ML20155A213: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot change
StriderTol Bot change
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:,     _
{{#Wiki_filter:,
b 771 8
b 771 8
        /*
/*
APR01 W66 Mr. H. W. Wahl Vice President Bechtel Power Corporation 15740 Shady Grove Road Gaithersburg, MD 10877-1454
APR01 W66 Mr. H. W. Wahl Vice President Bechtel Power Corporation 15740 Shady Grove Road Gaithersburg, MD 10877-1454


==Dear Mr. Wahl:==
==Dear Mr. Wahl:==
This is in response to your letter of November 20, 1985, to Mr. Dircks which requests the NRC staff to reconsider its position, expressed in a {{letter dated|date=March 22, 1985|text=March 22, 1985 letter}} to Consumers Power Company, which holds open certain of the allegations made by E. Earl Kent regarding the Midland Power Station. The staff indicated that the allegations would be subject to follow-up inspections if and when construction at Midland should resume.
This is in response to your letter of November 20, 1985, to Mr. Dircks which requests the NRC staff to reconsider its position, expressed in a {{letter dated|date=March 22, 1985|text=March 22, 1985 letter}} to Consumers Power Company, which holds open certain of the allegations made by E. Earl Kent regarding the Midland Power Station. The staff indicated that the allegations would be subject to follow-up inspections if and when construction at Midland should resume.
The information contained in your letter of November 20, 1985 has been reviewed by the staff and all Midland allegations (other than those referred to 01) are now considered to be closed.
The information contained in your letter of November 20, 1985 has been reviewed by the staff and all Midland allegations (other than those referred to 01) are now considered to be closed.
Should you have any questions, please contact R. F. Warnick (312/790-5575) of the Region III staff.
Should you have any questions, please contact R. F. Warnick (312/790-5575) of the Region III staff.
Orldical C.I W L7 1-;m G. Kcypier James G. Keppler Regional Administrator See Attached Distribution bcc:   V. Stello, EDO H. Denton, NRR J. Taylor, IE G. Cunningham, ELD Dacw ugTmd  Ad~                                             Ato:t 3/ 2 h %         atS                           V(I     ed         "
Orldical C.I W L7 1-;m G. Kcypier James G. Keppler Regional Administrator See Attached Distribution bcc:
RIII             RJII         RIII           RIII RIII f       RIII era)
V. Stello, EDO H. Denton, NRR J. Taylor, IE G. Cunningham, ELD Dacw ugTmdAd~
Warnick/pd A
Ato:t 3/ 2 h %
nman Mu l~
atS V(I ed RIII RJII RIII RIII RIII f RIII era)
Pawlik WJ Weil     Berson           is 03/J//86           Qdm         c3hl/6L       3/,/g                     j RIII Ke  er e                              egg no  4oggs!Rgggggs aao) a                                             \
A Mu l~
                                                            ,e                       i o
WJ Warnick/pd nman Pawlik Weil Berson is 03/J//86 Qdm c3hl/6L 3/,/g j
RIII egg 4oggs!Rgggggs ao)
Ke er e
a no
\\
,e i o a
i
i


p' Bechtel Power Corporation                                                                                                                     .APR 01 1986
p' Bechtel Power Corporation.APR 01 1986
            . James W. Cook, Vice President                                                                                                                                       ,
. James W. Cook, Vice President Midland Project DMB/Docunent Control Desk (RIDS)
Midland Project                                                                                                                                                   '
The Honorable Charles Bechhoefer, ASLB J. Rutberg, ELD Michael Miller Ronald Callen, Michigan a
DMB/Docunent Control Desk (RIDS)
Public Service'Comission l
The Honorable Charles Bechhoefer, ASLB J. Rutberg, ELD                                                                                                                                                     ,
Myron M. Cherry Barbara Stamiris Mary Sinclair
,            Michael Miller Ronald Callen, Michigan a                 Public Service'Comission l           Myron M. Cherry Barbara Stamiris Mary Sinclair Colonel Steve J. Gadler
'Lynne Bernabei, Governmen(P.E.)
            'Lynne Bernabei, Governmen(P.E.)                         t Accountability Project Nuclear Facilities and Environmental Monitoring i                 Section                                                                                                                                                           -
Colonel Steve J. Gadler t
Accountability Project Nuclear Facilities and Environmental Monitoring i
Section
?
?
i I
i I
1
1
\'
\\'
i r
i r
I 4
I 4
i i
i i
l
l
        - .    . . _ . . . , . _    . . . - . - . - . . _ . . , . .      . . - . - - . - , . - - . - _ . . - - . . , . . - - _ . . . , . . , . - . . . - . .}}
.. -. - -. -,. - -. - _.. - -..,.. - - _...,..,. -... -..}}

Latest revision as of 23:38, 10 December 2024

Advises That All Midland Allegations Except Those Referred to Ofc of Investigations Closed,Per 851120 Request for NRC to Reconsider Ee Kent Allegations Held Open in NRC
ML20155A213
Person / Time
Site: Midland
Issue date: 04/01/1986
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Wahl H
BECHTEL GROUP, INC.
References
NUDOCS 8604080329
Download: ML20155A213 (2)


Text

,

b 771 8

/*

APR01 W66 Mr. H. W. Wahl Vice President Bechtel Power Corporation 15740 Shady Grove Road Gaithersburg, MD 10877-1454

Dear Mr. Wahl:

This is in response to your letter of November 20, 1985, to Mr. Dircks which requests the NRC staff to reconsider its position, expressed in a March 22, 1985 letter to Consumers Power Company, which holds open certain of the allegations made by E. Earl Kent regarding the Midland Power Station. The staff indicated that the allegations would be subject to follow-up inspections if and when construction at Midland should resume.

The information contained in your letter of November 20, 1985 has been reviewed by the staff and all Midland allegations (other than those referred to 01) are now considered to be closed.

Should you have any questions, please contact R. F. Warnick (312/790-5575) of the Region III staff.

Orldical C.I W L7 1-;m G. Kcypier James G. Keppler Regional Administrator See Attached Distribution bcc:

V. Stello, EDO H. Denton, NRR J. Taylor, IE G. Cunningham, ELD Dacw ugTmdAd~

Ato:t 3/ 2 h %

atS V(I ed RIII RJII RIII RIII RIII f RIII era)

A Mu l~

WJ Warnick/pd nman Pawlik Weil Berson is 03/J//86 Qdm c3hl/6L 3/,/g j

RIII egg 4oggs!Rgggggs ao)

Ke er e

a no

\\

,e i o a

i

p' Bechtel Power Corporation.APR 01 1986

. James W. Cook, Vice President Midland Project DMB/Docunent Control Desk (RIDS)

The Honorable Charles Bechhoefer, ASLB J. Rutberg, ELD Michael Miller Ronald Callen, Michigan a

Public Service'Comission l

Myron M. Cherry Barbara Stamiris Mary Sinclair

'Lynne Bernabei, Governmen(P.E.)

Colonel Steve J. Gadler t

Accountability Project Nuclear Facilities and Environmental Monitoring i

Section

?

i I

1

\\'

i r

I 4

i i

l

.. -. - -. -,. - -. - _.. - -..,.. - - _...,..,. -... -..