Revised Operating Data Rept for Oct 1986
ML20211Q012
Person / Time
Site: Millstone 
Issue date: 10/31/1986
From: Neron G
NORTHEAST NUCLEAR ENERGY CO.
To:
Shared Package
ML20211P990 List:
References
NUDOCS 8703020470
Download: ML20211Q012 (1)


Text

-_.

OPERATING DATA REPORT DOCKET NO. 50-336 0CTOBER, 1986 REVISED COPY DATE 12/9/:36 COMPLETED BY~G. Neron TELEPHONE (203) 447-1791 Ext. 4417 OPERATING STATUS 1.

Unit Name:

Millstone Unit 2 Notes Items 21 and 22 cumulative 2.

Reporting Period:

October, 1986 are weighted averages.

3.

Licensed Thermal Power (MWt):

2700 Unit operated at 2560 4.

Nameplate Rating (Gross MWe):

909 MW Thermal prior to its 5.

Design Electrical Rating (Net MWe):

870 uprating to the current 6.

Maximum Dependable Capacity (Gross MWe):

888.75 2700 MW Thermal Power

-7.

Maximum Dependable Capacity (Net MWe):

857.25 Level.

8.

If Changes Occur in Capacity Ratings (Items Number 3 Through 7)

Since Last Report, Give Reasons:

N/A i

9.

Power Level To Which Restricted, If Any (Net MWe):

N/A 10.

Reasons For Restrictions, If Any:

N/A This Month Yr.-to-Date Cumulative 11.

Hours In Reporting Period 744 7296 95112 12.

Number Of Hours Reactor Was Critical 0

6192.9 68730.6 0

2205.5 13.

Reactor Reserve Shutdown Hours 0 ~~

6058.7 64776.4 14.

Hours Generator On-Line 0

15.

Unit Reserve Shutdown Hours 0

0 468.2 16.

Gross Thermal Energy Generated (MWH) 0 16147799 164251601 17.

Gross Elec. Energy Generated (MWH) 0 5219000 53560479 18.

Net Electrical Energy Generated (MWH)

(-2051) 5022159 51343378 19.

Unit Service Factor 0

83.0 68.1 20.

Unit Availability Factor 0

83.0 68.6 21.

Unit Capacity Factor (Using MDC Net) 0 80.3 63.7 22.

Unit Capacity Factor (Using DER Net) 0 79.1 62.7 23.

Unit Forced Outage Rate 0

2.4 16.2 24.

Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Unit 2 is currently in its cycle 8 Refueling and Maintenance Outage.

25.

If Shut Down At End of Report Period, Estimated Date of Startup: December 19,1986 26.

Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A 070302o470 861212 PDR ADOCK 05000336 PDR R