                                                          NOV - T 1988
'
              In Reply Refer To: _
NOV - T 1988
              Docket: 50-267/88-26
'
            ~ Public Service Company of Colorado
'
              ATTN:         Robert O. Williams, Jr.
.
                            Vice President, Nuclear Operations
.
              2420 W. 26th Avenue, Suite 15c
,
              Denver, Colorado 80211
In Reply Refer To: _
              Gentlemen:
Docket: 50-267/88-26
              This refers to the inspection conducted by Mr. P. C. Wagner of this office
~ Public Service Company of Colorado
              during the periott October 17-21, 1988, of activities authorized by NRC
ATTN:
              Operating License' DPR-34 for the Fort St. Vrain Nuclear Generating Station, and
Robert O. Williams, Jr.
              to the discussion of our findings with members of your stoff at the conclusion
Vice President, Nuclear Operations
              of the inspection.
2420 W. 26th Avenue, Suite 15c
            Areas examined dering the inspection included followup on an emergency diesel
Denver, Colorado 80211
              generator event and instrumentation calibration. Within these areas, the
Gentlemen:
              inspection consisted of selective examination of procedures and representative
This refers to the inspection conducted by Mr. P. C. Wagner of this office
              records, interviews with personnel, and observations by the NRC inspector. The
during the periott October 17-21, 1988, of activities authorized by NRC
              inspection findings are documented in the enclosed inspection report.
Operating License' DPR-34 for the Fort St. Vrain Nuclear Generating Station, and
              An unresolved item involving inconsistencies with the sequencing of loads onto
to the discussion of our findings with members of your stoff at the conclusion
              Bus 2 is identified in paragraph 2.a of the report. In addition, an open item
of the inspection.
              involving revisions to Standard and Emergency Operating Procedures (SOPS and
Areas examined dering the inspection included followup on an emergency diesel
              E0Ps), was identified in paragraph 2.b of the report. We request that you
generator event and instrumentation calibration.
              provide a clarification of the loading of Bus 2 and a comitment date for the
Within these areas, the
              revisions to the SOPS and E0Ps to use within 30 days of your receipt of this
inspection consisted of selective examination of procedures and representative
              letter.
records, interviews with personnel, and observations by the NRC inspector.
            Within the scope of the inspection, no violations or deviations were
The
              identified.
inspection findings are documented in the enclosed inspection report.
              Sheuld you have any questions concerning this inspectinn, we will be pleased to
An unresolved item involving inconsistencies with the sequencing of loads onto
              discuss them with you.
Bus 2 is identified in paragraph 2.a of the report.
                                                                      Sincerely.
In addition, an open item
                                                                        Oripne           .y
involving revisions to Standard and Emergency Operating Procedures (SOPS and
                                                                            A. II. Iler h
E0Ps), was identified in paragraph 2.b of the report. We request that you
                                                                      L. J. Callan, Director
provide a clarification of the loading of Bus 2 and a comitment date for the
                                                                      Division of Reactor Projects
revisions to the SOPS and E0Ps to use within 30 days of your receipt of this
              En           res:         (se         page)                     (
letter.
                                                            . RS         i D:
Within the scope of the inspection, no violations or deviations were
                'a'. er/cz
identified.
                                            . S
Sheuld you have any questions concerning this inspectinn, we will be pleased to
                                            5"e ka         LMilhoan           f7
discuss them with you.
                                                                          ILJ.anlan
Sincerely.
                  g/88                   l(/4/88         U/y/88         li /1 /88
Oripne
                                                                                                      i
.y
                      8811160035 881107                                                           //
A. II. Iler h
                      PDR
L. J. Callan, Director
                      O
Division of Reactor Projects
                                      ADOCK 05000267
En
                                                    PDC
res:
                                                                                                    fl
(se
page)
(
S
. RS
i D: f7
.
'a'. er/cz
5"e ka
LMilhoan
ILJ.anlan
g/88
l(/4/88
U/y/88
li /1 /88
i
8811160035 881107
//
PDR
ADOCK 05000267
fl
O
PDC


  ,
,
        *
*
      ,   ,
,
    .         .
,
                      ,
.
          Public Service Company of Colorado         -2-
.
          Enclosure:
,
          Appendix - NRC Inspection Report
Public Service Company of Colorado
            50-267/88-26 w/ attachment
-2-
          cc w/ enclosure:
Enclosure:
          Fort St. Vrain Nuclear Station
Appendix - NRC Inspection Report
          Manager, Nuclear Production Division
50-267/88-26 w/ attachment
          16805 WCR 19)
cc w/ enclosure:
          Platteville, Colorado 80651
Fort St. Vrain Nuclear Station
          Fort St. Vrain Nuclear Station
Manager, Nuclear Production Division
          P. Tomlinson, Menager, Quality
16805 WCR 19)
            Assurance Division
Platteville, Colorado 80651
          (sameaddress)
Fort St. Vrain Nuclear Station
          Colorado Radiation Control Program Director
P. Tomlinson, Menager, Quality
          Colorado Public Utilities Comissicn                                         I
Assurance Division
          bec to DMB (IE01)
(sameaddress)
          bec distrib. by RIV:
Colorado Radiation Control Program Director
          *RRI                               *R. D. Martin, RA
Colorado Public Utilities Comissicn
          *Section Chief (DRP/B)             * Project Engineer, DRP/B
I
f         *RPB-DRSS                           t.isa Shea, RM/ALF
bec to DMB (IE01)
          * MIS System                       *RSTS Operator
bec distrib. by RIV:
          *RIV File                         *K. Heitner, NRR Project Mgr. ,MS 13D-18
*RRI
          *DRS                               *DRP
*R. D. Martin, RA
          *P. Wagner                         *T. Stetka
*Section Chief (DRP/B)
          *w/766
* Project Engineer, DRP/B
f
*RPB-DRSS
t.isa Shea, RM/ALF
* MIS System
*RSTS Operator
*RIV File
*K. Heitner, NRR Project Mgr. ,MS 13D-18
*DRS
*DRP
*P. Wagner
*T. Stetka
*w/766
l
l
l
l
Line 111: Line 145:
1
1
l
l
                                                            _____     _     _-
_____
_
_-
}}
}}

Latest revision as of 02:21, 7 December 2024

Forwards Insp Rept 50-267/88-26 on 881017-21.No Violations or Deviations Noted.Unresolved Item Involving Inconsistencies W/Sequencing of Loads Onto Bus 2 & Open Item Involving Revs to Std & Emergency Operating Procedure Noted
ML20206B853
Person / Time
Site: Fort Saint Vrain 
Issue date: 11/07/1988
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Robert Williams
PUBLIC SERVICE CO. OF COLORADO
Shared Package
ML20206B858 List:
References
NUDOCS 8811160035
Download: ML20206B853 (2)


See also: IR 05000267/1988026

Text

,

_

__

_ _ _ _

_ _ _ _

.

r

'

NOV - T 1988

'

'

.

.

,

In Reply Refer To: _

Docket: 50-267/88-26

~ Public Service Company of Colorado

ATTN:

Robert O. Williams, Jr.

Vice President, Nuclear Operations

2420 W. 26th Avenue, Suite 15c

Denver, Colorado 80211

Gentlemen:

This refers to the inspection conducted by Mr. P. C. Wagner of this office

during the periott October 17-21, 1988, of activities authorized by NRC

Operating License' DPR-34 for the Fort St. Vrain Nuclear Generating Station, and

to the discussion of our findings with members of your stoff at the conclusion

of the inspection.

Areas examined dering the inspection included followup on an emergency diesel

generator event and instrumentation calibration.

Within these areas, the

inspection consisted of selective examination of procedures and representative

records, interviews with personnel, and observations by the NRC inspector.

The

inspection findings are documented in the enclosed inspection report.

An unresolved item involving inconsistencies with the sequencing of loads onto

Bus 2 is identified in paragraph 2.a of the report.

In addition, an open item

involving revisions to Standard and Emergency Operating Procedures (SOPS and

E0Ps), was identified in paragraph 2.b of the report. We request that you

provide a clarification of the loading of Bus 2 and a comitment date for the

revisions to the SOPS and E0Ps to use within 30 days of your receipt of this

letter.

Within the scope of the inspection, no violations or deviations were

identified.

Sheuld you have any questions concerning this inspectinn, we will be pleased to

discuss them with you.

Sincerely.

Oripne

.y

A. II. Iler h

L. J. Callan, Director

Division of Reactor Projects

En

res:

(se

page)

(

S

. RS

i D: f7

.

'a'. er/cz

5"e ka

LMilhoan

ILJ.anlan

g/88

l(/4/88

U/y/88

li /1 /88

i

8811160035 881107

//

PDR

ADOCK 05000267

fl

O

PDC

,

,

,

.

.

,

Public Service Company of Colorado

-2-

Enclosure:

Appendix - NRC Inspection Report

50-267/88-26 w/ attachment

cc w/ enclosure:

Fort St. Vrain Nuclear Station

Manager, Nuclear Production Division

16805 WCR 19)

Platteville, Colorado 80651

Fort St. Vrain Nuclear Station

P. Tomlinson, Menager, Quality

Assurance Division

(sameaddress)

Colorado Radiation Control Program Director

Colorado Public Utilities Comissicn

I

bec to DMB (IE01)

bec distrib. by RIV:

  • RRI
  • R. D. Martin, RA
  • Section Chief (DRP/B)
  • Project Engineer, DRP/B

f

  • RPB-DRSS

t.isa Shea, RM/ALF

  • MIS System
  • RSTS Operator
  • RIV File
  • DRS
  • DRP
  • P. Wagner
  • T. Stetka
  • w/766

l

l

l

l

1

l

_____

_

_-