ML20202B024: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:pc'0
{{#Wiki_filter:-
  -
pc'0
    !
!
                                                    February 5, 1998
February 5, 1998
      Mr. Oliver D. Kingsley
Mr. Oliver D. Kingsley
      President, Nuclear Generation Group
President, Nuclear Generation Group
      Commonwealth Edison Company
Commonwealth Edison Company
      ATTN: Regulatory Services
ATTN: Regulatory Services
      Executive Towers West lli
Executive Towers West lli
      1400 Opus Place, Suite 500
1400 Opus Place, Suite 500
      Downers Grove,IL 60515
Downers Grove,IL 60515
SUBJECT:
NRC RADIATION PROTECTION INSPECTION REPORTS
,
,
      SUBJECT:        NRC RADIATION PROTECTION INSPECTION REPORTS
50 254/98002(DRS); 50 265/98002(DRS) AND NOTICE OF VIOLATION
                        50 254/98002(DRS); 50 265/98002(DRS) AND NOTICE OF VIOLATION
Dear Mr. Kingsley:
      Dear Mr. Kingsley:
On January 16,1998, the NRC completed an inspection of the radiation protection program at
      On January 16,1998, the NRC completed an inspection of the radiation protection program at
your Quad Cities Nuclear Power Station. The results of this inspection were discussed on that
      your Quad Cities Nuclear Power Station. The results of this inspection were discussed on that
date with Mr. Pearce and other members of his staff. The enclosed report presents the results
      date with Mr. Pearce and other members of his staff. The enclosed report presents the results
of thatinspection.
      of thatinspection.
The purpose of the inspection was to review the radiation protection controls for the Unit 1
      The purpose of the inspection was to review the radiation protection controls for the Unit 1
surveillance (Q1PO1) outage work, including a review of radiation work permits and ALARA
      surveillance (Q1PO1) outage work, including a review of radiation work permits and ALARA
Initiatives, in addition, the inspection included a review of posting and labeling, tool issuance
      Initiatives, in addition, the inspection included a review of posting and labeling, tool issuance
and control, portable Instrument calibration, and initiatives underway in the radiological waste
      and control, portable Instrument calibration, and initiatives underway in the radiological waste
processing area to return the waste collector and floor drain systems to their normal flow paths.
      processing area to return the waste collector and floor drain systems to their normal flow paths.
Outage ALARA plans and radiation work permits were comprehensive and observed workers
      Outage ALARA plans and radiation work permits were comprehensive and observed workers
exhibited good radiation work practices. The posting and labeling, tool issuance and control,
      exhibited good radiation work practices. The posting and labeling, tool issuance and control,
and portable instrument calibration programs were effectively implemented. However, one
      and portable instrument calibration programs were effectively implemented. However, one
violation was identified for the failure of the Radiation Protection department to issue (control)
      violation was identified for the failure of the Radiation Protection department to issue (control)
faceshields that were in a contaminated area. During the inspection, the inspectors noted that
      faceshields that were in a contaminated area. During the inspection, the inspectors noted that
the faceshields were left on the floor of contaminated areas, which, if used, could lead to
      the faceshields were left on the floor of contaminated areas, which, if used, could lead to
personal contamination of Individuals using these faceshields. This violation is cited in the
      personal contamination of Individuals using these faceshields. This violation is cited in the
enclosed Notice of Violation (Notice), and the circumstances sutrounding the violation are
      enclosed Notice of Violation (Notice), and the circumstances sutrounding the violation are
described in detail in the enclosed report. Please note that you are required to respond to this
      described in detail in the enclosed report. Please note that you are required to respond to this
letter and should follow the instructions specified in the enclosed Notice when preparing your
      letter and should follow the instructions specified in the enclosed Notice when preparing your
- response. The NRC will use your response, in part, to determine whether further enforcement
      - response. The NRC will use your response, in part, to determine whether further enforcement
action is necessary to ensure compliance with regulatory requirements.
      action is necessary to ensure compliance with regulatory requirements.
in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its
        in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its
enclosures, and your response to this letter will be placed in the NRC Public Document Room.
      enclosures, and your response to this letter will be placed in the NRC Public Document Room.
\\
                                                                                                          \
'
                                              '
6)
          9002110064 990205
\\
          PDR     ADOCK 05000254
9002110064 990205
                                                                                    6)                    \
PDR
          0                        PDR
ADOCK 05000254
                                  .
0
PDR
.


  -     -
-
          .. _ _ _. .
-
                                  __.____.-____._..___.._..__._.__.__;._.....-__
.. _ _ _. .
      .
__.____.-____._..___.._..__._.__.__;._.....-__
    .,
.
                                                                                                                                i
.,
i
>
>
    .f
.f
                  O. D. Kingsley                                     2                             February 5, 1998
O. D. Kingsley
                  We will gladly discuss any questions you have concerning this inspection. .
2
                                                              Sincerely,
February 5, 1998
                                                        Original Signed by Melvyn t.each (for)
We will gladly discuss any questions you have concerning this inspection. .
                                                              John A. Grobe, Director
Sincerely,
Original Signed by Melvyn t.each (for)
John A. Grobe, Director
Division of Reactsr Safety
.
Dackst Nos. 50-254; 50-265
License Nos. DPR 29; DPR 30
Enclosures:
1. Notice of Violation
2. Inspection Reports 50 254/98002(DRS); 50 265/98002(DRS)
cc w/encls:
M. Wallace, Chief of Staff
D. Helwig, Senior Vice President
G. Stanley, PWR Vice President
J. Perry, BWR Vice President
D. Farrar, Regulatory
Services Manager
I. Johnson, Licensing Director
DCD - Licensing
E. Kraft, Jr., Site Vice President
. D. Cook, Quad Cities Station Manager
C. C. Peterson, Regulatory Affairs
Manager
Richard Hubbard
Nathan Schloss, Economist
Office of the Attorney General
State Liaison Officer
Chairman, Illinois Comrreres
Commission
W. D. Leech, Manager of Nuclear
MidAmerican Energy Company
DOCUMENT NAME: G:DRS\\QUA98002.DRS
v.
.~. . ..
ww. m m. w.. e . c ~ .u
.u. 2,.
r . co
.n.c~,--.
.c . + e.
OFFICE
Rill
IE Rill
O Rlll
Scf
C
Rill
N
NAME
Klambert:Jp//45& MRing7/JE
GShear
J W a9&C
DATE
02/3 /98
02/3 /98
02/J /98
62/s "/98
'
OFFICIAL RECORD COPY
-
-
--
.
.
                                                              Division of Reactsr Safety
.
                  Dackst Nos. 50-254; 50-265
- . - -
                  License Nos. DPR 29; DPR 30
.
                  Enclosures:      1. Notice of Violation
.
                                    2. Inspection Reports 50 254/98002(DRS); 50 265/98002(DRS)
- - -
                  cc w/encls:      M. Wallace, Chief of Staff
                                    D. Helwig, Senior Vice President
                                    G. Stanley, PWR Vice President
                                    J. Perry, BWR Vice President
                                    D. Farrar, Regulatory
                                      Services Manager
                                    I. Johnson, Licensing Director
                                    DCD - Licensing
                                    E. Kraft, Jr., Site Vice President
                                  . D. Cook, Quad Cities Station Manager
                                    C. C. Peterson, Regulatory Affairs
                                      Manager
                                    Richard Hubbard
                                    Nathan Schloss, Economist
                                      Office of the Attorney General
                                    State Liaison Officer
                                    Chairman, Illinois Comrreres
                                      Commission
                                    W. D. Leech, Manager of Nuclear
                                      MidAmerican Energy Company
                  DOCUMENT NAME: G:DRS\QUA98002.DRS
                  v.    .~. . ..          ww. m m. w.. e . c ~ .u          .u. 2,.    r . co  .n.c~,--.      .c . + e.
                      OFFICE      Rill                IE  Rill              O Rlll          Scf    C Rill              N
                      NAME      Klambert:Jp//45& MRing7/JE                      GShear                  J W a9&C
                      DATE      02/3 /98                02/3 /98              02/J /98                62/s "/98
                                                                                                                                '
                                                          OFFICIAL RECORD COPY
                                -          -        --            .      .        - . - -      .    .                - - -


l.     e
l.
    .,.
e
    . (.
. , .
          ' O. D. Kingsley                       3               February 5, 1998
. (.
            Distribution
' O. D. Kingsley
          ' Docket File w/enct   Rlll PRR w/enct               Rlli Enf. Coordinatcr w/ encl
3
            PUBLIC IE-01 w/ encl SRI, Quad Cities w/enci       TSS w/enci
February 5, 1998
            LPM, NRR w/enci     J. L. Caldwell, Rlli w/enci   R, A. Capra, NRR w/enci
Distribution
            DRP w/ encl         A. B. Beach, Rill w/enci       DOCDESK w/enci
' Docket File w/enct
            DRS w/enci           CAA1 w/enci
Rlll PRR w/enct
                                                                                              ,
Rlli Enf. Coordinatcr w/ encl
                                                                                -
PUBLIC IE-01 w/ encl
                                                                                ___
SRI, Quad Cities w/enci
  -
TSS w/enci
                                                                                                1
LPM, NRR w/enci
  -
J. L. Caldwell, Rlli w/enci
          .s             m                                   --
R, A. Capra, NRR w/enci
DRP w/ encl
A. B. Beach, Rill w/enci
DOCDESK w/enci
DRS w/enci
CAA1 w/enci
,
-
___
-
1
-
.s
m
--
}}
}}

Latest revision as of 03:38, 8 December 2024

Forwards Insp Repts 50-254/98-02 & 50-265/98-02 on 980112-16 & Nov.Violation Regarding Failure of Radiation Protection Dept to Issue Faceshields That Were in Contaminated Area
ML20202B024
Person / Time
Site: Quad Cities  Constellation icon.png
Issue date: 02/05/1998
From: Grobe J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Kingsley O
COMMONWEALTH EDISON CO.
Shared Package
ML20202B026 List:
References
50-254-98-02, 50-254-98-2, 50-265-98-02, 50-265-98-2, NUDOCS 9802110064
Download: ML20202B024 (3)


See also: IR 05000254/1998002

Text

-

pc'0

!

February 5, 1998

Mr. Oliver D. Kingsley

President, Nuclear Generation Group

Commonwealth Edison Company

ATTN: Regulatory Services

Executive Towers West lli

1400 Opus Place, Suite 500

Downers Grove,IL 60515

SUBJECT:

NRC RADIATION PROTECTION INSPECTION REPORTS

,

50 254/98002(DRS); 50 265/98002(DRS) AND NOTICE OF VIOLATION

Dear Mr. Kingsley:

On January 16,1998, the NRC completed an inspection of the radiation protection program at

your Quad Cities Nuclear Power Station. The results of this inspection were discussed on that

date with Mr. Pearce and other members of his staff. The enclosed report presents the results

of thatinspection.

The purpose of the inspection was to review the radiation protection controls for the Unit 1

surveillance (Q1PO1) outage work, including a review of radiation work permits and ALARA

Initiatives, in addition, the inspection included a review of posting and labeling, tool issuance

and control, portable Instrument calibration, and initiatives underway in the radiological waste

processing area to return the waste collector and floor drain systems to their normal flow paths.

Outage ALARA plans and radiation work permits were comprehensive and observed workers

exhibited good radiation work practices. The posting and labeling, tool issuance and control,

and portable instrument calibration programs were effectively implemented. However, one

violation was identified for the failure of the Radiation Protection department to issue (control)

faceshields that were in a contaminated area. During the inspection, the inspectors noted that

the faceshields were left on the floor of contaminated areas, which, if used, could lead to

personal contamination of Individuals using these faceshields. This violation is cited in the

enclosed Notice of Violation (Notice), and the circumstances sutrounding the violation are

described in detail in the enclosed report. Please note that you are required to respond to this

letter and should follow the instructions specified in the enclosed Notice when preparing your

- response. The NRC will use your response, in part, to determine whether further enforcement

action is necessary to ensure compliance with regulatory requirements.

in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its

enclosures, and your response to this letter will be placed in the NRC Public Document Room.

\\

'

6)

\\

9002110064 990205

PDR

ADOCK 05000254

0

PDR

.

-

-

.. _ _ _. .

__.____.-____._..___.._..__._.__.__;._.....-__

.

.,

i

>

.f

O. D. Kingsley

2

February 5, 1998

We will gladly discuss any questions you have concerning this inspection. .

Sincerely,

Original Signed by Melvyn t.each (for)

John A. Grobe, Director

Division of Reactsr Safety

.

Dackst Nos. 50-254; 50-265

License Nos. DPR 29; DPR 30

Enclosures:

1. Notice of Violation

2. Inspection Reports 50 254/98002(DRS); 50 265/98002(DRS)

cc w/encls:

M. Wallace, Chief of Staff

D. Helwig, Senior Vice President

G. Stanley, PWR Vice President

J. Perry, BWR Vice President

D. Farrar, Regulatory

Services Manager

I. Johnson, Licensing Director

DCD - Licensing

E. Kraft, Jr., Site Vice President

. D. Cook, Quad Cities Station Manager

C. C. Peterson, Regulatory Affairs

Manager

Richard Hubbard

Nathan Schloss, Economist

Office of the Attorney General

State Liaison Officer

Chairman, Illinois Comrreres

Commission

W. D. Leech, Manager of Nuclear

MidAmerican Energy Company

DOCUMENT NAME: G:DRS\\QUA98002.DRS

v.

.~. . ..

ww. m m. w.. e . c ~ .u

.u. 2,.

r . co

.n.c~,--.

.c . + e.

OFFICE

Rill

IE Rill

O Rlll

Scf

C

Rill

N

NAME

Klambert:Jp//45& MRing7/JE

GShear

J W a9&C

DATE

02/3 /98

02/3 /98

02/J /98

62/s "/98

'

OFFICIAL RECORD COPY

-

-

--

.

.

- . - -

.

.

- - -

l.

e

. , .

. (.

' O. D. Kingsley

3

February 5, 1998

Distribution

' Docket File w/enct

Rlll PRR w/enct

Rlli Enf. Coordinatcr w/ encl

PUBLIC IE-01 w/ encl

SRI, Quad Cities w/enci

TSS w/enci

LPM, NRR w/enci

J. L. Caldwell, Rlli w/enci

R, A. Capra, NRR w/enci

DRP w/ encl

A. B. Beach, Rill w/enci

DOCDESK w/enci

DRS w/enci

CAA1 w/enci

,

-

___

-

1

-

.s

m

--