ML20210T706: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot insert |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter:[\ | {{#Wiki_filter:[\\ | ||
. . , | |||
'9 | |||
w a | |||
SEP 2 611186 | |||
Docket No. 50-213 | |||
License Nos. OPR-61 | |||
Connecticut Yankee Atomic Power Company | |||
ATTN: Mr. J. F. Opeka | |||
Senior Vice President - Nuclear | |||
Engineering and Operations Group | |||
P. O. Box 270 | |||
Hartford, Connecticut 06101 | |||
Gentlemen: | |||
Subject: Enforcement Conference for Inspection No. 50-213/86-17 | |||
This letter transmits the details of the enforcement conference held on | |||
September 3, 1986 in the Region I office, King of Prussia, Pennsylvania, to | |||
discuss the findings of the above referenced Inspection Report. | |||
The topics discussed at that conference relate to the findings identified | |||
during the inspection, conducted to assess Haddam Neck Station's ability to | |||
safely shutdown, in the event of a fire. A reply to this letter is not | |||
required. You will be notified of our evaluation of appropriate enforcement | |||
actions at a later date. | |||
Your cooperation with us in this matter is appreciated. | |||
Sincerely, | |||
Original Signed W3 | |||
clifford J. Anderson | |||
Stewart D. Ebneter, Director | |||
Division of Reactor Safety | |||
/ - | |||
i | |||
Enclosures: | |||
1. | |||
NRC Region I EnforcementjConference Report | |||
2. | |||
Connecticut Yankee Atomic Power Company Presentation | |||
cc: | |||
R. Graves, Plant Superintendent | |||
D. O. Nordquist, Manager of Quality Assurance | |||
R. T. Laudenat, Manager, Generation Facilities Licensing | |||
E. J. Mroczka, Vice President, Nuclear Operations | |||
8g | |||
Gerald Garfield, Esquire | |||
Public Document Room (PDR) | |||
), | |||
Local Public Document Room (LPOR) | |||
/ | |||
Nuclear Safety Information Center (NSIC) | |||
l | |||
NRC Resident Inspector | |||
h I | |||
State of Connecticut | |||
OFFICIAL RFrnon COPY | |||
EC HN 86-17 - 0001.0.0 | |||
$00 $$ $N | |||
3 | |||
0 | |||
.., | . . , | ||
' | ' | ||
Connecticut Yankee Atomic | |||
2 | |||
Power. Company | |||
. | |||
bcc w/ encl: | |||
Region I Docket Room (with concurrences) | |||
Management Assistant, DRMA (w/o encl) | |||
Section Chief, DRP | |||
M. McBride, RI, Pilgrim | |||
J. Shediosky, SRI, Millstone 1&2 | |||
T. Rebelowski,_ SRI, Millstone 3 | |||
J. Akstulewicz, LPM, NRR | |||
Robert J. Bores, DRSS | |||
(f.btS | |||
CC: bl5 | |||
tje | |||
gy goto&> | |||
A"bl % | |||
[ | |||
'/!hI 8 | |||
FFICIAL RECORD COPY | |||
EC HN 86-17 - 0002.0.0 | |||
7 | |||
09/23/86 | |||
}} | }} | ||
Latest revision as of 01:03, 6 December 2024
| ML20210T706 | |
| Person / Time | |
|---|---|
| Site: | Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png |
| Issue date: | 09/26/1986 |
| From: | Ebneter S NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Opeka J CONNECTICUT YANKEE ATOMIC POWER CO. |
| Shared Package | |
| ML20210T709 | List: |
| References | |
| NUDOCS 8610090152 | |
| Download: ML20210T706 (2) | |
See also: IR 05000213/1986017
Text
[\\
. . ,
'9
w a
SEP 2 611186
Docket No. 50-213
License Nos. OPR-61
Connecticut Yankee Atomic Power Company
ATTN: Mr. J. F. Opeka
Senior Vice President - Nuclear
Engineering and Operations Group
P. O. Box 270
Hartford, Connecticut 06101
Gentlemen:
Subject: Enforcement Conference for Inspection No. 50-213/86-17
This letter transmits the details of the enforcement conference held on
September 3, 1986 in the Region I office, King of Prussia, Pennsylvania, to
discuss the findings of the above referenced Inspection Report.
The topics discussed at that conference relate to the findings identified
during the inspection, conducted to assess Haddam Neck Station's ability to
safely shutdown, in the event of a fire. A reply to this letter is not
required. You will be notified of our evaluation of appropriate enforcement
actions at a later date.
Your cooperation with us in this matter is appreciated.
Sincerely,
Original Signed W3
clifford J. Anderson
Stewart D. Ebneter, Director
Division of Reactor Safety
/ -
i
Enclosures:
1.
NRC Region I EnforcementjConference Report
2.
Connecticut Yankee Atomic Power Company Presentation
cc:
R. Graves, Plant Superintendent
D. O. Nordquist, Manager of Quality Assurance
R. T. Laudenat, Manager, Generation Facilities Licensing
E. J. Mroczka, Vice President, Nuclear Operations
8g
Gerald Garfield, Esquire
Public Document Room (PDR)
),
Local Public Document Room (LPOR)
/
Nuclear Safety Information Center (NSIC)
l
NRC Resident Inspector
h I
State of Connecticut
OFFICIAL RFrnon COPY
EC HN 86-17 - 0001.0.0
$00 $$ $N
3
0
. . ,
'
Connecticut Yankee Atomic
2
Power. Company
.
bcc w/ encl:
Region I Docket Room (with concurrences)
Management Assistant, DRMA (w/o encl)
Section Chief, DRP
M. McBride, RI, Pilgrim
J. Shediosky, SRI, Millstone 1&2
T. Rebelowski,_ SRI, Millstone 3
J. Akstulewicz, LPM, NRR
Robert J. Bores, DRSS
(f.btS
CC: bl5
tje
gy goto&>
A"bl %
[
'/!hI 8
FFICIAL RECORD COPY
EC HN 86-17 - 0002.0.0
7
09/23/86