ML20235M666: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:r                 x
{{#Wiki_filter:r
                                                                                                      '
x
                                  _
'
                +               ,       ,
_
                                                                                                        .
+
      ^  ,.         1.;                                 ppp j 7 }g89
,
              .
,
                            ~
.
            '
,.
                  In Rep 1y Refer:To:L..
1.;
                ~ Dockets:- 50-313/89-03.
ppp j 7 }g89
                                  50-368/89-03
^
                                                                            .
.
                  Ark'ansas Power & Light' Company                         -
~
                  ATTN: Mr.-Gene Campbell L
In Rep 1y Refer:To:L..
                              Vice. President, Nuclear.
'
                        .
~ Dockets:- 50-313/89-03.
                                Operations                   ,'
50-368/89-03
                  P.O.~ Box 551                         -         *
.
                  Little Rock, Arkansas 72203                 ,.   ;
Ark'ansas Power & Light' Company
                                                                      '
-
                  Gentelemen:
ATTN: Mr.-Gene Campbell L
                                                                              !
Vice. President, Nuclear.
            j    Thisreferstotheshecial,onsiteinspectionconductedbytheNRCAugmented-
.
                ! Inspection Team (AIT) during the: period January.2.4-25,c1989,!a'nd to the
Operations
                  discussion of our findings with-Mr..J. H. Levine'and other members-of your
,'
                  staff at the conclusion of the inspection.
P.O.~ Box 551
                  This;inspectionwasconductedto*rev.ibwthe. circumstance'sfollowingareactor
-
                  trip on: January 20, 1989, which led to the event where reactor coolant           .
*
                  backleakage occurred through a'high pressure safety injection check valve which
Little Rock, Arkansas 72203
                  failed to. reseat. .Thisfresulted'in a high temperature condition on,a crossover-
,.
                  line in'a piping penetration room outside-of containment. The enclosed copy of.
;
                1the AIT report describes the-areas examined during this review. Within these
'
                  areas, the inspection consisted of selective examination of procedures and'
Gentelemen:
                l representative records, interviews with personnel, and observations by the NRC
!
                  inspectors.
Thisreferstotheshecial,onsiteinspectionconductedbytheNRCAugmented-
                  Should you have any questions concerning this. inspection,'we will be pleased to
j
                . discuss-them with you.
! Inspection Team (AIT) during the: period January.2.4-25,c1989,!a'nd to the
                                                                Sincerely,
discussion of our findings with-Mr..J. H. Levine'and other members-of your
                                                                    ORIGINAL SIGNED BY:
staff at the conclusion of the inspection.
                                                                    LJ. CALLAN
This;inspectionwasconductedto*rev.ibwthe. circumstance'sfollowingareactor
                                                                L. J. Callan, Director
trip on: January 20, 1989, which led to the event where reactor coolant
                                                                Division of Reactor Projects
.
                  Enclosure:
backleakage occurred through a'high pressure safety injection check valve which
                  Appendix - NRC Inspection Report
failed to. reseat. .Thisfresulted'in a high temperature condition on,a crossover-
,.                   50-313/89-03
line in'a piping penetration room outside-of containment. The enclosed copy of.
                      50-368/89-03
1the AIT report describes the-areas examined during this review. Within these
areas, the inspection consisted of selective examination of procedures and'
l representative records, interviews with personnel, and observations by the NRC
inspectors.
Should you have any questions concerning this. inspection,'we will be pleased to
. discuss-them with you.
Sincerely,
ORIGINAL SIGNED BY:
LJ. CALLAN
L. J. Callan, Director
Division of Reactor Projects
Enclosure:
Appendix - NRC Inspection Report
,.
50-313/89-03
50-368/89-03
i
i
                  cc w/ enclosure:       (see next page)
cc w/ enclosure:
        -
(see next page)
  ,
,
                  R       C DRP/A               D:DRR                                        f,
-
                  DDC mberlain                   LJ   llanN79                                  3(
f,
  .             2/1 /89                       2/j /89
R
                                                    ~
C DRP/A
                      8902280358 890217
D:DRRllanN79
    '
3(
                      PDR      ADOCK 05000313
DDC mberlain
                      o                     PNV
LJ
.
2/1 /89
2/j /89
~
'
8902280358 890217
PDR
ADOCK 05000313
o
PNV


  _ _ , _ _ _                                 _   _.                                     _       _ _ _ _ _ _   . _ _ _ _   __ _ _ _ _ _ _ _
_ _ , _ _ _
                                                                                                                                                          _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ -
_
                        .
_.
              i
_
                oo
_ _ _ _ _ _
                    .,       .
. _ _ _ _
__ _ _ _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ -
.
i
oo
.
.,
,,
,,
                    ,
,
                        Arkansas Power & Light Company                                                       2-
Arkansas Power & Light Company
                        cc w/ enclosure:
2-
                      ' Arkansas Nuclear One
cc w/ enclosure:
                        ATTN:               J. is. Levine, Executive
' Arkansas Nuclear One
                                              Director, Nuclear Operations
ATTN:
                        P.O. Box 608
J. is. Levine, Executive
                        Russellville, Arkansas 72801
Director, Nuclear Operations
                        Arkansas Radiation Control Program Director
P.O. Box 608
                        bec.to DMB'(IE01)
Russellville, Arkansas 72801
                        bec distrib. by RIV:
Arkansas Radiation Control Program Director
                        *RRI                                                                 *R. D. Martin, RA
bec.to DMB'(IE01)
                        *RPB-DRSS                                                             *Section Chief (DRP/A)
bec distrib. by RIV:
                          Lisa Shea, RM/ALF                                                 *RIV File
*RRI
                        *DRP                                                                 * MIS System
*R. D. Martin, RA
                        *RSTS Operator                                                       -* Project. Engineer, DRP/A
*RPB-DRSS
                        *DRS.*C. Harbuck, NRR Project Manager (MS: 13-D-18).
*Section Chief (DRP/A)
                        *C. Poslusny, NRR Project Manager.(MS: 13-D-18)
Lisa Shea, RM/ALF
                        *w/766
*RIV File
                                                      .
*DRP
                                                                                                                                                                                                  .
* MIS System
                                - - - - . _     _     - - - - - - - - - - - _ - - - - --           - - - -     -           -                 - - - - -     -                   --           -- J
*RSTS Operator
-* Project. Engineer, DRP/A
*DRS.*C. Harbuck, NRR Project Manager (MS:
13-D-18).
*C. Poslusny, NRR Project Manager.(MS:
13-D-18)
*w/766
.
.
- - - - . _
_
- - - - - - - - - - - _ - - - - --
- - - -
-
-
- - - - -
-
--
--
J
}}
}}

Latest revision as of 04:52, 3 December 2024

Forwards Insp Repts 50-313/89-03 & 50-368/89-03 on 890124-25.Insp Conducted to Review Circumstances Following 890120 Reactor Trip Which Led to Reactor Coolant Backleakage Through HPSI Check Valve
ML20235M666
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 02/17/1989
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Campbell G
ARKANSAS POWER & LIGHT CO.
Shared Package
ML20235M668 List:
References
NUDOCS 8902280358
Download: ML20235M666 (2)


See also: IR 05000313/1989003

Text

r

x

'

_

+

,

,

.

,.

1.;

ppp j 7 }g89

^

.

~

In Rep 1y Refer:To:L..

'

~ Dockets:- 50-313/89-03.

50-368/89-03

.

Ark'ansas Power & Light' Company

-

ATTN: Mr.-Gene Campbell L

Vice. President, Nuclear.

.

Operations

,'

P.O.~ Box 551

-

Little Rock, Arkansas 72203

,.

'

Gentelemen:

!

Thisreferstotheshecial,onsiteinspectionconductedbytheNRCAugmented-

j

! Inspection Team (AIT) during the: period January.2.4-25,c1989,!a'nd to the

discussion of our findings with-Mr..J. H. Levine'and other members-of your

staff at the conclusion of the inspection.

This;inspectionwasconductedto*rev.ibwthe. circumstance'sfollowingareactor

trip on: January 20, 1989, which led to the event where reactor coolant

.

backleakage occurred through a'high pressure safety injection check valve which

failed to. reseat. .Thisfresulted'in a high temperature condition on,a crossover-

line in'a piping penetration room outside-of containment. The enclosed copy of.

1the AIT report describes the-areas examined during this review. Within these

areas, the inspection consisted of selective examination of procedures and'

l representative records, interviews with personnel, and observations by the NRC

inspectors.

Should you have any questions concerning this. inspection,'we will be pleased to

. discuss-them with you.

Sincerely,

ORIGINAL SIGNED BY:

LJ. CALLAN

L. J. Callan, Director

Division of Reactor Projects

Enclosure:

Appendix - NRC Inspection Report

,.

50-313/89-03

50-368/89-03

i

cc w/ enclosure:

(see next page)

,

-

f,

R

C DRP/A

D:DRRllanN79

3(

DDC mberlain

LJ

.

2/1 /89

2/j /89

~

'

8902280358 890217

PDR

ADOCK 05000313

o

PNV

_ _ , _ _ _

_

_.

_

_ _ _ _ _ _

. _ _ _ _

__ _ _ _ _ _ _ _

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ -

.

i

oo

.

.,

,,

,

Arkansas Power & Light Company

2-

cc w/ enclosure:

' Arkansas Nuclear One

ATTN:

J. is. Levine, Executive

Director, Nuclear Operations

P.O. Box 608

Russellville, Arkansas 72801

Arkansas Radiation Control Program Director

bec.to DMB'(IE01)

bec distrib. by RIV:

  • RRI
  • R. D. Martin, RA
  • RPB-DRSS
  • Section Chief (DRP/A)

Lisa Shea, RM/ALF

  • RIV File
  • DRP
  • MIS System
  • RSTS Operator

-* Project. Engineer, DRP/A

  • DRS.*C. Harbuck, NRR Project Manager (MS:

13-D-18).

  • C. Poslusny, NRR Project Manager.(MS:

13-D-18)

  • w/766

.

.

- - - - . _

_

- - - - - - - - - - - _ - - - - --

- - - -

-

-

- - - - -

-

--

--

J