ML20216B973: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter:._ | {{#Wiki_filter:._ | ||
,q-i JUN 22 Iggr q | |||
Docket:- 50-285/0L-87-03 Omaha-Public Power District' ATTN: | In Reply Refer To: | ||
Docket:- 50-285/0L-87-03 Omaha-Public Power District' ATTN: | |||
R. L. Andrews, Division Manager-Nuclear Production 1623 Harney Street I | |||
0maha, Nebraska 68102-Gentlemen: | |||
==SUBJECT:== | ==SUBJECT:== | ||
OPERATOR LICENSE EXAMINATION REPORT OL-87-03 During the week of June 1,1987, NRC administered one Reactor Operator license and five Senior Reactor Operator requalification retake examinations at the Fort Calhoun Station (FCS). The results of this site visit have been discussed with members' of your staff. All of the examinees successfully completed their examinations. As a result, NRC has issued or renewed the appropriate licenses. | OPERATOR LICENSE EXAMINATION REPORT OL-87-03 During the week of June 1,1987, NRC administered one Reactor Operator license and five Senior Reactor Operator requalification retake examinations at the Fort Calhoun Station (FCS). The results of this site visit have been discussed with members' of your staff. All of the examinees successfully completed their examinations. As a result, NRC has issued or renewed the appropriate licenses. | ||
The requalification retake examinees, who were removed from license duties as | The requalification retake examinees, who were removed from license duties as 3 | ||
These results do not affect the current NRC evaluation of the FCS Requalif-ication Program as unsatisfactory. Therefore, operating licenses at FCS will | a result of prior.requalification examination failure, may be returned to license duties after completing any outstanding facility requirements. | ||
These results do not affect the current NRC evaluation of the FCS Requalif-ication Program as unsatisfactory. Therefore, operating licenses at FCS will l | |||
continue to be renewed only upon successful completion of an NRC examination, j | |||
at least until the requalification program is reevaluated in January,1988. | |||
j | j | ||
.Should you have any questions concerning this letter, please contact us. | |||
Sincerely OridnSISDd g, it Johnson J. E. Gagliardo, Chief Reactor Projects Branch | Sincerely OridnSISDd g, it Johnson J. E. Gagliardo, Chief Reactor Projects Branch | ||
==Enclosure:== | ==Enclosure:== | ||
Examination Report OL-87-03 | Examination Report OL-87-03 1 | ||
Fort Calhoun, Nebraska 68023 | cc: w/ enclosures i | ||
RIV:RSB/0L | W. G. Gates, Manager Fort Calhoun Station j | ||
PDR | P. O. Box 399 Fort Calhoun, Nebraska 68023 | ||
\\ | |||
RIV:RSB/0L OL OB RPB | |||
\\ | |||
JLPelletpf[- | |||
SACooleyh"C, RSB TFWesterman JECag ardo 6//2./87 h /p87 | |||
/ /87 b/p/87 8706300194 870622 PDR ADDCK 050002B5 V | |||
PDR | |||
'o 1 | |||
Omaha Public Power District 2 | |||
LeBoeuf. Lamb. Leiby, & MacRae 1333 New Hampshire Avenue, NW | Harry H. Voight, Esq. | ||
Washington, D. C. 20036 J. Fluehr Fort Calhoun Station P. O. Box 399 | LeBoeuf. Lamb. Leiby, & MacRae 1333 New Hampshire Avenue, NW Washington, D. C. | ||
Fort Calhoun, Nebraska '68023 | 20036 J. Fluehr Fort Calhoun Station P. O. Box 399 | ||
Kansas Radiation Control Program Director | ) | ||
bec distrib. by RIV.: | Fort Calhoun, Nebraska '68023 i | ||
RPB | i Kansas Radiation Control Program Director i | ||
RIV FILE | Nebraska Radiation Control Program Director bcc to DMB (IE42) bec distrib. by RIV.: | ||
RPB RRI R. D. Martin, RA RIV FILE DRSP R. Cooley, OLS RSB Project Inspector D. Weiss, RM/ALF J. Pellet b | |||
1 l | 1 l | ||
i I | i I | ||
>}} | |||
Latest revision as of 20:58, 3 December 2024
| ML20216B973 | |
| Person / Time | |
|---|---|
| Site: | Fort Calhoun |
| Issue date: | 06/22/1987 |
| From: | Gagliardo J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Andrews R OMAHA PUBLIC POWER DISTRICT |
| Shared Package | |
| ML20216B978 | List: |
| References | |
| NUDOCS 8706300194 | |
| Download: ML20216B973 (2) | |
Text
._
,q-i JUN 22 Iggr q
In Reply Refer To:
Docket:- 50-285/0L-87-03 Omaha-Public Power District' ATTN:
R. L. Andrews, Division Manager-Nuclear Production 1623 Harney Street I
0maha, Nebraska 68102-Gentlemen:
SUBJECT:
OPERATOR LICENSE EXAMINATION REPORT OL-87-03 During the week of June 1,1987, NRC administered one Reactor Operator license and five Senior Reactor Operator requalification retake examinations at the Fort Calhoun Station (FCS). The results of this site visit have been discussed with members' of your staff. All of the examinees successfully completed their examinations. As a result, NRC has issued or renewed the appropriate licenses.
The requalification retake examinees, who were removed from license duties as 3
a result of prior.requalification examination failure, may be returned to license duties after completing any outstanding facility requirements.
These results do not affect the current NRC evaluation of the FCS Requalif-ication Program as unsatisfactory. Therefore, operating licenses at FCS will l
continue to be renewed only upon successful completion of an NRC examination, j
at least until the requalification program is reevaluated in January,1988.
j
.Should you have any questions concerning this letter, please contact us.
Sincerely OridnSISDd g, it Johnson J. E. Gagliardo, Chief Reactor Projects Branch
Enclosure:
Examination Report OL-87-03 1
cc: w/ enclosures i
W. G. Gates, Manager Fort Calhoun Station j
P. O. Box 399 Fort Calhoun, Nebraska 68023
\\
RIV:RSB/0L OL OB RPB
\\
JLPelletpf[-
SACooleyh"C, RSB TFWesterman JECag ardo 6//2./87 h /p87
/ /87 b/p/87 8706300194 870622 PDR ADDCK 050002B5 V
'o 1
Omaha Public Power District 2
Harry H. Voight, Esq.
LeBoeuf. Lamb. Leiby, & MacRae 1333 New Hampshire Avenue, NW Washington, D. C.
20036 J. Fluehr Fort Calhoun Station P. O. Box 399
)
Fort Calhoun, Nebraska '68023 i
i Kansas Radiation Control Program Director i
Nebraska Radiation Control Program Director bcc to DMB (IE42) bec distrib. by RIV.:
RPB RRI R. D. Martin, RA RIV FILE DRSP R. Cooley, OLS RSB Project Inspector D. Weiss, RM/ALF J. Pellet b
1 l
i I
>