Operational Error (Explain)
F: Forced REASON:.
(4)         .
METHOD:
S: Scheduled A-Equipment Failure (Explain) 1 - Manual B-Maintenance or Test 2-Manual Scram
-C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Other (Explain) l-E-
Operator Training & Licensing Examination F-Administrative G-Operational Error (Explain)
(4)
(5)
(5)
.                Exhibit G -Instructions for Preparation of Data Entry Sheets                                     Exhibit 1 - Same Source for Licensee Event Report (LER) File (NUREG 0161) l.
Exhibit G -Instructions for Preparation of Data Entry Sheets Exhibit 1 - Same Source for Licensee Event Report (LER) File (NUREG 0161) l.
i ,'
i,'
                                                                          ._    .                      --                                              -}}
-}}

Latest revision as of 00:40, 11 December 2024

Monthly Operating Repts for Sept 1998 for North Anna Power Station,Units 1 & 2.With
ML20154H400
Person / Time
Site: North Anna  
Issue date: 09/30/1998
From: Matthews W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
98-608, NUDOCS 9810140166
Download: ML20154H400 (10)


Text

.

VINGINIA ELECTRIC AND POWER COMPANY Ricitwonn,VIHOINIA 20201 October 9,1998 United States Nuclear Regulatory Commission '

Serial No.98-608 i

Attention: Document Control Desk NAPS /JHL Washington, D. C. 20555 Docket Nos.

50-338 50-339 License Nos. NPF-4 NPF-7 Gentlemen:

VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNIT NOS.1 AND 2 MONTHLY OPERATING REPORT Enclosed is the September 1998 Monthly Operating Report for North Anna Power Station Units 1 and 2.

i i

Very truly yours, tuAW W. R. Matthews Site Vice President Enclosure 1

Commitments made in this letter: None.

cc:

U. S. Nuclear Regulatory Commission l

Region ll Atlanta Federal Center 61 Forsyth St., SW, Suite 23T85 Atlanta, Georgia 30303

/y b

Mr. M. J. Morgan NRC Senior Resident inspector North Anna Power Station 9810140166 990930 '~

PDR ADOCK 05000338 R

pgg

VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION MONTHLY OPERATING REPORT SEPTEMBER 1998 b

e>

2

/d 29[

Approved:

Site Vice President Date I

l l

w

l r

i I-OPERATING DATA REPORT Docket No : Sc 338 Date:

10/05/98

Contact:

W. R. Matthews l-Telephone: (540) 894-2101 1.

Unit Name:

North Anna Unit 1 2.

Reporting Period:.

September,1998

)

i:

3.

. Licensed Thermal Power (MWt):.

2,893 4.

Nameplate Rating (Gross MWe):.

979.74

)

5.

Design Electrical Rating (Net MWe):

907

6. - Maximum Dependable Capacity (Gross MWe):

940 i

l.

7.

Maximum Dependable Capacity (Net MWe):.

893 8; if Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

N/A 9.

Power Level To Which Restricted, if Any (Net MWe): N/A 10; Reasons For Restrictions, if Any:

N/A This Month Year-To-Date Cumulative

11. Hours in Reporting Period 720.0 6.551.0 177,731.0
12. Hours Reactor Was Critical 289.3 6,120.3 139,375.3
13. Reactor Reserve Shutdown Hours 14.0 14.9 7,109.9
14. Hours Generator On-Line 288.6 6,061.6 136,229.0
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 829,075.8 17,414,868.1 367,949,340.6
17. Gross Electrical Energy Generated (MWH) 269,615.0 5,674,967.0 157,845,620.0
18. Net Electrical Energy Generated (MWH) 256,230.0 5,396,315.0 114,540,498.0
19. Unit Service Factor 40.1 %

92.5 %

76.6%

20. Unit Availability Factor 40.1 %

92.5 %

76.6 %

21. Unit Capacity Factor (Using MDC Net) 39.9%

92.2%

72.1 %

i

22. Unit Capacity Factor (Using DER Net) 39.2 %

90.8 %

71.1 %

23. Unit Forced Outege Rate 0.0%

1.0%

8.0%

24.

Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

N/A

25. If Shut Down at End of Report Period, Estimated Date of Start-up:

October 7,1998

26. Unit in Test Status (Prior to Commercial Operation):

FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY l

COMMERCIAL OPERATION l

I-I-

i,

AVERAGE DAILY UNIT POWER LEVEL Docket No.: 50-338 Unit Name: North Anna Unit 1 Date: 10/05/98 Contact W. R. Matthews Telephone: (540) 894-2101 MONTH:

September,1998

{

Average Daily Power Level Average Daily Power Level Day (MWe - Net)

Day (MWe - Net) -

1 892 17 000 2

892 18 000 i

3 893 19 000 4

893 20 000 5-894 21 000 i

l 6

893 22 000 l

7' 893 23 000 8

894 24 000 9

895 25 000 f

10

'898 26 000 11 898 27 000 l

1 12 841 28 000 13 001 29 000 14 000 30 000 15 000 f

16 000 J

INSTRUCTIONS =

On this format, list the average daily unit power level in MWe - Net for each day in the reporting month. Compute to the nearest whole megawatt.-

.. - ~.

..~

)

Docket No.: 50-338 Unit Name: North Anna Unit 1 Date: 10/05/98 Contact W. R. Matthews Telephone: (540)894-2101 NORTH ANNA POWER STATION UNIT NO.:_j, MONTH: September 1998 -

SUMMARY

OF OPERATING EXPERIENCE Page 1 of 1 l

. Usted below in chronological sequence is a summary of operating expenences for this month which required load reductions or resulted in significant non-load related incidents.

i Edf E!DS 988 i

September 01,1998 0000 Began month in Mode 1, at 100% power, 933 MWe.

j September 12,1998 2015 Commenced ramping Unit 1 off-line for a refueling outage.

I September 13,1998 0038 Opened G-12 breaker. Unit 1 is off-line.

September 21,1998 1745 Unit 1 is defueled.

September 28,1998 0214 Unit 1 core on-load is complete.

September 30,1998 2400 Ended the month in Mode 5.

1 I

J

_. _ ~.____

.m.

l Docket No.: 50-338 l

Unit Name: North Anna Unit 1 Date: 10/05/98

Contact:

W. R. Matthews Telephone: (540) 894-2101 UNIT SHUTDOWN AND POWER REDUCTION (EQUAL To on GREATER THAN 20%)

REPORT MONTH: September,1998 (1)

(2)

(3)

(4)

(5)

Method Duration of LER No.

System Component Cause & Corrective Action l

Date Type Hours Reason Shutting Code Code to Prevent Recurrence Down Reactor 9-13-98 S

430 hrs.

C 1

NA NA NA 1998 scheduled refueling utage.

40 min.

(1)

(2)

(3)

F: Forced REASON:

METHOD:

S: Scheduled A-Equipment Failure (Explain) 1 - Manual B-Maintenance or Test 2-Manual Scram C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Other (Explain)

E-Operator Training & Licensing Examination F-Administrative G-Operational Error (Explain)

(4)

(5)

Exhibit G Instructions for Preparation of Data Entry Sheets Exhibit 1 - Same Source for Licensee Event Report (LER) File (NUREG 0161) f i

______,m

=

1

}

OPERATING DATA REPORT Docket No.: 50-339 Date:

10/05/98

Contact:

W. R. Matthews Telephone: (540) 894-2101 1,

Unit Name:

North Anna Unit 2 2.

Reporting Period:.

September,1998 3.

Licensed Thermal Power (MWt):.

2,893 4.

Nameplate Rating (Gross MWe):

979 5.

Design Electrical Rating (Net MWe):.

907 6.

Maximum Dependable Capacity (Gross MWe):..

944 1

7.

Maximum Dependable Capacity (Net MWe):.

897 8.

If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

N/A 9.

Power Level To Which Restricted, if Any (Net MWe): N/A 10.

Reasons For Restrictions, if Any:

N/A This Month Year-To-Date Cumulative 11.

Hours in Reporting Period 720.0 6,551.0 155,999.0

.12.

Hours Reactor Was Critical 703.2 5,864.8 131,579.2 13.

Reactor Reserve Shutdown Hours 16.4 57.3 7,241.5 14.

Hours Generator On-Line 699.5 5,842.1 130,364.3 15.

Unit Reserve Shutdown Hours 0.0 0.0 0.0 16.

Gross Thermal Energy Generated (MWH) 2,011,445.1 16,544,902.6 357,338,082.6 17.

Gross Electrical Energy Generated (MWH) 648,867.0 5,372,031.0 118,874,545.0 18.

Net Electrical Energy Generated (MWH) 616,337.0 5,103,782.0 111,631,750.0 19.

Unit Service Factor 97.1 %

89.2 %

83.6 %

20.

Unit Availability Factor 97.1 %

89.2 %

83.6 %

21.

Unit Capacity Factor (Using MDC Net) 95.4 %

86.9 %

79.6%

22.

Unrt Capacity Factor (Using DER Net) 94.4 %

85.9 %

78.9 %

23.

Unrt Forced Outage Rate 2.9%

0.3%

4.9%

i

24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

None 25, if Shut Down at End of Report Period, Estimated Date of Start-up:

N/A

26. Unit in Test Status (Prior to Commercial Operation):

FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION n

AVERAGE DAILY UNIT POWER LEVEL Docket No.: 50-339 Unit Name: North Anna Unit 2 Date: 10/05/98

Contact:

W. R. Matthews Telephone: (540) 894-2101 l

month:

September,1998

')

Average Daily Power Level Average Daily Power Level Day (MWe - Net)

Day (MWe - Net)

'1 886 17 759 2

887 18 089 3

386 19 867 4

887 20 884 5

888 21 886 6

887 22 886 7

887 23 886 8

889 24 890 i

9 890 25 889 10 887 20 888 11 888 27 888 12 890 28 890 1

13 887 29.

890 14 887 30-890 l

15 886 16

-885 INSTRUCTIONS On this format, list the average daily unit power level in MWe - Net for each day in the reporting month. Compute to the nearest whole megawatt.

l Docket No.: 50-339 Unit Name: North Anna Unit 2 Date:

10/05/98

Contact:

W. R. Matthews Telephone: (540) 894-2101 NORTH ANNA POWER STATION UNIT NO.:.2 MONTH: Septeminr 1998

SUMMARY

OF OPERATING EXPERIENCE Page 1 of 1

' Listed below in chronolo;ical sequence is a summary of operating experiences for the month which required load reductions or resulted in significant non-load related incidents.

ggig -

Time Qala September.1,1998 0000 Began the month in Mode 1,100% power,933 MWe.

j September 17,1998 2032 Unit 2 reactor trip due to lightning strike.

j September 18,1998 0000 Unit stable in Mode 3. Reactor trip recovery in progress.

l 1236

' Commenced reactor startup.

1321 Reactor critical.-

1404 Entered Mode 1.

1705 Unit 2 is on-line.

2127 Started 2-FW-P-1A. Commenced ramp to 100% power.

September 19,1998 0410 Unit 2 at 100% power,933 Mwe.

September 30,1998 2400 Ended the month in Mode 1,100% power, 935 MWe.

)

i

i l

Docket No.: 50-339 Unit Name: North Anna Unit 2 Date: 10/05/98

Contact:

W. R. Matthews Telephone: (540) 894-2101 UNIT SHUTDOWN AND POWER REDUCTION (EcuAL To oR GREATEN THAN 20%)

Report MONTH: September,1998 I

(1)

(2)

(3)

(4)

(5) i Method Duration of LER No.

System Component Cause & Corrective Action Date Type Hours Reason Shutting Code Code to Prevent Recurrence Down Rx I

l 9-17 98 F

20 hrs.

H 3

N2 Lightning strike caused 004-00 33 min.

automatic reactor trip.

i I

i.

l I

-(1)

(2)

(3)

F: Forced REASON:.

METHOD:

S: Scheduled A-Equipment Failure (Explain) 1 - Manual B-Maintenance or Test 2-Manual Scram

-C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Other (Explain) l-E-

Operator Training & Licensing Examination F-Administrative G-Operational Error (Explain)

(4)

(5)

Exhibit G -Instructions for Preparation of Data Entry Sheets Exhibit 1 - Same Source for Licensee Event Report (LER) File (NUREG 0161) l.

i,'

-