Forwards Integrated Performance Assessment Insp Rept 50-213/86-29 on 861114-21.No Fundamental Weaknesses Noted
ML20210B514
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 01/30/1987
From: Kane W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Mroczka E
CONNECTICUT YANKEE ATOMIC POWER CO.
Shared Package
ML20210B518 List:
References
NUDOCS 8702090177
Download: ML20210B514 (3)


See also: IR 05000213/1986029

Text

,- - -- -= . ---- , . - - - - _ - - - - . - . - - _ - _ . - _ . _ - _ - -

1

,

'

JAN 3 0 $87

l

,

.

4

Docket No. 50-213

,

I

Connecticut Yankee Atomic Power Company i

ATTN: Mr. E. J. Mroczka

j

'

Senior Vice President - Nuclear

Engineering and Operations

j P. O. Box 270 ,

'

Hartford, Connecticut 06101 '

Gentlemen:

j Subject: Inspection Report No. 50-213/86-29

!

.

During the period from November 14 to 21, 1986, a Region I team of nine in-

,

spectors conducted an integrated performance assessment inspection at the

! Haddam Neck Nuclect Power Plant. The objective of this inspection was to

1

obtain additional insight into your overall facility / organizational performance

I in order to improve our understanding of declining trends in performance during ,

l the past several years as indicated by our Systematic Assessment of Licensee '

Performance (SALP) evaluations of your facility. The inspection was intended

+

to provide a fresh perspective independent of previous NRC inspections and

evaluations. At the conclusion of the inspection Messrs. H. Kister and

{ R. Conte of my staff summarized the inspection findings with you and other

j members of your staff.

l Overall, we did not identify any fundamental weaknesses in the facility opera-

I tion and generally confirmed our past assessment of your performance in the '

i most recent SALP report. As we previously concluded, you have a strong,

! knowledgeable operations staff with a good safety perspective. We noted good

! practices in operator training, problem identification methods, and site

security. However, some areas require your further attention to bring about  ;

I needed performance improvements. These include communications between the

l plant staff and engineering support groups, temporary equipment storage, and

sensitivity toward out-of-service time for critical equipment.

J

l Further, recent changes in management assignments along with enhanced resources

! applied to new training programs, increased activity in the area of plant

! modifications, and implementation of new technical specifications, will require

the special attention of your managers to complete these necessary improvements

and at the same time maintain a high assurance of nuclear and radiological

safety. [

!

i

l 8702090177 870130

t PDR ADOCK 05000213

i G PDR

i

0FFICIAL RECORD COPY IR HN 86-29 - 0001.0.0

01/29/87.IE0/

If '

-

4

Connecticut Yankee Atomic 2

Power Company

No response to this report is required. Your cooperation with us is

appreciated.

Sincerely,

Original SI : nod Ey:

William F. Kane, Director

Division of Reactor Projects

cc w/ encl:

D. Miller, Station Superintendent

D. O. Nordquist, Manager of Quality Assurance

R. Kacich, Manager, Generation Facilities Licensing

W. Romberg, Vice President, Nuclear Operations

Gerald Garfield, Esquire

Public Document Room (PDR)

Local Public Document Room (LPOR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

State of Connecticut

bcc w/ encl:

Region I Docket Room (with concurrences)

Senior Operations Officer (w/o encis)

T. Murley, RI

R. Starostecki, IE

S. Ebneter, RI

T. Martin, RI

W. Kane, RI

S. Collins, RI

J. Johnson, RI

R. Blough, RI

E. Wenzinger, RI

E. McCabe, RI

E. Conner,RI

P. Bissett, Reactor Engineer

R. Conte, SRI, (Three Mile Island-1)

C. Holden, Jr., SRI, (Maine Yankee)

R. Gramm, SRI, (Limerick-2)

S. Sherbini, Senior Radiation Specialist

D. Silk, Reactor Engineer (Examiner)

G. Smith, Security Specialist

W. Troskoski, SRI, (Beaver Valley-1)

K. Abraham, RI l

P. Lohaus, RI

0FFICIAL RECORD COPY IR HN 86-29 - 0001.0.1

01/29/87

.

e

Connecticut Yankee Atomic 3

Power Company

ku'

RI. RP'/ RI:0RP

)W

RI:DRP

\

Ri gDR

RConte/geb RBlough EWenzinger SCo ins 'f 1 e

1/27/87 1/Q7/87 1/11/87 1

/\7 1/jf/87

0FFICIAL RECORD COPY R HN 86-29 - 0002.0.0

01/29/87