NRC Monthly Operations Surmary Peach Botton Atomic Power Station j                                               September, 1988 l
NRC Monthly Operations Surmary Peach Botton Atomic Power Station j
l                                                                                                                                   '
September, 1988 l
l        UNIT 2 l                                                                                                                                     i
l l
!        The unit rem &ined shut down throughout the report period. Activities in progress during the report period included 13 kV and 4 kV electrical bus maintenance and E-1 and E-3 diesel generator annual maintenance.
UNIT 2 l
i The unit rem &ined shut down throughout the report period. Activities in progress during the report period included 13 kV and 4 kV electrical bus maintenance and E-1 and E-3 diesel generator annual maintenance.
1 UNIT 3 The unit remained shut down throughout the report period. Activities in progress during the report period included iSW pipe replacement, feedwater heater replacement, preventive maintenance for hydraulic control units and 13 and 4 kV electrical bus maintenance, i
1 UNIT 3 The unit remained shut down throughout the report period. Activities in progress during the report period included iSW pipe replacement, feedwater heater replacement, preventive maintenance for hydraulic control units and 13 and 4 kV electrical bus maintenance, i
l                                                                                                                                    l t
l l
l l
l                                                                                                                                   t
t l
!                                                                                                                                    f I
l l
I l                                                                                                                                   !
t f
l b
I I
SS10190268 880930 PDR   ADOCK 0S000277                                                                                                 ./
l l
R                   PDC                                                                                               B
b SS10190268 880930 PDR ADOCK 0S000277
./
R PDC B


Docket No. 50-277 Attachment to Monthly Operating Report for September, 1988 UNIT 2 RffultlNG INFORMAL g
Docket No. 50-277 Attachment to Monthly Operating Report for September, 1988 UNIT 2 RffultlNG INFORMAL g 1.
: 1. Name of facility:
Name of facility:
Peach Bottom Unit ?
Peach Bottom Unit ?
]           ?. Scheduled date for next refueling *,hutdown:
]
?.
Scheduled date for next refueling *,hutdown:
(1) Reload 7 completed
(1) Reload 7 completed
(?) keload 8 scheduled f or March 10, 1990
(?) keload 8 scheduled f or March 10, 1990 3.
: 3. Scheduled date for restart following refueling:
Scheduled date for restart following refueling:
(1) Restart following NRC Shutdown Order scheduled for December 20, 1988 (2) Restart following refueling scheduled for June 8, 1990.
(1) Restart following NRC Shutdown Order scheduled for December 20, 1988 (2) Restart following refueling scheduled for June 8, 1990.
: 4. Will refueling or resumpti;n of operation thereafter require a technical specification change or other license amendment?
4.
Will refueling or resumpti;n of operation thereafter require a technical specification change or other license amendment?
Yes if answer is yes, what, in general, will these be?
Yes if answer is yes, what, in general, will these be?
(1) Administrative changes to reload amendment (2)Loadsequencemodificatlonamendment (3) Diesel Generator Cardox modification amendment
(1) Administrative changes to reload amendment (2)Loadsequencemodificatlonamendment (3) Diesel Generator Cardox modification amendment b.
: b. Scheduled date(s) for submitting proposed licensing action and supporting informatlon:
Scheduled date(s) for submitting proposed licensing action and supporting informatlon:
: 1) Submitted April 25, 1988
: 1) Submitted April 25, 1988
: 2) Submitted September 7, 1986
: 2) Submitted September 7, 1986
: 3) SubmlLted Septemt er 7,1988 f, . Important Itcensing considerations associated with refueling, e.g., new or dif f erent fuel design or supplier. nreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:
: 3) SubmlLted Septemt er 7,1988 f,.
Important Itcensing considerations associated with refueling, e.g., new or dif f erent fuel design or supplier. nreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:
Refue1ing completed.
Refue1ing completed.
            /. lhe number of fuel assemblies (a) h the core and (b) in the spent fuel storage pool:
/.
(a) Core - 764 fuel Assemblies (b) f uel Pool - 1734 f uel Assemblies 58 f uel Rods
lhe number of fuel assemblies (a) h the core and (b) in the spent fuel storage pool:
: 8. 1he present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:
(a) Core - 764 fuel Assemblies (b) f uel Pool - 1734 f uel Assemblies 58 f uel Rods 8.
1he present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:
the spent fuel pool storage capacity has been relicensed for 3819 fuel assemblles.
the spent fuel pool storage capacity has been relicensed for 3819 fuel assemblles.


                                ,                                                                Docket No. 50-277-Attachment t2
Docket No. 50-277-Attachment t2 Monthly Operating i
* Monthly Operating                             i Report for September, 1988                   >
Report for September, 1988 Page 2
Page 2
}
                                                                                                                                              }
i UNil ? REf0EllNG INf0RMA110N (Continued) i 9.
i UNil ? REf0EllNG INf0RMA110N (Continued)                                         !
lhe projected date of the last refueling that can be discharged to the j
spent fuel pool assuming the pr.sent capacity:
I September, 1998 (September.1995, with reserve full core discharge) k r
i
i
: 9. lhe projected date of the last refueling that can be discharged to the                                            j spent fuel pool assuming the pr.sent capacity:                                                                    ;
)
September, 1998 (September.1995, with reserve full core discharge)                                    I; k
r i
                                                                                                                                              )
i I
i I
f
f
Line 68: Line 74:
i i
i i
i t
i t
t i                                                                                                                                             i i
t i
i i
i
i


    .  .                                                                                    f Dockst No. 60-278               I Attachment to Monthly Operating               '
f Dockst No. 60-278 I
Report for September, 1988     ;
Attachment to Monthly Operating Report for September, 1988 4
4 4                          UNil 3 REFUELING INFORMAi!0N                                     i i
UNil 3 REFUELING INFORMAi!0N i
: 1. Name of facility:                                                           !
4 i
1.
Name of facility:
Peach Botton Unit 3 i
Peach Botton Unit 3 i
          ?. Scheduled date for next refueling shutdown:                                 j (1) keload 7 in progress (Major Pipe Replatcment Outage)             !
?.
(2) Reload 8 scheduled for October 20. 1990                         i
Scheduled date for next refueling shutdown:
: 3.   $cheduled date for restart following refueling I
j (1) keload 7 in progress (Major Pipe Replatcment Outage)
(2) Reload 8 scheduled for October 20. 1990 i
3.
$cheduled date for restart following refueling I
(1)RestartfollowingrefuelingscheduledforMarch 31, 1989
(1)RestartfollowingrefuelingscheduledforMarch 31, 1989
(?) Restart following refueling scheduled for January 18, 1991
(?) Restart following refueling scheduled for January 18, 1991 4.
: 4. Will refueling or resumption of operation thereaf ter require a technical   i specifIcatton change or other license amendment?
Will refueling or resumption of operation thereaf ter require a technical i
specifIcatton change or other license amendment?
Yes.
Yes.
If answer is yes, what. In general, will these be?
If answer is yes, what. In general, will these be?
(1) Alternate Rod Insertion modification and modified Recirculation Trip logic amendment
(1) Alternate Rod Insertion modification and modified Recirculation Trip logic amendment
(?) Primary system piping installation modification amendment (3) Reload 7 Amendment
(?) Primary system piping installation modification amendment (3) Reload 7 Amendment b.
: b. 5theduled date(s) for suteltting proposed licensing action and supporting   I information:
5theduled date(s) for suteltting proposed licensing action and supporting I
Alternate Rod insertion /RPI Amendment submitted June !?.198/   I Primary System Piping Amendment submitted March Pl. 1988 Reload 7 t_icense Amendment submitted July 7. 1988 l
information:
P
Alternate Rod insertion /RPI Amendment submitted June !?.198/
: 6. Important licensing considerations associated with refueling, e.g., new or >
I Primary System Piping Amendment submitted March Pl. 1988 Reload 7 t_icense Amendment submitted July 7. 1988 l
dif ferent fuel design or supplier, unreviewed design or performance analysis method:4 significant changes in fuel design, t.ew operating procedures:
P 6.
Important licensing considerations associated with refueling, e.g., new or dif ferent fuel design or supplier, unreviewed design or performance analysis method:4 significant changes in fuel design, t.ew operating procedures:
None expcCted.
None expcCted.
          /. ihenumberc'fuelassemblies(a)inthecoreand(b)inthespentfuel storage pool:
/.
ihenumberc'fuelassemblies(a)inthecoreand(b)inthespentfuel storage pool:
a Core - 0 fuel Assemblies (/64 assemblies offloaded during outage) b f uel Pool - 2260 fuel Assemblies. 6 f uel Rods
a Core - 0 fuel Assemblies (/64 assemblies offloaded during outage) b f uel Pool - 2260 fuel Assemblies. 6 f uel Rods


. ,                                                                        Docket No. 50-278                                                         !
Docket No. 50-278 Attachment to Monthly Operating Report for September, 1988 i
* Attachment to                                                             !
Page 2 UNIT 3 RIFUf LING INFORMATION (Continued) 8.
Monthly Operating                                                         '
The present licensed spent fuel pool storage capacity and the site of any increase in 1; censed storage capacity that has been requested or is planned, in number of fuel assemblies:
Report for September, 1988                                               i Page 2 UNIT 3 RIFUf LING INFORMATION (Continued)
i i
: 8. The present licensed spent fuel pool storage capacity and the site of any                                                                     ,
increase in 1; censed storage capacity that has been requested or is planned, in number of fuel assemblies:                                                                                                       i i
lhe spent fuel pool storage capacity has been relicensed for 3819 fuel assemblies. This modification began on february P0,1987. The completion date for this modification has been rescheduled for february,1989 to accommodate the Unit 3 pipe replacement outage.
lhe spent fuel pool storage capacity has been relicensed for 3819 fuel assemblies. This modification began on february P0,1987. The completion date for this modification has been rescheduled for february,1989 to accommodate the Unit 3 pipe replacement outage.
: 9. The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present capacity:
9.
March, 1993 (reserve full core discharge cannot be accommodated                                                                         t after the restart following the completion of the October, 1987                                                                         t refueling outage untti the completion of the new fuel racks)                                                                           ;
The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present capacity:
installation of the new fuel racks will extend the projected date                                                                       ;
March, 1993 (reserve full core discharge cannot be accommodated t
of the last refueling to September, P000 (March, 1996, with reserve                                                                     '
after the restart following the completion of the October, 1987 t
full core discharge)                                                                                                                   '
refueling outage untti the completion of the new fuel racks) installation of the new fuel racks will extend the projected date of the last refueling to September, P000 (March, 1996, with reserve full core discharge) f i
f i
l l
l l
t i
t i
Line 115: Line 127:
h i
h i
I
I
                              ,_p - - - - -. ,, - , - ,- , - - ~ ww - - - - - - - - - - - - , - . - - - . _ . . . - _ - - - - , - _ . - - . - - - -
,_p
- - - - -.,, -, -,-, - - ~ ww


AVERAGF DAILY WIT PONER LEVEL                                                                                             .
AVERAGF DAILY WIT PONER LEVEL t
                              .                                                                                                                                                                      t DOCKET NO. 50     277                                                                               u
DOCKET NO. 50 277 u
                                                                                                            .............................                                                            l I
l I
WIT PEACH BOTTCH WIT t OtTE         OCT 14. 1968                                                                     .
WIT PEACH BOTTCH WIT t OtTE OCT 14. 1968 COMPAt# PHILADELPHI A ELECTRIC C0t9ANf L. L. MIDDLETON
COMPAt# PHILADELPHI A ELECTRIC C0t9ANf                                                         !
[
L. L. MIDDLETON                                                                         [
TECte41 CAL A!.S!$7 ANT LICitc!M2 SECTION PAJCLE AR $UPPORT DEPARTNENT r
TECte41 CAL A!.S!$7 ANT LICitc!M2 SECTION PAJCLE AR $UPPORT DEPARTNENT                                                             r
?
                                                                                                                                                                                                    ?
TELEPHCNE I215) 641-6174 MONTN StPTIteRR 1944 I
TELEPHCNE I215) 641-6174 MONTN StPTIteRR 1944 I
DAY         AVERACE DAILY PCMER LEVil                                                         DAY     AVERAGE DAILY POMER LEYtL (P94E NET )                                                                             1 P94E-NET I                                                           ;
DAY AVERACE DAILY PCMER LEVil DAY AVERAGE DAILY POMER LEYtL (P94E NET )
1                              0                                                           17                       0 2                             0                                                           18                       0                                                             l 3                             0                                                           19                       0 4                             0                                                           20                       0 1
1 P94E-NET I 1
5                             0                                                           21                       0 f
0 17 0
i 6                             0                                                           et                       0                                                             l I
2 0
7                             0                                                           23                       0                                                             [
18 0
i 4                             0                                                           24                       0 t
l 3
9                              0                                                           25                       0
0 19 0
4 0
20 0
1 f
5 0
21 0
i 6
0 et 0
l I
7 0
23 0
[
i 4
0 24 0
t 9
0 25 0
[
[
10                             0                                                           26                       0                                                             I e
I 10 0
f 11                             0                                                           FF                       0                                                             6
26 0
                                                                                                                                                                                                *?
e f
12                             0                                                           to                       0                                                             !
11 0
t il                             0                                                           29                       0                                                             l 14                             0                                                           30                       0 i
FF 0
15                             0 u                               0                                                                                                                                                   !
6
*?
12 0
to 0
t il 0
29 0
l 14 0
30 0
i 15 0
u 0
f t
f t
I t
I t
I l
I l
                                                                                                                                                                                      - -_ . - - . r
- -. - -. r


A?tRAGE DAILY (MIT PONER LEVEL DOCKET No. 50 - 276 LNIT PEACH BOTTON LNIT 3                                                                                                                               i DATE                       OCT 14e 1984                                                                                                               f COMPANY PHILADELPHIA ELECTRIC COMPANY
A?tRAGE DAILY (MIT PONER LEVEL DOCKET No. 50 - 276 LNIT PEACH BOTTON LNIT 3 i
                                                                              .............................                                                                                                                    i L. L. MIDDLETON                                                                                                                                 ;
DATE OCT 14e 1984 f
TECHNICAL ASSISTANT LICENSING SECTICH                                                                                                                               ,
COMPANY PHILADELPHIA ELECTRIC COMPANY i
tAJCLEAR SUPPORT DEPARTMENT 1
L. L. MIDDLETON TECHNICAL ASSISTANT LICENSING SECTICH tAJCLEAR SUPPORT DEPARTMENT 1
TELEPHONE t215) 441-6174                                                                                                                                   j MONTH StPTttatR 1964 DAY       AVERAGE DAILY PONER LEYtl                             DAY                   AVERAGE DAILY POW R LEVEL                                                                                                 -
TELEPHONE t215) 441-6174 j
(PHE-NETI                                                                                                             ( P94E.NE T I r
MONTH StPTttatR 1964 DAY AVERAGE DAILY PONER LEYtl DAY AVERAGE DAILY POW R LEVEL (PHE-NETI
1                                   0                         17                                                                                                               0                             ;
( P94E.NE T I r
I 0                         la                                                                                                               0                             l l
1 0
3                                   0                         19                                                                                                               0 i
17 0
4                                    0                         to                                                                                                               0                             I 5                                   0                         21                                                                                                               0 4                                   0                         t2                                                                                                               0 1                                   0                         23                                                                                                               0 8                                   0                         t4                                                                                                               0 9                                   0                         21                                                                                                               0 10                                   0                         26                                                                                                               0 11                                   0                         27                                                                                                               0 12                                   0                         t4                                                                                                               0 15                                   0                         t9                                                                                                               0 14                                   0                         30                                                                                                               0 15                                   0 16                                   0
I 0
la 0
l l
3 0
19 0
i 4
0 to 0
I 5
0 21 0
4 0
t2 0
1 0
23 0
8 0
t4 0
9 0
21 0
10 0
26 0
11 0
27 0
12 0
t4 0
15 0
t9 0
14 0
30 0
15 0
16 0


OPERATING 3ATA REPORT                                                                                                                                                                           r r
OPERATING 3ATA REPORT r
l DOCKET No. 50           277 b
r l
DATE         OCT 14e 1988 LOMPLtith BY PHILADELPHIA ELECTRIC COMPANY                                     ;
DOCKET No. 50 277 b
                                                                                                                                                                                                                                      .............................                              e L. L. MIDDLtTON TECHNICAL ASSISTANT LICENSING SECTIDH IAJCtt AR SUPPORT DEPARTNLAT                               '
DATE OCT 14e 1988 LOMPLtith BY PHILADELPHIA ELECTRIC COMPANY e
TELEPHONE (21518416IF4 DPERATING STATUS
L. L. MIDDLtTON TECHNICAL ASSISTANT LICENSING SECTIDH IAJCtt AR SUPPORT DEPARTNLAT TELEPHONE (21518416IF4 DPERATING STATUS
                              ................                                                                                                                                                                     ..............n....................                  .....
[
..............n....................
: 1. LNIT HAME R PEACH DOTTCH LHIT t l NOTESI LNIT t AtMAINED SHUTDokN l
T l
l 4
: t. REPORTING PERIODI SEPTEMBER 1966 l
UNDER NRC ORDER HITH l
l l
l t
: 3. LICENSt0 THCRMAL P0HERt HHTil 3191 l
RESTART ACTIVITIES l
l l
: 4. NAMEPLATE RAT!tG ICROSS ttit le 1152 l
CONT!!4 JING.
I
(
l l
S. DESIGN ELECTRICAL RATING (HET N>Qll 1065 I
l l
l
[
[
: 1. LNIT HAME R PEACH DOTTCH LHIT t                                                                                                                                                        l NOTESI LNIT t AtMAINED SHUTDokN                          l T
: 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MHill 1098 I
                                              ..................................                                                                                                                                    l                                                          l 4
i j
: t. REPORTING PERIODI SEPTEMBER 1966                                                                                                                                                      l              UNDER NRC ORDER HITH                        l                l
l l
                                                        ...........................                                                                                                                                                                                                                t l                                                          l
r
: 3. LICENSt0 THCRMAL P0HERt HHTil                                                                                                                                                3191      l              RESTART ACTIVITIES                          l
: 7. MAXIMUM DEPENDASLE CAPACITY INET HHE ls 1051 l
                                                                                                                                  ................                                                                                                                              l l                      4. NAMEPLATE RAT!tG ICROSS ttit le                                                                                                                                              1152      l              CONT!!4 JING.                                I
l I
(                                                                                                                                      ...............                                                            l                                                          l S. DESIGN ELECTRICAL RATING (HET N>Qll                                                                                                                                          1065      I                                                          l
: 8. IF FNAPGES OCCUR IN CAPACITY RATINGS (ITEMS PUSER 3 THROUGH 7) $1NCE LAST REPORTe GIVE REASONSI J
                                                                                                                                                                                          .........                  l                                                          l                [
f
: 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MHill 1098                                                                                                                                           I                                                           i                 j
: 9. PONER LEVEL TO HHICH RESTRICTIO, IF ANY INtf NHElt i
                                                                                                                                                                                                          ....      l                                                           l                 r
i i
: 7. MAXIMUM DEPENDASLE CAPACITY INET HHE ls                                                                                                                                     1051       l                                                           l
: 10. RE ASONS FDR RESTRICTIONS. IF ANY 4
                                                                                                                                                                                                      ......        .........................................                                    I
i 6
: 8. IF FNAPGES OCCUR IN CAPACITY RATINGS (ITEMS PUSER 3 THROUGH 7) $1NCE LAST REPORTe GIVE REASONSI J                                                                                                                                                                                                                                                                                                 f
i THIS tomRH YR TO-DATE COMULAT1VE r
: 9. PONER LEVEL TO HHICH RESTRICTIO, IF ANY INtf NHElt                                                                                                                                                                                                                   i i
i
i 4                        10. RE ASONS FDR RESTRICTIONS. IF ANY i
: 11. HOURS IN REPORTING PERIDO
6 i
?!O 6.575 124.647 l
THIS tomRH             YR TO-DATE             COMULAT1VE                       r i
: 12. NUMBER OF HOURS RE ACTOR HAS CRITIC AL 0
: 11. HOURS IN REPORTING PERIDO                                                                                                                                                                       ?!O                 6.575               124.647                     l
0 74.196.8
: 12. NUMBER OF HOURS RE ACTOR HAS CRITIC AL                                                                                                                                                             0                     0           74.196.8
: 11. RE ACTD4 RISERVE SHUfDGf4 HOURS 0.0 0.0 0.0 I
,                      11. RE ACTD4 RISERVE SHUfDGf4 HOURS                                                                                                                                                                 0.0                     0.0                   0.0                   I
[
[
IS. HOURS CINERATOR ON-LINE                                                                                                                                                                         0.0                     0.0             71.866.4 i
i IS. HOURS CINERATOR ON-LINE 0.0 0.0 71.866.4 4
4                                                                                                                                                                                                              ............            ............            ............                        i l                       15. U41T RESERvt SHUTDctet F.JUR$                                                                                                                                                                 0.0                     0.0                   0.0                   I
i l
                                                                                                                                                                                                              ............            ............            ............                        l
: 15. U41T RESERvt SHUTDctet F.JUR$
: 16. GROSS THERMAL ENERGY GENERAf t0 t MHH b                                                                                                                                                             0                     0       812.410.745
0.0 0.0 0.0 I
: 17. GRUGS EttLTRIC AL ENE RGY GENER Af t 0 ( MHH )                                                                                                                                                     0                     0         70.019.23V                       {
l
: 16. GROSS THERMAL ENERGY GENERAf t0 t MHH b 0
0 812.410.745
: 17. GRUGS EttLTRIC AL ENE RGY GENER Af t 0 ( MHH )
0 0
70.019.23V
{
i I
i I
i
i
;                        18. NET ELECTRICAL ENERGY GENERAf t0 iHHH b                                                                                                                                           a         5 700
: 18. NET ELECTRICAL ENERGY GENERAf t0 iHHH b a
* 54.414           67.006.702                       i
5 700 54.414 67.006.702 i
;                                                                                                                                                                                                                                                                                                  {
{
r PAGE 1 OF 2                     ;
r PAGE 1 OF 2 i
i                                                                                                                                                                                                                                                                                                i i
i i
i
i


4 OPERATING DATA REPORT (CONTDA>tDi                                                           DOCKET NO. 50 . t??
4 OPERATING DATA REPORT (CONTDA>tDi DOCKET NO. 50. t??
DATE         OCT 14. 1964 THIS HONTH             VR.TO Daft             CUHJLATIVE                         !
DATE OCT 14. 1964 THIS HONTH VR.TO Daft CUHJLATIVE l
l
: 19. UNIT SERVICE / ACTOR 0.0 0.0 57.6
: 19. UNIT SERVICE / ACTOR                                                                                     0.0                   0.0                   57.6                     *
: 20. UNIT AVAILA81LITY FACTOR 0.0 0.0 57.6 f
: 20. UNIT AVAILA81LITY FACTOR                                                                                 0.0                   0.0                   57.6                       ;
: 21. UNIT CAPACITY FACTOR (USING HDC NET) 0.0 0.0
                                                                                                      ............              ............          ............                          f
$1.1 f t. UNIT CAPACITY FACTOR IUSING OtR NETI 0.0 0.0 50.4 it. UNIT FORCEO OUTAGE RATE 0.0 0.0 14.6 r
: 21. UNIT CAPACITY FACTOR (USING HDC NET)                                                                     0.0                   0.0                   $1.1 f t. UNIT CAPACITY FACTOR IUSING OtR NETI                                                                   0.0                   0.0                   50.4 it. UNIT FORCEO OUTAGE RATE                                                                                 0.0                   0.0                   14.6
: 24. SHLITDol#43 SCHIDULED OVER NEXT 6 MONTHS ITYPE: DA*t e AND DURATION OF E ACHis REFutLING OUTAGE
                                                                                                      ............              ............          ............                          r
[
: 24. SHLITDol#43 SCHIDULED OVER NEXT 6 MONTHS ITYPE: DA*t e AND DURATION OF E ACHis REFutLING OUTAGE                                                                                                                                                           [
t f
t f
: 25. IF SNUTDOHN AT END OF REPORT PERID0e ESTIMAf t0 DATE OF STARTUPI                                                                                                               l i
: 25. IF SNUTDOHN AT END OF REPORT PERID0e ESTIMAf t0 DATE OF STARTUPI l
1
i 1
: 26. Lt41TS IN TEST STATUS (PRIOR TO CottttRCI AL OPERATIONil                                                       FORtCAST         ACHIEYt0 INITIAL CRITICALITY                                                                         09/16/75
: 26. Lt41TS IN TEST STATUS (PRIOR TO CottttRCI AL OPERATIONil FORtCAST ACHIEYt0 INITIAL CRITICALITY 09/16/75 l
                                                                                                                              .........        ........                                      l INITIAL ELECTRICITY                                                                         02/18/74 CONhtRCIAL OPERATION                                                                         07/0E/74                                       !
INITIAL ELECTRICITY 02/18/74 CONhtRCIAL OPERATION 07/0E/74 I
I i
i f
f I
I 1
1                                                                                                                                                                                              \
\\
i l                                                                                                                                                                                             <
i l
l 1
l 1
i I
i I
I t
I t
l PAGE 2 CF 2 e . NEGATIVE VALUE REPORTED FOR COPGISTEPCY MITH FEDERAL ENERGY REGULATORY CCrti!S$1Cr4 REPORTS.                                                                                   !
l PAGE 2 CF 2 e. NEGATIVE VALUE REPORTED FOR COPGISTEPCY MITH FEDERAL ENERGY REGULATORY CCrti!S$1Cr4 REPORTS.
I i
I i
l 4
l 4
4
4


OPERAf!NG DATA REPORT                                                                                             ,
OPERAf!NG DATA REPORT DOCKET NO. 50 - 274
DOCKET NO. 50 - 274
.4TE DCT 14e 1966
                                                                                                                                                                                  .4TE         DCT 14e 1966
[
                                                                                                                                                                                        .............................                              [
COMPLEft0 SY PHILADELPHIA ELECTRIC COMPANY l
COMPLEft0 SY PHILADELPHIA ELECTRIC COMPANY                                     ;
L. L. MIDDLETON TECHNICAL ASSISTANT i
                                                                                                                                                                                        .............................                              l L. L. MIDDLETON TECHNICAL ASSISTANT                                       i t
t LICENSING SICT!DN MJCLEAR CUPPORT DEPARTNENT TELEPHONE (215) 641-6374 i
LICENSING SICT!DN MJCLEAR CUPPORT DEPARTNENT TELEPHONE (215) 641-6374                                                 i
j OPERATING STATUS I
                                                                                                                                                                                        .............................                            j OPERATING STATUS                                                                                                                                                                                                                   I
: 1. tHIT NAM 48 PEACPI DOTTON UNIT 3 i NOTES 6 UNIT 1 REMAINED SHUTO' D94 l
: 1. tHIT NAM 48 PEACPI DOTTON UNIT 3                                                                                                                       i NOTES 6 UNIT 1 REMAINED SHUTO' D94                               l
)
                                                                            ..................................                                                        )                                                                   l         l
l l
: 2. REPORTING PERIDOI Sf PTEMBE R, 1964                                                                                                                   l               UNDER NRC ORDER HITH                               l       [
: 2. REPORTING PERIDOI Sf PTEMBE R, 1964 l
                                                                                                                        ...........................                  l                                                                   l       l
UNDER NRC ORDER HITH l
: 3. LICttGt0 THERMAL P0HERitNTil                                                                                                             St93         i               REFlEL AND PIPE REPLACEMENT                         l         .
[
                                                                                                                                        ................              l                                                                   ;        j
l l
: 6. NAPEPLATI RATING (GROGS POE ll                                                                                                           1152         l               IN PROGRESS.                                       l       l
l
                                                                                                                                        ...............              l                                                                   l       j
: 3. LICttGt0 THERMAL P0HERitNTil St93 i
: 5. DESIGN ELECTRICAL RATING (NET HNEle                                                                                                       1065         l                                                                   l       L l
REFlEL AND PIPE REPLACEMENT l
                                                                                                                                                  .........          l                                                                  l f
l j
: 6. MAXIMUM CIPENDASLE C&PACITY t GROSS P>E ll 1098                                                                                                       l                                                                   l       r i
: 6. NAPEPLATI RATING (GROGS POE ll 1152 l
                                                                                                                                                        ....        l                                                                   l
IN PROGRESS.
: 7. MAXIMUM DEPENDABLE CAPACITY INtf P>E li                                                                                                   1035         l                                                                   l A. IF CHANGES OCCUR IN CAPACITY RATINGS t! TEM 3 PAketR 3 THROUGH 71 $1NCE LAST REPOQT, G1YF RE ASOPSI l
l l
: 9. P0HER LEYtl TO HMICH RESTRICitDe IF ANY (HET tNEll                                                                                                                                                                                 I i
l l
: 10. REASOPG FOR RESTRICTIOPC , IF ANfs I
j
r THIS HONTH             YR TO-DATE                     C' etAAT!vt
: 5. DESIGN ELECTRICAL RATING (NET HNEle 1065 l
: 11. HOURS IN REPORTING PERICO                                                                                                                                         720                 6.575                     120.741           !
l L
: 12. NVPSER OF HOURS RE ACTOR KAS CRITICAL                                                                                                                               0                     0                     76.357.4
l l
: 13. RE ACTOR RESERVE SHLffDO>N HOURS                                                                                                                                 0.0                     0.0                           0.0         i L
l f
1                                                                                                                                                            ............              ............                    ............              e t
: 6. MAXIMUM CIPENDASLE C&PACITY t GROSS P>E ll 1098 l
l r
l l
i
: 7. MAXIMUM DEPENDABLE CAPACITY INtf P>E li 1035 l
l A. IF CHANGES OCCUR IN CAPACITY RATINGS t! TEM 3 PAketR 3 THROUGH 71 $1NCE LAST REPOQT, G1YF RE ASOPSI l
: 9. P0HER LEYtl TO HMICH RESTRICitDe IF ANY (HET tNEll I
i
: 10. REASOPG FOR RESTRICTIOPC, IF ANfs I
r THIS HONTH YR TO-DATE C' etAAT!vt
: 11. HOURS IN REPORTING PERICO 720 6.575 120.741
: 12. NVPSER OF HOURS RE ACTOR KAS CRITICAL 0
0 76.357.4
: 13. RE ACTOR RESERVE SHLffDO>N HOURS 0.0 0.0 0.0 i
L 1
e l
t
: 14. HOURS 6tNERATOR OH-LIN!
0.0 0.0 73.929.3 i
l l
l l
: 14. HOURS 6tNERATOR OH-LIN!                                                                                                                                          0.0                    0.0                    73.929.3            i l
t
t
: 15. UNIT RESERvt SHJTDON>4 HOURS                                                                                                                                     0.0                     0.0                           0.0         t i
: 15. UNIT RESERvt SHJTDON>4 HOURS 0.0 0.0 0.0 t
: 14. GfeOSS THIRMAL ENERGY GLhtRATIO I MHH I                                                                                                                             O                     O               315.t76.901             (
i
: 14. GfeOSS THIRMAL ENERGY GLhtRATIO I MHH I O
O 315.t76.901
(
(
(
: 17. GROSS ELECTRIC AL ENERGY GtPARATED (MHHI                                                                                                                             O                     O                 70.611,632
: 17. GROSS ELECTRIC AL ENERGY GtPARATED (MHHI O
: 14. NET ELECTRICAL ENERGY GENERATt0 (NnHI                                                                                                         e           5.457         e         36.171                   67.665.984 L
O 70.611,632
: 14. NET ELECTRICAL ENERGY GENERATt0 (NnHI e
5.457 e
36.171 67.665.984 L
L PAGE 1 0F t I
L PAGE 1 0F t I
i r
i r
1 O
1 O


                          -mm                                             .                            <                          ~
r777
r777 l '/
-mm
r             *
~
      ~ ' -
l '/
q                      *
r
                                              -OPERA 7ING DATA REPORT (CONTINUED)                                         DOCKET No. 50 - 278 DATE         OCT 14, 1968 THIS HONTH         YR-TO-DATE                 CUMULATIVE
-OPERA 7ING DATA REPORT (CONTINUED)
: 19. UNIT SERVICE FACTOR                                             0.0                   0.0                     61.2
DOCKET No. 50 - 278
: 20. UNIT AVAILABILITY FACTOR                                       0.0                   0.0                     61.2
~ ' -
: 21. UNIT CAPACITY FACTOR (USING MDC NET)                             0.0                   0.0                     54.1 f t. UNIT CAPACI'Y FACTOR (USING DER NET)                           0.0                   0.0                     52.6
q DATE OCT 14, 1968 THIS HONTH YR-TO-DATE CUMULATIVE
          -23. UNIT FORCf3 DUTAGE RATE                                         0.0                   0.0                     13.3
: 19. UNIT SERVICE FACTOR 0.0 0.0 61.2
: 20. UNIT AVAILABILITY FACTOR 0.0 0.0 61.2
: 21. UNIT CAPACITY FACTOR (USING MDC NET) 0.0 0.0 54.1 f t. UNIT CAPACI'Y FACTOR (USING DER NET) 0.0 0.0 52.6
-23. UNIT FORCf3 DUTAGE RATE 0.0 0.0 13.3
: 20. SHUTDO>NS SCHEDULED DVER NEXT 6 MONTHS ITYPE, DA - AND DURATION OF EACH):
: 20. SHUTDO>NS SCHEDULED DVER NEXT 6 MONTHS ITYPE, DA - AND DURATION OF EACH):
INDETERMINATE UNTIL NRC ORDER IS SATISFIED.
INDETERMINATE UNTIL NRC ORDER IS SATISFIED.
: 25. IF SHUTDOPN AT END OF REPORT PERIOD, ESTINATED DATE OF STARTUPt
: 25. IF SHUTDOPN AT END OF REPORT PERIOD, ESTINATED DATE OF STARTUPt
: 20. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATIONlt               FORECAST           ACHIEVED INITIAL CRITICALITY                                                 08/07/74 INITIAL ELECTRICITY                                                 09/01/74 COHKERCIAL OPERATIDH                                                 12/23/74 f
: 20. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATIONlt FORECAST ACHIEVED INITIAL CRITICALITY 08/07/74 INITIAL ELECTRICITY 09/01/74 COHKERCIAL OPERATIDH 12/23/74 f
I 4
I 4
PAGE 2 0F 2
PAGE 2 0F 2


        .b   ,      ..
.b g
g UNIT SHUTD0694S AND PCHFR REDUCTIONS                                 DOCKET No. 50 - E77                                 /
UNIT SHUTD0694S AND PCHFR REDUCTIONS DOCKET No. 50 - E77
LHIT NAME PEACH BOTTOM LMIT E DATE           OCT 14, 1986                   i REFORT NONTH SEPTEteER, 1988                           COMPLETED BY PHILADELPHIA ELECTRIC COMPANY L. L. MIDDLETON-TECHNICAL ASSISTANT LICENSING SECTION NUCLEAR SUPPORT DEPARTHENT TELEPHONE (E15) 841-6374
/
: 3.          ........................................................................................................................
LHIT NAME PEACH BOTTOM LMIT E i
l             l     l           l             l HETHOO 0F I LICENSEE ISYSTEMICONFCNEN*l CAUSE AND CORRECTIVE l             l TYPE l DURATION l RE ASON I SHUTTING 00604 )         EVENT       l CODE l       CODE l         ACTION TO                                         -
DATE OCT 14, 1986 REFORT NONTH SEPTEteER, 1988 COMPLETED BY PHILADELPHIA ELECTRIC COMPANY L. L. MIDDLETON-TECHNICAL ASSISTANT LICENSING SECTION NUCLEAR SUPPORT DEPARTHENT TELEPHONE (E15) 841-6374 3.
    '.I         OATE l 11)l (HOURSil IE)               l REACTOR 13) l REPORT 8 l (4) l                   (5) l PREVENT RECURRENCE 1             I     l           l             l               l                 l       l             l                                                       l 7 l 880001 l- S l 720.0 l                     C l           1       l         N/A     l RC l FUELXX l NRC REGUIRED SHUTDOHN.                                         !
l l
      -1               I     i ----- 1                 I               I                 I       I             I l             l     l 720.0 l                 l               l                 l       l             l                                                       !
l l
(1)                             (E)                                                           131                             141 f
l HETHOO 0F I LICENSEE ISYSTEMICONFCNEN*l CAUSE AND CORRECTIVE l
      - FORCED               REASON                                                         HETHOO                             EXHIBIT G - INSTRUCTIONS
l TYPE l DURATION l RE ASON I SHUTTING 00604 )
      - SCHEDULED             A - EQUIPMENT FAILURE t tXPLAIN)                                 1 - HANUAL                         FOR PREPARATION OF DATA                 [
EVENT l CODE l CODE l ACTION TO
B - MAINTENANCE OR TEST                                         E - MA1AJAL SCRAM.                 ENTRY SHEETS FOR LICENSEE C - REFUELING                                                   3 - AUTOHATIC SCRAM.               EVENT REPORT (LER)                       (
'.I OATE l 11)l (HOURSil IE) l REACTOR 13) l REPORT 8 l (4) l (5) l PREVENT RECURRENCE 1
0 - REGULATORY RESTRICTION                                     4 - OTHER (EXPLAIN)                   FILE OAREG-0161)
I l
E - OPERATOR TRAINING + LICENSE EXAMINATIDH                                                                                                 !
l l
F - ADMINISTRATIVE                                                                                           (5)                           ;
l l
G = DPERATICHAL ERROR (EXPLAIN)                                                                                                             ,
l l
H = OTHERIEXPLAIN)                                                                                 EXHIBIT I - SANC SOURCE                   [
l 7 l 880001 l-S l 720.0 l C l 1
l N/A l RC l FUELXX l NRC REGUIRED SHUTDOHN.
-1 I
i ----- 1 I
I I
I I
l l
l 720.0 l l
l l
l l
f (1)
(E) 131 141
- FORCED REASON HETHOO EXHIBIT G - INSTRUCTIONS
- SCHEDULED A - EQUIPMENT FAILURE t tXPLAIN) 1 - HANUAL FOR PREPARATION OF DATA
[
B - MAINTENANCE OR TEST E - MA1AJAL SCRAM.
ENTRY SHEETS FOR LICENSEE
(
C - REFUELING 3 - AUTOHATIC SCRAM.
EVENT REPORT (LER) 0 - REGULATORY RESTRICTION 4 - OTHER (EXPLAIN)
FILE OAREG-0161)
E - OPERATOR TRAINING + LICENSE EXAMINATIDH F - ADMINISTRATIVE (5)
G = DPERATICHAL ERROR (EXPLAIN)
H = OTHERIEXPLAIN)
EXHIBIT I - SANC SOURCE
[
i r
i r
i I
i I
h e
h e
i i
i i
I                                                                                                                                                                           t i
I t
t I
i t
i I
I i
1
I 1


                          *      ~
~
UNIT SHUTDO4C AND hMER REDUCTI0tG                                     DOCKET NO. 50 - 278 UNIT NAME PEACH BOTTCH LNIT 3 DATE                       OCT 14, 1968 REPORT HONTH SEPTENDER,1988                                 C.21PLETED BY PHILADELPHI A ELECTRIC COMPAf#
UNIT SHUTDO4C AND hMER REDUCTI0tG DOCKET NO. 50 - 278 UNIT NAME PEACH BOTTCH LNIT 3 DATE OCT 14, 1968 REPORT HONTH SEPTENDER,1988 C.21PLETED BY PHILADELPHI A ELECTRIC COMPAf#
L. L. HIDDLETON TECHNICAL ASSISTANT LICEtGils SECTI0t4 NUCLkAR SUPPGAT DEPARTMEh!
L. L. HIDDLETON TECHNICAL ASSISTANT LICEtGils SECTI0t4 NUCLkAR SUPPGAT DEPARTMEh!
TELEFH0t(E 1215) 841-6374 l         l     l           l         l NETHOD CF l LICEtGEE l SYSTEMIC 0HP001ENTI CAUGE AND CONRECTIVE l         l TYPE I DUR ATI ON I RE ASON I SHUTT!tG DOf41         EVENT       l CODE I       CODE I         ACTI0tt TO
TELEFH0t(E 1215) 841-6374 l
    .I     DATt. I i1)) (HOURSIl 42)         l REACTOR I3) l REPORT 5 l f4) l                       t51 1 PREVENT RECURRENCE
l l
    ~l           I     l           l         I                 I                 I         I             i
l l NETHOD CF l LICEtGEE l SYSTEMIC 0HP001ENTI CAUGE AND CONRECTIVE l
  ' l 680901 l S l 720.0 l                 C l           1         1       PVA     l RC l FUELM: l PIPE REPLACEMENT CUTAGE.
l TYPE I DUR ATI ON I RE ASON I SHUTT!tG DOf41 EVENT l CODE I CODE I ACTI0tt TO
I         I     I           I         I                 I                 I         i             1 1         I     I ----- 1             I                 l                 l         l             l 1         1     I no.D I               I                 I                 I         I             I (1)                         82)                                                           (3)                                           141
.I DATt. I i1)) (HOURSIl 42) l REACTOR I3) l REPORT 5 l f4) l t51 1 PREVENT RECURRENCE
    - ThXED             REASott                                                         HETH00                                     EXHIBIT G a ItGTRUCTIOG
~l I
    - SCHfDULED         A - EQUIPMENT F AILURL I EXPLAIN)                               1 - HA1AJAL                                 FOR PREPARATIOPl QF DATA B - t%1NTENANCE OR TEST                                         2 - HAPAJAL SCRAM.                         ENTRY SHEETS FOR LICEtGEE i                        C     REFUELItG                                                 3 - AUTOMATIC SCR/!1.                       EVENT REPORT ILER) l                       D - REGAATORY PESTRICTION                                       4 - OYHER IEXPLAINI                           FILE (IHREG-0161)
l l
E - CPERATOR TRAINING e LICEtGE EXAMINAT!We F   ADMINISTRATIVE                                                                                                       (51 G - OPERATIONAL ERROA (F.XPLAIN)
I I
H - OTHERIEXPLAINI                                                                                           CXHIBIT I . SAME SITURCE
I I
i
' l 680901 l S l 720.0 l C l 1
1 PVA l RC l FUELM: l PIPE REPLACEMENT CUTAGE.
I I
I I
I I
I i
1 1
I I ----- 1 I
l l
l l
1 1
I no.D I I
I I
I I
(1) 82)
(3) 141
- ThXED REASott HETH00 EXHIBIT G a ItGTRUCTIOG
- SCHfDULED A - EQUIPMENT F AILURL I EXPLAIN) 1 - HA1AJAL FOR PREPARATIOPl QF DATA B - t%1NTENANCE OR TEST 2 - HAPAJAL SCRAM.
ENTRY SHEETS FOR LICEtGEE C
REFUELItG 3 - AUTOMATIC SCR/!1.
EVENT REPORT ILER) i l
D - REGAATORY PESTRICTION 4 - OYHER IEXPLAINI FILE (IHREG-0161)
E - CPERATOR TRAINING e LICEtGE EXAMINAT!We F
ADMINISTRATIVE (51 G - OPERATIONAL ERROA (F.XPLAIN)
H - OTHERIEXPLAINI CXHIBIT I. SAME SITURCE


f.
f.
Line 325: Line 489:
Peach Bottom Atemic Power Station Monthly Operating Report Gentlemen:
Peach Bottom Atemic Power Station Monthly Operating Report Gentlemen:
Attached are twelve copies of the monthly operat ng report for Peacli Botton, linits 2 and 3 for the :nonth of September,1988 fontarded pursuant to Technical Speci.'ication 6.9.1.d under the guidance of Regflatory Guide 10.1, Revision 4.
Attached are twelve copies of the monthly operat ng report for Peacli Botton, linits 2 and 3 for the :nonth of September,1988 fontarded pursuant to Technical Speci.'ication 6.9.1.d under the guidance of Regflatory Guide 10.1, Revision 4.
Very truly yours,                   ,
Very truly yours, Ydb/
Ydb/
*/
W. M. Alden     */ N/
N/
* g. /
W. M. Alden
Director               /     '
/
Licensing Section
: g. /
                                                                                                          /
Director
Nuclear Support Division Attachment cc:   W. 1. Russell, Administrator, Region I, USNRC l'. P. Johnson, USNRC Senior Resident inspector S. P. Mangi. Dept. of Envir. Resources W.11. Lovelace, NRC (2 copies)
/
Licensing Section Nuclear Support Division Attachment cc:
W. 1. Russell, Administrator, Region I, USNRC l'. P. Johnson, USNRC Senior Resident inspector S. P. Mangi. Dept. of Envir. Resources W.11. Lovelace, NRC (2 copies)
R. E. Martin, NRC Project Manager Thomas Magette, Maryland Power Plant Siting INPO Records Center
R. E. Martin, NRC Project Manager Thomas Magette, Maryland Power Plant Siting INPO Records Center
                                                                                                                , i
, i
_-__            _    __}}
__}}

Latest revision as of 20:10, 6 December 2024

Monthly Operating Repts for Sept 1988 for Peach Bottom Units 1 & 2
ML20207N637
Person / Time
Site: Peach Bottom  
Issue date: 09/30/1988
From: Alden W, Middleton L
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
NUDOCS 8810190268
Download: ML20207N637 (14)


Text

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _.

NRC Monthly Operations Surmary Peach Botton Atomic Power Station j

September, 1988 l

l l

UNIT 2 l

i The unit rem &ined shut down throughout the report period. Activities in progress during the report period included 13 kV and 4 kV electrical bus maintenance and E-1 and E-3 diesel generator annual maintenance.

1 UNIT 3 The unit remained shut down throughout the report period. Activities in progress during the report period included iSW pipe replacement, feedwater heater replacement, preventive maintenance for hydraulic control units and 13 and 4 kV electrical bus maintenance, i

l l

t l

l l

t f

I I

l l

b SS10190268 880930 PDR ADOCK 0S000277

./

R PDC B

Docket No. 50-277 Attachment to Monthly Operating Report for September, 1988 UNIT 2 RffultlNG INFORMAL g 1.

Name of facility:

Peach Bottom Unit ?

]

?.

Scheduled date for next refueling *,hutdown:

(1) Reload 7 completed

(?) keload 8 scheduled f or March 10, 1990 3.

Scheduled date for restart following refueling:

(1) Restart following NRC Shutdown Order scheduled for December 20, 1988 (2) Restart following refueling scheduled for June 8, 1990.

4.

Will refueling or resumpti;n of operation thereafter require a technical specification change or other license amendment?

Yes if answer is yes, what, in general, will these be?

(1) Administrative changes to reload amendment (2)Loadsequencemodificatlonamendment (3) Diesel Generator Cardox modification amendment b.

Scheduled date(s) for submitting proposed licensing action and supporting informatlon:

1) Submitted April 25, 1988
2) Submitted September 7, 1986
3) SubmlLted Septemt er 7,1988 f,.

Important Itcensing considerations associated with refueling, e.g., new or dif f erent fuel design or supplier. nreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:

Refue1ing completed.

/.

lhe number of fuel assemblies (a) h the core and (b) in the spent fuel storage pool:

(a) Core - 764 fuel Assemblies (b) f uel Pool - 1734 f uel Assemblies 58 f uel Rods 8.

1he present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:

the spent fuel pool storage capacity has been relicensed for 3819 fuel assemblles.

Docket No. 50-277-Attachment t2 Monthly Operating i

Report for September, 1988 Page 2

}

i UNil ? REf0EllNG INf0RMA110N (Continued) i 9.

lhe projected date of the last refueling that can be discharged to the j

spent fuel pool assuming the pr.sent capacity:

I September, 1998 (September.1995, with reserve full core discharge) k r

i

)

i I

f

[

t k

i i

i t

t i

i i

i

f Dockst No.60-278 I

Attachment to Monthly Operating Report for September, 1988 4

UNil 3 REFUELING INFORMAi!0N i

4 i

1.

Name of facility:

Peach Botton Unit 3 i

?.

Scheduled date for next refueling shutdown:

j (1) keload 7 in progress (Major Pipe Replatcment Outage)

(2) Reload 8 scheduled for October 20. 1990 i

3.

$cheduled date for restart following refueling I

(1)RestartfollowingrefuelingscheduledforMarch 31, 1989

(?) Restart following refueling scheduled for January 18, 1991 4.

Will refueling or resumption of operation thereaf ter require a technical i

specifIcatton change or other license amendment?

Yes.

If answer is yes, what. In general, will these be?

(1) Alternate Rod Insertion modification and modified Recirculation Trip logic amendment

(?) Primary system piping installation modification amendment (3) Reload 7 Amendment b.

5theduled date(s) for suteltting proposed licensing action and supporting I

information:

Alternate Rod insertion /RPI Amendment submitted June !?.198/

I Primary System Piping Amendment submitted March Pl. 1988 Reload 7 t_icense Amendment submitted July 7. 1988 l

P 6.

Important licensing considerations associated with refueling, e.g., new or dif ferent fuel design or supplier, unreviewed design or performance analysis method:4 significant changes in fuel design, t.ew operating procedures:

None expcCted.

/.

ihenumberc'fuelassemblies(a)inthecoreand(b)inthespentfuel storage pool:

a Core - 0 fuel Assemblies (/64 assemblies offloaded during outage) b f uel Pool - 2260 fuel Assemblies. 6 f uel Rods

Docket No. 50-278 Attachment to Monthly Operating Report for September, 1988 i

Page 2 UNIT 3 RIFUf LING INFORMATION (Continued) 8.

The present licensed spent fuel pool storage capacity and the site of any increase in 1; censed storage capacity that has been requested or is planned, in number of fuel assemblies:

i i

lhe spent fuel pool storage capacity has been relicensed for 3819 fuel assemblies. This modification began on february P0,1987. The completion date for this modification has been rescheduled for february,1989 to accommodate the Unit 3 pipe replacement outage.

9.

The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present capacity:

March, 1993 (reserve full core discharge cannot be accommodated t

after the restart following the completion of the October, 1987 t

refueling outage untti the completion of the new fuel racks) installation of the new fuel racks will extend the projected date of the last refueling to September, P000 (March, 1996, with reserve full core discharge) f i

l l

t i

I r

h r

t i

h i

I

,_p

- - - - -.,, -, -,-, - - ~ ww

AVERAGF DAILY WIT PONER LEVEL t

DOCKET NO. 50 277 u

l I

WIT PEACH BOTTCH WIT t OtTE OCT 14. 1968 COMPAt# PHILADELPHI A ELECTRIC C0t9ANf L. L. MIDDLETON

[

TECte41 CAL A!.S!$7 ANT LICitc!M2 SECTION PAJCLE AR $UPPORT DEPARTNENT r

?

TELEPHCNE I215) 641-6174 MONTN StPTIteRR 1944 I

DAY AVERACE DAILY PCMER LEVil DAY AVERAGE DAILY POMER LEYtL (P94E NET )

1 P94E-NET I 1

0 17 0

2 0

18 0

l 3

0 19 0

4 0

20 0

1 f

5 0

21 0

i 6

0 et 0

l I

7 0

23 0

[

i 4

0 24 0

t 9

0 25 0

[

I 10 0

26 0

e f

11 0

FF 0

6

  • ?

12 0

to 0

t il 0

29 0

l 14 0

30 0

i 15 0

u 0

f t

I t

I l

- -. - -. r

A?tRAGE DAILY (MIT PONER LEVEL DOCKET No. 50 - 276 LNIT PEACH BOTTON LNIT 3 i

DATE OCT 14e 1984 f

COMPANY PHILADELPHIA ELECTRIC COMPANY i

L. L. MIDDLETON TECHNICAL ASSISTANT LICENSING SECTICH tAJCLEAR SUPPORT DEPARTMENT 1

TELEPHONE t215) 441-6174 j

MONTH StPTttatR 1964 DAY AVERAGE DAILY PONER LEYtl DAY AVERAGE DAILY POW R LEVEL (PHE-NETI

( P94E.NE T I r

1 0

17 0

I 0

la 0

l l

3 0

19 0

i 4

0 to 0

I 5

0 21 0

4 0

t2 0

1 0

23 0

8 0

t4 0

9 0

21 0

10 0

26 0

11 0

27 0

12 0

t4 0

15 0

t9 0

14 0

30 0

15 0

16 0

OPERATING 3ATA REPORT r

r l

DOCKET No. 50 277 b

DATE OCT 14e 1988 LOMPLtith BY PHILADELPHIA ELECTRIC COMPANY e

L. L. MIDDLtTON TECHNICAL ASSISTANT LICENSING SECTIDH IAJCtt AR SUPPORT DEPARTNLAT TELEPHONE (21518416IF4 DPERATING STATUS

[

..............n....................

1. LNIT HAME R PEACH DOTTCH LHIT t l NOTESI LNIT t AtMAINED SHUTDokN l

T l

l 4

t. REPORTING PERIODI SEPTEMBER 1966 l

UNDER NRC ORDER HITH l

l l

l t

3. LICENSt0 THCRMAL P0HERt HHTil 3191 l

RESTART ACTIVITIES l

l l

4. NAMEPLATE RAT!tG ICROSS ttit le 1152 l

CONT!!4 JING.

I

(

l l

S. DESIGN ELECTRICAL RATING (HET N>Qll 1065 I

l l

l

[

6. MAXIMUM DEPENDABLE CAPACITY (GROSS MHill 1098 I

i j

l l

r

7. MAXIMUM DEPENDASLE CAPACITY INET HHE ls 1051 l

l I

8. IF FNAPGES OCCUR IN CAPACITY RATINGS (ITEMS PUSER 3 THROUGH 7) $1NCE LAST REPORTe GIVE REASONSI J

f

9. PONER LEVEL TO HHICH RESTRICTIO, IF ANY INtf NHElt i

i i

10. RE ASONS FDR RESTRICTIONS. IF ANY 4

i 6

i THIS tomRH YR TO-DATE COMULAT1VE r

i

11. HOURS IN REPORTING PERIDO

?!O 6.575 124.647 l

12. NUMBER OF HOURS RE ACTOR HAS CRITIC AL 0

0 74.196.8

11. RE ACTD4 RISERVE SHUfDGf4 HOURS 0.0 0.0 0.0 I

[

i IS. HOURS CINERATOR ON-LINE 0.0 0.0 71.866.4 4

i l

15. U41T RESERvt SHUTDctet F.JUR$

0.0 0.0 0.0 I

l

16. GROSS THERMAL ENERGY GENERAf t0 t MHH b 0

0 812.410.745

17. GRUGS EttLTRIC AL ENE RGY GENER Af t 0 ( MHH )

0 0

70.019.23V

{

i I

i

18. NET ELECTRICAL ENERGY GENERAf t0 iHHH b a

5 700 54.414 67.006.702 i

{

r PAGE 1 OF 2 i

i i

i

4 OPERATING DATA REPORT (CONTDA>tDi DOCKET NO. 50. t??

DATE OCT 14. 1964 THIS HONTH VR.TO Daft CUHJLATIVE l

19. UNIT SERVICE / ACTOR 0.0 0.0 57.6
20. UNIT AVAILA81LITY FACTOR 0.0 0.0 57.6 f
21. UNIT CAPACITY FACTOR (USING HDC NET) 0.0 0.0

$1.1 f t. UNIT CAPACITY FACTOR IUSING OtR NETI 0.0 0.0 50.4 it. UNIT FORCEO OUTAGE RATE 0.0 0.0 14.6 r

24. SHLITDol#43 SCHIDULED OVER NEXT 6 MONTHS ITYPE: DA*t e AND DURATION OF E ACHis REFutLING OUTAGE

[

t f

25. IF SNUTDOHN AT END OF REPORT PERID0e ESTIMAf t0 DATE OF STARTUPI l

i 1

26. Lt41TS IN TEST STATUS (PRIOR TO CottttRCI AL OPERATIONil FORtCAST ACHIEYt0 INITIAL CRITICALITY 09/16/75 l

INITIAL ELECTRICITY 02/18/74 CONhtRCIAL OPERATION 07/0E/74 I

i f

I 1

\\

i l

l 1

i I

I t

l PAGE 2 CF 2 e. NEGATIVE VALUE REPORTED FOR COPGISTEPCY MITH FEDERAL ENERGY REGULATORY CCrti!S$1Cr4 REPORTS.

I i

l 4

4

OPERAf!NG DATA REPORT DOCKET NO. 50 - 274

.4TE DCT 14e 1966

[

COMPLEft0 SY PHILADELPHIA ELECTRIC COMPANY l

L. L. MIDDLETON TECHNICAL ASSISTANT i

t LICENSING SICT!DN MJCLEAR CUPPORT DEPARTNENT TELEPHONE (215) 641-6374 i

j OPERATING STATUS I

1. tHIT NAM 48 PEACPI DOTTON UNIT 3 i NOTES 6 UNIT 1 REMAINED SHUTO' D94 l

)

l l

2. REPORTING PERIDOI Sf PTEMBE R, 1964 l

UNDER NRC ORDER HITH l

[

l l

l

3. LICttGt0 THERMAL P0HERitNTil St93 i

REFlEL AND PIPE REPLACEMENT l

l j

6. NAPEPLATI RATING (GROGS POE ll 1152 l

IN PROGRESS.

l l

l l

j

5. DESIGN ELECTRICAL RATING (NET HNEle 1065 l

l L

l l

l f

6. MAXIMUM CIPENDASLE C&PACITY t GROSS P>E ll 1098 l

l r

l l

i

7. MAXIMUM DEPENDABLE CAPACITY INtf P>E li 1035 l

l A. IF CHANGES OCCUR IN CAPACITY RATINGS t! TEM 3 PAketR 3 THROUGH 71 $1NCE LAST REPOQT, G1YF RE ASOPSI l

9. P0HER LEYtl TO HMICH RESTRICitDe IF ANY (HET tNEll I

i

10. REASOPG FOR RESTRICTIOPC, IF ANfs I

r THIS HONTH YR TO-DATE C' etAAT!vt

11. HOURS IN REPORTING PERICO 720 6.575 120.741
12. NVPSER OF HOURS RE ACTOR KAS CRITICAL 0

0 76.357.4

13. RE ACTOR RESERVE SHLffDO>N HOURS 0.0 0.0 0.0 i

L 1

e l

t

14. HOURS 6tNERATOR OH-LIN!

0.0 0.0 73.929.3 i

l l

t

15. UNIT RESERvt SHJTDON>4 HOURS 0.0 0.0 0.0 t

i

14. GfeOSS THIRMAL ENERGY GLhtRATIO I MHH I O

O 315.t76.901

(

(

17. GROSS ELECTRIC AL ENERGY GtPARATED (MHHI O

O 70.611,632

14. NET ELECTRICAL ENERGY GENERATt0 (NnHI e

5.457 e

36.171 67.665.984 L

L PAGE 1 0F t I

i r

1 O

r777

-mm

~

l '/

r

-OPERA 7ING DATA REPORT (CONTINUED)

DOCKET No. 50 - 278

~ ' -

q DATE OCT 14, 1968 THIS HONTH YR-TO-DATE CUMULATIVE

19. UNIT SERVICE FACTOR 0.0 0.0 61.2
20. UNIT AVAILABILITY FACTOR 0.0 0.0 61.2
21. UNIT CAPACITY FACTOR (USING MDC NET) 0.0 0.0 54.1 f t. UNIT CAPACI'Y FACTOR (USING DER NET) 0.0 0.0 52.6

-23. UNIT FORCf3 DUTAGE RATE 0.0 0.0 13.3

20. SHUTDO>NS SCHEDULED DVER NEXT 6 MONTHS ITYPE, DA - AND DURATION OF EACH):

INDETERMINATE UNTIL NRC ORDER IS SATISFIED.

25. IF SHUTDOPN AT END OF REPORT PERIOD, ESTINATED DATE OF STARTUPt
20. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATIONlt FORECAST ACHIEVED INITIAL CRITICALITY 08/07/74 INITIAL ELECTRICITY 09/01/74 COHKERCIAL OPERATIDH 12/23/74 f

I 4

PAGE 2 0F 2

.b g

UNIT SHUTD0694S AND PCHFR REDUCTIONS DOCKET No. 50 - E77

/

LHIT NAME PEACH BOTTOM LMIT E i

DATE OCT 14, 1986 REFORT NONTH SEPTEteER, 1988 COMPLETED BY PHILADELPHIA ELECTRIC COMPANY L. L. MIDDLETON-TECHNICAL ASSISTANT LICENSING SECTION NUCLEAR SUPPORT DEPARTHENT TELEPHONE (E15) 841-6374 3.

l l

l l

l HETHOO 0F I LICENSEE ISYSTEMICONFCNEN*l CAUSE AND CORRECTIVE l

l TYPE l DURATION l RE ASON I SHUTTING 00604 )

EVENT l CODE l CODE l ACTION TO

'.I OATE l 11)l (HOURSil IE) l REACTOR 13) l REPORT 8 l (4) l (5) l PREVENT RECURRENCE 1

I l

l l

l l

l l

l 7 l 880001 l-S l 720.0 l C l 1

l N/A l RC l FUELXX l NRC REGUIRED SHUTDOHN.

-1 I

i ----- 1 I

I I

I I

l l

l 720.0 l l

l l

l l

f (1)

(E) 131 141

- FORCED REASON HETHOO EXHIBIT G - INSTRUCTIONS

- SCHEDULED A - EQUIPMENT FAILURE t tXPLAIN) 1 - HANUAL FOR PREPARATION OF DATA

[

B - MAINTENANCE OR TEST E - MA1AJAL SCRAM.

ENTRY SHEETS FOR LICENSEE

(

C - REFUELING 3 - AUTOHATIC SCRAM.

EVENT REPORT (LER) 0 - REGULATORY RESTRICTION 4 - OTHER (EXPLAIN)

FILE OAREG-0161)

E - OPERATOR TRAINING + LICENSE EXAMINATIDH F - ADMINISTRATIVE (5)

G = DPERATICHAL ERROR (EXPLAIN)

H = OTHERIEXPLAIN)

EXHIBIT I - SANC SOURCE

[

i r

i I

h e

i i

I t

i t

I i

I 1

~

UNIT SHUTDO4C AND hMER REDUCTI0tG DOCKET NO. 50 - 278 UNIT NAME PEACH BOTTCH LNIT 3 DATE OCT 14, 1968 REPORT HONTH SEPTENDER,1988 C.21PLETED BY PHILADELPHI A ELECTRIC COMPAf#

L. L. HIDDLETON TECHNICAL ASSISTANT LICEtGils SECTI0t4 NUCLkAR SUPPGAT DEPARTMEh!

TELEFH0t(E 1215) 841-6374 l

l l

l l NETHOD CF l LICEtGEE l SYSTEMIC 0HP001ENTI CAUGE AND CONRECTIVE l

l TYPE I DUR ATI ON I RE ASON I SHUTT!tG DOf41 EVENT l CODE I CODE I ACTI0tt TO

.I DATt. I i1)) (HOURSIl 42) l REACTOR I3) l REPORT 5 l f4) l t51 1 PREVENT RECURRENCE

~l I

l l

I I

I I

i

' l 680901 l S l 720.0 l C l 1

1 PVA l RC l FUELM: l PIPE REPLACEMENT CUTAGE.

I I

I I

I I

I i

1 1

I I ----- 1 I

l l

l l

1 1

I no.D I I

I I

I I

(1) 82)

(3) 141

- ThXED REASott HETH00 EXHIBIT G a ItGTRUCTIOG

- SCHfDULED A - EQUIPMENT F AILURL I EXPLAIN) 1 - HA1AJAL FOR PREPARATIOPl QF DATA B - t%1NTENANCE OR TEST 2 - HAPAJAL SCRAM.

ENTRY SHEETS FOR LICEtGEE C

REFUELItG 3 - AUTOMATIC SCR/!1.

EVENT REPORT ILER) i l

D - REGAATORY PESTRICTION 4 - OYHER IEXPLAINI FILE (IHREG-0161)

E - CPERATOR TRAINING e LICEtGE EXAMINAT!We F

ADMINISTRATIVE (51 G - OPERATIONAL ERROA (F.XPLAIN)

H - OTHERIEXPLAINI CXHIBIT I. SAME SITURCE

f.

4 PHILADELPHIA ELECTRIC COMPANY 2301 MARKET STREET P.O. DOX 8699 PHILADELPHI A. PA.19101 (2151041 4000 October 14, 1988 Doci:et Mos. 50-P77 50-278 Director Office of Inspection & Enforcement-US Nuclear Regulatory Comunission Washington, DC 20555 Attention: Document Control Desk

SUBJECT:

Peach Bottom Atemic Power Station Monthly Operating Report Gentlemen:

Attached are twelve copies of the monthly operat ng report for Peacli Botton, linits 2 and 3 for the :nonth of September,1988 fontarded pursuant to Technical Speci.'ication 6.9.1.d under the guidance of Regflatory Guide 10.1, Revision 4.

Very truly yours, Ydb/

  • /

N/

W. M. Alden

/

g. /

Director

/

Licensing Section Nuclear Support Division Attachment cc: