ML20213G439: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:- -
{{#Wiki_filter:\\,
              \,    -
- -
    ~
-
                    --
Yd&
                                                                                                  Yd&
~
          . .
--
. .
,
,
                                                        NOV 1 0 fM6
NOV 1 0 fM6
                Docket No. 50-424
Docket No. 50-424
                License No. CPPR-108
License No. CPPR-108
                Georgia Power Company
Georgia Power Company
                ATTN: Mr. J. H. Miller, Jr.
ATTN: Mr. J. H. Miller, Jr.
                            President
President
                P. O. Box 4545
P. O. Box 4545
                Atlanta, GA 30302
Atlanta, GA 30302
                Gentlemen:
Gentlemen:
                SUBJECT: NRC REVIEW 0F V0GTLE READINESS REVIEW MODULE N0. 11,
SUBJECT: NRC REVIEW 0F V0GTLE READINESS REVIEW MODULE N0. 11,
                            STRESS ANALYSIS AND SUPPORTS - REPORT N0. 50-424/86-44
STRESS ANALYSIS AND SUPPORTS - REPORT N0. 50-424/86-44
                The NRC has completed a detailed review, inspection, and verification of the
The NRC has completed a detailed review, inspection, and verification of the
                subject Module which you submitted to the NRC on February 28, 1986.     Periodic
subject Module which you submitted to the NRC on February 28, 1986.
                inspections were conducted at the Vogtle site and the resultant findings were
Periodic
                discussed with members of your staff at the conclusion of these inspections.
inspections were conducted at the Vogtle site and the resultant findings were
                Technical reviews were conducted primarily in NRC Bethesda offices and the
discussed with members of your staff at the conclusion of these inspections.
                findings from these reviews have also been discussed separately with your staff.
Technical reviews were conducted primarily in NRC Bethesda offices and the
  ,              Areas contained in the module, which were reviewed, examined, and verified, are
findings from these reviews have also been discussed separately with your staff.
                identified in the enclosed report.     Within these areas, the inspection and
Areas contained in the module, which were reviewed, examined, and verified, are
                verification consisted of selected examinations of procedures and representative
,
                records, discussions with personnel, observations of activities in progress, and
identified in the enclosed report.
                review of your licensing commitments, activities in progress.
Within these areas, the inspection and
                The results of Module No.11 reviews and inspections are summarized into the
verification consisted of selected examinations of procedures and representative
,i             categories of deficiencies, inspector followup, unresolved items, and violations.
records, discussions with personnel, observations of activities in progress, and
                Your attention is invited to these matters which will be pursued during future
review of your licensing commitments, activities in progress.
Iv   t
The results of Module No.11 reviews and inspections are summarized into the
                licensing reviews and inspections.
,i
                Based upon the NRC review and inspection of those activities identified in the
categories of deficiencies, inspector followup, unresolved items, and violations.
                module, we have determined that the activity control of the licensee's programs
Your attention is invited to these matters which will be pursued during future
h               for pipe stress and supports for Vogtle Unit No.1 are acceptable and comply
Iv
                -with applicable regulatory requirements with the exception of those items or
licensing reviews and inspections.
                areas identified in the report.   This decision is based on information currently
t
                available to the inspectors and reviewers.     Should information subsequently
Based upon the NRC review and inspection of those activities identified in the
                become available which was not considered during this review or which conflicts
module, we have determined that the activity control of the licensee's programs
                with earlier information, it will be evaluated to determine what effect it may
h
                have on the above conclusion.
for pipe stress and supports for Vogtle Unit No.1 are acceptable and comply
                                        t
-with applicable regulatory requirements with the exception of those items or
                                                      i
areas identified in the report.
                                kojljDOCKo12o05000424
This decision is based on information currently
                                              86212o
available to the inspectors and reviewers.
                                G                 PDR
Should information subsequently
                                                                                          /I
become available which was not considered during this review or which conflicts
                                                                                                    IEDI )
with earlier information, it will be evaluated to determine what effect it may
have on the above conclusion.
t
i
kojljDOCKo12o 86212o
05000424
G
PDR
/I
IEDI
-
-
)


. . -         ,
. . -
      .-
,
              *
.-
    -
*
          Georgia Power Company                     2
NOV J o 9996
                                                                                    NOV J o 9996
-
            Should you have any questions concerning this letter, please contact us.
Georgia Power Company
                                                  Sincerely.
2
                                                  ORIGINAL S!GHED DY:
Should you have any questions concerning this letter, please contact us.
                                                  A MI.S0tlf.S Q.
Sincerely.
                                                  J. Nelson Grace
ORIGINAL S!GHED DY:
                                                  Regional Administrator
A MI.S0tlf.S Q.
            Enclosure:
J. Nelson Grace
            Inspection Report No. 50-424/86-44
Regional Administrator
            cc w/ encl:
Enclosure:
        VJ.P.O'Reilly,SeniorVicePresident
Inspection Report No. 50-424/86-44
              Nuclear Operations
cc w/ encl:
        J . E. Conway, Senior Vice President &
VJ.P.O'Reilly,SeniorVicePresident
              Project Director
Nuclear Operations
          v0. O. Foster, Vice President, Project
J . E. Conway, Senior Vice President &
              Support
Project Director
        /12     D. Rice, Vice President, Project
v0. O. Foster, Vice President, Project
              Engineering
Support
        LR. H. Pinson, Vice President, Project
/12
              Construction
D. Rice, Vice President, Project
        i d. T. Beckham, Vice President &
Engineering
              General Manager - Operations
LR. H. Pinson, Vice President, Project
        t R. A. Thomas, Vice President,
Construction
              Licensing
i d. T. Beckham, Vice President &
        4 D. S. Read, General Manager,
General Manager - Operations
        12. Quality   Assurance
t R. A. Thomas, Vice President,
                W. Hayes, Vogtle Quality
Licensing
              Assurance Manager
4 D. S. Read, General Manager,
        IX' C. Ramsey, Manager -
12. Quality Assurance
              Readiness Review
W. Hayes, Vogtle Quality
        a G. B. Bockhold, General Manager,
Assurance Manager
              Nuclear Operations
IX' C. Ramsey, Manager -
      I, -L. Gucwa, Manager, Nuclear Safety
Readiness Review
              and Licensing
a G. B. Bockhold, General Manager,
        t M. H. Googe, Project
Nuclear Operations
              Construction Manager
I, -L. Gucwa, Manager, Nuclear Safety
        t,-E. D. Groover, Quality
and Licensing
            ~ Assurance Site Manager -
t M. H. Googe, Project
              Construction
Construction Manager
        g.A. Bailey,ProjectLicensing
t,-E. D. Groover, Quality
              Manager
~ Assurance Site Manager -
            (cc w/ enc 1 cont'd - see page 3)
Construction
                                                                                                  )
g.A. Bailey,ProjectLicensing
Manager
(cc w/ enc 1 cont'd - see page 3)
)


    . .         .
. .
        ..
.
                  .
..
                                                                                      NOV 1 o g
NOV 1 o g
        .
.
              Georgia Power Company                         3
.
              (cc w/ encl cont'd)
Georgia Power Company
          v4  . F. Trowbridge, Esq., Shaw,
3
                  Pittman, Potts and Trowbridge
(cc w/ encl cont'd)
          P B. W. Churchill, Esq., Shaw,
v . F. Trowbridge, Esq., Shaw,
                  Pittman, Potts and Trowbridge
4
          t4. L. Blake, Jr., Esq., Shaw,
Pittman, Potts and Trowbridge
                  Pittman, Potts and Trowbridge
P B. W. Churchill, Esq., Shaw,
          v f E. Joiner, Troutman, Sanders,
Pittman, Potts and Trowbridge
                    G. Ledbetter, Commissioner,
t4. L. Blake, Jr., Esq., Shaw,
          M.LockermanandAshmore
Pittman, Potts and Trowbridge
                  Department of Human Resources
v f E. Joiner, Troutman, Sanders,
          % . H. Badger, Office of Planning
M.LockermanandAshmore
                  and Budget
G. Ledbetter, Commissioner,
          e l Kirkland, III, Counsel,
Department of Human Resources
                Office of the Consumer's Utility
% . H. Badger, Office of Planning
              / Council
and Budget
          p/D. Feig, Georgians Against
e l Kirkland, III, Counsel,
              / Nuclear Energy
Office of the Consumer's Utility
            @.B.Margulies,Esq., Chairman,
/ Council
                Atomic Safety and Licensing Board
p/D. Feig, Georgians Against
                  Panel
/ Nuclear Energy
          y 0r. O. H. Paris, Administrative Judge
@.B.Margulies,Esq., Chairman,
                Atomic Safety and Licensing Board
Atomic Safety and Licensing Board
                  Panel
Panel
          /G.A.Linenberger,Jr.,AdministrativeJudge
y 0r. O. H. Paris, Administrative Judge
                  Atomic Safety and Licensing Board
Atomic Safety and Licensing Board
                  Panel
Panel
          \f /ccw/
/G.A.Linenberger,Jr.,AdministrativeJudge
              F. Reis, encl:
Atomic Safety and Licensing Board
                        GS0
Panel
          VW, M. Hill, IE
/ccw/ encl:
          vd81. Miller, NRR
\\f F. Reis, GS0
          Al. Brach, GS0
VW, M. Hill, IE
          vN. Sinkule, RII
vd81. Miller, NRR
          ,/E. Christnot, RII
Al. Brach, GS0
          c NRC Resident Inspector
vN. Sinkule, RII
              Document Control Desk
,/E. Christnot, RII
              State of Georgia
c NRC Resident Inspector
                                                                                    I
Document Control Desk
                                                                                  9
State of Georgia
                              '
I
                      IAh    /         ('                       k le Br nle   al
9
                                                              M
IAh
                    as         ak     H       VP ci ra
/
                                                                / /86  9/4/86/d/y/86
('
                NRC:NRR     NRC: ELD         RII
'
                ph%y/             p24,(w
nle
                TNovak     EChristen'sen   M trY s\ ,   '
al
  ,            11/3 /86 11/'3/86           11/ /8h6
Br
as
ak
H
VP
ci ra
M
k le
9/4/86/d/y/86
/ /86
NRC:NRR
NRC: ELD
RII
ph%y/
p24,(w
TNovak
EChristen'sen
M trY s\\ ,
'
/8h6
11/3 /86 11/'3/86
11/
,
!
!
l                                                                                               )
l
)
}}
}}

Latest revision as of 03:06, 4 December 2024

Forwards Insp Rept 50-424/86-44 Re Detailed Review,Insp & Verification of Readiness Review Module 11, Stress Analysis & Supports. Activity Control of Licensee Programs for Pipe Stress & Supports Acceptable
ML20213G439
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 11/10/1986
From: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: John Miller
GEORGIA POWER CO.
Shared Package
ML20213G441 List:
References
NUDOCS 8611180120
Download: ML20213G439 (3)


See also: IR 05000424/1986044

Text

\\,

- -

-

Yd&

~

--

. .

,

NOV 1 0 fM6

Docket No. 50-424

License No. CPPR-108

Georgia Power Company

ATTN: Mr. J. H. Miller, Jr.

President

P. O. Box 4545

Atlanta, GA 30302

Gentlemen:

SUBJECT: NRC REVIEW 0F V0GTLE READINESS REVIEW MODULE N0. 11,

STRESS ANALYSIS AND SUPPORTS - REPORT N0. 50-424/86-44

The NRC has completed a detailed review, inspection, and verification of the

subject Module which you submitted to the NRC on February 28, 1986.

Periodic

inspections were conducted at the Vogtle site and the resultant findings were

discussed with members of your staff at the conclusion of these inspections.

Technical reviews were conducted primarily in NRC Bethesda offices and the

findings from these reviews have also been discussed separately with your staff.

Areas contained in the module, which were reviewed, examined, and verified, are

,

identified in the enclosed report.

Within these areas, the inspection and

verification consisted of selected examinations of procedures and representative

records, discussions with personnel, observations of activities in progress, and

review of your licensing commitments, activities in progress.

The results of Module No.11 reviews and inspections are summarized into the

,i

categories of deficiencies, inspector followup, unresolved items, and violations.

Your attention is invited to these matters which will be pursued during future

Iv

licensing reviews and inspections.

t

Based upon the NRC review and inspection of those activities identified in the

module, we have determined that the activity control of the licensee's programs

h

for pipe stress and supports for Vogtle Unit No.1 are acceptable and comply

-with applicable regulatory requirements with the exception of those items or

areas identified in the report.

This decision is based on information currently

available to the inspectors and reviewers.

Should information subsequently

become available which was not considered during this review or which conflicts

with earlier information, it will be evaluated to determine what effect it may

have on the above conclusion.

t

i

kojljDOCKo12o 86212o

05000424

G

PDR

/I

IEDI

-

-

)

. . -

,

.-

NOV J o 9996

-

Georgia Power Company

2

Should you have any questions concerning this letter, please contact us.

Sincerely.

ORIGINAL S!GHED DY:

A MI.S0tlf.S Q.

J. Nelson Grace

Regional Administrator

Enclosure:

Inspection Report No. 50-424/86-44

cc w/ encl:

VJ.P.O'Reilly,SeniorVicePresident

Nuclear Operations

J . E. Conway, Senior Vice President &

Project Director

v0. O. Foster, Vice President, Project

Support

/12

D. Rice, Vice President, Project

Engineering

LR. H. Pinson, Vice President, Project

Construction

i d. T. Beckham, Vice President &

General Manager - Operations

t R. A. Thomas, Vice President,

Licensing

4 D. S. Read, General Manager,

12. Quality Assurance

W. Hayes, Vogtle Quality

Assurance Manager

IX' C. Ramsey, Manager -

Readiness Review

a G. B. Bockhold, General Manager,

Nuclear Operations

I, -L. Gucwa, Manager, Nuclear Safety

and Licensing

t M. H. Googe, Project

Construction Manager

t,-E. D. Groover, Quality

~ Assurance Site Manager -

Construction

g.A. Bailey,ProjectLicensing

Manager

(cc w/ enc 1 cont'd - see page 3)

)

. .

.

..

NOV 1 o g

.

.

Georgia Power Company

3

(cc w/ encl cont'd)

v . F. Trowbridge, Esq., Shaw,

4

Pittman, Potts and Trowbridge

P B. W. Churchill, Esq., Shaw,

Pittman, Potts and Trowbridge

t4. L. Blake, Jr., Esq., Shaw,

Pittman, Potts and Trowbridge

v f E. Joiner, Troutman, Sanders,

M.LockermanandAshmore

G. Ledbetter, Commissioner,

Department of Human Resources

% . H. Badger, Office of Planning

and Budget

e l Kirkland, III, Counsel,

Office of the Consumer's Utility

/ Council

p/D. Feig, Georgians Against

/ Nuclear Energy

@.B.Margulies,Esq., Chairman,

Atomic Safety and Licensing Board

Panel

y 0r. O. H. Paris, Administrative Judge

Atomic Safety and Licensing Board

Panel

/G.A.Linenberger,Jr.,AdministrativeJudge

Atomic Safety and Licensing Board

Panel

/ccw/ encl:

\\f F. Reis, GS0

VW, M. Hill, IE

vd81. Miller, NRR

Al. Brach, GS0

vN. Sinkule, RII

,/E. Christnot, RII

c NRC Resident Inspector

Document Control Desk

State of Georgia

I

9

IAh

/

('

'

nle

al

Br

as

ak

H

VP

ci ra

M

k le

9/4/86/d/y/86

/ /86

NRC:NRR

NRC: ELD

RII

ph%y/

p24,(w

TNovak

EChristen'sen

M trY s\\ ,

'

/8h6

11/3 /86 11/'3/86

11/

,

!

l

)