ML20206C216: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
(One intermediate revision by the same user not shown)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:'~ * *
{{#Wiki_filter:'~
                                                                            ,o ,  _
,o NOV v 8 1988 Docket No. 50-366 License No. NPF-5
NOV v 8 1988 Docket No. 50-366 License No. NPF-5
[
[
          /GeorgiaPowerCompany ATTN: Mr. W. G. Hairston, III Senior Vice President -
/GeorgiaPowerCompany ATTN: Mr. W. G. Hairston, III Senior Vice President -
Nuclear Operations P. O. Box 1295 Birmingham, AL 35201                                                                 \
Nuclear Operations P. O. Box 1295 Birmingham, AL 35201
\\
Gentlemen:
Gentlemen:


==SUBJECT:==
==SUBJECT:==
CONFIRMATION OF ENFORCEMENT DISCRETION REGARDING TECHNICAL SPECIFICATION 3.5.2 - HATCH - UNIT 2 This letter acknowledges receipt of your letter dated November 1,1988, regarding your request for relief of Hatch Unit 2 Technical Specification 3.5.2 on a temporary basis. This requirement provides a limiting condition for operation (LC0) for the automatic depressurization system (ADS), and the waiver allowed the continued operation of Hatch Unit 2 until a design change could be implemented to correct a design deficiency in the ADS power supply circuitry.
CONFIRMATION OF ENFORCEMENT DISCRETION REGARDING TECHNICAL SPECIFICATION 3.5.2 - HATCH - UNIT 2 This letter acknowledges receipt of your {{letter dated|date=November 1, 1988|text=letter dated November 1,1988}}, regarding your request for relief of Hatch Unit 2 Technical Specification 3.5.2 on a temporary basis.
This waiver was requested and subsequently granted via telecon on October 26, 1988. During a second telephone conference on October 27, 1988, the time frame       !
This requirement provides a limiting condition for operation (LC0) for the automatic depressurization system (ADS), and the waiver allowed the continued operation of Hatch Unit 2 until a design change could be implemented to correct a design deficiency in the ADS power supply circuitry.
,              and extent of the enforcement discretion were discussed.
This waiver was requested and subsequently granted via telecon on October 26, 1988.
The NRC has reviewed your November 1, 1988, letter documenting this issue and confirms that enforcement discretion was granted to temporarily permit i             continued operation of Unit 2. It is our understanding that Unit 2 will be shut down and the proposed modifications will be implemented prior to January 1, 1989. We also understand that the proposed modifications will be l             implemented on Unit 1 prior to restarting the unit at the end of the current         i refueling outage, which is presently scheduled for Dacember 5,1988.
During a second telephone conference on October 27, 1988, the time frame and extent of the enforcement discretion were discussed.
The NRC has reviewed your {{letter dated|date=November 1, 1988|text=November 1, 1988, letter}} documenting this issue and confirms that enforcement discretion was granted to temporarily permit i
continued operation of Unit 2.
It is our understanding that Unit 2 will be shut down and the proposed modifications will be implemented prior to January 1, 1989.
We also understand that the proposed modifications will be l
implemented on Unit 1 prior to restarting the unit at the end of the current i
refueling outage, which is presently scheduled for Dacember 5,1988.
Should you have any further questions regarding this letter, please contact this office.
Should you have any further questions regarding this letter, please contact this office.
Sincerely,                                 ,
Sincerely, gp/Ap S4 Malcolm L. Ernst Acting Regional Administrator cc:
gp/Ap           S4 l
(See page 2)
Malcolm L. Ernst Acting Regional Administrator
)
,              cc:   (See page 2)
8911160165 08110s k
  )
{DR ADOCK 05000366 1
:            8911160165 08110s                                                                 k 1
s PDC ZEo/
{DR   ADOCK 05000366                                                               s !
PDC ZEo/


        .m.,,
.m.,,
a Georgia Power Company                                         2 cc:/R.P. Mcdonald,ExecutiveVicePresident, d.NuclearOperations T. Beckham, Vice President, Plant Hatch A . C. Nix, Gen'ral Manager, Plant Hatch v6. M. Fraser, Site Quality Assurance Manager
a Georgia Power Company 2
                /L. T. Gucwa, Manager, Nuclear Safety and Licensing, Plant Hatch
cc:/R.P. Mcdonald,ExecutiveVicePresident, d.NuclearOperations T. Beckham, Vice President, Plant Hatch A. C. Nix, Gen'ral Manager, Plant Hatch v6. M. Fraser, Site Quality Assurance Manager
                <J. P. Kane, Manager, Licensing and Engineering                                                                 ;
/L. T. Gucwa, Manager, Nuclear Safety and Licensing, Plant Hatch
vs. B. Tipps, Manager of Nuclear Safety and Compliance State of Georgia bec: L. P. Crocker, NRR                                                                   I M. V. Sinkule. Rll vNRC Resident inspector DRS Technical Assistant                                                             l Document Control Desk l
<J. P. Kane, Manager, Licensing and Engineering vs. B. Tipps, Manager of Nuclear Safety and Compliance State of Georgia bec: L. P. Crocker, NRR I
l Ril          Ril      R!l                                 I   1 RI       Rll ~   R!!
M. V. Sinkule. Rll vNRC Resident inspector DRS Technical Assistant l
AT           %h         6                 [ eyes'                           ,
Document Control Desk l
GJen us J hr LTrocine MSinkule VBrownlee                                       AGi  n 11/7 /88 11/ /88 11/7/88                                   1/7/88 11// /88 11y/88 11/f/88
l R!l I
  %                            -          - _ - - - - -}}
1 RI Rll ~
R!!
Ril Ril AT
%h 6
[ eyes' AGi n
GJen us J hr LTrocine MSinkule VBrownlee 11/7 /88 11/
/88 11/7/88 1/7/88 11// /88 11y/88 11/f/88
- _ - - - - -}}

Latest revision as of 02:17, 7 December 2024

Ack Receipt of 881101 Request for Relief of Tech Spec 3.5.2 on Temporary Basis to Provide Limiting Condition for Operation for Automatic Depressurization Sys & Waive Allowed Continued Operation Until Design Change Implemented
ML20206C216
Person / Time
Site: Hatch 
Issue date: 11/08/1988
From: Ernst M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Hairston W
GEORGIA POWER CO.
References
NUDOCS 8811160165
Download: ML20206C216 (2)


Text

'~

,o NOV v 8 1988 Docket No. 50-366 License No. NPF-5

[

/GeorgiaPowerCompany ATTN: Mr. W. G. Hairston, III Senior Vice President -

Nuclear Operations P. O. Box 1295 Birmingham, AL 35201

\\

Gentlemen:

SUBJECT:

CONFIRMATION OF ENFORCEMENT DISCRETION REGARDING TECHNICAL SPECIFICATION 3.5.2 - HATCH - UNIT 2 This letter acknowledges receipt of your letter dated November 1,1988, regarding your request for relief of Hatch Unit 2 Technical Specification 3.5.2 on a temporary basis.

This requirement provides a limiting condition for operation (LC0) for the automatic depressurization system (ADS), and the waiver allowed the continued operation of Hatch Unit 2 until a design change could be implemented to correct a design deficiency in the ADS power supply circuitry.

This waiver was requested and subsequently granted via telecon on October 26, 1988.

During a second telephone conference on October 27, 1988, the time frame and extent of the enforcement discretion were discussed.

The NRC has reviewed your November 1, 1988, letter documenting this issue and confirms that enforcement discretion was granted to temporarily permit i

continued operation of Unit 2.

It is our understanding that Unit 2 will be shut down and the proposed modifications will be implemented prior to January 1, 1989.

We also understand that the proposed modifications will be l

implemented on Unit 1 prior to restarting the unit at the end of the current i

refueling outage, which is presently scheduled for Dacember 5,1988.

Should you have any further questions regarding this letter, please contact this office.

Sincerely, gp/Ap S4 Malcolm L. Ernst Acting Regional Administrator cc:

(See page 2)

)

8911160165 08110s k

{DR ADOCK 05000366 1

s PDC ZEo/

.m.,,

a Georgia Power Company 2

cc:/R.P. Mcdonald,ExecutiveVicePresident, d.NuclearOperations T. Beckham, Vice President, Plant Hatch A. C. Nix, Gen'ral Manager, Plant Hatch v6. M. Fraser, Site Quality Assurance Manager

/L. T. Gucwa, Manager, Nuclear Safety and Licensing, Plant Hatch

<J. P. Kane, Manager, Licensing and Engineering vs. B. Tipps, Manager of Nuclear Safety and Compliance State of Georgia bec: L. P. Crocker, NRR I

M. V. Sinkule. Rll vNRC Resident inspector DRS Technical Assistant l

Document Control Desk l

l R!l I

1 RI Rll ~

R!!

Ril Ril AT

%h 6

[ eyes' AGi n

GJen us J hr LTrocine MSinkule VBrownlee 11/7 /88 11/

/88 11/7/88 1/7/88 11// /88 11y/88 11/f/88

- _ - - - - -