| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE
| page count = 2
| page count = 2
| project =  
| project = TAC:71809
| stage = Other
| stage = Approval
}}
}}


=Text=
=Text=
{{#Wiki_filter:. - _ -      -__ -__--____-_ _ _-
{{#Wiki_filter:. - _ -
l                                     April 17, 1989 Docket No. 50-416                                                   DISTRIBUTION e Docketafilet                         NRC PCR Mr.. W. T. Cottle                                   T ocal PDR ~                           PD21 r/f Vice President, Nuclear Operations                   SVarga (14E4) Glainas (14H3)
l April 17, 1989 Docket No. 50-416 DISTRIBUTION e Docketafilet NRC PCR Mr.. W. T. Cottle T ocal PDR ~
System Energy Resources, Inc.                         EAdensam                             PAnderson P. O. Box 23054                                       LKintner                 '
PD21 r/f Vice President, Nuclear Operations SVarga (14E4) Glainas (14H3)
OGC Jackson, Mississippi     39205                       BGrimes(9A2) EJordan.(MNBB3302)
System Energy Resources, Inc.
ACRS (10)                             FAllenspach(11B19)
EAdensam PAnderson P. O. Box 23054 LKintner OGC Jackson, Mississippi 39205 BGrimes(9A2) EJordan.(MNBB3302)
ACRS (10)
FAllenspach(11B19)


==Dear Mr. Cottle:==
==Dear Mr. Cottle:==
Plant File                                               i
Plant File i


==SUBJECT:==
==SUBJECT:==
GRAND GULF-NUCLEAR STATION, UNIT 1-PROPOSED AMENDMENT
GRAND GULF-NUCLEAR STATION, UNIT 1-PROPOSED AMENDMENT
                  -TO CHANGE ADMINISTRATIVE CONTROLS IN TECHNICAL SPECIFICATIONS (TAC N0. 71809)
-TO CHANGE ADMINISTRATIVE CONTROLS IN TECHNICAL SPECIFICATIONS (TAC N0. 71809)
By letter dated December 16, 1988, System Energy Resources, Inc. 3 (the licensee) requested an amendment to Facility Operating License No. NPF-29 for the Grand Gulf Nuclear Station, Unit 1 (GGNS-1). The proposed amendment would (1) change the Technical Specifications (TF) by replacing GGHS-1 position titles in Section 6.0, " Administrative Cor.trols," with generic titles so that changes in the GGHS-1 organization would not necessitate a TS change, and (2) change the minimum shift crew composition to allow a senior reactor operator on the crew to also serve as a shift technical advisor.                                                                   ;
By {{letter dated|date=December 16, 1988|text=letter dated December 16, 1988}}, System Energy Resources, Inc. 3 (the licensee) requested an amendment to Facility Operating License No. NPF-29 for the Grand Gulf Nuclear Station, Unit 1 (GGNS-1).
The NRC staff has reviewed the December 16, 1988 submittal and concludes that                                 i the proposed changes are not completely acceptable. The staff's safety evaluation of the proposed amendment is enclosed. The requests for changes.to Section 6.3, " Unit Staff Qualifications," and Section 6.4 " Training," may be withdrawn,                             i or if not withdrawn they will be denied. The other requests may be modified to alleviate the concerns expressed in the enclosed Safety Evaluation. You are requested to modify your application within 60 days of the receipt of this letter.
The proposed amendment would (1) change the Technical Specifications (TF) by replacing GGHS-1 position titles in Section 6.0, " Administrative Cor.trols," with generic titles so that changes in the GGHS-1 organization would not necessitate a TS change, and (2) change the minimum shift crew composition to allow a senior reactor operator on the crew to also serve as a shift technical advisor.
The NRC staff has reviewed the December 16, 1988 submittal and concludes that i
the proposed changes are not completely acceptable. The staff's safety evaluation of the proposed amendment is enclosed. The requests for changes.to Section 6.3, " Unit Staff Qualifications," and Section 6.4 " Training," may be withdrawn, i
or if not withdrawn they will be denied.
The other requests may be modified to alleviate the concerns expressed in the enclosed Safety Evaluation. You are requested to modify your application within 60 days of the receipt of this letter.
The reporting and/or recordkeeping requirements of this letter affect fewer than ten respondents; therefore, OMB clearance is not required under P. L. 96-511.
The reporting and/or recordkeeping requirements of this letter affect fewer than ten respondents; therefore, OMB clearance is not required under P. L. 96-511.
Sincerely, 3
Sincerely, 3
Line 39: Line 45:
==Enclosure:==
==Enclosure:==
Safety Evaluation cc w/ enclosure:
Safety Evaluation cc w/ enclosure:
See next page (GGNS PROPOSED AMENDMENT)                         /
See next page (GGNS PROPOSED AMENDMENT)
l               L
/
;      LA:kI;hRPR           PM:PD   DRPR     - D     1:DRPR l       PAnderson             LKintner:jw     4   EAdensam 04/13 /89             04/p/89             04/f]/89 I
l L
8904250400 890417 PDR   ADOCK 05000416 P                   PDC av
LA:kI;hRPR PM:PD DRPR
- D 1:DRPR l
PAnderson LKintner:jw EAdensam 4
04/13 /89 04/p/89 04/f]/89 I
8904250400 890417 PDR ADOCK 05000416 P
PDC av


Q,
Q,
                                  ~
~
  't       .                                c 1 ...
't c
L#
1 L#
o           Mr. W. T. Cottle-
o Mr. W. T. Cottle-System Energy Resources, Inc.
  !            System Energy Resources, Inc.           GrandGulfNuclearStation(GGNS) l L           CC:
GrandGulfNuclearStation(GGNS) l L
L           Mr. T. H. Cloninger                     Mr. C. R. Hutchinson L
CC:
              - Vice President, Nuclear Engineering   GGNS-General Manager-and Support                     System Energy Resources, Inc.
L Mr. T. H. Cloninger Mr. C. R. Hutchinson L
System Energy Resources, Inc.           Post Office Box 756 P..O. Box 23054                         Port Gibson, Mississippi     39150
- Vice President, Nuclear Engineering GGNS-General Manager-and Support System Energy Resources, Inc.
            - Jackson, Mississippi: 39205 Robert B. McGehee.. Esquire             The Honorable William J. Guste, Jr.
System Energy Resources, Inc.
Wise, Carter, Child, Steen and         Attorney General
Post Office Box 756 P..O. Box 23054 Port Gibson, Mississippi 39150
                ' Caraway-                             Department of Justice P. O. Box 651                           State of Louisiana Jackson, Mississippi             39205 Baton Rouge, Lnuisiana 70804
- Jackson, Mississippi: 39205 Robert B. McGehee.. Esquire The Honorable William J. Guste, Jr.
            . Nicholas-S. Reynolds, Esquire           Office of the. Governor
Wise, Carter, Child, Steen and Attorney General
            ~ Bishop, Liberman, Cook, Purcell         State of Mississippi and Reynolds                     Jackson, Mississippi     39201 1400 L Street, N.W.
' Caraway-Department of Justice P. O. Box 651 State of Louisiana Jackson, Mississippi 39205 Baton Rouge, Lnuisiana 70804
Washington, D.C. 20005-3502             Attorney General.
. Nicholas-S. Reynolds, Esquire Office of the. Governor
Gartin Building Mr. Ralph T.'Lally                     Jackson, Mississippi 39205 Manager of Quality Assurance Middle South utilities System           Mr. Jack McMillan, Director Services,.Inc.                   Division of Solid Waste. Management 639 Loyola Avenue 3rd Floor             Mississippi Department of Natural
~ Bishop, Liberman, Cook, Purcell State of Mississippi and Reynolds Jackson, Mississippi 39201 1400 L Street, N.W.
            . New Orleans, thuisiana 70113             Resources Post' Office Box 10385-Mr. John G. Cesare                     Jackson, Mississippi 39209
Washington, D.C.
            ' Director, Nuclear Licensing Systen Energy Resources, Inc.           Alton B. Cobb, M.D.
20005-3502 Attorney General.
P. O. Box 23054                         State Health Officer Jackson, Mississippi 39205             State Board of Health P.O. Box 1700 Mr. C. B. Hogg, Project Manager         Jackson, Mississippi 39205 Bechtel Power Corporation P. O. Box 2166                         President Houston, Texas 77252-2166               Claiborne County Board of Supervisors Port Gibson, Mississippi     39150 Mr. H. O. Christensen Senior Resident Inspector               Regional Administrator, Region II U.S. Nuclear Regulatory Commission       U. S. Nuclear Regulatory Commission Route 2, Box 399                       101 Mariett3 Street Port Gibson, Mississippi 39150         Suite 2900 Atlanta, Georgia 30323
Gartin Building Mr. Ralph T.'Lally Jackson, Mississippi 39205 Manager of Quality Assurance Middle South utilities System Mr. Jack McMillan, Director Services,.Inc.
_ _ _ _ - _ _ - _ _ _ _ - _  -_}}
Division of Solid Waste. Management 639 Loyola Avenue 3rd Floor Mississippi Department of Natural
. New Orleans, thuisiana 70113 Resources Post' Office Box 10385-Mr. John G. Cesare Jackson, Mississippi 39209
' Director, Nuclear Licensing Systen Energy Resources, Inc.
Alton B. Cobb, M.D.
P. O. Box 23054 State Health Officer Jackson, Mississippi 39205 State Board of Health P.O. Box 1700 Mr. C. B. Hogg, Project Manager Jackson, Mississippi 39205 Bechtel Power Corporation P. O. Box 2166 President Houston, Texas 77252-2166 Claiborne County Board of Supervisors Port Gibson, Mississippi 39150 Mr. H. O. Christensen Senior Resident Inspector Regional Administrator, Region II U.S. Nuclear Regulatory Commission U. S. Nuclear Regulatory Commission Route 2, Box 399 101 Mariett3 Street Port Gibson, Mississippi 39150 Suite 2900 Atlanta, Georgia 30323
-_}}

Latest revision as of 03:25, 2 December 2024

Forwards SER Re 881216 Application for Amend to License NPF-29.Proposed Changes Unacceptable.Requests for Changes to Section 6.3 & 6.4,if Not Withdrawn,Will Be Denied.Mod of Application Requested within 60 Days of Receipt of Ltr
ML20245A816
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 04/17/1989
From: Kintner L
Office of Nuclear Reactor Regulation
To: Cottle W
SYSTEM ENERGY RESOURCES, INC.
Shared Package
ML20245A819 List:
References
TAC-71809, NUDOCS 8904250400
Download: ML20245A816 (2)


Text

. - _ -

l April 17, 1989 Docket No. 50-416 DISTRIBUTION e Docketafilet NRC PCR Mr.. W. T. Cottle T ocal PDR ~

PD21 r/f Vice President, Nuclear Operations SVarga (14E4) Glainas (14H3)

System Energy Resources, Inc.

EAdensam PAnderson P. O. Box 23054 LKintner OGC Jackson, Mississippi 39205 BGrimes(9A2) EJordan.(MNBB3302)

ACRS (10)

FAllenspach(11B19)

Dear Mr. Cottle:

Plant File i

SUBJECT:

GRAND GULF-NUCLEAR STATION, UNIT 1-PROPOSED AMENDMENT

-TO CHANGE ADMINISTRATIVE CONTROLS IN TECHNICAL SPECIFICATIONS (TAC N0. 71809)

By letter dated December 16, 1988, System Energy Resources, Inc. 3 (the licensee) requested an amendment to Facility Operating License No. NPF-29 for the Grand Gulf Nuclear Station, Unit 1 (GGNS-1).

The proposed amendment would (1) change the Technical Specifications (TF) by replacing GGHS-1 position titles in Section 6.0, " Administrative Cor.trols," with generic titles so that changes in the GGHS-1 organization would not necessitate a TS change, and (2) change the minimum shift crew composition to allow a senior reactor operator on the crew to also serve as a shift technical advisor.

The NRC staff has reviewed the December 16, 1988 submittal and concludes that i

the proposed changes are not completely acceptable. The staff's safety evaluation of the proposed amendment is enclosed. The requests for changes.to Section 6.3, " Unit Staff Qualifications," and Section 6.4 " Training," may be withdrawn, i

or if not withdrawn they will be denied.

The other requests may be modified to alleviate the concerns expressed in the enclosed Safety Evaluation. You are requested to modify your application within 60 days of the receipt of this letter.

The reporting and/or recordkeeping requirements of this letter affect fewer than ten respondents; therefore, OMB clearance is not required under P. L.96-511.

Sincerely, 3

Lester L. Kintner, Senior Project Manager Project Directorate 11-1 Division of Reactor Projects I/II, NRR

Enclosure:

Safety Evaluation cc w/ enclosure:

See next page (GGNS PROPOSED AMENDMENT)

/

l L

LA:kI;hRPR PM:PD DRPR

- D 1:DRPR l

PAnderson LKintner:jw EAdensam 4

04/13 /89 04/p/89 04/f]/89 I

8904250400 890417 PDR ADOCK 05000416 P

PDC av

Q,

~

't c

1 L#

o Mr. W. T. Cottle-System Energy Resources, Inc.

GrandGulfNuclearStation(GGNS) l L

CC:

L Mr. T. H. Cloninger Mr. C. R. Hutchinson L

- Vice President, Nuclear Engineering GGNS-General Manager-and Support System Energy Resources, Inc.

System Energy Resources, Inc.

Post Office Box 756 P..O. Box 23054 Port Gibson, Mississippi 39150

- Jackson, Mississippi: 39205 Robert B. McGehee.. Esquire The Honorable William J. Guste, Jr.

Wise, Carter, Child, Steen and Attorney General

' Caraway-Department of Justice P. O. Box 651 State of Louisiana Jackson, Mississippi 39205 Baton Rouge, Lnuisiana 70804

. Nicholas-S. Reynolds, Esquire Office of the. Governor

~ Bishop, Liberman, Cook, Purcell State of Mississippi and Reynolds Jackson, Mississippi 39201 1400 L Street, N.W.

Washington, D.C.

20005-3502 Attorney General.

Gartin Building Mr. Ralph T.'Lally Jackson, Mississippi 39205 Manager of Quality Assurance Middle South utilities System Mr. Jack McMillan, Director Services,.Inc.

Division of Solid Waste. Management 639 Loyola Avenue 3rd Floor Mississippi Department of Natural

. New Orleans, thuisiana 70113 Resources Post' Office Box 10385-Mr. John G. Cesare Jackson, Mississippi 39209

' Director, Nuclear Licensing Systen Energy Resources, Inc.

Alton B. Cobb, M.D.

P. O. Box 23054 State Health Officer Jackson, Mississippi 39205 State Board of Health P.O. Box 1700 Mr. C. B. Hogg, Project Manager Jackson, Mississippi 39205 Bechtel Power Corporation P. O. Box 2166 President Houston, Texas 77252-2166 Claiborne County Board of Supervisors Port Gibson, Mississippi 39150 Mr. H. O. Christensen Senior Resident Inspector Regional Administrator, Region II U.S. Nuclear Regulatory Commission U. S. Nuclear Regulatory Commission Route 2, Box 399 101 Mariett3 Street Port Gibson, Mississippi 39150 Suite 2900 Atlanta, Georgia 30323