NRC Monthly Operations Surmary Peach Botton Atomic Power Station j

September, 1988 l

l l

UNIT 2 l

i The unit rem &ined shut down throughout the report period. Activities in progress during the report period included 13 kV and 4 kV electrical bus maintenance and E-1 and E-3 diesel generator annual maintenance.

1 UNIT 3 The unit remained shut down throughout the report period. Activities in progress during the report period included iSW pipe replacement, feedwater heater replacement, preventive maintenance for hydraulic control units and 13 and 4 kV electrical bus maintenance, i

l l

t l

l l

t f

I I

l l

b SS10190268 880930 PDR ADOCK 0S000277

./

R PDC B

Docket No. 50-277 Attachment to Monthly Operating Report for September, 1988 UNIT 2 RffultlNG INFORMAL g 1.

Name of facility:

Peach Bottom Unit ?

]

?.

Scheduled date for next refueling *,hutdown:

(1) Reload 7 completed

(?) keload 8 scheduled f or March 10, 1990 3.

Scheduled date for restart following refueling:

(1) Restart following NRC Shutdown Order scheduled for December 20, 1988 (2) Restart following refueling scheduled for June 8, 1990.

4.

Will refueling or resumpti;n of operation thereafter require a technical specification change or other license amendment?

Yes if answer is yes, what, in general, will these be?

(1) Administrative changes to reload amendment (2)Loadsequencemodificatlonamendment (3) Diesel Generator Cardox modification amendment b.

Scheduled date(s) for submitting proposed licensing action and supporting informatlon:

1) Submitted April 25, 1988
2) Submitted September 7, 1986
3) SubmlLted Septemt er 7,1988 f,.

Important Itcensing considerations associated with refueling, e.g., new or dif f erent fuel design or supplier. nreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:

Refue1ing completed.

/.

lhe number of fuel assemblies (a) h the core and (b) in the spent fuel storage pool:

(a) Core - 764 fuel Assemblies (b) f uel Pool - 1734 f uel Assemblies 58 f uel Rods 8.

1he present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:

the spent fuel pool storage capacity has been relicensed for 3819 fuel assemblles.

Docket No. 50-277-Attachment t2 Monthly Operating i

Report for September, 1988 Page 2

}

i UNil ? REf0EllNG INf0RMA110N (Continued) i 9.

lhe projected date of the last refueling that can be discharged to the j

spent fuel pool assuming the pr.sent capacity:

I September, 1998 (September.1995, with reserve full core discharge) k r

i

)

i I

f

[

t k

i i

i t

t i

i i

i

f Dockst No.60-278 I

Attachment to Monthly Operating Report for September, 1988 4

UNil 3 REFUELING INFORMAi!0N i

4 i

1.

Name of facility:

Peach Botton Unit 3 i

?.

Scheduled date for next refueling shutdown:

j (1) keload 7 in progress (Major Pipe Replatcment Outage)

(2) Reload 8 scheduled for October 20. 1990 i

3.

$cheduled date for restart following refueling I

(1)RestartfollowingrefuelingscheduledforMarch 31, 1989

(?) Restart following refueling scheduled for January 18, 1991 4.

Will refueling or resumption of operation thereaf ter require a technical i

specifIcatton change or other license amendment?

Yes.

If answer is yes, what. In general, will these be?

(1) Alternate Rod Insertion modification and modified Recirculation Trip logic amendment

(?) Primary system piping installation modification amendment (3) Reload 7 Amendment b.

5theduled date(s) for suteltting proposed licensing action and supporting I

information:

Alternate Rod insertion /RPI Amendment submitted June !?.198/

I Primary System Piping Amendment submitted March Pl. 1988 Reload 7 t_icense Amendment submitted July 7. 1988 l

P 6.

Important licensing considerations associated with refueling, e.g., new or dif ferent fuel design or supplier, unreviewed design or performance analysis method:4 significant changes in fuel design, t.ew operating procedures:

None expcCted.

/.

ihenumberc'fuelassemblies(a)inthecoreand(b)inthespentfuel storage pool:

a Core - 0 fuel Assemblies (/64 assemblies offloaded during outage) b f uel Pool - 2260 fuel Assemblies. 6 f uel Rods

Docket No. 50-278 Attachment to Monthly Operating Report for September, 1988 i

Page 2 UNIT 3 RIFUf LING INFORMATION (Continued) 8.

The present licensed spent fuel pool storage capacity and the site of any increase in 1; censed storage capacity that has been requested or is planned, in number of fuel assemblies:

i i

lhe spent fuel pool storage capacity has been relicensed for 3819 fuel assemblies. This modification began on february P0,1987. The completion date for this modification has been rescheduled for february,1989 to accommodate the Unit 3 pipe replacement outage.

9.

The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present capacity:

March, 1993 (reserve full core discharge cannot be accommodated t

after the restart following the completion of the October, 1987 t

refueling outage untti the completion of the new fuel racks) installation of the new fuel racks will extend the projected date of the last refueling to September, P000 (March, 1996, with reserve full core discharge) f i

l l

t i

I r

h r

t i

h i

I

,_p

- - - - -.,, -, -,-, - - ~ ww

AVERAGF DAILY WIT PONER LEVEL t

DOCKET NO. 50 277 u

l I

WIT PEACH BOTTCH WIT t OtTE OCT 14. 1968 COMPAt# PHILADELPHI A ELECTRIC C0t9ANf L. L. MIDDLETON

[

TECte41 CAL A!.S!$7 ANT LICitc!M2 SECTION PAJCLE AR $UPPORT DEPARTNENT r

?

TELEPHCNE I215) 641-6174 MONTN StPTIteRR 1944 I

DAY AVERACE DAILY PCMER LEVil DAY AVERAGE DAILY POMER LEYtL (P94E NET )

1 P94E-NET I 1

0 17 0

2 0

18 0

l 3

0 19 0

4 0

20 0

1 f

5 0

21 0

i 6

0 et 0

l I

7 0

23 0

[

i 4

0 24 0

t 9

0 25 0

[

I 10 0

26 0

e f

11 0

FF 0

6

  • ?

12 0

to 0

t il 0

29 0

l 14 0

30 0

i 15 0

u 0

f t

I t

I l

- -. - -. r

A?tRAGE DAILY (MIT PONER LEVEL DOCKET No. 50 - 276 LNIT PEACH BOTTON LNIT 3 i

DATE OCT 14e 1984 f

COMPANY PHILADELPHIA ELECTRIC COMPANY i

L. L. MIDDLETON TECHNICAL ASSISTANT LICENSING SECTICH tAJCLEAR SUPPORT DEPARTMENT 1

TELEPHONE t215) 441-6174 j

MONTH StPTttatR 1964 DAY AVERAGE DAILY PONER LEYtl DAY AVERAGE DAILY POW R LEVEL (PHE-NETI

( P94E.NE T I r

1 0

17 0

I 0

la 0

l l

3 0

19 0

i 4

0 to 0

I 5

0 21 0

4 0

t2 0

1 0

23 0

8 0

t4 0

9 0

21 0

10 0

26 0

11 0

27 0

12 0

t4 0

15 0

t9 0

14 0

30 0

15 0

16 0

OPERATING 3ATA REPORT r

r l

DOCKET No. 50 277 b

DATE OCT 14e 1988 LOMPLtith BY PHILADELPHIA ELECTRIC COMPANY e

L. L. MIDDLtTON TECHNICAL ASSISTANT LICENSING SECTIDH IAJCtt AR SUPPORT DEPARTNLAT TELEPHONE (21518416IF4 DPERATING STATUS

[

..............n....................

1. LNIT HAME R PEACH DOTTCH LHIT t l NOTESI LNIT t AtMAINED SHUTDokN l

T l

l 4

t. REPORTING PERIODI SEPTEMBER 1966 l

UNDER NRC ORDER HITH l

l l

l t

3. LICENSt0 THCRMAL P0HERt HHTil 3191 l

RESTART ACTIVITIES l

l l

4. NAMEPLATE RAT!tG ICROSS ttit le 1152 l

CONT!!4 JING.

I

(

l l

S. DESIGN ELECTRICAL RATING (HET N>Qll 1065 I

l l

l

[

6. MAXIMUM DEPENDABLE CAPACITY (GROSS MHill 1098 I

i j

l l

r

7. MAXIMUM DEPENDASLE CAPACITY INET HHE ls 1051 l

l I

8. IF FNAPGES OCCUR IN CAPACITY RATINGS (ITEMS PUSER 3 THROUGH 7) $1NCE LAST REPORTe GIVE REASONSI J

f

9. PONER LEVEL TO HHICH RESTRICTIO, IF ANY INtf NHElt i

i i

10. RE ASONS FDR RESTRICTIONS. IF ANY 4

i 6

i THIS tomRH YR TO-DATE COMULAT1VE r

i

11. HOURS IN REPORTING PERIDO

?!O 6.575 124.647 l

12. NUMBER OF HOURS RE ACTOR HAS CRITIC AL 0

0 74.196.8

11. RE ACTD4 RISERVE SHUfDGf4 HOURS 0.0 0.0 0.0 I

[

i IS. HOURS CINERATOR ON-LINE 0.0 0.0 71.866.4 4

i l

15. U41T RESERvt SHUTDctet F.JUR$

0.0 0.0 0.0 I

l

16. GROSS THERMAL ENERGY GENERAf t0 t MHH b 0

0 812.410.745

17. GRUGS EttLTRIC AL ENE RGY GENER Af t 0 ( MHH )

0 0

70.019.23V

{

i I

i

18. NET ELECTRICAL ENERGY GENERAf t0 iHHH b a

5 700 54.414 67.006.702 i

{

r PAGE 1 OF 2 i

i i

i

4 OPERATING DATA REPORT (CONTDA>tDi DOCKET NO. 50. t??

DATE OCT 14. 1964 THIS HONTH VR.TO Daft CUHJLATIVE l

19. UNIT SERVICE / ACTOR 0.0 0.0 57.6
20. UNIT AVAILA81LITY FACTOR 0.0 0.0 57.6 f
21. UNIT CAPACITY FACTOR (USING HDC NET) 0.0 0.0

$1.1 f t. UNIT CAPACITY FACTOR IUSING OtR NETI 0.0 0.0 50.4 it. UNIT FORCEO OUTAGE RATE 0.0 0.0 14.6 r

24. SHLITDol#43 SCHIDULED OVER NEXT 6 MONTHS ITYPE: DA*t e AND DURATION OF E ACHis REFutLING OUTAGE

[

t f

25. IF SNUTDOHN AT END OF REPORT PERID0e ESTIMAf t0 DATE OF STARTUPI l

i 1

26. Lt41TS IN TEST STATUS (PRIOR TO CottttRCI AL OPERATIONil FORtCAST ACHIEYt0 INITIAL CRITICALITY 09/16/75 l

INITIAL ELECTRICITY 02/18/74 CONhtRCIAL OPERATION 07/0E/74 I

i f

I 1

\\

i l

l 1

i I

I t

l PAGE 2 CF 2 e. NEGATIVE VALUE REPORTED FOR COPGISTEPCY MITH FEDERAL ENERGY REGULATORY CCrti!S$1Cr4 REPORTS.

I i

l 4

4

OPERAf!NG DATA REPORT DOCKET NO. 50 - 274

.4TE DCT 14e 1966

[

COMPLEft0 SY PHILADELPHIA ELECTRIC COMPANY l

L. L. MIDDLETON TECHNICAL ASSISTANT i

t LICENSING SICT!DN MJCLEAR CUPPORT DEPARTNENT TELEPHONE (215) 641-6374 i

j OPERATING STATUS I

1. tHIT NAM 48 PEACPI DOTTON UNIT 3 i NOTES 6 UNIT 1 REMAINED SHUTO' D94 l

)

l l

2. REPORTING PERIDOI Sf PTEMBE R, 1964 l

UNDER NRC ORDER HITH l

[

l l

l

3. LICttGt0 THERMAL P0HERitNTil St93 i

REFlEL AND PIPE REPLACEMENT l

l j

6. NAPEPLATI RATING (GROGS POE ll 1152 l

IN PROGRESS.

l l

l l

j

5. DESIGN ELECTRICAL RATING (NET HNEle 1065 l

l L

l l

l f

6. MAXIMUM CIPENDASLE C&PACITY t GROSS P>E ll 1098 l

l r

l l

i

7. MAXIMUM DEPENDABLE CAPACITY INtf P>E li 1035 l

l A. IF CHANGES OCCUR IN CAPACITY RATINGS t! TEM 3 PAketR 3 THROUGH 71 $1NCE LAST REPOQT, G1YF RE ASOPSI l

9. P0HER LEYtl TO HMICH RESTRICitDe IF ANY (HET tNEll I

i

10. REASOPG FOR RESTRICTIOPC, IF ANfs I

r THIS HONTH YR TO-DATE C' etAAT!vt

11. HOURS IN REPORTING PERICO 720 6.575 120.741
12. NVPSER OF HOURS RE ACTOR KAS CRITICAL 0

0 76.357.4

13. RE ACTOR RESERVE SHLffDO>N HOURS 0.0 0.0 0.0 i

L 1

e l

t

14. HOURS 6tNERATOR OH-LIN!

0.0 0.0 73.929.3 i

l l

t

15. UNIT RESERvt SHJTDON>4 HOURS 0.0 0.0 0.0 t

i

14. GfeOSS THIRMAL ENERGY GLhtRATIO I MHH I O

O 315.t76.901

(

(

17. GROSS ELECTRIC AL ENERGY GtPARATED (MHHI O

O 70.611,632

14. NET ELECTRICAL ENERGY GENERATt0 (NnHI e

5.457 e

36.171 67.665.984 L

L PAGE 1 0F t I

i r

1 O

r777

-mm

~

l '/

r

-OPERA 7ING DATA REPORT (CONTINUED)

DOCKET No. 50 - 278

~ ' -

q DATE OCT 14, 1968 THIS HONTH YR-TO-DATE CUMULATIVE

19. UNIT SERVICE FACTOR 0.0 0.0 61.2
20. UNIT AVAILABILITY FACTOR 0.0 0.0 61.2
21. UNIT CAPACITY FACTOR (USING MDC NET) 0.0 0.0 54.1 f t. UNIT CAPACI'Y FACTOR (USING DER NET) 0.0 0.0 52.6

-23. UNIT FORCf3 DUTAGE RATE 0.0 0.0 13.3

20. SHUTDO>NS SCHEDULED DVER NEXT 6 MONTHS ITYPE, DA - AND DURATION OF EACH):

INDETERMINATE UNTIL NRC ORDER IS SATISFIED.

25. IF SHUTDOPN AT END OF REPORT PERIOD, ESTINATED DATE OF STARTUPt
20. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATIONlt FORECAST ACHIEVED INITIAL CRITICALITY 08/07/74 INITIAL ELECTRICITY 09/01/74 COHKERCIAL OPERATIDH 12/23/74 f

I 4

PAGE 2 0F 2

.b g

UNIT SHUTD0694S AND PCHFR REDUCTIONS DOCKET No. 50 - E77

/

LHIT NAME PEACH BOTTOM LMIT E i

DATE OCT 14, 1986 REFORT NONTH SEPTEteER, 1988 COMPLETED BY PHILADELPHIA ELECTRIC COMPANY L. L. MIDDLETON-TECHNICAL ASSISTANT LICENSING SECTION NUCLEAR SUPPORT DEPARTHENT TELEPHONE (E15) 841-6374 3.

l l

l l

l HETHOO 0F I LICENSEE ISYSTEMICONFCNEN*l CAUSE AND CORRECTIVE l

l TYPE l DURATION l RE ASON I SHUTTING 00604 )

EVENT l CODE l CODE l ACTION TO

'.I OATE l 11)l (HOURSil IE) l REACTOR 13) l REPORT 8 l (4) l (5) l PREVENT RECURRENCE 1

I l

l l

l l

l l

l 7 l 880001 l-S l 720.0 l C l 1

l N/A l RC l FUELXX l NRC REGUIRED SHUTDOHN.

-1 I

i ----- 1 I

I I

I I

l l

l 720.0 l l

l l

l l

f (1)

(E) 131 141

- FORCED REASON HETHOO EXHIBIT G - INSTRUCTIONS

- SCHEDULED A - EQUIPMENT FAILURE t tXPLAIN) 1 - HANUAL FOR PREPARATION OF DATA

[

B - MAINTENANCE OR TEST E - MA1AJAL SCRAM.

ENTRY SHEETS FOR LICENSEE

(

C - REFUELING 3 - AUTOHATIC SCRAM.

EVENT REPORT (LER) 0 - REGULATORY RESTRICTION 4 - OTHER (EXPLAIN)

FILE OAREG-0161)

E - OPERATOR TRAINING + LICENSE EXAMINATIDH F - ADMINISTRATIVE (5)

G = DPERATICHAL ERROR (EXPLAIN)

H = OTHERIEXPLAIN)

EXHIBIT I - SANC SOURCE

[

i r

i I

h e

i i

I t

i t

I i

I 1

~

UNIT SHUTDO4C AND hMER REDUCTI0tG DOCKET NO. 50 - 278 UNIT NAME PEACH BOTTCH LNIT 3 DATE OCT 14, 1968 REPORT HONTH SEPTENDER,1988 C.21PLETED BY PHILADELPHI A ELECTRIC COMPAf#

L. L. HIDDLETON TECHNICAL ASSISTANT LICEtGils SECTI0t4 NUCLkAR SUPPGAT DEPARTMEh!

TELEFH0t(E 1215) 841-6374 l

l l

l l NETHOD CF l LICEtGEE l SYSTEMIC 0HP001ENTI CAUGE AND CONRECTIVE l

l TYPE I DUR ATI ON I RE ASON I SHUTT!tG DOf41 EVENT l CODE I CODE I ACTI0tt TO

.I DATt. I i1)) (HOURSIl 42) l REACTOR I3) l REPORT 5 l f4) l t51 1 PREVENT RECURRENCE

~l I

l l

I I

I I

i

' l 680901 l S l 720.0 l C l 1

1 PVA l RC l FUELM: l PIPE REPLACEMENT CUTAGE.

I I

I I

I I

I i

1 1

I I ----- 1 I

l l

l l

1 1

I no.D I I

I I

I I

(1) 82)

(3) 141

- ThXED REASott HETH00 EXHIBIT G a ItGTRUCTIOG

- SCHfDULED A - EQUIPMENT F AILURL I EXPLAIN) 1 - HA1AJAL FOR PREPARATIOPl QF DATA B - t%1NTENANCE OR TEST 2 - HAPAJAL SCRAM.

ENTRY SHEETS FOR LICEtGEE C

REFUELItG 3 - AUTOMATIC SCR/!1.

EVENT REPORT ILER) i l

D - REGAATORY PESTRICTION 4 - OYHER IEXPLAINI FILE (IHREG-0161)

E - CPERATOR TRAINING e LICEtGE EXAMINAT!We F

ADMINISTRATIVE (51 G - OPERATIONAL ERROA (F.XPLAIN)

H - OTHERIEXPLAINI CXHIBIT I. SAME SITURCE

f.

4 PHILADELPHIA ELECTRIC COMPANY 2301 MARKET STREET P.O. DOX 8699 PHILADELPHI A. PA.19101 (2151041 4000 October 14, 1988 Doci:et Mos. 50-P77 50-278 Director Office of Inspection & Enforcement-US Nuclear Regulatory Comunission Washington, DC 20555 Attention: Document Control Desk

SUBJECT:

Peach Bottom Atemic Power Station Monthly Operating Report Gentlemen:

Attached are twelve copies of the monthly operat ng report for Peacli Botton, linits 2 and 3 for the :nonth of September,1988 fontarded pursuant to Technical Speci.'ication 6.9.1.d under the guidance of Regflatory Guide 10.1, Revision 4.

Very truly yours, Ydb/

  • /

N/

W. M. Alden

/

g. /

Director

/

Licensing Section Nuclear Support Division Attachment cc:

W. 1. Russell, Administrator, Region I, USNRC l'. P. Johnson, USNRC Senior Resident inspector S. P. Mangi. Dept. of Envir. Resources W.11. Lovelace, NRC (2 copies)

R. E. Martin, NRC Project Manager Thomas Magette, Maryland Power Plant Siting INPO Records Center

, i

__