Forwards Insp Repts 50-313/89-03 & 50-368/89-03 on 890124-25.Insp Conducted to Review Circumstances Following 890120 Reactor Trip Which Led to Reactor Coolant Backleakage Through HPSI Check Valve
ML20235M666
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 02/17/1989
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Campbell G
ARKANSAS POWER & LIGHT CO.
Shared Package
ML20235M668 List:
References
NUDOCS 8902280358
Download: ML20235M666 (2)


See also: IR 05000313/1989003

Text

r

x

'

_

+

,

,

.

,.

1.;

ppp j 7 }g89

^

.

~

In Rep 1y Refer:To:L..

'

~ Dockets:- 50-313/89-03.

50-368/89-03

.

Ark'ansas Power & Light' Company

-

ATTN: Mr.-Gene Campbell L

Vice. President, Nuclear.

.

Operations

,'

P.O.~ Box 551

-

Little Rock, Arkansas 72203

,.

'

Gentelemen:

!

Thisreferstotheshecial,onsiteinspectionconductedbytheNRCAugmented-

j

! Inspection Team (AIT) during the: period January.2.4-25,c1989,!a'nd to the

discussion of our findings with-Mr..J. H. Levine'and other members-of your

staff at the conclusion of the inspection.

This;inspectionwasconductedto*rev.ibwthe. circumstance'sfollowingareactor

trip on: January 20, 1989, which led to the event where reactor coolant

.

backleakage occurred through a'high pressure safety injection check valve which

failed to. reseat. .Thisfresulted'in a high temperature condition on,a crossover-

line in'a piping penetration room outside-of containment. The enclosed copy of.

1the AIT report describes the-areas examined during this review. Within these

areas, the inspection consisted of selective examination of procedures and'

l representative records, interviews with personnel, and observations by the NRC

inspectors.

Should you have any questions concerning this. inspection,'we will be pleased to

. discuss-them with you.

Sincerely,

ORIGINAL SIGNED BY:

LJ. CALLAN

L. J. Callan, Director

Division of Reactor Projects

Enclosure:

Appendix - NRC Inspection Report

,.

50-313/89-03

50-368/89-03

i

cc w/ enclosure:

(see next page)

,

-

f,

R

C DRP/A

D:DRRllanN79

3(

DDC mberlain

LJ

.

2/1 /89

2/j /89

~

'

8902280358 890217

PDR

ADOCK 05000313

o

PNV

_ _ , _ _ _

_

_.

_

_ _ _ _ _ _

. _ _ _ _

__ _ _ _ _ _ _ _

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ -

.

i

oo

.

.,

,,

,

Arkansas Power & Light Company

2-

cc w/ enclosure:

' Arkansas Nuclear One

ATTN:

J. is. Levine, Executive

Director, Nuclear Operations

P.O. Box 608

Russellville, Arkansas 72801

Arkansas Radiation Control Program Director

bec.to DMB'(IE01)

bec distrib. by RIV:

  • RRI
  • R. D. Martin, RA
  • RPB-DRSS
  • Section Chief (DRP/A)

Lisa Shea, RM/ALF

  • RIV File
  • DRP
  • MIS System
  • RSTS Operator

-* Project. Engineer, DRP/A

  • DRS.*C. Harbuck, NRR Project Manager (MS:

13-D-18).

  • C. Poslusny, NRR Project Manager.(MS:

13-D-18)

  • w/766

.

.

- - - - . _

_

- - - - - - - - - - - _ - - - - --

- - - -

-

-

- - - - -

-

--

--

J