ML20214F851: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 19: Line 19:
=Text=
=Text=
{{#Wiki_filter:<
{{#Wiki_filter:<
  ,o
,o
    '  ,,
,,
      '
'
                                            ' MAY 2 01987
' MAY 2 01987
                  '
'
        In Reply Refer To:
'
        Dockets:~ 50-498/87-24
In Reply Refer To:
Dockets:~ 50-498/87-24
.
.
                    -50-499/87-24
-50-499/87-24
L
L
l
l
l
l
Houston Lighting & Power Company
,
,
        Houston Lighting & Power Company
ATTN:
        ATTN:   J. H. Goldberg, Group Vice
J. H. Goldberg, Group Vice
                    President, Nuclear
President, Nuclear
P. O. Box 1700
l-
l-
        P. O. Box 1700
Houston, Texas
        Houston, Texas     77001
77001
        Gentlemen:
Gentlemen:
        This refers to the inspection conducted by Mr. J. B. Baird of this office
This refers to the inspection conducted by Mr. J. B. Baird of this office
        during the period April 20-24, 1987, of activities authorized by NRC'
during the period April 20-24, 1987, of activities authorized by NRC'
l       Construction Permits CPPR-128 and CPPR-129 for the South Texas Project, and to
l
        the discussion of our findings with Mr. G. Vaughn and -other members of your
Construction Permits CPPR-128 and CPPR-129 for the South Texas Project, and to
        staff at the conclusion of the inspection.
the discussion of our findings with Mr. G. Vaughn and -other members of your
!       Areas examined during the inspection included review of corrective actions for
staff at the conclusion of the inspection.
        deficiencies identified during the NRC emergency preparedness implementation
!
        appraisal. Within these areas, the inspection consisted of selective
Areas examined during the inspection included review of corrective actions for
;       examination of procedures and representative records, interviews with
deficiencies identified during the NRC emergency preparedness implementation
        personne_l, and observations by the NRC inspector. The inspection findings.are
appraisal. Within these areas, the inspection consisted of selective
;
examination of procedures and representative records, interviews with
personne_l, and observations by the NRC inspector.
The inspection findings.are
,
,
        documented in the enclosed inspection report.
documented in the enclosed inspection report.
:
:
        Within'the scope of the inspection, no violations or deviations were
Within'the scope of the inspection, no violations or deviations were
        identified.
identified.
l       One unresolved item is identified in paragraph 4 of the enclosed inspection
l
        report.
One unresolved item is identified in paragraph 4 of the enclosed inspection
        The status of actions you have taken with regard to deficiencies previously
report.
        identified during the emergency preparedness implementation appraisal is
The status of actions you have taken with regard to deficiencies previously
l       identified in paragraph 2 of the enclosed report.
identified during the emergency preparedness implementation appraisal is
        Should you have any questions concerning this inspection, we will be pleased to
l
        discuss them with you.
identified in paragraph 2 of the enclosed report.
                                                      Sincerely,
Should you have any questions concerning this inspection, we will be pleased to
                                                        Original Signed By
discuss them with you.
                                                          E. H. Johnson   ,v'
Sincerely,
                                                      J. E. Gagliardo, Chief
Original Signed By
                                                      Reactor Projects Branch
E. H. Johnson
        Enclosure: (see next page)                                                           )
,v'
        RIV:TA()[/       C:NMEPB         C:     /           C:RPB
J. E. Gagliardo, Chief
        JBBaird:cz       WLFisher       G       able     JEGagliardo                     i
Reactor Projects Branch
          5/lb/87         T/l3/87             I(/87         [/f/87                           }
Enclosure: (see next page)
                                                                                              ;
)
                                    '
RIV:TA()[/
        8705260318 870520
C:NMEPB
        ;a     doockosoge,         ,                                              @     /y[g ]
C:
                                                                                              1
/
C:RPB
JBBaird:cz
WLFisher
G
able
JEGagliardo
i
5/lb/87
T/l3/87
I(/87
[/f/87
}
;
8705260318 870520
'
;a
doockosoge,
@
/y[g
]
,
- - - - -
1


>
>
  ,. _ ,,-
,. _ ,,-
        Houston Lt '..cing & Power Company     -2-
Houston Lt '..cing & Power Company
        Enclosure:
-2-
        Appendix - NRC Inspection Report
Enclosure:
          50-498/87-24
Appendix - NRC Inspection Report
          50-499/87-24
50-498/87-24
        cc w/ enclosure:
50-499/87-24
        Houston Lighting & Power Company
cc w/ enclosure:
        ATTN: M. Wisenberg, Manager,
Houston Lighting & Power Company
                  Nuclear Licensing
ATTN:
        P. O. Box 1700
M. Wisenberg, Manager,
        Houston, Texas 77701
Nuclear Licensing
l       Houston Lighting & Power Company
P. O. Box 1700
        ATTN: Gerald E. Vaughn, Vice President
Houston, Texas 77701
l
Houston Lighting & Power Company
ATTN: Gerald E. Vaughn, Vice President
'
'
                Nuclear Operations
Nuclear Operations
        P. O. Box 1700
P. O. Box 1700
l       Houston, Texas     77001
l
Houston, Texas
77001
l
l
l
l        Texas Radiation Control Program Director
Texas Radiation Control Program Director
        bec to DMB (IE35)
bec to DMB (IE35)
        bec distrib. by RIV:
bec distrib. by RIV:
        *RPB                                     DRSP
*RPB
        *RRI-OPS                                 R. D. Martin, RA
DRSP
;        *RRI-CONST.                             *Section Chief (RPB/C)
*RRI-OPS
                                                  * MIS System
R. D. Martin, RA
*RRI-CONST.
*Section Chief (RPB/C)
;
'
'
        *R&SPB
*R&SPB
        *RIV File                               *D. Weiss, RM/ALF
* MIS System
        *RSTS Operator                             R. Pirfo, OGC
*RIV File
        *R. G. Taylor, RPB/C                     *RSB
*D. Weiss, RM/ALF
l       * Project Inspector                     *R. Hall
*RSTS Operator
l       *J. B. Baird                             *W. L. Fisher
R. Pirfo, OGC
          R. L. Bangart                             D. B. Matthews, NRR
*R. G. Taylor, RPB/C
          FEMA, RVI
*RSB
                                                                        l
l
* Project Inspector
*R. Hall
l
*J. B. Baird
*W. L. Fisher
R. L. Bangart
D. B. Matthews, NRR
FEMA, RVI
l
l
                                                                        l
                                                                        l
l
l
[
[
.
.
l
l
                                                                        l
}}
}}

Latest revision as of 02:10, 4 December 2024

Forwards Insp Repts 50-498/87-24 & 50-499/87-24 on 870420-24.No Violations or Deviations Noted.Status of Actions Re Deficiencies Identified During Emergency Preparednesss Implementation Appraisal Noted
ML20214F851
Person / Time
Site: South Texas  
Issue date: 05/20/1987
From: Gagliardo J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Goldberg J
HOUSTON LIGHTING & POWER CO.
Shared Package
ML20214F852 List:
References
NUDOCS 8705260318
Download: ML20214F851 (2)


See also: IR 05000498/1987024

Text

<

,o

,,

'

' MAY 2 01987

'

'

In Reply Refer To:

Dockets:~ 50-498/87-24

.

-50-499/87-24

L

l

l

Houston Lighting & Power Company

,

ATTN:

J. H. Goldberg, Group Vice

President, Nuclear

P. O. Box 1700

l-

Houston, Texas

77001

Gentlemen:

This refers to the inspection conducted by Mr. J. B. Baird of this office

during the period April 20-24, 1987, of activities authorized by NRC'

l

Construction Permits CPPR-128 and CPPR-129 for the South Texas Project, and to

the discussion of our findings with Mr. G. Vaughn and -other members of your

staff at the conclusion of the inspection.

!

Areas examined during the inspection included review of corrective actions for

deficiencies identified during the NRC emergency preparedness implementation

appraisal. Within these areas, the inspection consisted of selective

examination of procedures and representative records, interviews with

personne_l, and observations by the NRC inspector.

The inspection findings.are

,

documented in the enclosed inspection report.

Within'the scope of the inspection, no violations or deviations were

identified.

l

One unresolved item is identified in paragraph 4 of the enclosed inspection

report.

The status of actions you have taken with regard to deficiencies previously

identified during the emergency preparedness implementation appraisal is

l

identified in paragraph 2 of the enclosed report.

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

Original Signed By

E. H. Johnson

,v'

J. E. Gagliardo, Chief

Reactor Projects Branch

Enclosure: (see next page)

)

RIV:TA()[/

C:NMEPB

C:

/

C:RPB

JBBaird:cz

WLFisher

G

able

JEGagliardo

i

5/lb/87

T/l3/87

I(/87

[/f/87

}

8705260318 870520

'

a

doockosoge,

@

/y[g

]

,

- - - - -

1

>

,. _ ,,-

Houston Lt '..cing & Power Company

-2-

Enclosure:

Appendix - NRC Inspection Report

50-498/87-24

50-499/87-24

cc w/ enclosure:

Houston Lighting & Power Company

ATTN:

M. Wisenberg, Manager,

Nuclear Licensing

P. O. Box 1700

Houston, Texas 77701

l

Houston Lighting & Power Company

ATTN: Gerald E. Vaughn, Vice President

'

Nuclear Operations

P. O. Box 1700

l

Houston, Texas

77001

l

l

Texas Radiation Control Program Director

bec to DMB (IE35)

bec distrib. by RIV:

  • RPB

DRSP

  • RRI-OPS

R. D. Martin, RA

  • RRI-CONST.
  • Section Chief (RPB/C)

'

  • R&SPB
  • MIS System
  • RIV File
  • D. Weiss, RM/ALF
  • RSTS Operator

R. Pirfo, OGC

  • R. G. Taylor, RPB/C
  • RSB

l

  • Project Inspector
  • R. Hall

l

  • J. B. Baird
  • W. L. Fisher

R. L. Bangart

D. B. Matthews, NRR

FEMA, RVI

l

l

[

.

l