ML20235M666
| ML20235M666 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 02/17/1989 |
| From: | Callan L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Campbell G ARKANSAS POWER & LIGHT CO. |
| Shared Package | |
| ML20235M668 | List: |
| References | |
| NUDOCS 8902280358 | |
| Download: ML20235M666 (2) | |
See also: IR 05000313/1989003
Text
r
x
'
_
+
,
,
.
,.
1.;
ppp j 7 }g89
^
.
~
In Rep 1y Refer:To:L..
'
~ Dockets:- 50-313/89-03.
50-368/89-03
.
Ark'ansas Power & Light' Company
-
ATTN: Mr.-Gene Campbell L
Vice. President, Nuclear.
.
Operations
,'
P.O.~ Box 551
-
Little Rock, Arkansas 72203
,.
'
Gentelemen:
!
Thisreferstotheshecial,onsiteinspectionconductedbytheNRCAugmented-
j
! Inspection Team (AIT) during the: period January.2.4-25,c1989,!a'nd to the
discussion of our findings with-Mr..J. H. Levine'and other members-of your
staff at the conclusion of the inspection.
This;inspectionwasconductedto*rev.ibwthe. circumstance'sfollowingareactor
trip on: January 20, 1989, which led to the event where reactor coolant
.
backleakage occurred through a'high pressure safety injection check valve which
failed to. reseat. .Thisfresulted'in a high temperature condition on,a crossover-
line in'a piping penetration room outside-of containment. The enclosed copy of.
1the AIT report describes the-areas examined during this review. Within these
areas, the inspection consisted of selective examination of procedures and'
l representative records, interviews with personnel, and observations by the NRC
inspectors.
Should you have any questions concerning this. inspection,'we will be pleased to
. discuss-them with you.
Sincerely,
ORIGINAL SIGNED BY:
LJ. CALLAN
L. J. Callan, Director
Division of Reactor Projects
Enclosure:
Appendix - NRC Inspection Report
,.
50-313/89-03
50-368/89-03
i
cc w/ enclosure:
(see next page)
,
-
f,
R
C DRP/A
D:DRRllanN79
3(
DDC mberlain
LJ
.
2/1 /89
2/j /89
~
'
8902280358 890217
ADOCK 05000313
o
PNV
_ _ , _ _ _
_
_.
_
_ _ _ _ _ _
. _ _ _ _
__ _ _ _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ -
.
i
oo
.
.,
,,
,
Arkansas Power & Light Company
2-
cc w/ enclosure:
' Arkansas Nuclear One
ATTN:
J. is. Levine, Executive
Director, Nuclear Operations
P.O. Box 608
Russellville, Arkansas 72801
Arkansas Radiation Control Program Director
bec.to DMB'(IE01)
bec distrib. by RIV:
- RRI
- R. D. Martin, RA
- RPB-DRSS
- Section Chief (DRP/A)
Lisa Shea, RM/ALF
- RIV File
- DRP
- MIS System
- RSTS Operator
-* Project. Engineer, DRP/A
- DRS.*C. Harbuck, NRR Project Manager (MS:
13-D-18).
- C. Poslusny, NRR Project Manager.(MS:
13-D-18)
- w/766
.
.
- - - - . _
_
- - - - - - - - - - - _ - - - - --
- - - -
-
-
- - - - -
-
--
--
J