ML20215N206: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot insert |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:SAFEGUARDS INFORMATION | ||
- | |||
. | |||
; | |||
OCT 291986 | |||
Docket Nos. 50-325, 50-324 | |||
License Nos. DPR-71, DPR-62 | |||
4 | 4 | ||
Carolina Power and Light Company | |||
ATTN: | |||
Mr. E. E. Utley | |||
Senior Executive Vice President | |||
Power Supply and Engineering | |||
and Construction | |||
P. O. Box 1551 | |||
Raleigh, NC 27602 | |||
Gentlemen: | |||
SUBJECT: NRC INSPECTION REPORT NOS. 50-325/86-23 AND 50-324/S6-24 | |||
This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by | |||
A. Tillman on September 23-26, 1986. | |||
The- inspection included a review of | |||
activities authorized for your Brunswick facility. | |||
At the conclusion of the | |||
inspection, the findings were discussed with those members of your staff | |||
identified in the enclosed inspection report. | |||
Areas examined during the inspection are identified in the report. Within these | |||
areas, the inspection consisted of selective examinations of procedures and | |||
representative records, interviews with personnel, and observation of activities | |||
in progress. | |||
Within the scope of the inspection, no violations or deviations were identified. | |||
Your attention is invited to unresolved item identified .in the inspection report. | |||
This matter will be pursued during future inspections. | |||
In accordance with 10 CFR 2.790(d) and 10 CFR 73.21, safeguards activities and | |||
security measures are exempt from public disclosure; therefore, the enclosure to | |||
this letter, with the exception of the report cover page which presents a | |||
nonexempt summary, will not be placed in the NRC Public Document. Room. | |||
Should you have any questions concerning this letter, please contact us. | |||
. Sincerely, | |||
David M. Verrelli, Chief | |||
Reactor Projects Branch 2 | |||
l | |||
" | |||
Enclosure: | |||
(See page 2) | |||
ERCLOSURE CONTAINS | |||
SAFEGUARDS INFORMATION. | |||
WONSEPARATIo | |||
, | , | ||
l | l | ||
i | 8611040435 861029 | ||
I | i | ||
PDR | |||
ADOCK 05000324 | |||
PACE IS DECONTROLLEL. | |||
.. | |||
I | |||
G | |||
PDR | |||
w | |||
y | |||
n | |||
SAFEGUARDS INFORMATin | |||
. | . | ||
. | |||
Carolina Power and Light Company | |||
2 | |||
OCT 2 91986 | |||
Enclosure: | |||
NRC Inspection Report | |||
(Safeguards Information) | |||
cc w/ encl: | |||
P. W. Howe, Vice President | |||
Brunswick Nuclear Project | |||
C. R. Dietz, Plant General Manager | |||
bcc w/ encl: | |||
NRC Resident Inspector | |||
Document Control Desk | |||
State of North Carolina | |||
RII | |||
RII | |||
' | |||
E.tn ac' | |||
V | |||
0 | |||
, | |||
SMele[Qe Fredric~kson | |||
ATillman:es | |||
D cGuire | |||
Ji'" Aip ine | |||
t r | |||
10/ /86 | |||
10/2166 | |||
10/20/86 | |||
3/W86 | |||
1Mg8 | |||
, | |||
SAFECUAgg | |||
T4fM3 | |||
!Offj;afdifj{ls" | |||
SAFEGUARDS INFORMATIC?i | |||
, | |||
- - - | |||
-- | |||
}} | }} | ||
Latest revision as of 21:21, 3 December 2024
| ML20215N206 | |
| Person / Time | |
|---|---|
| Site: | Brunswick |
| Issue date: | 10/29/1986 |
| From: | Verrelli D NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Utley E CAROLINA POWER & LIGHT CO. |
| Shared Package | |
| ML20215N207 | List: |
| References | |
| NUDOCS 8611040435 | |
| Download: ML20215N206 (2) | |
See also: IR 05000324/1986024
Text
SAFEGUARDS INFORMATION
-
.
OCT 291986
Docket Nos. 50-325, 50-324
4
Carolina Power and Light Company
ATTN:
Mr. E. E. Utley
Senior Executive Vice President
Power Supply and Engineering
and Construction
P. O. Box 1551
Raleigh, NC 27602
Gentlemen:
SUBJECT: NRC INSPECTION REPORT NOS. 50-325/86-23 AND 50-324/S6-24
This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by
A. Tillman on September 23-26, 1986.
The- inspection included a review of
activities authorized for your Brunswick facility.
At the conclusion of the
inspection, the findings were discussed with those members of your staff
identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report. Within these
areas, the inspection consisted of selective examinations of procedures and
representative records, interviews with personnel, and observation of activities
in progress.
Within the scope of the inspection, no violations or deviations were identified.
Your attention is invited to unresolved item identified .in the inspection report.
This matter will be pursued during future inspections.
In accordance with 10 CFR 2.790(d) and 10 CFR 73.21, safeguards activities and
security measures are exempt from public disclosure; therefore, the enclosure to
this letter, with the exception of the report cover page which presents a
nonexempt summary, will not be placed in the NRC Public Document. Room.
Should you have any questions concerning this letter, please contact us.
. Sincerely,
David M. Verrelli, Chief
Reactor Projects Branch 2
l
"
Enclosure:
(See page 2)
ERCLOSURE CONTAINS
SAFEGUARDS INFORMATION.
WONSEPARATIo
,
l
8611040435 861029
i
ADOCK 05000324
PACE IS DECONTROLLEL.
..
I
G
w
y
n
SAFEGUARDS INFORMATin
.
.
Carolina Power and Light Company
2
OCT 2 91986
Enclosure:
NRC Inspection Report
(Safeguards Information)
cc w/ encl:
P. W. Howe, Vice President
Brunswick Nuclear Project
C. R. Dietz, Plant General Manager
bcc w/ encl:
NRC Resident Inspector
Document Control Desk
State of North Carolina
RII
RII
'
E.tn ac'
V
0
,
SMele[Qe Fredric~kson
ATillman:es
D cGuire
Ji'" Aip ine
t r
10/ /86
10/2166
10/20/86
3/W86
1Mg8
,
SAFECUAgg
T4fM3
!Offj;afdifj{ls"
SAFEGUARDS INFORMATIC?i
,
- - -
--