OPERATING DATA REPORT DOCKET NO. 50-336 0CTOBER, 1986 REVISED COPY | OPERATING DATA REPORT DOCKET NO. 50-336 0CTOBER, 1986 REVISED COPY DATE 12/9/:36 COMPLETED BY~G. Neron TELEPHONE (203) 447-1791 Ext. 4417 OPERATING STATUS 1. | ||
Unit Name: | |||
Millstone Unit 2 Notes Items 21 and 22 cumulative 2. | |||
Reporting Period: | |||
October, 1986 are weighted averages. | |||
3. | |||
Licensed Thermal Power (MWt): | |||
2700 Unit operated at 2560 4. | |||
Nameplate Rating (Gross MWe): | |||
909 MW Thermal prior to its 5. | |||
Design Electrical Rating (Net MWe): | |||
870 uprating to the current 6. | |||
Maximum Dependable Capacity (Gross MWe): | |||
888.75 2700 MW Thermal Power | |||
-7. | |||
Maximum Dependable Capacity (Net MWe): | |||
857.25 Level. | |||
8. | |||
If Changes Occur in Capacity Ratings (Items Number 3 Through 7) | |||
Since Last Report, Give Reasons: | Since Last Report, Give Reasons: | ||
N/A i | N/A i | ||
9. | |||
Power Level To Which Restricted, If Any (Net MWe): | |||
N/A This Month | N/A 10. | ||
Reasons For Restrictions, If Any: | |||
N/A This Month Yr.-to-Date Cumulative 11. | |||
Hours In Reporting Period 744 7296 95112 12. | |||
Number Of Hours Reactor Was Critical 0 | |||
6192.9 68730.6 0 | |||
2205.5 13. | |||
Reactor Reserve Shutdown Hours 0 ~~ | |||
6058.7 64776.4 14. | |||
Hours Generator On-Line 0 | |||
15. | |||
Unit Reserve Shutdown Hours 0 | |||
0 468.2 16. | |||
Gross Thermal Energy Generated (MWH) 0 16147799 164251601 17. | |||
Gross Elec. Energy Generated (MWH) 0 5219000 53560479 18. | |||
Net Electrical Energy Generated (MWH) | |||
(-2051) 5022159 51343378 19. | |||
Unit Service Factor 0 | |||
83.0 68.1 20. | |||
Unit Availability Factor 0 | |||
83.0 68.6 21. | |||
Unit Capacity Factor (Using MDC Net) 0 80.3 63.7 22. | |||
Unit Capacity Factor (Using DER Net) 0 79.1 62.7 23. | |||
Unit Forced Outage Rate 0 | |||
2.4 16.2 24. | |||
Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): | |||
Unit 2 is currently in its cycle 8 Refueling and Maintenance Outage. | Unit 2 is currently in its cycle 8 Refueling and Maintenance Outage. | ||
25. | |||
If Shut Down At End of Report Period, Estimated Date of Startup: December 19,1986 26. | |||
Units In Test Status (Prior to Commercial Operation): | |||
Forecast Achieved INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A 070302o470 861212 PDR ADOCK 05000336 PDR R}} | |||
Latest revision as of 21:18, 5 December 2024
| ML20211Q012 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 10/31/1986 |
| From: | Neron G NORTHEAST NUCLEAR ENERGY CO. |
| To: | |
| Shared Package | |
| ML20211P990 | List: |
| References | |
| NUDOCS 8703020470 | |
| Download: ML20211Q012 (1) | |
Text
-_.
OPERATING DATA REPORT DOCKET NO. 50-336 0CTOBER, 1986 REVISED COPY DATE 12/9/:36 COMPLETED BY~G. Neron TELEPHONE (203) 447-1791 Ext. 4417 OPERATING STATUS 1.
Unit Name:
Millstone Unit 2 Notes Items 21 and 22 cumulative 2.
Reporting Period:
October, 1986 are weighted averages.
3.
Licensed Thermal Power (MWt):
2700 Unit operated at 2560 4.
Nameplate Rating (Gross MWe):
909 MW Thermal prior to its 5.
Design Electrical Rating (Net MWe):
870 uprating to the current 6.
Maximum Dependable Capacity (Gross MWe):
888.75 2700 MW Thermal Power
-7.
Maximum Dependable Capacity (Net MWe):
857.25 Level.
8.
If Changes Occur in Capacity Ratings (Items Number 3 Through 7)
Since Last Report, Give Reasons:
N/A i
9.
Power Level To Which Restricted, If Any (Net MWe):
N/A 10.
Reasons For Restrictions, If Any:
N/A This Month Yr.-to-Date Cumulative 11.
Hours In Reporting Period 744 7296 95112 12.
Number Of Hours Reactor Was Critical 0
6192.9 68730.6 0
2205.5 13.
Reactor Reserve Shutdown Hours 0 ~~
6058.7 64776.4 14.
Hours Generator On-Line 0
15.
Unit Reserve Shutdown Hours 0
0 468.2 16.
Gross Thermal Energy Generated (MWH) 0 16147799 164251601 17.
Gross Elec. Energy Generated (MWH) 0 5219000 53560479 18.
Net Electrical Energy Generated (MWH)
(-2051) 5022159 51343378 19.
Unit Service Factor 0
83.0 68.1 20.
Unit Availability Factor 0
83.0 68.6 21.
Unit Capacity Factor (Using MDC Net) 0 80.3 63.7 22.
Unit Capacity Factor (Using DER Net) 0 79.1 62.7 23.
Unit Forced Outage Rate 0
2.4 16.2 24.
Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Unit 2 is currently in its cycle 8 Refueling and Maintenance Outage.
25.
If Shut Down At End of Report Period, Estimated Date of Startup: December 19,1986 26.
Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A 070302o470 861212 PDR ADOCK 05000336 PDR R