ML20211D356: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:- _ _ _ -
{{#Wiki_filter:(ng3LYS RY?)LdTORY COMMISSION Nb t OiA HtouENN$bE Hm _ _ _.
(ng3LYS RY?)LdTORY COMMISSION Nb t OiA HtouENN$bE Hm _ _ _ .
FOIA 252 p aeg*
p aeg*
* HESPONSE TYPE f~.
* FOIA 252 HESPONSE TYPE f~.
RESPONSE TO FREEDOM OF InNu h [mRmt (1 %)
g                  1                            RESPONSE TO FREEDOM OF                                                     InNu                   h [mRmt (1 %)
g 1
Lg                                                                                      om
\\c=oj Lg INFORMATION ACT (FOIA) REQUEST om g
\c=oj                 .
INFORMATION ACT (FOIA) REQUEST                                                         g         ,
J :c g,-
J :c g,-
DOCKET NUMBEHfSn Ilf sophcabiel R E QUEST E R Mi Chael O' Mati a
DOCKET NUMBEHfSn Ilf sophcabiel R E QUEST E R Mi Chael O' Mati a PART l.-AGENCY REERDS RELE ASED OR NOT LOCATED (Sec checdedtiomes!
_                                            PART l.-AGENCY REERDS RELE ASED OR NOT LOCATED (Sec checdedtiomes!
N2 agency records subject to the request have been located.
N2 agency records subject to the request have been located.
N3 additional agency records subject to the request have been located.
N3 additional agency records subject to the request have been located.
Requested records are avaliable through another public distribution program. See Comments section.
Requested records are avaliable through another public distribution program. See Comments section.
4ency records subject to the request that are identified in Append.xtes)                             are already available for pubhc inspection and copying at the NRC Public Document Room,2120 L Street, N.W., Washington, DC.
4ency records subject to the request that are identified in Append.xtes) are already available for pubhc inspection and copying at the NRC Public Document Room,2120 L Street, N.W., Washington, DC.
Agency records subject to th- request that are ider tified in Appendix (es)         A               are being made avai!ab!e for pubbc inspution and copying
Agency records subject to th-request that are ider tified in Appendix (es)
    )(     et the NRC Public Document Room,2120 L Stnet. N.W., Washington, DC,in a folder under this FOI A number.
A are being made avai!ab!e for pubbc inspution and copying
)(
et the NRC Public Document Room,2120 L Stnet. N.W., Washington, DC,in a folder under this FOI A number.
The nonproprietary version of the proposat(s) that you agreed ;o accept in a telephone conversation with a member of my staff is now being made avai!ab!c for public insnection and copying at the NRC Pubbe Document Room. 2120 L Street, N.W., Washington, DC, m a folder under this FOI A number.
The nonproprietary version of the proposat(s) that you agreed ;o accept in a telephone conversation with a member of my staff is now being made avai!ab!c for public insnection and copying at the NRC Pubbe Document Room. 2120 L Street, N.W., Washington, DC, m a folder under this FOI A number.
Agency records subjact to the request that are identified in Appendix {es)                   may be mspected and copied at the NRC Local Pubhc Document Room identified in the Comments section.
Agency records subjact to the request that are identified in Appendix {es) may be mspected and copied at the NRC Local Pubhc Document Room identified in the Comments section.
Enclosed is information on how you may obtain access to and the charges for copying records located at the NRC Public Document Room,2120 L Street, N.W., Washington, DC.
Enclosed is information on how you may obtain access to and the charges for copying records located at the NRC Public Document Room,2120 L Street, N.W., Washington, DC.
    )(     Agency records subject to th? request are enclosed.
)(
Records subject to the request have been referred to snother Federal agency (ies       review and direct response to you Fees
Agency records subject to th? request are enclosed.
                - You will be billed by the N RC for fees totakng $
Records subject to the request have been referred to snother Federal agency (ies review and direct response to you Fees
- You will be billed by the N RC for fees totakng $
You will receive a refund from the NRC in t+ e amount of $
You will receive a refund from the NRC in t+ e amount of $
In view of N RC. . response to this request, no further ac* ion is beinq taken on appeal letter dated                             , No.
In view of N RC.. response to this request, no further ac* ion is beinq taken on appeal letter dated
, No.
PART 11. A-INFORMATION WITHHELD FROM PUBLIC DISCLOSURE Certain information in the requested records is being withheld from public disclosure pursuant to the exemptions described in and for the reasons stated in Part II, B, C, and D, Any released portions of the documents for which only part of the record is being withheld are being made Evailable for public inspection and copying in the NRC Pubhc Document Room,2120 L St eet, N.W., Washington, DC in a folder under this FOIA number.
PART 11. A-INFORMATION WITHHELD FROM PUBLIC DISCLOSURE Certain information in the requested records is being withheld from public disclosure pursuant to the exemptions described in and for the reasons stated in Part II, B, C, and D, Any released portions of the documents for which only part of the record is being withheld are being made Evailable for public inspection and copying in the NRC Pubhc Document Room,2120 L St eet, N.W., Washington, DC in a folder under this FOIA number.
COMME NTS The records identified on enclosed Appendix 1. are responsive to your request.                 Copies of these records are enclosed.
COMME NTS The records identified on enclosed Appendix 1. are responsive to your request.
Additional records are being reviewed.                                               Once this review has been completed, you w311 be notified, c)f I .2
Copies of these records are enclosed.
[k F DOM Of 70RMATION AND PUBtlCATIONS SERVICES GluAJWRE, X                      Q1 RECTOR..p(IV.JStON     '/                OF FLb Nuca y
Additional records are being reviewed.
9709290116 970923 PDR       FOIA O'MEALI97-252 PDR                                                                                                                                           I
Once this review has been completed, you w311 be notified, c)f I.2
[k GluAJWRE, Q1 RECTOR..p(IV.JStON OF FLb Nuca
'/
F DOM Of 70RMATION AND PUBtlCATIONS SERVICES Xy 9709290116 970923 PDR FOIA O'MEALI97-252 PDR I
..m.m...m..,,..,..
..m.m...m..,,..,..


r     -
r b
b Re: FOIA 97 252 APPENDIX A RECORDS BEING RELEASED IN THEIR ENTIRETY (if copyrighted identify with *)
Re: FOIA 97 252 APPENDIX A RECORDS BEING RELEASED IN THEIR ENTIRETY (if copyrighted identify with *)
d DATE ENTITY           DESC!'IPTION/(PAGE COUNT) 1     6/19/95 NRC       NRC Ltr to William J. Cahill, Jr. NYPA, Subj. Rei,wrt of the Indian Point 3 Nuclear Power Plant (Modification of CAL 1-93-009) (25 pgs) 2     8/14/95 NRC       NRC Memorandum to R. W. Cooper, il and S. A, Varga, NRR from C. J. Cowgill, Subj. Final Revision to the indian Point 3 Restart Action Plan (27 pgs) 3     2/16/94 NRC       NRC Ltr to William A. Josiger, NYPA - Status Update No.1 of the indiary Point 3 Restart Action Plan - (26 pgs) 4     11/7/95 NRC       NRC Ltr to Ms. Debbie Dolan and Encts. (25 pgs)
d DATE ENTITY DESC!'IPTION/(PAGE COUNT) 1 6/19/95 NRC NRC Ltr to William J. Cahill, Jr. NYPA, Subj. Rei,wrt of the Indian Point 3 Nuclear Power Plant (Modification of CAL 1-93-009) (25 pgs) 2 8/14/95 NRC NRC Memorandum to R. W. Cooper, il and S. A, Varga, NRR from C. J. Cowgill, Subj. Final Revision to the indian Point 3 Restart Action Plan (27 pgs) 3 2/16/94 NRC NRC Ltr to William A. Josiger, NYPA - Status Update No.1 of the indiary Point 3 Restart Action Plan - (26 pgs) 4 11/7/95 NRC NRC Ltr to Ms. Debbie Dolan and Encts. (25 pgs)
:5     5/6/94 NRC       Meeting Notice for indian Point Unit 3 - Management Meeting to Discuss indian Point 3 Restart Plan (3 pgs) 6   :5/12/94 NRC       NRC Memorandum to W. D. Lanning, M. W. Hodges, and C. W. Hehl. Indian Point 3 Restart Action Plan -Issue Closure (3 pgs) 7     5/12/94 NRC       NRC Memorandum to W. D. Lanning and J.A. Ce vo, from C.
:5 5/6/94 NRC Meeting Notice for indian Point Unit 3 - Management Meeting to Discuss indian Point 3 Restart Plan (3 pgs) 6
J. Cowgill - Revision & Status Update No. 2 -indian Point 3 Restart Action Plan (14 pgs) 8   ~ 5/1C/94 NRC     NRC Ltr to W. A. Josiger forwarding a copy of Revision and Status Update No. 2 of the Indian Point 3 Restart Action Plan -
:5/12/94 NRC NRC Memorandum to W. D. Lanning, M. W. Hodges, and C. W. Hehl. Indian Point 3 Restart Action Plan -Issue Closure (3 pgs) 7 5/12/94 NRC NRC Memorandum to W. D. Lanning and J.A. Ce vo, from C.
(30 pgs) 9     6/17/93 NRC       NRC CAL No. 1 93-009- Restart Commitments (3 pgs) 10-   8/8/94 NRC       NRC Ltr to W. A. Josiger - Subj. Comments Regarrling the Indian Point 3 Restart and Continuous Improvement Plan -(4 pgs)
J. Cowgill - Revision & Status Update No. 2 -indian Point 3 Restart Action Plan (14 pgs) 8
NRC Ltr to Leslie Hill, Jr. - Subj. Document Request for Restart
~ 5/1C/94 NRC NRC Ltr to W. A. Josiger forwarding a copy of Revision and Status Update No. 2 of the Indian Point 3 Restart Action Plan -
                                                                              ~
(30 pgs) 9 6/17/93 NRC NRC CAL No. 1 93-009-Restart Commitments (3 pgs) 10-8/8/94 NRC NRC Ltr to W. A. Josiger - Subj. Comments Regarrling the Indian Point 3 Restart and Continuous Improvement Plan -(4 pgs)
        '11    12/13/94 NRC Assessment Team Inspection - (7 pgs) 12   11/8/95 NRC       NRC Memorandum to R. W. Cooper from C. J. Cowgill, Subj.
'11 12/13/94 NRC NRC Ltr to Leslie Hill, Jr. - Subj. Document Request for Restart
~
Assessment Team Inspection - (7 pgs) 12 11/8/95 NRC NRC Memorandum to R. W. Cooper from C. J. Cowgill, Subj.
Augmented Inspection Coverage During Indian Point 3 Restart (33 pgs)
Augmented Inspection Coverage During Indian Point 3 Restart (33 pgs)
                                                                                                  ]
]
:s o-13 12/21/94 NRC NRC Memorandum to R. W. Cooper and S. A. Varga from C. J.
Cowgill Sub]._ Revision and Status Update No. 3 Indian Point 3 Restart Action Plan - (27 pgs) 14 6/1/95 - NRC NRC Memorandum to R. W. Cooper end S. A. Varga from C. J.-
Cowgill Subj. Revisioni and Status Update No. 5 Indian Point 3 Restart Action Plan -(27 pgs) 15 11/4/94 NYPA New York Power Authority (NYPA) Indian Point 3 Restart and -
Continuous improvement Plan - (209 pgs) 16 5/23/97 NRC NRC Ltr to Michael B. Sellman, Maine Yankee Atomic Power Co. - Subj. NRC Restart Action Plan for Main Yankae (9 pgs)
Enclosures - 1. NRC Ltr to NNEC B. Kenyon Subj. - Restart Assessment Plan - (3 pgs) - 2. NRC Restart Assessment P!an for Millstone Station 7/21/97 - (48 pgs) 17 6/4/97 NRC NRC Ltr to L. R. Eliason PSE&G, Subj. NRC Restart Action Plan
- Revision 3 (26 pgs) 19 8/6/97 ' NRC NRC Ltr to L. R. Eliason PSE&G, Subj. NRC Restart Action Plan
- Revision 4 (27 pgs) 19.
5/5/97 PSE&G PSE&G Ltr to NRC - Subj. Revised Request for Restart Assessment Team inspection for Salem Generating Station Unit No. 2 - (2 pgs) 20 8/3/96 NRC NRC Ltr to L. R, Eliason, PSE&G - Subj. NRC Restart Action Plan - Revision 1 - (23 pgs) 21 12/26/96 NRC NRC Ltr to L. R. Eliason, PSE&G - Subj. NRC Restart Action Plan - Revision 2 - (25 pgs)
:22 -
2/23/96 NRC NRC Ltr to L. R. Eliasoni, PSE&G - Subj. NRC Restart Action-Plan for Salem Units 1 & 2 - (30 pgs) i-


:s o-13  12/21/94 NRC  NRC Memorandum to R. W. Cooper and S. A. Varga from C. J.
e Ret FOIA-97-252 APPENDIE A RECORDS BEING RELEASED IN THEIR ENTIRETY (If copyrighted identify with *)-
Cowgill Sub]._ Revision and Status Update No. 3 Indian Point 3 Restart Action Plan - (27 pgs) 14  6/1/95 - NRC  NRC Memorandum to R. W. Cooper end S. A. Varga from C. J.-  .
Cowgill Subj. Revisioni and Status Update No. 5 Indian Point 3 Restart Action Plan -(27 pgs) 15  11/4/94 NYPA  New York Power Authority (NYPA) Indian Point 3 Restart and -
Continuous improvement Plan - (209 pgs) 16  5/23/97 NRC  NRC Ltr to Michael B. Sellman, Maine Yankee Atomic Power Co. - Subj. NRC Restart Action Plan for Main Yankae (9 pgs)
Enclosures - 1. NRC Ltr to NNEC B. Kenyon Subj. - Restart Assessment Plan - (3 pgs) - 2. NRC Restart Assessment P!an    ,
for Millstone Station 7/21/97 - (48 pgs) 17  6/4/97 NRC    NRC Ltr to L. R. Eliason PSE&G, Subj. NRC Restart Action Plan
                          - Revision 3 (26 pgs) 19  8/6/97 ' NRC  NRC Ltr to L. R. Eliason PSE&G, Subj. NRC Restart Action Plan
                          - Revision 4 (27 pgs)
: 19. 5/5/97 PSE&G  PSE&G Ltr to NRC - Subj. Revised Request for Restart Assessment Team inspection for Salem Generating Station Unit No. 2 - (2 pgs) 20  8/3/96 NRC    NRC Ltr to L. R, Eliason, PSE&G - Subj. NRC Restart Action Plan - Revision 1 - (23 pgs) 21  12/26/96 NRC  NRC Ltr to L. R. Eliason, PSE&G - Subj. NRC Restart Action Plan - Revision 2 - (25 pgs)
:22 - 2/23/96 NRC  NRC Ltr to L. R. Eliasoni, PSE&G - Subj. NRC Restart Action-Plan for Salem Units 1 & 2 - (30 pgs) i-
 
e Ret       FOIA-97-252 APPENDIE A RECORDS BEING RELEASED IN THEIR ENTIRETY (If copyrighted identify with *)-
l
l
          &=   PAIE           DESCRIPTION /(PAGE COUNT)
&=
: 23. 02/12/97         Letter from A.B. Beach to R.R. Grigg Re:
PAIE DESCRIPTION /(PAGE COUNT) 23.
02/12/97 Letter from A.B. Beach to R.R. Grigg Re:
Point-Beach Semiannual Plant Performance Review (14 pages) d 4
Point-Beach Semiannual Plant Performance Review (14 pages) d 4
F f
F f
g}}
g}}

Latest revision as of 00:04, 6 December 2024

First Partial Response to FOIA Request for Documents.Records Subj to Request Encl & Identified in App A.Addl Records Being Reviewed & Notification Will Be Provided Upon Completion
ML20211D356
Person / Time
Site: Millstone, Indian Point  
Issue date: 09/23/1997
From: Racquel Powell
NRC OFFICE OF ADMINISTRATION (ADM)
To: Omealia M
AFFILIATION NOT ASSIGNED
Shared Package
ML20211D362 List:
References
FOIA-97-252 NUDOCS 9709290116
Download: ML20211D356 (4)


Text

(ng3LYS RY?)LdTORY COMMISSION Nb t OiA HtouENN$bE Hm _ _ _.

FOIA 252 p aeg*

  • HESPONSE TYPE f~.

RESPONSE TO FREEDOM OF InNu h [mRmt (1 %)

g 1

\\c=oj Lg INFORMATION ACT (FOIA) REQUEST om g

J :c g,-

DOCKET NUMBEHfSn Ilf sophcabiel R E QUEST E R Mi Chael O' Mati a PART l.-AGENCY REERDS RELE ASED OR NOT LOCATED (Sec checdedtiomes!

N2 agency records subject to the request have been located.

N3 additional agency records subject to the request have been located.

Requested records are avaliable through another public distribution program. See Comments section.

4ency records subject to the request that are identified in Append.xtes) are already available for pubhc inspection and copying at the NRC Public Document Room,2120 L Street, N.W., Washington, DC.

Agency records subject to th-request that are ider tified in Appendix (es)

A are being made avai!ab!e for pubbc inspution and copying

)(

et the NRC Public Document Room,2120 L Stnet. N.W., Washington, DC,in a folder under this FOI A number.

The nonproprietary version of the proposat(s) that you agreed ;o accept in a telephone conversation with a member of my staff is now being made avai!ab!c for public insnection and copying at the NRC Pubbe Document Room. 2120 L Street, N.W., Washington, DC, m a folder under this FOI A number.

Agency records subjact to the request that are identified in Appendix {es) may be mspected and copied at the NRC Local Pubhc Document Room identified in the Comments section.

Enclosed is information on how you may obtain access to and the charges for copying records located at the NRC Public Document Room,2120 L Street, N.W., Washington, DC.

)(

Agency records subject to th? request are enclosed.

Records subject to the request have been referred to snother Federal agency (ies review and direct response to you Fees

- You will be billed by the N RC for fees totakng $

You will receive a refund from the NRC in t+ e amount of $

In view of N RC.. response to this request, no further ac* ion is beinq taken on appeal letter dated

, No.

PART 11. A-INFORMATION WITHHELD FROM PUBLIC DISCLOSURE Certain information in the requested records is being withheld from public disclosure pursuant to the exemptions described in and for the reasons stated in Part II, B, C, and D, Any released portions of the documents for which only part of the record is being withheld are being made Evailable for public inspection and copying in the NRC Pubhc Document Room,2120 L St eet, N.W., Washington, DC in a folder under this FOIA number.

COMME NTS The records identified on enclosed Appendix 1. are responsive to your request.

Copies of these records are enclosed.

Additional records are being reviewed.

Once this review has been completed, you w311 be notified, c)f I.2

[k GluAJWRE, Q1 RECTOR..p(IV.JStON OF FLb Nuca

'/

F DOM Of 70RMATION AND PUBtlCATIONS SERVICES Xy 9709290116 970923 PDR FOIA O'MEALI97-252 PDR I

..m.m...m..,,..,..

r b

Re: FOIA 97 252 APPENDIX A RECORDS BEING RELEASED IN THEIR ENTIRETY (if copyrighted identify with *)

d DATE ENTITY DESC!'IPTION/(PAGE COUNT) 1 6/19/95 NRC NRC Ltr to William J. Cahill, Jr. NYPA, Subj. Rei,wrt of the Indian Point 3 Nuclear Power Plant (Modification of CAL 1-93-009) (25 pgs) 2 8/14/95 NRC NRC Memorandum to R. W. Cooper, il and S. A, Varga, NRR from C. J. Cowgill, Subj. Final Revision to the indian Point 3 Restart Action Plan (27 pgs) 3 2/16/94 NRC NRC Ltr to William A. Josiger, NYPA - Status Update No.1 of the indiary Point 3 Restart Action Plan - (26 pgs) 4 11/7/95 NRC NRC Ltr to Ms. Debbie Dolan and Encts. (25 pgs)

5 5/6/94 NRC Meeting Notice for indian Point Unit 3 - Management Meeting to Discuss indian Point 3 Restart Plan (3 pgs) 6
5/12/94 NRC NRC Memorandum to W. D. Lanning, M. W. Hodges, and C. W. Hehl. Indian Point 3 Restart Action Plan -Issue Closure (3 pgs) 7 5/12/94 NRC NRC Memorandum to W. D. Lanning and J.A. Ce vo, from C.

J. Cowgill - Revision & Status Update No. 2 -indian Point 3 Restart Action Plan (14 pgs) 8

~ 5/1C/94 NRC NRC Ltr to W. A. Josiger forwarding a copy of Revision and Status Update No. 2 of the Indian Point 3 Restart Action Plan -

(30 pgs) 9 6/17/93 NRC NRC CAL No. 1 93-009-Restart Commitments (3 pgs) 10-8/8/94 NRC NRC Ltr to W. A. Josiger - Subj. Comments Regarrling the Indian Point 3 Restart and Continuous Improvement Plan -(4 pgs)

'11 12/13/94 NRC NRC Ltr to Leslie Hill, Jr. - Subj. Document Request for Restart

~

Assessment Team Inspection - (7 pgs) 12 11/8/95 NRC NRC Memorandum to R. W. Cooper from C. J. Cowgill, Subj.

Augmented Inspection Coverage During Indian Point 3 Restart (33 pgs)

]

s o-13 12/21/94 NRC NRC Memorandum to R. W. Cooper and S. A. Varga from C. J.

Cowgill Sub]._ Revision and Status Update No. 3 Indian Point 3 Restart Action Plan - (27 pgs) 14 6/1/95 - NRC NRC Memorandum to R. W. Cooper end S. A. Varga from C. J.-

Cowgill Subj. Revisioni and Status Update No. 5 Indian Point 3 Restart Action Plan -(27 pgs) 15 11/4/94 NYPA New York Power Authority (NYPA) Indian Point 3 Restart and -

Continuous improvement Plan - (209 pgs) 16 5/23/97 NRC NRC Ltr to Michael B. Sellman, Maine Yankee Atomic Power Co. - Subj. NRC Restart Action Plan for Main Yankae (9 pgs)

Enclosures - 1. NRC Ltr to NNEC B. Kenyon Subj. - Restart Assessment Plan - (3 pgs) - 2. NRC Restart Assessment P!an for Millstone Station 7/21/97 - (48 pgs) 17 6/4/97 NRC NRC Ltr to L. R. Eliason PSE&G, Subj. NRC Restart Action Plan

- Revision 3 (26 pgs) 19 8/6/97 ' NRC NRC Ltr to L. R. Eliason PSE&G, Subj. NRC Restart Action Plan

- Revision 4 (27 pgs) 19.

5/5/97 PSE&G PSE&G Ltr to NRC - Subj. Revised Request for Restart Assessment Team inspection for Salem Generating Station Unit No. 2 - (2 pgs) 20 8/3/96 NRC NRC Ltr to L. R, Eliason, PSE&G - Subj. NRC Restart Action Plan - Revision 1 - (23 pgs) 21 12/26/96 NRC NRC Ltr to L. R. Eliason, PSE&G - Subj. NRC Restart Action Plan - Revision 2 - (25 pgs)

22 -

2/23/96 NRC NRC Ltr to L. R. Eliasoni, PSE&G - Subj. NRC Restart Action-Plan for Salem Units 1 & 2 - (30 pgs) i-

e Ret FOIA-97-252 APPENDIE A RECORDS BEING RELEASED IN THEIR ENTIRETY (If copyrighted identify with *)-

l

&=

PAIE DESCRIPTION /(PAGE COUNT) 23.

02/12/97 Letter from A.B. Beach to R.R. Grigg Re:

Point-Beach Semiannual Plant Performance Review (14 pages) d 4

F f

g