ML20199B723: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:E.      .
{{#Wiki_filter:E.
f ., ~           _
f., ~
Willll8(N CAlllORNI4 -                                                                   '
Willll8(N CAlllORNI4 -
EDISON                                                               0%"Le, AA l'lWOW l.%TERWf0M1* Gunpanv 4
EDISON 0%"Le, AA l'lWOW l.%TERWf0M1* Gunpanv November 12, 1997-4 U. S. Nuclear Regulatory Commission Attention: Document Control Desk
November 12, 1997-U. S. Nuclear Regulatory Commission
~
                                                    ~
~ Washington, D.C. 20555 Gentlemen:
Attention: Document Control Desk
                      ~ Washington, D.C. 20555 Gentlemen:


==Subject:==
==Subject:==
 
' Docket Nos. 50-361 and 50-362 Technical Specification 3.8.1 San Onofre Nuclear Generating Station Units 2 and 3
                                            ' Docket Nos. 50-361 and 50-362 Technical Specification 3.8.1 San Onofre Nuclear Generating Station Units 2 and 3
~ This letter addresses Technical Specification 3.8.1, Action B.2 for San Onofre Nuclear Generating Station, Units 2 and 3.
                      ~ This letter addresses Technical Specification 3.8.1, Action B.2 for San Onofre Nuclear Generating Station, Units 2 and 3. For one required diesel generator
For one required diesel generator
                        -(06) inoperable, Action 3.8.1.B.2 states:
-(06) inoperable, Action 3.8.1.B.2 states:
Declare required feature (s) supported by the inoperfle DG inope:able when its redundant required feature (s) is inoperable.
Declare required feature (s) supported by the inoperfle DG inope:able when its redundant required feature (s) is inoperable.
The first sentence of the Basis for Action 3.8.1.B.2 states:
The first sentence of the Basis for Action 3.8.1.B.2 states:
Requircd Action.B.2 is intended to provide assurance-that a loss of l                                   offsite power, during the period that a DG is inoperable, does not result in a complete loss of safety function of critical systems.
Requircd Action.B.2 is intended to provide assurance-that a loss of l
Southern California Edison (SCE) has historically interpreted this Action L                         statement to apply to critical accident mitigation equipment which relies on j_
offsite power, during the period that a DG is inoperable, does not result in a complete loss of safety function of critical systems.
either offsite power or a DG for motive power; e.g., pumps and valves. The specific components are listed in San Onofre procedures. SCE does not apply this action to instrumentation which is connected to a tattery backed source.
Southern California Edison (SCE) has historically interpreted this Action L
                                          ~
statement to apply to critical accident mitigation equipment which relies on j_
j                     'It is.our understanding that this is consistent with the general industry interpretation of this Action statement.
either offsite power or a DG for motive power; e.g., pumps and valves. The specific components are listed in San Onofre procedures.
SCE does not apply this action to instrumentation which is connected to a tattery backed source.
~
j
'It is.our understanding that this is consistent with the general industry interpretation of this Action statement.
l
l
                        ,In order to clearly define the required actions, SCE is prepa ing a change to the Bases'for Action 3.8.1.B.2, which will specify the critical components and L
,In order to clearly define the required actions, SCE is prepa ing a change to the Bases'for Action 3.8.1.B.2, which will specify the critical components and L
their associated Technical Specifications. This change will be provided to l/                         the NRC by November 21, 1997, for information or approval, as appropriate, in accordance with the provisions of the Bases control program in Technical Specification 5.4.
their associated Technical Specifications. This change will be provided to l/
[0CI 9711190066 471112                             -
the NRC by November 21, 1997, for information or approval, as appropriate, in accordance with the provisions of the Bases control program in Technical
PDR         ADOCK 0S000361 P                             PDR _                           gglg   gglllglg     f* 0 i .-                  San Otwfre Nudeur Caerating Stark >n                         **'''*
[0CI Specification 5.4.
* l                     P. O.Ikn 128
9711190066 471112 PDR ADOCK 0S000361 P
: l.                     San Clemente, CA W674-012t 714.% M 420 i
PDR _
ISOMS b
gglg gglllglg f
0 San Otwfre Nudeur Caerating Stark >n i.-
l P. O.Ikn 128 l.
San Clemente, CA W674-012t 714.% M 420 ISOMS i
b


r-f:= -
r-f:= -
e Document Control Desk                   2 If_yoe have any. questions regarding'this information, please let us know.
e Document Control Desk 2
If_yoe have any. questions regarding'this information, please let us know.
Ve-y truly yours, A,-
Ve-y truly yours, A,-
cc:   E._W. Merschoff, Regional Administrator, NRC Region IV
cc:
                  -K. E. Perkins, Jr., Director,. Walnut Creek Field Office, NRC Region IV     ,
E._W. Merschoff, Regional Administrator, NRC Region IV
J. A. Sloan, NRC Senior Resident inspector, San Onofre Units 2 & 3         l M. B. Fields. NRC Project Manager, San Onofre Units 2 and 3                 )
-K. E. Perkins, Jr., Director,. Walnut Creek Field Office, NRC Region IV J. A. Sloan, NRC Senior Resident inspector, San Onofre Units 2 & 3 l
M. B. Fields. NRC Project Manager, San Onofre Units 2 and 3
)
s k}}
s k}}

Latest revision as of 08:31, 10 December 2024

Addresses TS 3.8.1,Action B.2 for San Onofre Nuclear Generating Station,Units 2 & 3.Licensee Preparing Change to Bases for Action 3.8.1.B.2,to Specify Critical Components & Associated TSs
ML20199B723
Person / Time
Site: San Onofre  
Issue date: 11/12/1997
From: Rainsberry J
SOUTHERN CALIFORNIA EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9711190066
Download: ML20199B723 (2)


Text

E.

f., ~

Willll8(N CAlllORNI4 -

EDISON 0%"Le, AA l'lWOW l.%TERWf0M1* Gunpanv November 12, 1997-4 U. S. Nuclear Regulatory Commission Attention: Document Control Desk

~

~ Washington, D.C. 20555 Gentlemen:

Subject:

' Docket Nos. 50-361 and 50-362 Technical Specification 3.8.1 San Onofre Nuclear Generating Station Units 2 and 3

~ This letter addresses Technical Specification 3.8.1, Action B.2 for San Onofre Nuclear Generating Station, Units 2 and 3.

For one required diesel generator

-(06) inoperable, Action 3.8.1.B.2 states:

Declare required feature (s) supported by the inoperfle DG inope:able when its redundant required feature (s) is inoperable.

The first sentence of the Basis for Action 3.8.1.B.2 states:

Requircd Action.B.2 is intended to provide assurance-that a loss of l

offsite power, during the period that a DG is inoperable, does not result in a complete loss of safety function of critical systems.

Southern California Edison (SCE) has historically interpreted this Action L

statement to apply to critical accident mitigation equipment which relies on j_

either offsite power or a DG for motive power; e.g., pumps and valves. The specific components are listed in San Onofre procedures.

SCE does not apply this action to instrumentation which is connected to a tattery backed source.

~

j

'It is.our understanding that this is consistent with the general industry interpretation of this Action statement.

l

,In order to clearly define the required actions, SCE is prepa ing a change to the Bases'for Action 3.8.1.B.2, which will specify the critical components and L

their associated Technical Specifications. This change will be provided to l/

the NRC by November 21, 1997, for information or approval, as appropriate, in accordance with the provisions of the Bases control program in Technical

[0CI Specification 5.4.

9711190066 471112 PDR ADOCK 0S000361 P

PDR _

gglg gglllglg f

0 San Otwfre Nudeur Caerating Stark >n i.-

l P. O.Ikn 128 l.

San Clemente, CA W674-012t 714.% M 420 ISOMS i

b

r-f:= -

e Document Control Desk 2

If_yoe have any. questions regarding'this information, please let us know.

Ve-y truly yours, A,-

cc:

E._W. Merschoff, Regional Administrator, NRC Region IV

-K. E. Perkins, Jr., Director,. Walnut Creek Field Office, NRC Region IV J. A. Sloan, NRC Senior Resident inspector, San Onofre Units 2 & 3 l

M. B. Fields. NRC Project Manager, San Onofre Units 2 and 3

)

s k