Text
\\,
- -
-
Yd&
~
--
. .
,
NOV 1 0 fM6
Docket No. 50-424
License No. CPPR-108
Georgia Power Company
ATTN: Mr. J. H. Miller, Jr.
President
P. O. Box 4545
Atlanta, GA 30302
Gentlemen:
SUBJECT: NRC REVIEW 0F V0GTLE READINESS REVIEW MODULE N0. 11,
STRESS ANALYSIS AND SUPPORTS - REPORT N0. 50-424/86-44
The NRC has completed a detailed review, inspection, and verification of the
subject Module which you submitted to the NRC on February 28, 1986.
Periodic
inspections were conducted at the Vogtle site and the resultant findings were
discussed with members of your staff at the conclusion of these inspections.
Technical reviews were conducted primarily in NRC Bethesda offices and the
findings from these reviews have also been discussed separately with your staff.
Areas contained in the module, which were reviewed, examined, and verified, are
,
identified in the enclosed report.
Within these areas, the inspection and
verification consisted of selected examinations of procedures and representative
records, discussions with personnel, observations of activities in progress, and
review of your licensing commitments, activities in progress.
The results of Module No.11 reviews and inspections are summarized into the
,i
categories of deficiencies, inspector followup, unresolved items, and violations.
Your attention is invited to these matters which will be pursued during future
Iv
licensing reviews and inspections.
t
Based upon the NRC review and inspection of those activities identified in the
module, we have determined that the activity control of the licensee's programs
h
for pipe stress and supports for Vogtle Unit No.1 are acceptable and comply
-with applicable regulatory requirements with the exception of those items or
areas identified in the report.
This decision is based on information currently
available to the inspectors and reviewers.
Should information subsequently
become available which was not considered during this review or which conflicts
with earlier information, it will be evaluated to determine what effect it may
have on the above conclusion.
t
i
kojljDOCKo12o 86212o
05000424
G
/I
IEDI
-
-
)
. . -
,
.-
NOV J o 9996
-
Georgia Power Company
2
Should you have any questions concerning this letter, please contact us.
Sincerely.
ORIGINAL S!GHED DY:
A MI.S0tlf.S Q.
J. Nelson Grace
Regional Administrator
Enclosure:
Inspection Report No. 50-424/86-44
cc w/ encl:
VJ.P.O'Reilly,SeniorVicePresident
Nuclear Operations
J . E. Conway, Senior Vice President &
Project Director
v0. O. Foster, Vice President, Project
Support
/12
D. Rice, Vice President, Project
Engineering
LR. H. Pinson, Vice President, Project
Construction
i d. T. Beckham, Vice President &
General Manager - Operations
t R. A. Thomas, Vice President,
Licensing
4 D. S. Read, General Manager,
12. Quality Assurance
W. Hayes, Vogtle Quality
Assurance Manager
IX' C. Ramsey, Manager -
Readiness Review
a G. B. Bockhold, General Manager,
Nuclear Operations
I, -L. Gucwa, Manager, Nuclear Safety
and Licensing
t M. H. Googe, Project
Construction Manager
t,-E. D. Groover, Quality
~ Assurance Site Manager -
Construction
g.A. Bailey,ProjectLicensing
Manager
(cc w/ enc 1 cont'd - see page 3)
)
. .
.
..
NOV 1 o g
.
.
Georgia Power Company
3
(cc w/ encl cont'd)
v . F. Trowbridge, Esq., Shaw,
4
Pittman, Potts and Trowbridge
P B. W. Churchill, Esq., Shaw,
Pittman, Potts and Trowbridge
t4. L. Blake, Jr., Esq., Shaw,
Pittman, Potts and Trowbridge
v f E. Joiner, Troutman, Sanders,
M.LockermanandAshmore
G. Ledbetter, Commissioner,
Department of Human Resources
% . H. Badger, Office of Planning
and Budget
e l Kirkland, III, Counsel,
Office of the Consumer's Utility
/ Council
p/D. Feig, Georgians Against
/ Nuclear Energy
@.B.Margulies,Esq., Chairman,
Atomic Safety and Licensing Board
Panel
y 0r. O. H. Paris, Administrative Judge
Atomic Safety and Licensing Board
Panel
/G.A.Linenberger,Jr.,AdministrativeJudge
Atomic Safety and Licensing Board
Panel
/ccw/ encl:
\\f F. Reis, GS0
VW, M. Hill, IE
vd81. Miller, NRR
Al. Brach, GS0
vN. Sinkule, RII
,/E. Christnot, RII
c NRC Resident Inspector
Document Control Desk
State of Georgia
I
9
IAh
/
('
'
nle
al
Br
as
ak
H
ci ra
M
k le
9/4/86/d/y/86
/ /86
NRC:NRR
NRC: ELD
RII
ph%y/
p24,(w
TNovak
EChristen'sen
M trY s\\ ,
'
/8h6
11/3 /86 11/'3/86
11/
,
!
l
)