                                                        APPENDIX B
APPENDIX B
                                              U.S. NUCLEAR REGULATORY COMMISSION
U.S. NUCLEAR REGULATORY COMMISSION
                                                          REGION IV
REGION IV
              NRC Inspection Report: 50-498/89-16                   Operating Licenses:   NPF-76
NRC Inspection Report: 50-498/89-16
                                              50-499/89-16                                 NPF-78
Operating Licenses:
              Dockets: 50-498
NPF-76
                            50-499
50-499/89-16
              Licensee: Houston Lighting and Power Company (HL&P)
NPF-78
                Facility Name: SouthTexasProject(STP), Units 1and2
Dockets: 50-498
                Inspection At: .STP, Matagorda County, Texas
50-499
                Inspection Conducted: June 5-9, 1989
Licensee: Houston Lighting and Power Company (HL&P)
                Inspectors:    u          _
Facility Name: SouthTexasProject(STP), Units 1and2
                                                /
Inspection At: .STP, Matagorda County, Texas
                                                  t                                  'h/.2//G1
Inspection Conducted: June 5-9, 1989
                                  L. D. Gilbert, Reactor Inspector, Materials         / Date
/
                                      and Quality Programs Section, Division of
'h/.2//G1
                                      Re tor Safety
Inspectors:
                                                                                                  a
u
                                          D-       AADlta                             b     l
_
                                  (. E. Ellershaw, Reactor Inspector, Materials         / DaYe
t
                                      and Quality Programs Section, Division of
L. D. Gilbert, Reactor Inspector, Materials
                                      Reactor Safety                                               ;
/ Date
              Approved:                        w                                      4 de /M   i
and Quality Programs Section, Division of
                                  I. Barnes, Chief, Materials and Quality                 Date
Re tor Safety
                                      Programs Section, Division of Reactor Safety
a
                Inspection Sumary
D-
                  Inspection Conducted June 5-9, 1989 (Report 50-498/89-16)
AADlta
                Areas inspected: Routine, unannounced inspection of the audit progrem; the
b
                procurement program; and the receipt, storage, and handling of equipment and
l
              materials program.
(. E. Ellershaw, Reactor Inspector, Materials
                Results: In general, the audit program was consistent with the TS requirements   l
/ DaYe
                                                                                                  '
and Quality Programs Section, Division of
                and FSAR comitments. A noncited violation (NCV) was identified and reviewed
Reactor Safety
                                                  #
;
                    890620o063 890622
4 de /M
                    PDR ADOCK 05000498           .
i
                    G                 PNU
Approved:
                                                  '
w
<. .-                                                                                             i
I. Barnes, Chief, Materials and Quality
        - _ _ _ - -                                                                               i
Date
Programs Section, Division of Reactor Safety
Inspection Sumary
Inspection Conducted June 5-9, 1989 (Report 50-498/89-16)
Areas inspected: Routine, unannounced inspection of the audit progrem; the
procurement program; and the receipt, storage, and handling of equipment and
materials program.
Results:
In general, the audit program was consistent with the TS requirements
l
and FSAR comitments. A noncited violation (NCV) was identified and reviewed
'
#
890620o063 890622
PDR
ADOCK 05000498
G
PNU
.
'
l
i
<. .-
- _ _ _ - -
i


                                                                                          ._   _       ____
._
y                             '
_
                                .
____
                                                                                                              ,
y
          .
.
                                                                    -2-
,
                            in paragraph 2 for failure to meet minor administrative requirements of the TS
'
                            and QA program. During a partial review of the procurement program, one
.
                            apparent violation (paragraph 3) was identified in regard to the failure to
-2-
                            incorporate applicable requirements of purchase requisitions (prs) into
in paragraph 2 for failure to meet minor administrative requirements of the TS
                            purchase orders (P0s). This finding indicated a programmatic weakness, in that
and QA program. During a partial review of the procurement program, one
                            technical and quality assurance reviews were performed only on prs and no
apparent violation (paragraph 3) was identified in regard to the failure to
                            measures were established to validate that issued P0s accurately reflected PR
incorporate applicable requirements of purchase requisitions (prs) into
                            requirements. One unresolved item (paragraph 3) was also identified in regard
purchase orders (P0s). This finding indicated a programmatic weakness, in that
                            to the commercial grade procurement and dedication program. The inspection
technical and quality assurance reviews were performed only on prs and no
                            revealed that the procurement program had not appropriately addressed this
measures were established to validate that issued P0s accurately reflected PR
                            subject area in the past, bringing the adequacy of prior procurement into
requirements. One unresolved item (paragraph 3) was also identified in regard
                            potential question. The licensee has recognized this weakness and is currently
to the commercial grade procurement and dedication program. The inspection
                            _ finalizing program requirements ard required procurement review actions. The
revealed that the procurement program had not appropriately addressed this
                                                                                                              j
subject area in the past, bringing the adequacy of prior procurement into
                                                                                                                ,
potential question. The licensee has recognized this weakness and is currently
                            licensee has established and implemented an effective program with respect to
_ finalizing program requirements ard required procurement review actions. The
                            receiving inspection, storage of material, and control of nonconforming parts
,
                            identified during receiving inspection.
licensee has established and implemented an effective program with respect to
                            Inspection Conducted June 5-9, 1989 (Report 50-499/89-16)
j
                            Areas Inspected: Routine, unannounced inspection of the audit program; the
receiving inspection, storage of material, and control of nonconforming parts
                            procurement program; and the receipt, storage, and handling of equipment and
identified during receiving inspection.
                            materials program.
Inspection Conducted June 5-9, 1989 (Report 50-499/89-16)
                            Results: In general, the audit program was consistent with the TS requirements
Areas Inspected:
                            and FSAR commitments. A NCV was identified and reviewed in paragraph 2 for
Routine, unannounced inspection of the audit program; the
                            failure to meet minor administrative requirements of the TS and QA program.
procurement program; and the receipt, storage, and handling of equipment and
                            During a partial review of the procurement program, one apparent violation
materials program.
                            (paragraph 3) was identified in regard to the failure to incorporate a
Results:
                            requirements of purchase requisitions (prs) into purchase orders (P0s)pplicable
In general, the audit program was consistent with the TS requirements
                                                                                                    . This
and FSAR commitments. A NCV was identified and reviewed in paragraph 2 for
                            finding indicated a programmatic weakness, in that technical and quality
failure to meet minor administrative requirements of the TS and QA program.
                            assurance reviews were performed only on prs and no measures were established
During a partial review of the procurement program, one apparent violation
                            to validate that issued P0s accurately reflected PR requirements. One
requirements of purchase requisitions (prs) into purchase orders (P0s)pplicable
                            unresolved item (paragraph 3) was also identified in regard to the commercial
(paragraph 3) was identified in regard to the failure to incorporate a
                            grade procurement and dedication program. The inspection revealed that the
This
                            procurement program had not appropriately addressed this subject area in the
.
                            past, bringing the adequacy of prior procurement into potential question. The
finding indicated a programmatic weakness, in that technical and quality
                            licensee has recognized this weakness and is currently finalizing program
assurance reviews were performed only on prs and no measures were established
                            requirements and required procurement review actions. The licensee has
to validate that issued P0s accurately reflected PR requirements. One
                            established and implemented an effective program with respect to receiving
unresolved item (paragraph 3) was also identified in regard to the commercial
                            inspection, storage of material, and control of nonconforming parts identified
grade procurement and dedication program. The inspection revealed that the
                            during receiving inspection,
procurement program had not appropriately addressed this subject area in the
                                                                                                                i
past, bringing the adequacy of prior procurement into potential question. The
  - _ _ _ _ _ _ _ - _ - _ _
licensee has recognized this weakness and is currently finalizing program
requirements and required procurement review actions. The licensee has
established and implemented an effective program with respect to receiving
inspection, storage of material, and control of nonconforming parts identified
during receiving inspection,
i
- _ _ _ _ _ _ _ - _ - _ _


                                                                                                                                                  *i"
%;w %.mDytl E.
                                                                                '             '
''
                                                        ''
'
                                                                                                                                          "
'
                                                                                                                          4
"
%;w                %.mDytl                E.
*i"
                                                                                              <
<
                                                                                                                                            -
4
                                                                          s
-
                                                                                                                                  - .,
s
                                                                      -                             ,
,
                                                                                                                                ,
-
1
..
<
- .,
,
y
y
- y
#.
c
e
:. n
:. n
                          - y                #.
.
                                                              1
.
                                                                                      c
f Q . .y ,'
                                                                                                              ..      <
. ' *
                                                                                                                              e
Ill' l+f;;
                                                      . ' * L.
;
                                      .                      .
,
f Q . .y ,'                                                                                                                               I
f jf V tjg
. ojfry; V          .,,
,
                              tjg
-
                                :.t
,
                                            ,
,
                                                          4                        ,
L.
                                                                                                            -
y
                                                                                                                            ;
,3
                                                                                                                            ,
. o ry; . , ,
                                                                                                                              ,
:.t
                                                                                                                                      y
4
                                                                                                                                      ,
,
                                                                                                                                          ll' l+f;;
W- . , , "
                                                                                                                                                ,3
1
W-
a-3-
,                  .,,"                                                                 a-3-
,
  "h( j
"h( j
    .                               1
.
                                                l
l
                                '
'
;j.
l
l
          e                                   ;j.
e
lqQ                                       ,                                                                      ;
lqQ
                                                                                                                    '
'
                                                                                                                                              ,
,
l:;' E- ,
,
                                              <                                   . DETAILS
;
                                                                                                                                    ,
l:;' E-
  _ f . ~ r.                                                                                         ,                                 ,
,
                                    El.. ' Persons Contacted.
<
                                                -
. DETAILS
                                                                                                                          m:
,
_ f . ~ r.
,
,
El..
' Persons Contacted.
-
m:
ft '
.gggp
h'
h'
  ft '                                          .gggp
1
      1
,
                        ,
*G'J. EpVaughn,LVice President, Nuclear Operations
                        '
'
                                                *G'J. EpVaughn,LVice President, Nuclear Operations
*J.:E.'Seiger, General Manager. Nuclear Assurance
          < >                                  *J.:E.'Seiger, General Manager. Nuclear Assurance
< >
                                            -L*R. L. Balcom, Mana'ger, Audits & Assessments
-L*R. L. Balcom, Mana'ger, Audits & Assessments
                                                *D. R. Keating, Manager, Quality Engineering (QE)'
*D. R. Keating, Manager, Quality Engineering (QE)'
        1 -                                  . *J. l D. Green. Manager. -Inspection and -Surveillance
. J. l D. Green. Manager. -Inspection and -Surveillance
A.                                             *S. M. Dew, Manager.. Nuclear Purchasing and Materials Management
*
                                                            .
1 -
  9
A.
                                            . *M.-A.) Ludwig, Manager, Material Management ~
*S. M. Dew, Manager.. Nuclear Purchasing and Materials Management
                                                                                                                      '
*
                                            :*E. R. Rivera, Manager, Purchasing.
.
                                                                  .
'
                  D                           *R. P..Garris . Director, Purchasing'and Contracts
9
                                                *A. C. McIntyre Manager,. Support Engineering                                                       Gj
. M.-A.) Ludwig, Manager, Material Management ~
                , ' '            '
:*E. R. Rivera, Manager, Purchasing.
                                                *C. A.: Ayala, Supervisor Licensing Engineer
.
  <
D
                                            ;*A. W.-'-Harrison. Supervisor Licensing-Engineer                 *
*R. P..Garris . Director, Purchasing'and Contracts
                                                                                                                                                      f)
*A. C. McIntyre Manager,. Support Engineering
                                                *P. L. Walker, Senior Licensing Engineer                                                               "
Gj
                                                *A.-K. Khosla, Senior Licensing Engineer
*C. A.: Ayala, Supervisor Licensing Engineer
                                                *W.; G. LWellborn, Manager, Material Technical Services:
f
9;p                 ,
, ' '
                                                *M..F. Polishak, Material Technical Services Supervisor                                                 ,
'
                                            '. *J. E. Adkins, Staff.QA Specialist
;*A. W.-'-Harrison. Supervisor Licensing-Engineer
                          '
*
    L
<
                                                      .
*P. L. Walker, Senior Licensing Engineer
                                                                                                                                                        !
"
                            -
*A.-K. Khosla, Senior Licensing Engineer
                                                *D. E. Mathews, Purchasing Supervisor .           _
*W.; G. LWellborn, Manager, Material Technical Services:
                                                                                                                                                        j
9;p
                t                                 R. W.'Chewning,' Chairman, Nuclear Safety Review Board'                                               i
*M..F. Polishak, Material Technical Services Supervisor
                                                                                                                                                        l '
,
                                                "NRC
,
            s                            ' *J..E. Bess,. Senior Resident' Inspector-                                                               ,
'. *J. E. Adkins, Staff.QA Specialist
                                                                                                                                                    ,*
!
                                                *J. I. Tapia, Senior Resident Inspector                 .
'
                                                                                                          *.
L
                                                *D. L. Garrison, Resident Inspector.
.
                                                  The hRC inspector also interviewed other licensee employees during the-
-
                                                  inspection.
*D. E. Mathews, Purchasing Supervisor .
                                                * Denotes attendance at exit interview conducted on June 9,1989.
_
  T, _'                             2.           Audit Program (40702 and 40704)
j
                                                  The objective of this inspection was.to verify that the licensee.has
t
            ..
R. W.'Chewning,' Chairman, Nuclear Safety Review Board'
                                                  developed and implemented a quality assurance (QA) program relating to
i
      &,
l'
                '
"NRC
                                                  audits of activities that is in conformance with Technical
' *J..E. Bess,. Senior Resident' Inspector-
      f                                            S                                                                                                    q
,
                      .
s
                                                  ?(specifications
,*
                                                    FSAR).          (TS) and commitments in the Final. Safety Analysis Report                         <
*J. I. Tapia, Senior Resident Inspector
                                                                                                                                                          i
.
'
*.
                                                  The NRC inspector reviewed the following documents to verify that
*D. L. Garrison, Resident Inspector.
                                                  ' administrative controls exist and that they provide measures to assure
The hRC inspector also interviewed other licensee employees during the-
                                      ~,
inspection.
                                                  that audits are scheduled and performed by independent ano qualified                               1
* Denotes attendance at exit interview conducted on June 9,1989.
                                                    personnel including special expertise when needed.                                                 d
T, _'
                '
2.
                                                                                                                                                        I
Audit Program (40702 and 40704)
                                                                                                                                                          !
The objective of this inspection was.to verify that the licensee.has
  -
..
                -
developed and implemented a quality assurance (QA) program relating to
                    *
&,
audits of activities that is in conformance with Technical
?(specifications (TS) and commitments in the Final. Safety Analysis Report
'
S
q
f
FSAR).
i
<
.
The NRC inspector reviewed the following documents to verify that
'
~,
' administrative controls exist and that they provide measures to assure
that audits are scheduled and performed by independent ano qualified
1
personnel including special expertise when needed.
d
I
'
!
-
-
*


                                        - -                       -                         -           - - - - - -   ---- - - - - - - - - - - - -
y 4,
y 4,,
-
  ,
-
                                                              >
>
                                                                                      ,
-
                                        -
-
  + ,
- - - - - -
                                      '
----
      .,
- - - - - - - - - - - -
  ,
,
                                                                                -4-
,
                                                  ' Operations'Ouality Assurance Plan, Section 15.0, Revision 3. " Quality
,
                                                    Assurance Audit and Surveillance"
-
                                            *
+
                                                  QA Procedure QAP-2.8, Revision 1, " Plant and. Vendor Audits"
                                            *
g                                                  QA Procedure QAP-1.5, Revision 3, " Deficiency Reporting"
                                            *
                                                  QA Procedure QAP-2.1, Revision 1, " Training, Qualification and
                                                    Certification of Audit Personnel"
                                            The NRC inspector also verified that the audit
  '
                                            cognizance of the Nuclear Safety Review Board (program is under theNSRB) by in
                                          LChairman of the NSRB, reviewing minutes of the NSRB meetings, and
                                            reviewing the following documents.
                                            *
                                                    Nuclear Group Policies NGP-820. Revision 6. " Nuclear Safety Review
                                                                                                                      '_
                                                    Board"                                                                                            l
                                                    Nuclear Safety Review Board NSRB-04, Revision 3. " Audit / Assessment
                                                    Procedure"-
,
,
                                                    Nuclear Safety Review Board NSRB-01, Revision 3, " Rules'of Conduct"
'
                                            In reviewing the long-range audit plan and schedules-for 1988 and 1989,
.,
                                            the NRC inspector noted that although the audi.ts were perfomed at the.
,
                                            frequency required by the TS the audit plan frequency terminology did not
-4-
                                            conform to that'used in the TS. For example, the audit' plan frequency
' Operations'Ouality Assurance Plan, Section 15.0, Revision 3. " Quality
                                            uses the term " annual" when the TS specifies "at least once per 12'
Assurance Audit and Surveillance"
                                            months." The licensee indicated that the annual audit plan terminology
QA Procedure QAP-2.8, Revision 1, " Plant and. Vendor Audits"
                                            would be clarified to ensure that-the TS requirements for frequency are
*
                                            incorporated into the audit plan scheduling.
g
                                            To assess the implementation of the audit program, the NRC. inspector
QA Procedure QAP-1.5, Revision 3, " Deficiency Reporting"
                                            reviewed the following audit reports. The audit reports were selectively
*
                                            reviewed to ascertain adequacy of audit scope, audit content, audit                                       .
QA Procedure QAP-2.1, Revision 1, " Training, Qualification and
                                            checklist, distribution to management, followup actions, timeliness of                                   q
*
                                            reports and responses to audit findings, and audit personnel                                             L
Certification of Audit Personnel"
                                            qualifications,                                                                                           l
cognizance of the Nuclear Safety Review Board (program is under theNSRB) by in
                                                    Audit B2 - Personnel Training and Qualification, Audit Reports 89-21
The NRC inspector also verified that the audit
                                                      and 88-21
'
                                                                                                                                                      i
LChairman of the NSRB, reviewing minutes of the NSRB meetings, and
                                                    Audit A - Compliance to Technical Specifications and License                                       j
reviewing the following documents.
                                                      Conditions, Audit Reports 89-18 and 88-23
Nuclear Group Policies NGP-820. Revision 6. " Nuclear Safety Review
                                            *      Audit C - Nonconformance Control and Corrective Action, Audit
*
                                                      Reports 89-05, 88-05, and 88-37                                                                 )
Board"
                                                    Audit D1 - Conduct of Operations, Audit Report 88-30
'_
                                                                                                                                                        '
l
                                            *
Nuclear Safety Review Board NSRB-04, Revision 3. " Audit / Assessment
                                                    Audit 012 - Cooperative Management Audit, Audit Report 88-64
Procedure"-
                                                                                                                                                        !
,
          _ _ _ _ _ _ _ _ _ _ _ _ _ _                 _ _ _ _                                                                                         _]
Nuclear Safety Review Board NSRB-01, Revision 3, " Rules'of Conduct"
In reviewing the long-range audit plan and schedules-for 1988 and 1989,
the NRC inspector noted that although the audi.ts were perfomed at the.
frequency required by the TS the audit plan frequency terminology did not
conform to that'used in the TS. For example, the audit' plan frequency
uses the term " annual" when the TS specifies "at least once per 12'
months." The licensee indicated that the annual audit plan terminology
would be clarified to ensure that-the TS requirements for frequency are
incorporated into the audit plan scheduling.
To assess the implementation of the audit program, the NRC. inspector
reviewed the following audit reports. The audit reports were selectively
reviewed to ascertain adequacy of audit scope, audit content, audit
.
checklist, distribution to management, followup actions, timeliness of
q
reports and responses to audit findings, and audit personnel
L
qualifications,
l
Audit B2 - Personnel Training and Qualification, Audit Reports 89-21
and 88-21
i
Audit A - Compliance to Technical Specifications and License
j
Conditions, Audit Reports 89-18 and 88-23
Audit C - Nonconformance Control and Corrective Action, Audit
*
Reports 89-05, 88-05, and 88-37
)
Audit D1 - Conduct of Operations, Audit Report 88-30
'
Audit 012 - Cooperative Management Audit, Audit Report 88-64
*
_ _ _ _ _ _ _ _ _ _ _ _ _ _
_ _ _ _
_]


                                                                      . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _                 -_____ - _______ __- _
. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
                r
-_____ - _______ __- _
                        ('             r
r
v           ,~
( '
                  ,.
r
v
,~
,.
l b.
l b.
    <  bs                       ,
bs
                                                                  -5-
-5-
<
,
l
l
              t
t
                            In' general' the audit program was consistent with the TS. requirements and
In' general' the audit program was consistent with the TS. requirements and
                            FSAR commitments. However, administrative' requirements of the TS were
FSAR commitments. However, administrative' requirements of the TS were
                            violated, in that 2 of the 10 audit reports reviewed were not issued
violated, in that 2 of the 10 audit reports reviewed were not issued
  #                          within 30 days efter completion of the' audit as required by
within 30 days efter completion of the' audit as required by
                            Specification 6.5.2.9c of the TS. As a result of the NRC inspector's'
#
                            finding,.the licensee: issued Deficiency. Report No. 89-045 to document the
Specification 6.5.2.9c of the TS. As a result of the NRC inspector's'
                            ' deficiency, review other audit reports for this deficiency, and implement-
finding,.the licensee: issued Deficiency. Report No. 89-045 to document the
                            corrective. action to ensure that all audit reports are issued within TS
' deficiency, review other audit reports for this deficiency, and implement-
                            requirements.r In addition, administrative' requirements of the QA program.
corrective. action to ensure that all audit reports are issued within TS
          .                /were violated, in that, the audit package for Audit Report 88-30 (D1) did
requirements.r In addition, administrative' requirements of the QA program.
                                    ,
/were violated, in that, the audit package for Audit Report 88-30 (D1) did
                            not contain a completed audit checklist as required by.Section 7.1.2 of-
.
                            QAP-2.8. The licensee issued Deficiency Report No. 89-042 to document the-
,
                            deficiency and locate or reconstruct'the audit checklist. This is an-
not contain a completed audit checklist as required by.Section 7.1.2 of-
                            apparent violation for. failure to meet the administrative requirements of:
QAP-2.8. The licensee issued Deficiency Report No. 89-042 to document the-
                            the TS and QA program; however, the violation is not being cited bccause
deficiency and locate or reconstruct'the audit checklist. This is an-
                            it. is of minor safety. significance and meets the criteria specified in
apparent violation for. failure to meet the administrative requirements of:
                            Sect'.on V.A. of the Enforcement Policy.
the TS and QA program; however, the violation is not being cited bccause
                                              .
it. is of minor safety. significance and meets the criteria specified in
                                                                                                          (NCV498/8916-01; NCV499/8916-01)2
Sect'.on V.A. of the Enforcement Policy.
      ,
(NCV498/8916-01; NCV499/8916-01)2
                    . 3',   Procurement Program (38701and38703I
.
            .-            'The objectives.of this inspection were:                                       (a)toascertainwhetherthe                   ,
,
                            licensee has implemented a QA program to control procurement activities
. 3',
                            that is in conformance with regulatory requirements and licensee'
Procurement Program (38701and38703I
                            commitments; (b) to evaluate the licensee's commercial grade procurement
'The objectives.of this inspection were:
                            activities to ensure that they-conform to established guidance and
(a)toascertainwhetherthe
                            requirements.
,
                                                                                                "
.-
                            a.       Program Review
licensee has implemented a QA program to control procurement activities
                                      The NRC inspector reviewed the documents listed below to verify that
that is in conformance with regulatory requirements and licensee'
                                      administrative controls exist and that they provide measures to                                             . _   ;
commitments; (b) to evaluate the licensee's commercial grade procurement
                                      assure that necessary technical and quality requirements are included
activities to ensure that they-conform to established guidance and
                                      in procurement documents for safety-related items or services. The
requirements.
                                      documents were also reviewed to verify that controls exist for the
"
                                      selection, approval, and use of vendors.
a.
                                            STP-FSAR, Section 17.2.4, " Procurement Document Control."                                                 <
Program Review
                                            Amendment 62                                                                                               !
The NRC inspector reviewed the documents listed below to verify that
                                                                                                                                                        1
administrative controls exist and that they provide measures to
                                      *
. _
                                          Operations Quality Assurance Plan, Section 7.0, Revision 4
;
                                              " Procurement"
assure that necessary technical and quality requirements are included
                                      *
in procurement documents for safety-related items or services. The
                                          QA Procedure QAP-1.6, Revision 1. " Procurement of Items and
documents were also reviewed to verify that controls exist for the
                                              Services"
selection, approval, and use of vendors.
                                          QA Procedure QAP-2.4, Revision 2 " Quality Engineering                                                       I
STP-FSAR, Section 17.2.4, " Procurement Document Control."
                                                                                                                                                        J
<
                                              Evaluation of Vendors"
Amendment 62
                                            QA Procedure QAP-2.6, Revision 1, Procurement Document Review"
!
                                      *
1
                                            QA Procedure QAP-2.8, Revision 1, " Plant and Vendor Audits"
Operations Quality Assurance Plan, Section 7.0, Revision 4
                                                                                                                                                        i
*
                                                                                                                                                        I
" Procurement"
                                                                                                                                                        l
QA Procedure QAP-1.6, Revision 1. " Procurement of Items and
                                                                                                                                                        1
*
                                                                                                                                                        1
Services"
QA Procedure QAP-2.4, Revision 2 " Quality Engineering
I
J
Evaluation of Vendors"
QA Procedure QAP-2.6, Revision 1, Procurement Document Review"
QA Procedure QAP-2.8, Revision 1, " Plant and Vendor Audits"
*
i
I
l
1
1


                  ,
,
e
e
                .
.
  '
'
p
p
                                                  -6-
-6-
                    '*
Procedure NPMMP-4.7Q,' Revision 0, " Preparation and Issuance of
                          Procedure NPMMP-4.7Q,' Revision 0, " Preparation and Issuance of
'*
                            Purchase Orders / Contracts and Supplements"
Purchase Orders / Contracts and Supplements"
                          Procedure NPMMP-4.12Q, Revision 0, " Preparation of RPDs for
Procedure NPMMP-4.12Q, Revision 0, " Preparation of RPDs for
                            Items and Services"
Items and Services"
                    *
Procedure IP-5.1Q, Revision 4 " Procedure of Items"
                          Procedure IP-5.1Q, Revision 4 " Procedure of Items"
*
                    -In order to assess implementation of the program, the NRC inspector
-In order to assess implementation of the program, the NRC inspector
                    reviewed the following purchase orders (P0s) in conjunction with the
reviewed the following purchase orders (P0s) in conjunction with the
                    applicable purchase requisitions (prs) and furnished vendor
applicable purchase requisitions (prs) and furnished vendor
                    documentation.
documentation.
                          PO RS 9876 to Wolf Creek Generating Station for Westinghouse
PO RS 9876 to Wolf Creek Generating Station for Westinghouse
                            P/N OT1MIC selector switches
P/N OT1MIC selector switches
                          P0 RS 8599 to ASEA Brown Boveri for underfrequency,. relays
P0 RS 8599 to ASEA Brown Boveri for underfrequency,. relays
                          P0 RS 8015 to A&G Engineering Co., Inc., for ASTM A-194,
P0 RS 8015 to A&G Engineering Co., Inc., for ASTM A-194,
                            Grade 2H hex jam nuts
Grade 2H hex jam nuts
                          P0 RS 10630 to Brazoria Valve and Fitting Co. for Crawford ASME
P0 RS 10630 to Brazoria Valve and Fitting Co. for Crawford ASME
                            Section III Class 2 tee fittings
Section III Class 2 tee fittings
                    *
P0 RS 8244 to Hub, Inc., for 3-inch, ASME Section III Class 2
                          P0 RS 8244 to Hub, Inc., for 3-inch, ASME Section III Class 2
*
                            SB-165 pipe
SB-165 pipe
                          P0 RS 9225 to Trentec, Inc., for ASME Section III Class 2 ball
P0 RS 9225 to Trentec, Inc., for ASME Section III Class 2 ball
                            valves
valves
                    From the above review, the NRC inspector observed three instances
From the above review, the NRC inspector observed three instances
                    where the issued P0 differed from the PR with respect'to applicable
where the issued P0 differed from the PR with respect'to applicable
                    technical and quality requirements. P0 RS 9876 was issued to Wolf
technical and quality requirements. P0 RS 9876 was issued to Wolf
                    Creek for Westinghouse P/N OTIMIC selector switches, with the items
Creek for Westinghouse P/N OTIMIC selector switches, with the items
>                    designated nonsafety-related. Review of the applicable PR (i.e.,
designated nonsafety-related. Review of the applicable PR (i.e.,
                    140234) showad, however, that the switches were required to be
>
                    procured as safety-related equipment. The NRC inspector noted that
140234) showad, however, that the switches were required to be
                    the P0 required any original supplier certification to'be furnished
procured as safety-related equipment. The NRC inspector noted that
                    with respect to this P0. P0 RS 10630 was issued to Brazoria Valve
the P0 required any original supplier certification to'be furnished
                    and Fitting Co. for Crtwford ASME Section III Class 2 instrumentation
with respect to this P0.
                    tees. The P0 indicated that 10 CFR Part 21 was not applicable, which
P0 RS 10630 was issued to Brazoria Valve
                    was contrary to the PR (596867) stipulation of 10 CFR Part 21
and Fitting Co. for Crtwford ASME Section III Class 2 instrumentation
                    applicability.   P0 RS 8244 was issued to Hub, Inc., for 3-inch,
tees. The P0 indicated that 10 CFR Part 21 was not applicable, which
                    Schedule 80 ASME Section III Class 2, SB-165 pipe. The designated
was contrary to the PR (596867) stipulation of 10 CFR Part 21
                    pipe schedule contained in the PR (141051) was, however,
applicability.
                    Schedule 160.
P0 RS 8244 was issued to Hub, Inc., for 3-inch,
                    No documented approval by Materials Engineering or QE was observed
Schedule 80 ASME Section III Class 2, SB-165 pipe. The designated
                    with respect to the changes from PR requirements contained in the
pipe schedule contained in the PR (141051) was, however,
                    three P0s. The NRC inspector confirmed from program review and
Schedule 160.
                    discussion with licensee personnel that Materials Engineering and QE
No documented approval by Materials Engineering or QE was observed
    - - _ _ _ _
with respect to the changes from PR requirements contained in the
three P0s. The NRC inspector confirmed from program review and
discussion with licensee personnel that Materials Engineering and QE
- - _ _ _ _


  __
__
  !     .
!
      ..
.
              ,
..
                                                -7-
-7-
                reviews are performed at only the PR stage of-procurement. The NRC
,
                inspector additionally ascertained from discussion with the.           ,
reviews are performed at only the PR stage of-procurement. The NRC
                Supervisor, Purchasing that no program was currently in place to
inspector additionally ascertained from discussion with the.
                require an independent review of buyer generated P0s for verification
,
                of compliance with PR requirements. The failure to assure P0s
Supervisor, Purchasing that no program was currently in place to
                reflect PR requirements is an apparent violation of Criterion IV of
require an independent review of buyer generated P0s for verification
  4 -          Appendix B to 10 CFR Part 50.     (498/8916-02; 499/8916-02)
of compliance with PR requirements. The failure to assure P0s
            b.   Commercial Grade Procurement
reflect PR requirements is an apparent violation of Criterion IV of
                At the start of the inspection, the NRC inspector was informed that
Appendix B to 10 CFR Part 50.
                licensee personnel were currently upgrading procurement program
(498/8916-02; 499/8916-02)
                requirements with respect to commercial gradt procurement practices.
4 -
                These activities were ascertained to have been initiated as a result
b.
                of evaluation of concerns' expressed to Safeteam on the adequacy of
Commercial Grade Procurement
                existing commercial grade procurement practices. The NRC inspector
At the start of the inspection, the NRC inspector was informed that
                reviewed STP Specification No. 5A010WS0026, Revision 0, " Specification
licensee personnel were currently upgrading procurement program
                for Parts Classification aad Commercial Grade Items. Dedication in
requirements with respect to commercial gradt procurement practices.
                Safety-Related-Applications," and also Revision 5 of Procedure IP-5.1Q
These activities were ascertained to have been initiated as a result
                which was currently at a review and comment stage. iIt wasLnoted from
of evaluation of concerns' expressed to Safeteam on the adequacy of
                this review that the planned STP approach appeared to be consistent     .
existing commercial grade procurement practices. The NRC inspector
                with the guidance contained in EPRI NP-5652, " Guideline for the
reviewed STP Specification No. 5A010WS0026, Revision 0, " Specification
                Utilization of Commercial Grade Items in Nuclear Safety-Related
for Parts Classification aad Commercial Grade Items. Dedication in
                Applications."
Safety-Related-Applications," and also Revision 5 of Procedure IP-5.1Q
                In response to a question concerning the planned scope of reviews of
which was currently at a review and comment stage. iIt wasLnoted from
                prior commercial grade procurement, the NRC inspector was informed-
this review that the planned STP approach appeared to be consistent
                that a statistical sampling approach would be used to evaluate the       .
with the guidance contained in EPRI NP-5652, " Guideline for the
                adequacy of,these procurement. The NRC inspector recommended to         !
.
                licensee personnel that consideration be given to reviewing all prior   ;
Utilization of Commercial Grade Items in Nuclear Safety-Related
                procurement, in that a homogeneous population would have to exist
Applications."
                for statistical sampling to be a valid approach.
In response to a question concerning the planned scope of reviews of
                The NRC inspector reviewed the following'five Level III P0s (i.e.,
prior commercial grade procurement, the NRC inspector was informed-
                commercial grade items requiring receiving inspection) to ascertain
that a statistical sampling approach would be used to evaluate the
                the types of requirements previously imposed on vendors for             ,
.
                commercial grade items and the basis for dedication of those items       '
adequacy of,these procurement. The NRC inspector recommended to
                used in safety-related applications:                                       1
!
                      P0 RS 7021 to Woodward Governor for packing                       i
licensee personnel that consideration be given to reviewing all prior
                                                                                        i
;
                      P0 RS 7358 to Anchor Darling Valve Company for an Inconel X         j
procurement, in that a homogeneous population would have to exist
                          wedge spring for a 2-inch, 2500 lb. double disc gate valve         i
for statistical sampling to be a valid approach.
                                                                                            I
The NRC inspector reviewed the following'five Level III P0s (i.e.,
-
commercial grade items requiring receiving inspection) to ascertain
                      PO RS 4728 to Energy Services Group for adapter indicator for
the types of requirements previously imposed on vendors for
                          diesel generator P/N KSV-29-1E                                 i
,
l                      P0 RS 6874 to Wholesale Electric Supply Company for Square D P/N      l
commercial grade items and the basis for dedication of those items
                          HD0-70 125 VDC relays                                          j
'
1
used in safety-related applications:
P0 RS 7021 to Woodward Governor for packing
i
i
P0 RS 7358 to Anchor Darling Valve Company for an Inconel X
j
wedge spring for a 2-inch, 2500 lb. double disc gate valve
i
I
-
PO RS 4728 to Energy Services Group for adapter indicator for
diesel generator P/N KSV-29-1E
i
l
l
                                                                                            i
P0 RS 6874 to Wholesale Electric Supply Company for Square D P/N
                      P0 RS 8236 to Arizona Power and Light for a crosshead              j
                                                                                          l
                                                                                          i
l
l
                                                                                        i
HD0-70 125 VDC relays
j
i
P0 RS 8236 to Arizona Power and Light for a crosshead
j
l
i
l
i


                                                                              _                           _-.   - - - _ - - _
_
                                                                                      ,    ,
,
                                                                                                  ,
,
                                            s-         ,
_-.
                                                                          '
- - - _ - - _
pv '                 ,
,
                            '
s-
                                                            ,
,
                    -
'
            ..
pv '
      ,.:,.
,
y-                               ,
,
                                                                  -8
'
      .
-
                                                              ,                          .
..
                                    Of the five P0s, only'P0 RS 6874 was established to be applicable to
,.:,.
                                  .a safety-related use; i.e., ESF load sequencers. .This P0 identified
y-
                                    that dedication was-the responsibility.of HL&P and also required the:
-8
                                    vendor to'use its standard QA program and to pass on the requirements                        j
,
              .
              '
                                    of the procurement document to lower tier supplies and                                        l
                                    subcontractors. The P0 additionally required certification by the                          ;j
,                                  vendor to the requirements.of the P0 and also prohibited changes in                            -
  -F                              design, process, or material. .The seller was also required to                                l
                -
                                    identify any char.ges 'in materials of construction, design or                                {
                                    manufacturing process that have taken place since 1976 and. to provide -                      J
                                    applicable information with respect to manufacturer's part number,                            I
                                    vendor's part number.. storage requirements, maintenance frequency,                           j
.
.
                                    shelf life, installed life (usability life), and vendor
,
                                    modification / activities performed on the original manufacturer's                         1
.
                                    part.
Of the five P0s, only'P0 RS 6874 was established to be applicable to
                                                        '
.a safety-related use; i.e., ESF load sequencers. .This P0 identified
                                    In response to this P0, the vendor completed en HL&P QA Department
that dedication was-the responsibility.of HL&P and also required the:
                                    Conformance Certificate which identified the manufacturer's part
vendor to'use its standard QA program and to pass on the requirements
                                    number and that there were no deviations from the requirements 'of the                       i
j
                                  'P0. This Conformance Certificate was noted by the NRC inspector to
.
                                    have been sign _ed by a vendor sales representative. No information'       ,-                 >
of the procurement document to lower tier supplies and
                                    was apparently provided with respect to the other_ criteria contained
l
                                    in the P0. After review.of the procurement package and discussion;                           ,
'
                                  'with licensee personnel, it was not apparent that albasis currently                           {
subcontractors. The P0 additionally required certification by the
                                    existed for dedicating these-items that was consistent with the'
;j
                                    guidance contained in EPRI NP-5652.                                                         fl
vendor to the requirements.of the P0 and also prohibited changes in
                                                                                                                                  '
-
                                    Commercial grade procurement and dedication practices are considered
,
                                    an unresolved item pending completion of licensee activities in this
-F
                                    area and subsequent NRC inspection.     (498/8916-03; 499/8916-03)'
design, process, or material. .The seller was also required to
                    4.       Receipt. Storage, and Handling of Equipment and Materials Program (38702)
l
                              The NRC inspector reviewed the following documents in order to verify that                         1
identify any char.ges 'in materials of construction, design or
                              administrative controls exist and that they provide measures to assure
{
                                                                                                                                    '
-
                              that received materials will be examined for conformance with requirements                         !
manufacturing process that have taken place since 1976 and. to provide -
                              specified in the procurement documents. The documents were reviewed to
J
                              verify that acceptance criteria and responsibilities were clearly
applicable information with respect to manufacturer's part number,
                              established and that requirements for documenting the performance of
I
                              receipt inspections were specified.
vendor's part number.. storage requirements, maintenance frequency,
                              *
j
                                    QCP-1,0, " Receipt Inspection," Revision 3
shelf life, installed life (usability life), and vendor
                              *
.
                                    QCP-6.0, " Receipt / Vendor Inspection Deficiency Reporting,"
modification / activities performed on the original manufacturer's
                                      Revision 3                                                                                 ]
1
                                                                                                                                  I
part.
                              *
'
                                    STP-FSAR, Section 17.2.7.1.3, " Receiving Inspection," Amendment 62
In response to this P0, the vendor completed en HL&P QA Department
                              *     Weld Filler Material Matrix dated February 17, 1989
Conformance Certificate which identified the manufacturer's part
                                                                                                                                  !
number and that there were no deviations from the requirements 'of the
                                                                                                                                  l
i
                                                                                                                                    !
'P0.
_ _ _ _ _ _ - - - _ - - - - -                 _     _                                                                           1
This Conformance Certificate was noted by the NRC inspector to
have been sign _ed by a vendor sales representative.
No information'
,-
>
was apparently provided with respect to the other_ criteria contained
in the P0. After review.of the procurement package and discussion;
,
'with licensee personnel, it was not apparent that albasis currently
{
existed for dedicating these-items that was consistent with the'
f
guidance contained in EPRI NP-5652.
'
Commercial grade procurement and dedication practices are considered
an unresolved item pending completion of licensee activities in this
area and subsequent NRC inspection.
(498/8916-03; 499/8916-03)'
4.
Receipt. Storage, and Handling of Equipment and Materials Program (38702)
The NRC inspector reviewed the following documents in order to verify that
1
administrative controls exist and that they provide measures to assure
'
that received materials will be examined for conformance with requirements
!
specified in the procurement documents. The documents were reviewed to
verify that acceptance criteria and responsibilities were clearly
established and that requirements for documenting the performance of
receipt inspections were specified.
QCP-1,0, " Receipt Inspection," Revision 3
*
QCP-6.0, " Receipt / Vendor Inspection Deficiency Reporting,"
*
Revision 3
]
I
STP-FSAR, Section 17.2.7.1.3, " Receiving Inspection," Amendment 62
*
Weld Filler Material Matrix dated February 17, 1989
*
!
l
_ _ _ _ _ _ - - - _ - - - - -
_
_
1


n                                                                                                                         ,
n
                      e
                    '
  ,
                                                        A
                                              ,
                                                                              -9-
                                          In_ order to assess the implementation of the program,'the NRC inspector
                                          reviewed all applicable receiving inspection documentation i.e., purchase
                                          orders (P0s), receiving inspection reports, certified' material test
                                          reports, certificates of compliance, heat treatment certificates, and AS*1E
                                          Code Data Reports, pertaining to the following P0s and spare parts for            !
                                        - which 10 CFR Part 21 was invoked:
                                                P0 RS 3843 to Westinghouse Electric Corporation for valve 0-rings          .j
                                                  .and diaphragms                                                      '
                                                                                                                            ")
                                                P0 RS 7359 to Anchor Darling Valve Company for a 2-inch, 2500 'lb'.
                                                    double disc gate valve and a bonnet assembly
                                                P0 RS 6040 to American Warming and Ventilating, Inc., for a Borg
                                                    Warner relay
                                          *
                                                P0 RS 7167 to Limitorque Corporation for 2 gasket and seal sets              i
                                                    for Limitorque SMB-1 operators                                            f
                                                P0 RS 10969 to Hub, Inc., for 11, 1-inch X 3-inch all threaded
                                                    studs
                                                P0 RS 9686 to Hub, Inc., for 2, 3-inch, 300 lb. blind flanges
                                        '
                                                                                                                              ;
                                                P0 RS 7053 to Power Conversion Products, Inc., for 2 ammeter
                                                    shunts used in Class IE battery chargers
                                          While all of the above spare parts had been received, none had been issued
                                          for use; thus all-were available for review in terms of item verification
                                          and storage. The NRC inspector compared the items with the procurement
                                          and receiving inspection documentation. There were no apparent                      ,
                                          discrepancies.                                                                      4
                                          The NRC inspector also reviewed the QC Receipt / Vendor Inspection
                                          Deficiency Report (R/VIDR) Log. This log is maintaired and used to
                                          document deficiencies identified during receipt or vendor inspection
                                          activities, and reflects the status of all R/VIDRs. Ten open R/VIDRS were
                                          selected for review in order to verify that the identified discrepant
                                          parts were properly tagged / marked, and segregated in the established hold        ,
,
,
                                          area. The NRC inspector verified that all of the items identified in the           i
e
                                          10 R/VIDRs were tagged / marked as being discrepant, and were located in the
'
                                          hold area.
,
                                          It would appear that the licensee has established and implemented an               ..
A
                                          effective program with respect to receiving inspection, storage of                 '
-9-
l                                         material / items, and control of nonconforming parts identified during
,
l                                         receiving inspection.
In_ order to assess the implementation of the program,'the NRC inspector
reviewed all applicable receiving inspection documentation i.e., purchase
orders (P0s), receiving inspection reports, certified' material test
reports, certificates of compliance, heat treatment certificates, and AS*1E
Code Data Reports, pertaining to the following P0s and spare parts for
!
- which 10 CFR Part 21 was invoked:
P0 RS 3843 to Westinghouse Electric Corporation for valve 0-rings
. j
.and diaphragms
")
'
P0 RS 7359 to Anchor Darling Valve Company for a 2-inch, 2500 'lb'.
double disc gate valve and a bonnet assembly
P0 RS 6040 to American Warming and Ventilating, Inc., for a Borg
Warner relay
P0 RS 7167 to Limitorque Corporation for 2 gasket and seal sets
i
*
for Limitorque SMB-1 operators
f
P0 RS 10969 to Hub, Inc., for 11, 1-inch X 3-inch all threaded
studs
'
P0 RS 9686 to Hub, Inc., for 2, 3-inch, 300 lb. blind flanges
;
P0 RS 7053 to Power Conversion Products, Inc., for 2 ammeter
shunts used in Class IE battery chargers
While all of the above spare parts had been received, none had been issued
for use; thus all-were available for review in terms of item verification
and storage. The NRC inspector compared the items with the procurement
and receiving inspection documentation. There were no apparent
,
4
discrepancies.
The NRC inspector also reviewed the QC Receipt / Vendor Inspection
Deficiency Report (R/VIDR) Log. This log is maintaired and used to
document deficiencies identified during receipt or vendor inspection
activities, and reflects the status of all R/VIDRs. Ten open R/VIDRS were
selected for review in order to verify that the identified discrepant
parts were properly tagged / marked, and segregated in the established hold
,
area. The NRC inspector verified that all of the items identified in the
i
,
10 R/VIDRs were tagged / marked as being discrepant, and were located in the
hold area.
It would appear that the licensee has established and implemented an
..
effective program with respect to receiving inspection, storage of
'
l
material / items, and control of nonconforming parts identified during
l
receiving inspection.
l
l
                                          There were no violations or deviations identified during this part of the
There were no violations or deviations identified during this part of the
                                          inspection.
inspection.
1
1
i
i
    _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ . _             __.                                                                   .)
_ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ . _
__.
.)


                                                                                                                                                        - . - - _ _ _ _ _ _ - _ _ _ _
,
                                                                                                                                                                                    _
,
                                                                                                                                                    ,
- . - - _ _ _ _ _ _ - _ _ _ _
                                                                                  ,
_
        ,.%                      ,        v..                                                                         ,,                       :
,.%
                                                                                    '   ~
,
                                                                                                                                      ''                                               ' '
v..
                                                                                                                                                                                              A
,,
ha                . ,
:
                ...
ha
                          h?  -
. ,
                                                                                      ,
'
                                                                                          ,
~
                                                                                                                                              ,
' '
                                                                                                                                                      -                         '
h?
                                                                                                                                                                            : .
''
                                                      '                                                                     '
A
                          1
'
            {'. { l                                                                                                          S
-
                                                                                            '
,
    ne                                           4
,
                                                                          L.
,
                                                                                  -
...
                                                                              '
-
                                                                                                                -10'- -
: .
U                     .
{'. { l
1
'
S
'
L.
'
ne
4
-
-10'- -
U
'
.
ra
ra
a
-
,
Iw
Iw
                        -
f
                                                                                                          ,  a
s,..
                                                                                                                                                                                      f
.5..
  <  s,..         ,
. Exit Interview
                              .5.. . Exit Interview                                                                 ,
,
                            '                                                                                                       '
,
                                                                                                                                                                                                    '
<
                                                                                          <
'
                                                                                                              .                 . .   s        ,
'
                                                    . An-exitinterviewwasconductedlonJune!9,1989,with.thosepersonnel
'
                                                        idenoted in paragraph 1 .
s
                                                                                              - . . . At the exit interview, the NRC inspectors
<
            ,
.
                                                            summarized, the inspection findings. No information was presented to.the
. .
                                                            NRC:-inspectors that was identified by the. licensee as proprietary.s                                                               ,
,
                                                                                                            >
. An-exitinterviewwasconductedlonJune!9,1989,with.thosepersonnel
                                                                                                                                            ,
idenoted in paragraph 1
                                                                                                                          4
At the exit interview, the NRC inspectors
                                                                                                'l ,
.
                                                                                                                                          7
- . . .
    ,(                                                                   k
summarized, the inspection findings. No information was presented to.the
                                                                                                                                                                                            ,
,
                                                                                                                                                                                                    %..
NRC:-inspectors that was identified by the. licensee as proprietary.s
                                                                                                                                                                        r
,
                                                                                                                                                                                                  .
>
,
4
'l
,
7
,(
k
,
%..
r
.
.t-.
.t-.
                                                                                                                                                                                      4-
4-
                                                                                                                                                                                                        4
4
      . g'
. g'
      - - '                     _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _
- - '
_ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _
}}
}}

Latest revision as of 02:33, 2 December 2024

Insp Repts 50-498/89-16 & 50-499/89-16 on 890605-09. Violations Noted.Major Areas Inspected:Audit,Procurement & Receipt,Storage & Handling of Equipment Matls Programs
ML20245F215
Person / Time
Site: South Texas  
Issue date: 06/21/1989
From: Barnes I, Ellershaw L, Gilbert L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML20245F205 List:
References
50-498-89-16, 50-499-89-16, NUDOCS 8906280063
Download: ML20245F215 (10)


See also: IR 05000498/1989016

Text

_

. . .

.'

..

APPENDIX B

U.S. NUCLEAR REGULATORY COMMISSION

REGION IV

NRC Inspection Report: 50-498/89-16

Operating Licenses:

NPF-76

50-499/89-16

NPF-78

Dockets: 50-498

50-499

Licensee: Houston Lighting and Power Company (HL&P)

Facility Name: SouthTexasProject(STP), Units 1and2

Inspection At: .STP, Matagorda County, Texas

Inspection Conducted: June 5-9, 1989

/

'h/.2//G1

Inspectors:

u

_

t

L. D. Gilbert, Reactor Inspector, Materials

/ Date

and Quality Programs Section, Division of

Re tor Safety

a

D-

AADlta

b

l

(. E. Ellershaw, Reactor Inspector, Materials

/ DaYe

and Quality Programs Section, Division of

Reactor Safety

4 de /M

i

Approved:

w

I. Barnes, Chief, Materials and Quality

Date

Programs Section, Division of Reactor Safety

Inspection Sumary

Inspection Conducted June 5-9, 1989 (Report 50-498/89-16)

Areas inspected: Routine, unannounced inspection of the audit progrem; the

procurement program; and the receipt, storage, and handling of equipment and

materials program.

Results:

In general, the audit program was consistent with the TS requirements

l

and FSAR comitments. A noncited violation (NCV) was identified and reviewed

'

890620o063 890622

PDR

ADOCK 05000498

G

PNU

.

'

l

i

<. .-

- _ _ _ - -

i

._

_

____

y

.

,

'

.

-2-

in paragraph 2 for failure to meet minor administrative requirements of the TS

and QA program. During a partial review of the procurement program, one

apparent violation (paragraph 3) was identified in regard to the failure to

incorporate applicable requirements of purchase requisitions (prs) into

purchase orders (P0s). This finding indicated a programmatic weakness, in that

technical and quality assurance reviews were performed only on prs and no

measures were established to validate that issued P0s accurately reflected PR

requirements. One unresolved item (paragraph 3) was also identified in regard

to the commercial grade procurement and dedication program. The inspection

revealed that the procurement program had not appropriately addressed this

subject area in the past, bringing the adequacy of prior procurement into

potential question. The licensee has recognized this weakness and is currently

_ finalizing program requirements ard required procurement review actions. The

,

licensee has established and implemented an effective program with respect to

j

receiving inspection, storage of material, and control of nonconforming parts

identified during receiving inspection.

Inspection Conducted June 5-9, 1989 (Report 50-499/89-16)

Areas Inspected:

Routine, unannounced inspection of the audit program; the

procurement program; and the receipt, storage, and handling of equipment and

materials program.

Results:

In general, the audit program was consistent with the TS requirements

and FSAR commitments. A NCV was identified and reviewed in paragraph 2 for

failure to meet minor administrative requirements of the TS and QA program.

During a partial review of the procurement program, one apparent violation

requirements of purchase requisitions (prs) into purchase orders (P0s)pplicable

(paragraph 3) was identified in regard to the failure to incorporate a

This

.

finding indicated a programmatic weakness, in that technical and quality

assurance reviews were performed only on prs and no measures were established

to validate that issued P0s accurately reflected PR requirements. One

unresolved item (paragraph 3) was also identified in regard to the commercial

grade procurement and dedication program. The inspection revealed that the

procurement program had not appropriately addressed this subject area in the

past, bringing the adequacy of prior procurement into potential question. The

licensee has recognized this weakness and is currently finalizing program

requirements and required procurement review actions. The licensee has

established and implemented an effective program with respect to receiving

inspection, storage of material, and control of nonconforming parts identified

during receiving inspection,

i

- _ _ _ _ _ _ _ - _ - _ _

%;w %.mDytl E.

'

'

"

  • i"

<

4

-

s

,

-

1

..

<

- .,

,

y

- y

  1. .

c

e

. n

.

.

f Q . .y ,'

. ' *

Ill' l+f;;

,

f jf V tjg

,

-

,

,

L.

y

,3

. o ry; . , ,

.t

4

,

W- . , , "

1

a-3-

,

"h( j

.

l

'

j.

l

e

lqQ

'

,

,

l:;' E-

,

<

. DETAILS

,

_ f . ~ r.

,

,

El..

' Persons Contacted.

-

m:

ft '

.gggp

h'

1

,

  • G'J. EpVaughn,LVice President, Nuclear Operations

'

  • J.:E.'Seiger, General Manager. Nuclear Assurance

< >

-L*R. L. Balcom, Mana'ger, Audits & Assessments

  • D. R. Keating, Manager, Quality Engineering (QE)'

. J. l D. Green. Manager. -Inspection and -Surveillance

1 -

A.

  • S. M. Dew, Manager.. Nuclear Purchasing and Materials Management

.

'

9

. M.-A.) Ludwig, Manager, Material Management ~

  • E. R. Rivera, Manager, Purchasing.

.

D

  • R. P..Garris . Director, Purchasing'and Contracts
  • A. C. McIntyre Manager,. Support Engineering

Gj

  • C. A.: Ayala, Supervisor Licensing Engineer

f

, ' '

'

  • A. W.-'-Harrison. Supervisor Licensing-Engineer

<

  • P. L. Walker, Senior Licensing Engineer

"

  • A.-K. Khosla, Senior Licensing Engineer
  • W.; G. LWellborn, Manager, Material Technical Services:

9;p

  • M..F. Polishak, Material Technical Services Supervisor

,

,

'. *J. E. Adkins, Staff.QA Specialist

!

'

L

.

-

  • D. E. Mathews, Purchasing Supervisor .

_

j

t

R. W.'Chewning,' Chairman, Nuclear Safety Review Board'

i

l'

"NRC

' *J..E. Bess,. Senior Resident' Inspector-

,

s

,*

  • J. I. Tapia, Senior Resident Inspector

.

  • .
  • D. L. Garrison, Resident Inspector.

The hRC inspector also interviewed other licensee employees during the-

inspection.

  • Denotes attendance at exit interview conducted on June 9,1989.

T, _'

2.

Audit Program (40702 and 40704)

The objective of this inspection was.to verify that the licensee.has

..

developed and implemented a quality assurance (QA) program relating to

&,

audits of activities that is in conformance with Technical

?(specifications (TS) and commitments in the Final. Safety Analysis Report

'

S

q

f

FSAR).

i

<

.

The NRC inspector reviewed the following documents to verify that

'

~,

' administrative controls exist and that they provide measures to assure

that audits are scheduled and performed by independent ano qualified

1

personnel including special expertise when needed.

d

I

'

!

-

-

y 4,

-

-

>

-

-

- - - - - -


- - - - - - - - - - - -

,

,

,

-

+

,

'

.,

,

-4-

' Operations'Ouality Assurance Plan, Section 15.0, Revision 3. " Quality

Assurance Audit and Surveillance"

QA Procedure QAP-2.8, Revision 1, " Plant and. Vendor Audits"

g

QA Procedure QAP-1.5, Revision 3, " Deficiency Reporting"

QA Procedure QAP-2.1, Revision 1, " Training, Qualification and

Certification of Audit Personnel"

cognizance of the Nuclear Safety Review Board (program is under theNSRB) by in

The NRC inspector also verified that the audit

'

LChairman of the NSRB, reviewing minutes of the NSRB meetings, and

reviewing the following documents.

Nuclear Group Policies NGP-820. Revision 6. " Nuclear Safety Review

Board"

'_

l

Nuclear Safety Review Board NSRB-04, Revision 3. " Audit / Assessment

Procedure"-

,

Nuclear Safety Review Board NSRB-01, Revision 3, " Rules'of Conduct"

In reviewing the long-range audit plan and schedules-for 1988 and 1989,

the NRC inspector noted that although the audi.ts were perfomed at the.

frequency required by the TS the audit plan frequency terminology did not

conform to that'used in the TS. For example, the audit' plan frequency

uses the term " annual" when the TS specifies "at least once per 12'

months." The licensee indicated that the annual audit plan terminology

would be clarified to ensure that-the TS requirements for frequency are

incorporated into the audit plan scheduling.

To assess the implementation of the audit program, the NRC. inspector

reviewed the following audit reports. The audit reports were selectively

reviewed to ascertain adequacy of audit scope, audit content, audit

.

checklist, distribution to management, followup actions, timeliness of

q

reports and responses to audit findings, and audit personnel

L

qualifications,

l

Audit B2 - Personnel Training and Qualification, Audit Reports 89-21

and 88-21

i

Audit A - Compliance to Technical Specifications and License

j

Conditions, Audit Reports 89-18 and 88-23

Audit C - Nonconformance Control and Corrective Action, Audit

Reports 89-05, 88-05, and 88-37

)

Audit D1 - Conduct of Operations, Audit Report 88-30

'

Audit 012 - Cooperative Management Audit, Audit Report 88-64

_ _ _ _ _ _ _ _ _ _ _ _ _ _

_ _ _ _

_]

. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

-_____ - _______ __- _

r

( '

r

v

,~

,.

l b.

bs

-5-

<

,

l

t

In' general' the audit program was consistent with the TS. requirements and

FSAR commitments. However, administrative' requirements of the TS were

violated, in that 2 of the 10 audit reports reviewed were not issued

within 30 days efter completion of the' audit as required by

Specification 6.5.2.9c of the TS. As a result of the NRC inspector's'

finding,.the licensee: issued Deficiency. Report No.89-045 to document the

' deficiency, review other audit reports for this deficiency, and implement-

corrective. action to ensure that all audit reports are issued within TS

requirements.r In addition, administrative' requirements of the QA program.

/were violated, in that, the audit package for Audit Report 88-30 (D1) did

.

,

not contain a completed audit checklist as required by.Section 7.1.2 of-

QAP-2.8. The licensee issued Deficiency Report No.89-042 to document the-

deficiency and locate or reconstruct'the audit checklist. This is an-

apparent violation for. failure to meet the administrative requirements of:

the TS and QA program; however, the violation is not being cited bccause

it. is of minor safety. significance and meets the criteria specified in

Sect'.on V.A. of the Enforcement Policy.

(NCV498/8916-01; NCV499/8916-01)2

.

,

. 3',

Procurement Program (38701and38703I

'The objectives.of this inspection were:

(a)toascertainwhetherthe

,

.-

licensee has implemented a QA program to control procurement activities

that is in conformance with regulatory requirements and licensee'

commitments; (b) to evaluate the licensee's commercial grade procurement

activities to ensure that they-conform to established guidance and

requirements.

"

a.

Program Review

The NRC inspector reviewed the documents listed below to verify that

administrative controls exist and that they provide measures to

. _

assure that necessary technical and quality requirements are included

in procurement documents for safety-related items or services. The

documents were also reviewed to verify that controls exist for the

selection, approval, and use of vendors.

STP-FSAR, Section 17.2.4, " Procurement Document Control."

<

Amendment 62

!

1

Operations Quality Assurance Plan, Section 7.0, Revision 4

" Procurement"

QA Procedure QAP-1.6, Revision 1. " Procurement of Items and

Services"

QA Procedure QAP-2.4, Revision 2 " Quality Engineering

I

J

Evaluation of Vendors"

QA Procedure QAP-2.6, Revision 1, Procurement Document Review"

QA Procedure QAP-2.8, Revision 1, " Plant and Vendor Audits"

i

I

l

1

1

,

e

.

'

p

-6-

Procedure NPMMP-4.7Q,' Revision 0, " Preparation and Issuance of

'*

Purchase Orders / Contracts and Supplements"

Procedure NPMMP-4.12Q, Revision 0, " Preparation of RPDs for

Items and Services"

Procedure IP-5.1Q, Revision 4 " Procedure of Items"

-In order to assess implementation of the program, the NRC inspector

reviewed the following purchase orders (P0s) in conjunction with the

applicable purchase requisitions (prs) and furnished vendor

documentation.

PO RS 9876 to Wolf Creek Generating Station for Westinghouse

P/N OT1MIC selector switches

P0 RS 8599 to ASEA Brown Boveri for underfrequency,. relays

P0 RS 8015 to A&G Engineering Co., Inc., for ASTM A-194,

Grade 2H hex jam nuts

P0 RS 10630 to Brazoria Valve and Fitting Co. for Crawford ASME

Section III Class 2 tee fittings

P0 RS 8244 to Hub, Inc., for 3-inch, ASME Section III Class 2

SB-165 pipe

P0 RS 9225 to Trentec, Inc., for ASME Section III Class 2 ball

valves

From the above review, the NRC inspector observed three instances

where the issued P0 differed from the PR with respect'to applicable

technical and quality requirements. P0 RS 9876 was issued to Wolf

Creek for Westinghouse P/N OTIMIC selector switches, with the items

designated nonsafety-related. Review of the applicable PR (i.e.,

>

140234) showad, however, that the switches were required to be

procured as safety-related equipment. The NRC inspector noted that

the P0 required any original supplier certification to'be furnished

with respect to this P0.

P0 RS 10630 was issued to Brazoria Valve

and Fitting Co. for Crtwford ASME Section III Class 2 instrumentation

tees. The P0 indicated that 10 CFR Part 21 was not applicable, which

was contrary to the PR (596867) stipulation of 10 CFR Part 21

applicability.

P0 RS 8244 was issued to Hub, Inc., for 3-inch,

Schedule 80 ASME Section III Class 2, SB-165 pipe. The designated

pipe schedule contained in the PR (141051) was, however,

Schedule 160.

No documented approval by Materials Engineering or QE was observed

with respect to the changes from PR requirements contained in the

three P0s. The NRC inspector confirmed from program review and

discussion with licensee personnel that Materials Engineering and QE

- - _ _ _ _

__

!

.

..

-7-

,

reviews are performed at only the PR stage of-procurement. The NRC

inspector additionally ascertained from discussion with the.

,

Supervisor, Purchasing that no program was currently in place to

require an independent review of buyer generated P0s for verification

of compliance with PR requirements. The failure to assure P0s

reflect PR requirements is an apparent violation of Criterion IV of

Appendix B to 10 CFR Part 50.

(498/8916-02; 499/8916-02)

4 -

b.

Commercial Grade Procurement

At the start of the inspection, the NRC inspector was informed that

licensee personnel were currently upgrading procurement program

requirements with respect to commercial gradt procurement practices.

These activities were ascertained to have been initiated as a result

of evaluation of concerns' expressed to Safeteam on the adequacy of

existing commercial grade procurement practices. The NRC inspector

reviewed STP Specification No. 5A010WS0026, Revision 0, " Specification

for Parts Classification aad Commercial Grade Items. Dedication in

Safety-Related-Applications," and also Revision 5 of Procedure IP-5.1Q

which was currently at a review and comment stage. iIt wasLnoted from

this review that the planned STP approach appeared to be consistent

with the guidance contained in EPRI NP-5652, " Guideline for the

.

Utilization of Commercial Grade Items in Nuclear Safety-Related

Applications."

In response to a question concerning the planned scope of reviews of

prior commercial grade procurement, the NRC inspector was informed-

that a statistical sampling approach would be used to evaluate the

.

adequacy of,these procurement. The NRC inspector recommended to

!

licensee personnel that consideration be given to reviewing all prior

procurement, in that a homogeneous population would have to exist

for statistical sampling to be a valid approach.

The NRC inspector reviewed the following'five Level III P0s(i.e.,

commercial grade items requiring receiving inspection) to ascertain

the types of requirements previously imposed on vendors for

,

commercial grade items and the basis for dedication of those items

'

1

used in safety-related applications:

P0 RS 7021 to Woodward Governor for packing

i

i

P0 RS 7358 to Anchor Darling Valve Company for an Inconel X

j

wedge spring for a 2-inch, 2500 lb. double disc gate valve

i

I

-

PO RS 4728 to Energy Services Group for adapter indicator for

diesel generator P/N KSV-29-1E

i

l

P0 RS 6874 to Wholesale Electric Supply Company for Square D P/N

l

HD0-70 125 VDC relays

j

i

P0 RS 8236 to Arizona Power and Light for a crosshead

j

l

i

l

i

_

,

,

_-.

- - - _ - - _

,

s-

,

'

pv '

,

,

'

-

..

,.:,.

y-

-8

,

.

,

.

Of the five P0s, only'P0 RS 6874 was established to be applicable to

.a safety-related use; i.e., ESF load sequencers. .This P0 identified

that dedication was-the responsibility.of HL&P and also required the:

vendor to'use its standard QA program and to pass on the requirements

j

.

of the procurement document to lower tier supplies and

l

'

subcontractors. The P0 additionally required certification by the

j

vendor to the requirements.of the P0 and also prohibited changes in

-

,

-F

design, process, or material. .The seller was also required to

l

identify any char.ges 'in materials of construction, design or

{

-

manufacturing process that have taken place since 1976 and. to provide -

J

applicable information with respect to manufacturer's part number,

I

vendor's part number.. storage requirements, maintenance frequency,

j

shelf life, installed life (usability life), and vendor

.

modification / activities performed on the original manufacturer's

1

part.

'

In response to this P0, the vendor completed en HL&P QA Department

Conformance Certificate which identified the manufacturer's part

number and that there were no deviations from the requirements 'of the

i

'P0.

This Conformance Certificate was noted by the NRC inspector to

have been sign _ed by a vendor sales representative.

No information'

,-

>

was apparently provided with respect to the other_ criteria contained

in the P0. After review.of the procurement package and discussion;

,

'with licensee personnel, it was not apparent that albasis currently

{

existed for dedicating these-items that was consistent with the'

f

guidance contained in EPRI NP-5652.

'

Commercial grade procurement and dedication practices are considered

an unresolved item pending completion of licensee activities in this

area and subsequent NRC inspection.

(498/8916-03; 499/8916-03)'

4.

Receipt. Storage, and Handling of Equipment and Materials Program (38702)

The NRC inspector reviewed the following documents in order to verify that

1

administrative controls exist and that they provide measures to assure

'

that received materials will be examined for conformance with requirements

!

specified in the procurement documents. The documents were reviewed to

verify that acceptance criteria and responsibilities were clearly

established and that requirements for documenting the performance of

receipt inspections were specified.

QCP-1,0, " Receipt Inspection," Revision 3

QCP-6.0, " Receipt / Vendor Inspection Deficiency Reporting,"

Revision 3

]

I

STP-FSAR, Section 17.2.7.1.3, " Receiving Inspection," Amendment 62

Weld Filler Material Matrix dated February 17, 1989

!

l

_ _ _ _ _ _ - - - _ - - - - -

_

_

1

n

,

e

'

,

A

-9-

,

In_ order to assess the implementation of the program,'the NRC inspector

reviewed all applicable receiving inspection documentation i.e., purchase

orders (P0s), receiving inspection reports, certified' material test

reports, certificates of compliance, heat treatment certificates, and AS*1E

Code Data Reports, pertaining to the following P0s and spare parts for

!

- which 10 CFR Part 21 was invoked:

P0 RS 3843 to Westinghouse Electric Corporation for valve 0-rings

. j

.and diaphragms

")

'

P0 RS 7359 to Anchor Darling Valve Company for a 2-inch, 2500 'lb'.

double disc gate valve and a bonnet assembly

P0 RS 6040 to American Warming and Ventilating, Inc., for a Borg

Warner relay

P0 RS 7167 to Limitorque Corporation for 2 gasket and seal sets

i

for Limitorque SMB-1 operators

f

P0 RS 10969 to Hub, Inc., for 11, 1-inch X 3-inch all threaded

studs

'

P0 RS 9686 to Hub, Inc., for 2, 3-inch, 300 lb. blind flanges

P0 RS 7053 to Power Conversion Products, Inc., for 2 ammeter

shunts used in Class IE battery chargers

While all of the above spare parts had been received, none had been issued

for use; thus all-were available for review in terms of item verification

and storage. The NRC inspector compared the items with the procurement

and receiving inspection documentation. There were no apparent

,

4

discrepancies.

The NRC inspector also reviewed the QC Receipt / Vendor Inspection

Deficiency Report (R/VIDR) Log. This log is maintaired and used to

document deficiencies identified during receipt or vendor inspection

activities, and reflects the status of all R/VIDRs. Ten open R/VIDRS were

selected for review in order to verify that the identified discrepant

parts were properly tagged / marked, and segregated in the established hold

,

area. The NRC inspector verified that all of the items identified in the

i

,

10 R/VIDRs were tagged / marked as being discrepant, and were located in the

hold area.

It would appear that the licensee has established and implemented an

..

effective program with respect to receiving inspection, storage of

'

l

material / items, and control of nonconforming parts identified during

l

receiving inspection.

l

There were no violations or deviations identified during this part of the

inspection.

1

i

_ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ . _

__.

.)

,

,

- . - - _ _ _ _ _ _ - _ _ _ _

_

,.%

,

v..

,,

ha

. ,

'

~

' '

h?

A

'

-

,

,

,

...

-

.

{'. { l

1

'

S

'

L.

'

ne

4

-

-10'- -

U

'

.

ra

a

-

,

Iw

f

s,..

.5..

. Exit Interview

,

,

<

'

'

'

s

<

.

. .

,

. An-exitinterviewwasconductedlonJune!9,1989,with.thosepersonnel

idenoted in paragraph 1

At the exit interview, the NRC inspectors

.

- . . .

summarized, the inspection findings. No information was presented to.the

,

NRC:-inspectors that was identified by the. licensee as proprietary.s

,

>

,

4

'l

,

7

,(

k

,

%..

r

.

.t-.

4-

4

. g'

- - '

_ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _