                                                        April 20, 1999
April 20, 1999
          Mr. Theodore A. Sullivan
Mr. Theodore A. Sullivan
          Vice President - Nuclear and Station Director
Vice President - Nuclear and Station Director
            BEC Energy
BEC Energy
            Pilgrim Nuclear Power Station
Pilgrim Nuclear Power Station
          600 Rocky Hill Road
600 Rocky Hill Road
            Plymouth, Massachusetts 02360-5599
Plymouth, Massachusetts 02360-5599
            SU3 JECT:       NRC INTEGRATED INSPECTION REPORT NO. 50-293/99-01
SU3 JECT:
            Dear Mr. Sullivan:
NRC INTEGRATED INSPECTION REPORT NO. 50-293/99-01
                                                                                                                1
Dear Mr. Sullivan:
          This refers to the inspection conducted on January 25,1999 through March 7,1999, at the
1
            Pilgrim Nuclear Power Station in Plymouth, Massachusetts. The enclosed report presents the
This refers to the inspection conducted on January 25,1999 through March 7,1999, at the
            results of this inspection.
Pilgrim Nuclear Power Station in Plymouth, Massachusetts. The enclosed report presents the
          . During the six weeks covered by this inspection period, the conduct of activities at the Pilgrim
results of this inspection.
            facility was characterized by safe plant operations. This was especially evident during planned
. During the six weeks covered by this inspection period, the conduct of activities at the Pilgrim
            evolutions such as during new reactor fuel inspections and also during a planned down power
facility was characterized by safe plant operations. This was especially evident during planned
          . outage at 50% reactor power. In both instances, good planning of the activities were observed,
evolutions such as during new reactor fuel inspections and also during a planned down power
            and your staff performed good mock-up training and oversight to promote positive human
. outage at 50% reactor power. In both instances, good planning of the activities were observed,
            performance.
and your staff performed good mock-up training and oversight to promote positive human
            Based on the results of this inspection, the NRC has determined that two violations of NRC
performance.
            requirements occurred. These violations are being treated as Non Cited Violations (NCVs),
Based on the results of this inspection, the NRC has determined that two violations of NRC
            consistent with Appendix C of the Enforcement Policy. These NCVs involved: (1) human error
requirements occurred. These violations are being treated as Non Cited Violations (NCVs),
            leading to a valve misalignment in the stator cooling water system, and (2) a design control
consistent with Appendix C of the Enforcement Policy. These NCVs involved: (1) human error
            error affecting the control room air filtration system that was reported in LER 50-293/98-24.
leading to a valve misalignment in the stator cooling water system, and (2) a design control
            These NCVs are further described in the subject inspection report. If you contest the violation
error affecting the control room air filtration system that was reported in LER 50-293/98-24.
            or severity level of these NCVs , you should provide a response within 30 days of the date of
These NCVs are further described in the subject inspection report. If you contest the violation
            this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission,
or severity level of these NCVs , you should provide a response within 30 days of the date of
            ATTN: Document Control Desk, Washington DC 20555-0001, with a copies to the Regional
this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission,
          . Administrator, Region I, and the Director, Office of Enforcement, United States Nuclear
ATTN: Document Control Desk, Washington DC 20555-0001, with a copies to the Regional
          ~ Regulatory Commission, Washington, DC 20555-0001.
. Administrator, Region I, and the Director, Office of Enforcement, United States Nuclear
            In the area of radiological controls, we reviewed several aspects of your program. Your limited
~ Regulatory Commission, Washington, DC 20555-0001.
            site radiological characterization revealed small amounts of radioactive contamination present
In the area of radiological controls, we reviewed several aspects of your program. Your limited
            in a few onsite soil samples. We found that your staff maintained appropriate records of spills   ) 3
site radiological characterization revealed small amounts of radioactive contamination present
            in accordance with 10 CFR 50.75 (g) and took adequate corrective actions to evaluate and             J
in a few onsite soil samples. We found that your staff maintained appropriate records of spills
            document the soil samples. Radiological planning was properly focused on maintaining                 l
)
            radiation dose for refuel outage (RFO) 12 as low as is reasonably achievable (ALARA). The
3
            security program was also inspected during this period. No safety concerns or violations were         ;
in accordance with 10 CFR 50.75 (g) and took adequate corrective actions to evaluate and
            identified. '                                                                                       j
J
                                                  ^^
document the soil samples. Radiological planning was properly focused on maintaining
        , 9904290206 990420
l
          PDR       ADOCK 05000293
radiation dose for refuel outage (RFO) 12 as low as is reasonably achievable (ALARA). The
          G                       PDR
security program was also inspected during this period. No safety concerns or violations were
                                                  OFFICIAL RECORD 00PY                                   IE:01
;
\1
identified. '
j
^^
9904290206 990420
,
PDR
ADOCK 05000293
G
PDR
OFFICIAL RECORD 00PY
IE:01
\\1


F-
F-
  .
.
  *
Theodore A. Sullivan
    Theodore A. Sullivan                             2
2
    in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its
*
    enclosure (s), and your response will be placed in the NRC Public Document Room .
in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its
                                                  Sincerely,
enclosure (s), and your response will be placed in the NRC Public Document Room .
                                                    Original Signed by:
Sincerely,
                                                  Clifford J. Anderson, Chief
Original Signed by:
                                                  Projects Branch 5
Clifford J. Anderson, Chief
                                                  Division of Reactor Projects
Projects Branch 5
    Docket No.:     50-293                                                                       ,
Division of Reactor Projects
    License No.: DPR-35                                                                           I
Docket No.:
    Enclosure:     Inspection Report 50-293/99-01
50-293
    cc w/ encl:
,
    R. Ledgett, Executive Vice President - Operations
License No.: DPR-35
    J. Alexander, Master Process Owner-Nuclear Assessment
Enclosure:
    D. Tarantino, Nuclear Information Manager
Inspection Report 50-293/99-01
    S. Brennion, Regulatory Affairs Department Manager
cc w/ encl:
    J. Fulton, Assistant General Counsel
R. Ledgett, Executive Vice President - Operations
    R. Hallisey, Department of Public Health, Commonwealth of Massachusetts
J. Alexander, Master Process Owner-Nuclear Assessment
    The Honorable Therese Murray
D. Tarantino, Nuclear Information Manager
    The Honorable Vincent DiMacedo
S. Brennion, Regulatory Affairs Department Manager
    T. MacGregor, Mass. Dept. Of Public Comm. & Energy
J. Fulton, Assistant General Counsel
    Chairman, Plymouth Board of Selectmen
R. Hallisey, Department of Public Health, Commonwealth of Massachusetts
    Chairman, Duxbury Board of Selectmen
The Honorable Therese Murray
    Chairman, Nuclear Matters Committee
The Honorable Vincent DiMacedo
    Plymouth Civil Defense Director
T. MacGregor, Mass. Dept. Of Public Comm. & Energy
    P. Gromer, Massachusetts Secretary of Energy Resources
Chairman, Plymouth Board of Selectmen
    J. Miller, Senior issues Manager
Chairman, Duxbury Board of Selectmen
    A. Nogee, MASSPIRG
Chairman, Nuclear Matters Committee
    Office of the Commissioner, Massachusetts Department of Environmental Quality Engineering
Plymouth Civil Defense Director
    Office of the Attomey General, Commonwealth of Massachusetts
P. Gromer, Massachusetts Secretary of Energy Resources
    J. Perlov, Secretary of Public Safety for the Commonwealth of Massachusetts
J. Miller, Senior issues Manager
    Chairman, Citizens Urging Responsible Energy
A. Nogee, MASSPIRG
    Commonwealth of Massachusetts, SLO Designee
Office of the Commissioner, Massachusetts Department of Environmental Quality Engineering
Office of the Attomey General, Commonwealth of Massachusetts
J. Perlov, Secretary of Public Safety for the Commonwealth of Massachusetts
Chairman, Citizens Urging Responsible Energy
Commonwealth of Massachusetts, SLO Designee


4
4
,
,
  Theodore A. Sullivan                         3
Theodore A. Sullivan
  Distribution w/ encl:
3
  H. Miller, RA/J. Wiggins, DRA
Distribution w/ encl:
  C. Anderson, DRP
H. Miller, RA/J. Wiggins, DRA
  R. Summers, DRP
C. Anderson, DRP
  S. Barr, DRP
R. Summers, DRP
  R. Junod, DRP
S. Barr, DRP
  Region i Docket Room (with concurrences)
R. Junod, DRP
  Nuclear Safety Information Center (NSIC)
Region i Docket Room (with concurrences)
  PUBLIC
Nuclear Safety Information Center (NSIC)
  NRC Resident inspector
PUBLIC
  Distribution w/enci(VIA E-MAIL):
NRC Resident inspector
  M.Tschiltz, OEDO
Distribution w/enci(VIA E-MAIL):
  E. Adensam, NRR
M.Tschiltz, OEDO
  A. Wang, NRR
E. Adensam, NRR
  R. Correia, NRR
A. Wang, NRR
  DOCDESK
R. Correia, NRR
                                                                              l
DOCDESK
                                                                              I
l
  DOCUMENT NAME: G:\ BRANCH 5\2-PG\lNSPECT\lR99-01.WPD
DOCUMENT NAME: G:\\ BRANCH 5\\2-PG\\lNSPECT\\lR99-01.WPD
  To receive a copy of this document, indicate in the box: "C" = Copy without
To receive a copy of this document, indicate in the box: "C" = Copy without
  attachment / enclosure "E" = Copy with attachment / enclosure "N" = No copy
attachment / enclosure
  OFFICE       Rl/DRP         l   Rl/DRP         l
"E" = Copy with attachment / enclosure
  NAME         RLaura     O /G /,, CAnderson CD /
"N" = No copy
                            '
OFFICE
  DATE         04SCf99             04/7d/99       ,
Rl/DRP
                                    OFFICIAL RECORD COPY
l
Rl/DRP
l
NAME
RLaura
O /G /,,
CAnderson CD
/
'
DATE
04SCf99
04/7d/99
,
OFFICIAL RECORD COPY


y
y
  .
.
  '
'
    Theodore A. Sullivan                         3'
Theodore A. Sullivan
    Distnbution w/ encl:
3'
    H. Miller, RA/J. Wiggins, DRA
Distnbution w/ encl:
    C. Anderson, DRP
H. Miller, RA/J. Wiggins, DRA
    R. Summers, DRP
C. Anderson, DRP
    S. Barr, DRP                                                               j
R. Summers, DRP
    R. Junod, DRP
S. Barr, DRP
                                                                                1
j
    Region I Docket Room (with concurrences)                                   i
R. Junod, DRP
    Nuclear Safety Information Center (NSIC) -
1
    PUBLIC
Region I Docket Room (with concurrences)
                                                                                .'
i
    NRC Resident inspector
Nuclear Safety Information Center (NSIC) -
    Distribution w/enci(VIA E4 RAIL):
.'
    M.Tschiltz, OEDO
PUBLIC
    E. Adensam, NRR
NRC Resident inspector
    A. Wang, NRR
Distribution w/enci(VIA E4 RAIL):
    R. Correia, NRR
M.Tschiltz, OEDO
    DOCDES.K
E. Adensam, NRR
    inspection Program Branch, NRR (IPAS)                                       1
A. Wang, NRR
    DOCUMENT NAME: G:\ BRANCH 5\2-PG\lNSPECT\lR99-01.WPD
R. Correia, NRR
    *See previous concurrences
DOCDES.K
    To receive a copy of this document, indicate in the box: "C" = Copy without
inspection Program Branch, NRR (IPAS)
    attachment / enclosure "E" = Copy with attachment / enclosure "N" = No copy
1
      OFFICE     *Rl/DRP         l   'Rl/DRP       l
DOCUMENT NAME: G:\\ BRANCH 5\\2-PG\\lNSPECT\\lR99-01.WPD
      NAME       RLaura/CA for -       CAnderson/CA
*See previous concurrences
      DATE       04/20/99             04/20/99
To receive a copy of this document, indicate in the box: "C" = Copy without
attachment / enclosure
"E" = Copy with attachment / enclosure
"N" = No copy
OFFICE
*Rl/DRP
l
'Rl/DRP
l
NAME
RLaura/CA for -
CAnderson/CA
DATE
04/20/99
04/20/99
}}
}}

Latest revision as of 02:26, 7 December 2024

Forwards Insp Rept 50-293/99-01 on 990125-0307.Two Violations of NRC Requirements Occurred & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy.Security Program Was Also Inspected
ML20206B303
Person / Time
Site: Pilgrim
Issue date: 04/20/1999
From: Anderson C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Ted Sullivan
BOSTON EDISON CO.
Shared Package
ML20206B306 List:
References
50-293-99-01, 50-293-99-1, NUDOCS 9904290206
Download: ML20206B303 (4)


See also: IR 05000293/1999001

Text

,

g.

o

s.

April 20, 1999

Mr. Theodore A. Sullivan

Vice President - Nuclear and Station Director

BEC Energy

Pilgrim Nuclear Power Station

600 Rocky Hill Road

Plymouth, Massachusetts 02360-5599

SU3 JECT:

NRC INTEGRATED INSPECTION REPORT NO. 50-293/99-01

Dear Mr. Sullivan:

1

This refers to the inspection conducted on January 25,1999 through March 7,1999, at the

Pilgrim Nuclear Power Station in Plymouth, Massachusetts. The enclosed report presents the

results of this inspection.

. During the six weeks covered by this inspection period, the conduct of activities at the Pilgrim

facility was characterized by safe plant operations. This was especially evident during planned

evolutions such as during new reactor fuel inspections and also during a planned down power

. outage at 50% reactor power. In both instances, good planning of the activities were observed,

and your staff performed good mock-up training and oversight to promote positive human

performance.

Based on the results of this inspection, the NRC has determined that two violations of NRC

requirements occurred. These violations are being treated as Non Cited Violations (NCVs),

consistent with Appendix C of the Enforcement Policy. These NCVs involved: (1) human error

leading to a valve misalignment in the stator cooling water system, and (2) a design control

error affecting the control room air filtration system that was reported in LER 50-293/98-24.

These NCVs are further described in the subject inspection report. If you contest the violation

or severity level of these NCVs , you should provide a response within 30 days of the date of

this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission,

ATTN: Document Control Desk, Washington DC 20555-0001, with a copies to the Regional

. Administrator, Region I, and the Director, Office of Enforcement, United States Nuclear

~ Regulatory Commission, Washington, DC 20555-0001.

In the area of radiological controls, we reviewed several aspects of your program. Your limited

site radiological characterization revealed small amounts of radioactive contamination present

in a few onsite soil samples. We found that your staff maintained appropriate records of spills

)

3

in accordance with 10 CFR 50.75 (g) and took adequate corrective actions to evaluate and

J

document the soil samples. Radiological planning was properly focused on maintaining

l

radiation dose for refuel outage (RFO) 12 as low as is reasonably achievable (ALARA). The

security program was also inspected during this period. No safety concerns or violations were

identified. '

j

^^

9904290206 990420

,

PDR

ADOCK 05000293

G

PDR

OFFICIAL RECORD 00PY

IE:01

\\1

F-

.

Theodore A. Sullivan

2

in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its

enclosure (s), and your response will be placed in the NRC Public Document Room .

Sincerely,

Original Signed by:

Clifford J. Anderson, Chief

Projects Branch 5

Division of Reactor Projects

Docket No.:

50-293

,

License No.: DPR-35

Enclosure:

Inspection Report 50-293/99-01

cc w/ encl:

R. Ledgett, Executive Vice President - Operations

J. Alexander, Master Process Owner-Nuclear Assessment

D. Tarantino, Nuclear Information Manager

S. Brennion, Regulatory Affairs Department Manager

J. Fulton, Assistant General Counsel

R. Hallisey, Department of Public Health, Commonwealth of Massachusetts

The Honorable Therese Murray

The Honorable Vincent DiMacedo

T. MacGregor, Mass. Dept. Of Public Comm. & Energy

Chairman, Plymouth Board of Selectmen

Chairman, Duxbury Board of Selectmen

Chairman, Nuclear Matters Committee

Plymouth Civil Defense Director

P. Gromer, Massachusetts Secretary of Energy Resources

J. Miller, Senior issues Manager

A. Nogee, MASSPIRG

Office of the Commissioner, Massachusetts Department of Environmental Quality Engineering

Office of the Attomey General, Commonwealth of Massachusetts

J. Perlov, Secretary of Public Safety for the Commonwealth of Massachusetts

Chairman, Citizens Urging Responsible Energy

Commonwealth of Massachusetts, SLO Designee

4

,

Theodore A. Sullivan

3

Distribution w/ encl:

H. Miller, RA/J. Wiggins, DRA

C. Anderson, DRP

R. Summers, DRP

S. Barr, DRP

R. Junod, DRP

Region i Docket Room (with concurrences)

Nuclear Safety Information Center (NSIC)

PUBLIC

NRC Resident inspector

Distribution w/enci(VIA E-MAIL):

M.Tschiltz, OEDO

E. Adensam, NRR

A. Wang, NRR

R. Correia, NRR

DOCDESK

l

DOCUMENT NAME: G:\\ BRANCH 5\\2-PG\\lNSPECT\\lR99-01.WPD

To receive a copy of this document, indicate in the box: "C" = Copy without

attachment / enclosure

"E" = Copy with attachment / enclosure

"N" = No copy

OFFICE

Rl/DRP

l

Rl/DRP

l

NAME

RLaura

O /G /,,

CAnderson CD

/

'

DATE

04SCf99

04/7d/99

,

OFFICIAL RECORD COPY

y

.

'

Theodore A. Sullivan

3'

Distnbution w/ encl:

H. Miller, RA/J. Wiggins, DRA

C. Anderson, DRP

R. Summers, DRP

S. Barr, DRP

j

R. Junod, DRP

1

Region I Docket Room (with concurrences)

i

Nuclear Safety Information Center (NSIC) -

.'

PUBLIC

NRC Resident inspector

Distribution w/enci(VIA E4 RAIL):

M.Tschiltz, OEDO

E. Adensam, NRR

A. Wang, NRR

R. Correia, NRR

DOCDES.K

inspection Program Branch, NRR (IPAS)

1

DOCUMENT NAME: G:\\ BRANCH 5\\2-PG\\lNSPECT\\lR99-01.WPD

  • See previous concurrences

To receive a copy of this document, indicate in the box: "C" = Copy without

attachment / enclosure

"E" = Copy with attachment / enclosure

"N" = No copy

OFFICE

  • Rl/DRP

l

'Rl/DRP

l

NAME

RLaura/CA for -

CAnderson/CA

DATE

04/20/99

04/20/99