ML20206B853

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-267/88-26 on 881017-21.No Violations or Deviations Noted.Unresolved Item Involving Inconsistencies W/Sequencing of Loads Onto Bus 2 & Open Item Involving Revs to Std & Emergency Operating Procedure Noted
ML20206B853
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 11/07/1988
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Robert Williams
PUBLIC SERVICE CO. OF COLORADO
Shared Package
ML20206B858 List:
References
NUDOCS 8811160035
Download: ML20206B853 (2)


See also: IR 05000267/1988026

Text

,

_

__

_ _ _ _

_ _ _ _

.

r

'

NOV - T 1988

'

'

.

.

,

In Reply Refer To: _

Docket: 50-267/88-26

~ Public Service Company of Colorado

ATTN:

Robert O. Williams, Jr.

Vice President, Nuclear Operations

2420 W. 26th Avenue, Suite 15c

Denver, Colorado 80211

Gentlemen:

This refers to the inspection conducted by Mr. P. C. Wagner of this office

during the periott October 17-21, 1988, of activities authorized by NRC

Operating License' DPR-34 for the Fort St. Vrain Nuclear Generating Station, and

to the discussion of our findings with members of your stoff at the conclusion

of the inspection.

Areas examined dering the inspection included followup on an emergency diesel

generator event and instrumentation calibration.

Within these areas, the

inspection consisted of selective examination of procedures and representative

records, interviews with personnel, and observations by the NRC inspector.

The

inspection findings are documented in the enclosed inspection report.

An unresolved item involving inconsistencies with the sequencing of loads onto

Bus 2 is identified in paragraph 2.a of the report.

In addition, an open item

involving revisions to Standard and Emergency Operating Procedures (SOPS and

E0Ps), was identified in paragraph 2.b of the report. We request that you

provide a clarification of the loading of Bus 2 and a comitment date for the

revisions to the SOPS and E0Ps to use within 30 days of your receipt of this

letter.

Within the scope of the inspection, no violations or deviations were

identified.

Sheuld you have any questions concerning this inspectinn, we will be pleased to

discuss them with you.

Sincerely.

Oripne

.y

A. II. Iler h

L. J. Callan, Director

Division of Reactor Projects

En

res:

(se

page)

(

S

. RS

i D: f7

.

'a'. er/cz

5"e ka

LMilhoan

ILJ.anlan

g/88

l(/4/88

U/y/88

li /1 /88

i

8811160035 881107

//

PDR

ADOCK 05000267

fl

O

PDC

,

,

,

.

.

,

Public Service Company of Colorado

-2-

Enclosure:

Appendix - NRC Inspection Report

50-267/88-26 w/ attachment

cc w/ enclosure:

Fort St. Vrain Nuclear Station

Manager, Nuclear Production Division

16805 WCR 19)

Platteville, Colorado 80651

Fort St. Vrain Nuclear Station

P. Tomlinson, Menager, Quality

Assurance Division

(sameaddress)

Colorado Radiation Control Program Director

Colorado Public Utilities Comissicn

I

bec to DMB (IE01)

bec distrib. by RIV:

  • RRI
  • R. D. Martin, RA
  • Section Chief (DRP/B)
  • Project Engineer, DRP/B

f

  • RPB-DRSS

t.isa Shea, RM/ALF

  • MIS System
  • RSTS Operator
  • RIV File
  • DRS
  • DRP
  • P. Wagner
  • T. Stetka
  • w/766