ML20210B514: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:,- - -- -= .                 ---- , . - - - - _ - - - -                     . - . - -         _ -     _ . -   _ . _ - _ - -
{{#Wiki_filter:,- - -- -= .
            *
---- , . - - - - _ - - - -
. - . - -
_ -
_ . -
_ . _ - _ - -
*
1
1
,
*
              *
,
    '
'
                                                                  JAN 3 0 $87
JAN 3 0 $87
  l
l
                                                                                                                                    ,
,
.
.
4
4
                  Docket No. 50-213
Docket No. 50-213
,
,
I
I
                  Connecticut Yankee Atomic Power Company                                                                           i
Connecticut Yankee Atomic Power Company
                  ATTN:       Mr. E. J. Mroczka
i
ATTN:
Mr. E. J. Mroczka
j
j
Senior Vice President - Nuclear
'
Engineering and Operations
j
P. O. Box 270
,
'
'
                              Senior Vice President - Nuclear
Hartford, Connecticut 06101
                              Engineering and Operations
j                  P. O. Box 270                                                                                                    ,
'
'
                  Hartford, Connecticut 06101                                                                                      '
Gentlemen:
                  Gentlemen:
j
j                 Subject:   Inspection Report No. 50-213/86-29
Subject:
Inspection Report No. 50-213/86-29
!
!
.
.
                  During the period from November 14 to 21, 1986, a Region I team of nine in-
During the period from November 14 to 21, 1986, a Region I team of nine in-
,
,
                  spectors conducted an integrated performance assessment inspection at the
spectors conducted an integrated performance assessment inspection at the
!                 Haddam Neck Nuclect Power Plant. The objective of this inspection was to
!
1
Haddam Neck Nuclect Power Plant. The objective of this inspection was to
                  obtain additional insight into your overall facility / organizational performance
obtain additional insight into your overall facility / organizational performance
I                 in order to improve our understanding of declining trends in performance during                                   ,
1
l                 the past several years as indicated by our Systematic Assessment of Licensee                                     '
I
;                 Performance (SALP) evaluations of your facility. The inspection was intended
in order to improve our understanding of declining trends in performance during
,
l
the past several years as indicated by our Systematic Assessment of Licensee
'
;
Performance (SALP) evaluations of your facility. The inspection was intended
to provide a fresh perspective independent of previous NRC inspections and
+
+
                  to provide a fresh perspective independent of previous NRC inspections and
evaluations. At the conclusion of the inspection Messrs. H. Kister and
                  evaluations. At the conclusion of the inspection Messrs. H. Kister and
{
{                 R. Conte of my staff summarized the inspection findings with you and other
R. Conte of my staff summarized the inspection findings with you and other
j                 members of your staff.
j
members of your staff.
:
:
l                 Overall, we did not identify any fundamental weaknesses in the facility opera-
l
I                 tion and generally confirmed our past assessment of your performance in the                                       '
Overall, we did not identify any fundamental weaknesses in the facility opera-
i                 most recent SALP report. As we previously concluded, you have a strong,
I
!                 knowledgeable operations staff with a good safety perspective. We noted good
tion and generally confirmed our past assessment of your performance in the
!                 practices in operator training, problem identification methods, and site
'
                  security. However, some areas require your further attention to bring about                                       ;
i
I                 needed performance improvements.                   These include communications between the
most recent SALP report. As we previously concluded, you have a strong,
l                 plant staff and engineering support groups, temporary equipment storage, and
!
                  sensitivity toward out-of-service time for critical equipment.
knowledgeable operations staff with a good safety perspective. We noted good
!
practices in operator training, problem identification methods, and site
security. However, some areas require your further attention to bring about
;
I
needed performance improvements.
These include communications between the
l
plant staff and engineering support groups, temporary equipment storage, and
sensitivity toward out-of-service time for critical equipment.
J
J
l                 Further, recent changes in management assignments along with enhanced resources
l
!                 applied to new training programs, increased activity in the area of plant
Further, recent changes in management assignments along with enhanced resources
!                 modifications, and implementation of new technical specifications, will require
!
                  the special attention of your managers to complete these necessary improvements
applied to new training programs, increased activity in the area of plant
                  and at the same time maintain a high assurance of nuclear and radiological
!
                  safety.                                                                                                           [
modifications, and implementation of new technical specifications, will require
                                                                                                                                    !
the special attention of your managers to complete these necessary improvements
and at the same time maintain a high assurance of nuclear and radiological
safety.
[
!
i
i
l                   8702090177 870130
l
t                   PDR   ADOCK 05000213
8702090177 870130
i                    G                        PDR
t
PDR
ADOCK 05000213
i
i
                                                            0FFICIAL RECORD COPY             IR HN 86-29 - 0001.0.0
G
                                                                                            01/29/87.IE0/
PDR
                                                                                                                    If               '
i
0FFICIAL RECORD COPY
IR HN 86-29 - 0001.0.0
01/29/87.IE0/
If
'


-
-
4
4
  Connecticut Yankee Atomic           2
Connecticut Yankee Atomic
    Power Company
2
  No response to this report is required. Your cooperation with us is
Power Company
  appreciated.
No response to this report is required. Your cooperation with us is
                                            Sincerely,
appreciated.
                                            Original SI : nod Ey:
Sincerely,
                                          William F. Kane, Director
Original SI : nod Ey:
                                          Division of Reactor Projects
William F. Kane, Director
  cc w/ encl:
Division of Reactor Projects
  D. Miller, Station Superintendent
cc w/ encl:
  D. O. Nordquist, Manager of Quality Assurance
D. Miller, Station Superintendent
  R. Kacich, Manager, Generation Facilities Licensing
D. O. Nordquist, Manager of Quality Assurance
  W. Romberg, Vice President, Nuclear Operations
R. Kacich, Manager, Generation Facilities Licensing
  Gerald Garfield, Esquire
W. Romberg, Vice President, Nuclear Operations
  Public Document Room (PDR)
Gerald Garfield, Esquire
  Local Public Document Room (LPOR)
Public Document Room (PDR)
  Nuclear Safety Information Center (NSIC)
Local Public Document Room (LPOR)
  NRC Resident Inspector
Nuclear Safety Information Center (NSIC)
  State of Connecticut
NRC Resident Inspector
  bcc w/ encl:
State of Connecticut
  Region I Docket Room (with concurrences)
bcc w/ encl:
  Senior Operations Officer (w/o encis)
Region I Docket Room (with concurrences)
  T. Murley, RI
Senior Operations Officer (w/o encis)
  R. Starostecki, IE
T. Murley, RI
  S. Ebneter, RI
R. Starostecki, IE
  T. Martin, RI
S. Ebneter, RI
  W. Kane, RI
T. Martin, RI
  S. Collins, RI
W. Kane, RI
  J. Johnson, RI
S. Collins, RI
  R. Blough, RI
J. Johnson, RI
  E. Wenzinger, RI
R. Blough, RI
  E. McCabe, RI
E. Wenzinger, RI
  E. Conner,RI
E. McCabe, RI
  P. Bissett, Reactor Engineer
E. Conner,RI
  R. Conte, SRI, (Three Mile Island-1)
P. Bissett, Reactor Engineer
  C. Holden, Jr., SRI, (Maine Yankee)
R. Conte, SRI, (Three Mile Island-1)
  R. Gramm, SRI, (Limerick-2)
C. Holden, Jr., SRI, (Maine Yankee)
  S. Sherbini, Senior Radiation Specialist
R. Gramm, SRI, (Limerick-2)
  D. Silk, Reactor Engineer (Examiner)
S. Sherbini, Senior Radiation Specialist
  G. Smith, Security Specialist
D. Silk, Reactor Engineer (Examiner)
  W. Troskoski, SRI, (Beaver Valley-1)
G. Smith, Security Specialist
  K. Abraham, RI                                                               l
W. Troskoski, SRI, (Beaver Valley-1)
  P. Lohaus, RI
K. Abraham, RI
                            0FFICIAL RECORD COPY         IR HN 86-29 - 0001.0.1
l
                                                        01/29/87
P. Lohaus, RI
0FFICIAL RECORD COPY
IR HN 86-29 - 0001.0.1
01/29/87


.
.
e
e
  Connecticut Yankee Atomic           3
Connecticut Yankee Atomic
    Power Company
3
    ku'
Power Company
  RI. RP'/           RI:0RP
ku'
                                          )W
)W
                                      RI:DRP
\\
                                                \
RI. RP'/
                                                Ri gDR
RI:0RP
  RConte/geb         RBlough         EWenzinger SCo ins         'f 1 e
RI:DRP
  1/27/87             1/Q7/87         1/11/87   1
Ri DR
                                                      /\7        1/jf/87
g
                          0FFICIAL RECORD COPY   R HN 86-29 - 0002.0.0
RConte/geb
                                                01/29/87
RBlough
EWenzinger
SCo ins
'f 1
e
/\\7
1/jf/87
1/27/87
1/Q7/87
1/11/87
1
0FFICIAL RECORD COPY
R HN 86-29 - 0002.0.0
01/29/87
}}
}}

Latest revision as of 17:00, 6 December 2024

Forwards Integrated Performance Assessment Insp Rept 50-213/86-29 on 861114-21.No Fundamental Weaknesses Noted
ML20210B514
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 01/30/1987
From: Kane W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Mroczka E
CONNECTICUT YANKEE ATOMIC POWER CO.
Shared Package
ML20210B518 List:
References
NUDOCS 8702090177
Download: ML20210B514 (3)


See also: IR 05000213/1986029

Text

,- - -- -= .


, . - - - - _ - - - -

. - . - -

_ -

_ . -

_ . _ - _ - -

1

,

'

JAN 3 0 $87

l

,

.

4

Docket No. 50-213

,

I

Connecticut Yankee Atomic Power Company

i

ATTN:

Mr. E. J. Mroczka

j

Senior Vice President - Nuclear

'

Engineering and Operations

j

P. O. Box 270

,

'

Hartford, Connecticut 06101

'

Gentlemen:

j

Subject:

Inspection Report No. 50-213/86-29

!

.

During the period from November 14 to 21, 1986, a Region I team of nine in-

,

spectors conducted an integrated performance assessment inspection at the

!

Haddam Neck Nuclect Power Plant. The objective of this inspection was to

obtain additional insight into your overall facility / organizational performance

1

I

in order to improve our understanding of declining trends in performance during

,

l

the past several years as indicated by our Systematic Assessment of Licensee

'

Performance (SALP) evaluations of your facility. The inspection was intended

to provide a fresh perspective independent of previous NRC inspections and

+

evaluations. At the conclusion of the inspection Messrs. H. Kister and

{

R. Conte of my staff summarized the inspection findings with you and other

j

members of your staff.

l

Overall, we did not identify any fundamental weaknesses in the facility opera-

I

tion and generally confirmed our past assessment of your performance in the

'

i

most recent SALP report. As we previously concluded, you have a strong,

!

knowledgeable operations staff with a good safety perspective. We noted good

!

practices in operator training, problem identification methods, and site

security. However, some areas require your further attention to bring about

I

needed performance improvements.

These include communications between the

l

plant staff and engineering support groups, temporary equipment storage, and

sensitivity toward out-of-service time for critical equipment.

J

l

Further, recent changes in management assignments along with enhanced resources

!

applied to new training programs, increased activity in the area of plant

!

modifications, and implementation of new technical specifications, will require

the special attention of your managers to complete these necessary improvements

and at the same time maintain a high assurance of nuclear and radiological

safety.

[

!

i

l

8702090177 870130

t

PDR

ADOCK 05000213

i

G

PDR

i

0FFICIAL RECORD COPY

IR HN 86-29 - 0001.0.0

01/29/87.IE0/

If

'

-

4

Connecticut Yankee Atomic

2

Power Company

No response to this report is required. Your cooperation with us is

appreciated.

Sincerely,

Original SI : nod Ey:

William F. Kane, Director

Division of Reactor Projects

cc w/ encl:

D. Miller, Station Superintendent

D. O. Nordquist, Manager of Quality Assurance

R. Kacich, Manager, Generation Facilities Licensing

W. Romberg, Vice President, Nuclear Operations

Gerald Garfield, Esquire

Public Document Room (PDR)

Local Public Document Room (LPOR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

State of Connecticut

bcc w/ encl:

Region I Docket Room (with concurrences)

Senior Operations Officer (w/o encis)

T. Murley, RI

R. Starostecki, IE

S. Ebneter, RI

T. Martin, RI

W. Kane, RI

S. Collins, RI

J. Johnson, RI

R. Blough, RI

E. Wenzinger, RI

E. McCabe, RI

E. Conner,RI

P. Bissett, Reactor Engineer

R. Conte, SRI, (Three Mile Island-1)

C. Holden, Jr., SRI, (Maine Yankee)

R. Gramm, SRI, (Limerick-2)

S. Sherbini, Senior Radiation Specialist

D. Silk, Reactor Engineer (Examiner)

G. Smith, Security Specialist

W. Troskoski, SRI, (Beaver Valley-1)

K. Abraham, RI

l

P. Lohaus, RI

0FFICIAL RECORD COPY

IR HN 86-29 - 0001.0.1

01/29/87

.

e

Connecticut Yankee Atomic

3

Power Company

ku'

)W

\\

RI. RP'/

RI:0RP

RI:DRP

Ri DR

g

RConte/geb

RBlough

EWenzinger

SCo ins

'f 1

e

/\\7

1/jf/87

1/27/87

1/Q7/87

1/11/87

1

0FFICIAL RECORD COPY

R HN 86-29 - 0002.0.0

01/29/87