ML20206B853
| ML20206B853 | |
| Person / Time | |
|---|---|
| Site: | Fort Saint Vrain |
| Issue date: | 11/07/1988 |
| From: | Callan L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Robert Williams PUBLIC SERVICE CO. OF COLORADO |
| Shared Package | |
| ML20206B858 | List: |
| References | |
| NUDOCS 8811160035 | |
| Download: ML20206B853 (2) | |
See also: IR 05000267/1988026
Text
,
_
__
_ _ _ _
_ _ _ _
.
r
'
NOV - T 1988
'
'
.
.
,
In Reply Refer To: _
Docket: 50-267/88-26
~ Public Service Company of Colorado
ATTN:
Robert O. Williams, Jr.
Vice President, Nuclear Operations
2420 W. 26th Avenue, Suite 15c
Denver, Colorado 80211
Gentlemen:
This refers to the inspection conducted by Mr. P. C. Wagner of this office
during the periott October 17-21, 1988, of activities authorized by NRC
Operating License' DPR-34 for the Fort St. Vrain Nuclear Generating Station, and
to the discussion of our findings with members of your stoff at the conclusion
of the inspection.
Areas examined dering the inspection included followup on an emergency diesel
generator event and instrumentation calibration.
Within these areas, the
inspection consisted of selective examination of procedures and representative
records, interviews with personnel, and observations by the NRC inspector.
The
inspection findings are documented in the enclosed inspection report.
An unresolved item involving inconsistencies with the sequencing of loads onto
Bus 2 is identified in paragraph 2.a of the report.
In addition, an open item
involving revisions to Standard and Emergency Operating Procedures (SOPS and
E0Ps), was identified in paragraph 2.b of the report. We request that you
provide a clarification of the loading of Bus 2 and a comitment date for the
revisions to the SOPS and E0Ps to use within 30 days of your receipt of this
letter.
Within the scope of the inspection, no violations or deviations were
identified.
Sheuld you have any questions concerning this inspectinn, we will be pleased to
discuss them with you.
Sincerely.
Oripne
.y
A. II. Iler h
L. J. Callan, Director
Division of Reactor Projects
En
res:
(se
page)
(
S
. RS
i D: f7
.
'a'. er/cz
5"e ka
LMilhoan
ILJ.anlan
g/88
l(/4/88
U/y/88
li /1 /88
i
8811160035 881107
//
ADOCK 05000267
fl
O
,
,
,
.
.
,
Public Service Company of Colorado
-2-
Enclosure:
Appendix - NRC Inspection Report
50-267/88-26 w/ attachment
cc w/ enclosure:
Fort St. Vrain Nuclear Station
Manager, Nuclear Production Division
16805 WCR 19)
Platteville, Colorado 80651
Fort St. Vrain Nuclear Station
P. Tomlinson, Menager, Quality
Assurance Division
(sameaddress)
Colorado Radiation Control Program Director
Colorado Public Utilities Comissicn
I
bec to DMB (IE01)
bec distrib. by RIV:
- RRI
- R. D. Martin, RA
- Section Chief (DRP/B)
- Project Engineer, DRP/B
f
- RPB-DRSS
t.isa Shea, RM/ALF
- MIS System
- RSTS Operator
- RIV File
- DRS
- DRP
- P. Wagner
- T. Stetka
- w/766
l
l
l
l
1
l
_____
_
_-