Forwards Insp Rept 50-424/86-44 Re Detailed Review,Insp & Verification of Readiness Review Module 11, Stress Analysis & Supports. Activity Control of Licensee Programs for Pipe Stress & Supports Acceptable
ML20213G439
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 11/10/1986
From: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: John Miller
GEORGIA POWER CO.
Shared Package
ML20213G441 List:
References
NUDOCS 8611180120
Download: ML20213G439 (3)


See also: IR 05000424/1986044

Text

\\,

- -

-

Yd&

~

--

. .

,

NOV 1 0 fM6

Docket No. 50-424

License No. CPPR-108

Georgia Power Company

ATTN: Mr. J. H. Miller, Jr.

President

P. O. Box 4545

Atlanta, GA 30302

Gentlemen:

SUBJECT: NRC REVIEW 0F V0GTLE READINESS REVIEW MODULE N0. 11,

STRESS ANALYSIS AND SUPPORTS - REPORT N0. 50-424/86-44

The NRC has completed a detailed review, inspection, and verification of the

subject Module which you submitted to the NRC on February 28, 1986.

Periodic

inspections were conducted at the Vogtle site and the resultant findings were

discussed with members of your staff at the conclusion of these inspections.

Technical reviews were conducted primarily in NRC Bethesda offices and the

findings from these reviews have also been discussed separately with your staff.

Areas contained in the module, which were reviewed, examined, and verified, are

,

identified in the enclosed report.

Within these areas, the inspection and

verification consisted of selected examinations of procedures and representative

records, discussions with personnel, observations of activities in progress, and

review of your licensing commitments, activities in progress.

The results of Module No.11 reviews and inspections are summarized into the

,i

categories of deficiencies, inspector followup, unresolved items, and violations.

Your attention is invited to these matters which will be pursued during future

Iv

licensing reviews and inspections.

t

Based upon the NRC review and inspection of those activities identified in the

module, we have determined that the activity control of the licensee's programs

h

for pipe stress and supports for Vogtle Unit No.1 are acceptable and comply

-with applicable regulatory requirements with the exception of those items or

areas identified in the report.

This decision is based on information currently

available to the inspectors and reviewers.

Should information subsequently

become available which was not considered during this review or which conflicts

with earlier information, it will be evaluated to determine what effect it may

have on the above conclusion.

t

i

kojljDOCKo12o 86212o

05000424

G

PDR

/I

IEDI

-

-

)

. . -

,

.-

NOV J o 9996

-

Georgia Power Company

2

Should you have any questions concerning this letter, please contact us.

Sincerely.

ORIGINAL S!GHED DY:

A MI.S0tlf.S Q.

J. Nelson Grace

Regional Administrator

Enclosure:

Inspection Report No. 50-424/86-44

cc w/ encl:

VJ.P.O'Reilly,SeniorVicePresident

Nuclear Operations

J . E. Conway, Senior Vice President &

Project Director

v0. O. Foster, Vice President, Project

Support

/12

D. Rice, Vice President, Project

Engineering

LR. H. Pinson, Vice President, Project

Construction

i d. T. Beckham, Vice President &

General Manager - Operations

t R. A. Thomas, Vice President,

Licensing

4 D. S. Read, General Manager,

12. Quality Assurance

W. Hayes, Vogtle Quality

Assurance Manager

IX' C. Ramsey, Manager -

Readiness Review

a G. B. Bockhold, General Manager,

Nuclear Operations

I, -L. Gucwa, Manager, Nuclear Safety

and Licensing

t M. H. Googe, Project

Construction Manager

t,-E. D. Groover, Quality

~ Assurance Site Manager -

Construction

g.A. Bailey,ProjectLicensing

Manager

(cc w/ enc 1 cont'd - see page 3)

)

. .

.

..

NOV 1 o g

.

.

Georgia Power Company

3

(cc w/ encl cont'd)

v . F. Trowbridge, Esq., Shaw,

4

Pittman, Potts and Trowbridge

P B. W. Churchill, Esq., Shaw,

Pittman, Potts and Trowbridge

t4. L. Blake, Jr., Esq., Shaw,

Pittman, Potts and Trowbridge

v f E. Joiner, Troutman, Sanders,

M.LockermanandAshmore

G. Ledbetter, Commissioner,

Department of Human Resources

% . H. Badger, Office of Planning

and Budget

e l Kirkland, III, Counsel,

Office of the Consumer's Utility

/ Council

p/D. Feig, Georgians Against

/ Nuclear Energy

@.B.Margulies,Esq., Chairman,

Atomic Safety and Licensing Board

Panel

y 0r. O. H. Paris, Administrative Judge

Atomic Safety and Licensing Board

Panel

/G.A.Linenberger,Jr.,AdministrativeJudge

Atomic Safety and Licensing Board

Panel

/ccw/ encl:

\\f F. Reis, GS0

VW, M. Hill, IE

vd81. Miller, NRR

Al. Brach, GS0

vN. Sinkule, RII

,/E. Christnot, RII

c NRC Resident Inspector

Document Control Desk

State of Georgia

I

9

IAh

/

('

'

nle

al

Br

as

ak

H

VP

ci ra

M

k le

9/4/86/d/y/86

/ /86

NRC:NRR

NRC: ELD

RII

ph%y/

p24,(w

TNovak

EChristen'sen

M trY s\\ ,

'

/8h6

11/3 /86 11/'3/86

11/

,

!

l

)