August 4, 1989 Docket Nos. 50-445 and 50-446 Mr. William J. Cahill, Jr.
August 4, 1989 Docket Nos. 50-445 and 50-446 Mr. William J. Cahill, Jr.
Executive Vice President, Nuclear Texas Utilities Electric Company 400 North Olive Street, L. B. 81 Dallas, Texas 75201
Executive Vice President, Nuclear Texas Utilities Electric Company 400 North Olive Street, L. B. 81 Dallas, Texas 75201


==Dear Mr. Cahill:==
==Dear Mr. Cahill:==
==SUBJECT:==
==SUBJECT:==
COMANCHE PEAK SQRT AUDIT A Seismic Qualification Review Team (SQRT) audit of the safety-related electrical and mechanical equipment for Comanche Peak is tentatively scheduled to be perfomed by the NRC staff between August 21 and August 25, 1989. The audit will be conducted using the guidance contained in Regulatory Guide 1.100. Industry Standard IEEE-344-1975, and guidance and acceptance criteria in NUREG-0800, Standard Review Plan (SRP), Section 3.10. The approach in the evaluation for the design adequacy of items from the Equipment Qualification Master List (EQML) will be very similar to the SQRT audit performed in August 1982 at Comanche Peak..
COMANCHE PEAK SQRT AUDIT A Seismic Qualification Review Team (SQRT) audit of the safety-related electrical and mechanical equipment for Comanche Peak is tentatively scheduled to be perfomed by the NRC staff between August 21 and August 25, 1989. The audit will be conducted using the guidance contained in Regulatory Guide 1.100. Industry Standard IEEE-344-1975, and guidance and acceptance criteria in NUREG-0800, Standard Review Plan (SRP), Section 3.10.
The approach in the evaluation for the design adequacy of items from the Equipment Qualification Master List (EQML) will be very similar to the SQRT audit performed in August 1982 at Comanche Peak..
Since 1982, TU Electric has been involved in an extensive corrective action program (CAP), one workscope of which involved equipment qualification. This workscope includes a methodology for correcting generic equipment qualification program deficiencies found by the Comanche Peak Response Team (CPRT). Among these were deficiencies in the identification and classification of require-ments for equipment qualification and in seismic documentation. The NRC staff evaluated the corrective action methodology covered by this workscope and concluded in NUREG-0797 Supplement 19 (SSER 19) that it provides a compre-hensive program for resolving CPRT and staff-identified equipment qualifica-tion issues. SSER 19 states that the adequacy of the program's implementation would be assessed prior to Comanche Peak fuel loading. The upcoming SQRT audit will assess the adequacy of the program's implementation.
Since 1982, TU Electric has been involved in an extensive corrective action program (CAP), one workscope of which involved equipment qualification. This workscope includes a methodology for correcting generic equipment qualification program deficiencies found by the Comanche Peak Response Team (CPRT). Among these were deficiencies in the identification and classification of require-ments for equipment qualification and in seismic documentation. The NRC staff evaluated the corrective action methodology covered by this workscope and concluded in NUREG-0797 Supplement 19 (SSER 19) that it provides a compre-hensive program for resolving CPRT and staff-identified equipment qualifica-tion issues. SSER 19 states that the adequacy of the program's implementation would be assessed prior to Comanche Peak fuel loading. The upcoming SQRT audit will assess the adequacy of the program's implementation.
The leader of the review team team will be Mr. Jai Rajan of the Mechanical Engineering Branch. He will be assisted by three consultants from EG&G Idaho, Inc.
The leader of the review team team will be Mr. Jai Rajan of the Mechanical Engineering Branch. He will be assisted by three consultants from EG&G Idaho, Inc.
As a minimum, the audit will include the items listed in the enclosure.         o On August 18, 1989, the team will identify three additional items for           i
As a minimum, the audit will include the items listed in the enclosure.
!                        audit.
o On August 18, 1989, the team will identify three additional items for i
audit.
TU Electric is requested to submit a completed Seismic Equipment Qualification Summary Package form for each of the items listed in the enclosure by August 9, 1989. The staff has reviewed a copy of TU Electric's sumary package form and found it to be acceptable.
TU Electric is requested to submit a completed Seismic Equipment Qualification Summary Package form for each of the items listed in the enclosure by August 9, 1989. The staff has reviewed a copy of TU Electric's sumary package form and found it to be acceptable.
W G
W Yo$ b Y
Yo$ b         Y   ''
G


n@                                                                       ~
n@
  ' :x&
~
j! , .
' :x&
1
1 j!,.
      + -                                              Mr. William J. Cahill, Jr. .                                  .
Mr. William J. Cahill, Jr..
                                                                                                                                      - 2.-
- 2.-
                                                    . Questions:regarding this_ review should be' referred to Jai Rajan at.(301) 492-0917 or.to Melinda Malloy, one of the Comanche Peak project managers at (301) 492-0738.
+ -
. Questions:regarding this_ review should be' referred to Jai Rajan at.(301) 492-0917 or.to Melinda Malloy, one of the Comanche Peak project managers at (301) 492-0738.
Should you expect any difficulty in meeting the August 9, 1989 deadline, please inform us.immediately.
Should you expect any difficulty in meeting the August 9, 1989 deadline, please inform us.immediately.
Sincerel Christopher I. Grimes, Director Comanche Peak Project Division Office of Nuclear Reactor Regulation
Sincerel Christopher I. Grimes, Director Comanche Peak Project Division Office of Nuclear Reactor Regulation


==Enclosure:==
==Enclosure:==
Equipment List for Audit cc:
Equipment List for Audit cc:
See next page 4
See next page 4
Line 54: Line 57:
i
i


    'I
'I
  \.      .
\\.
    .[       Mr. William J. Cahill, Jr.                                                                                   i cc:   . .            .
.[
I Asst. Director for Inspec. Programs     Roger D. Walker                                                       .,
Mr. William J. Cahill, Jr. i cc:
1          Comanche Peak Project Dtvision         Manager, Nuclear Licensing p             U. S. Nuclear Regulatory Commission     Texas Utilities Electric Company                                         l P. O. Box 1029                         400 North Olive Street, L.B. 81 Granbury, Texas 76048                   Dallas, Texas 75201
I Asst. Director for Inspec. Programs Roger D. Walker 1
            ' Regional Administrator., Region IV     Texas Utilities Electric Company                                         l U. S. Nuclear Regulatory Commission     c/o Bethesda Licensing 611 Ryan Flaza Drive, Suite 1000       3 Metro Center, Suite 610 Arlington, Texas 76011                   Bethesda, Maryland 20814 Ms. Billie Pirner Garde, Esq.           William A. Burchette, Esq.
Comanche Peak Project Dtvision Manager, Nuclear Licensing p
Garde Law Office                         Counsel for Tex-La Electric 104 East Wisconsin Avenue                 Cooperative of Texas                                                   ,
U. S. Nuclear Regulatory Commission Texas Utilities Electric Company l
Appleton, Wisconsin 54911               Heron, Burchette. Ruckert & Rothwell                                     !
P. O. Box 1029 400 North Olive Street, L.B. 81 Granbury, Texas 76048 Dallas, Texas 75201
1025 Thomas Jefferson Street, NW                                         l Washington, D.C. 20007 Mrs. Juanita Ellis, President           GOS ASSOCIATES, INC.
' Regional Administrator., Region IV Texas Utilities Electric Company l
Citizens Association for Sound Energy   Suite 720 1426 South Polk                         1850 Parkway Place Dallas, Texas 75224                     Marietta, Georgia 30067-8237 E. F. Ottney                             Jack R. Newman P. O. Box 1777                           Newman & Holtzinger Glen Rose, Texas 76043                   1615 L Street, NW Suite 1000 Washington, DC 20036 Mr. W. J. Cahill, Jr.                   Chief, Texas Bureau of Radiation Control Executive Vice President, Nuclear       Texas Departraent of Health Texas Utilities Electric Company         1100 West 49th Street 400 No. Olive Street, L.B. 81           Austin, Texas 78756 Dallas, Texas     75201 Honorable George Crump County Judge Glen Rose Texas 76043 l
U. S. Nuclear Regulatory Commission c/o Bethesda Licensing 611 Ryan Flaza Drive, Suite 1000 3 Metro Center, Suite 610 Arlington, Texas 76011 Bethesda, Maryland 20814 Ms. Billie Pirner Garde, Esq.
William A. Burchette, Esq.
Garde Law Office Counsel for Tex-La Electric 104 East Wisconsin Avenue Cooperative of Texas Appleton, Wisconsin 54911 Heron, Burchette. Ruckert & Rothwell 1025 Thomas Jefferson Street, NW l
Washington, D.C.
20007 Mrs. Juanita Ellis, President GOS ASSOCIATES, INC.
Citizens Association for Sound Energy Suite 720 1426 South Polk 1850 Parkway Place Dallas, Texas 75224 Marietta, Georgia 30067-8237 E. F. Ottney Jack R. Newman P. O. Box 1777 Newman & Holtzinger Glen Rose, Texas 76043 1615 L Street, NW Suite 1000 Washington, DC 20036 Mr. W. J. Cahill, Jr.
Chief, Texas Bureau of Radiation Control Executive Vice President, Nuclear Texas Departraent of Health Texas Utilities Electric Company 1100 West 49th Street 400 No. Olive Street, L.B. 81 Austin, Texas 78756 Dallas, Texas 75201 Honorable George Crump County Judge Glen Rose Texas 76043 l
l
l


e             _.
e l
q.:             <
q.:
                                  ,        ,                                                                                              l
, t...,
  , t. . . ,                       ,                                                                                                  , ;;
y, i
y,           .
! c. = 7 ENCLOSURE COMANCHE PEAK EQUIPMENT FOR 3
SEISMIC QUALIFICATION TEAM AUDIT l
1 Package No.
Description
: 1..SEQSP-ES-0024-01 Solid State Intulation Cabinet by
)
Forney Engineering Company j
i
i
! c. = 7                                                              ENCLOSURE COMANCHE PEAK EQUIPMENT FOR                                                      ,
: 2. 'SE0SP-MS-0605-01 Main Control Boaro j
3 SEISMIC QUALIFICATION TEAM AUDIT                                                    l 1
.3.
Package No.                                              Description                                        :
SEQSP-ES-0016A-02 Radiation Monitoring Cabinet I
: 1. .SEQSP-ES-0024-01                    Solid State Intulation Cabinet by                                            )
4.
Forney Engineering Company                                                  j i
SEQSP-ES-0011-02 DC Distribution Switch Board 5.
: 2. 'SE0SP-MS-0605-01                           Main Control Boaro                                                   j
SEQSP-ES-0011-03 DC Distribution Panel 6.
                    .3.     SEQSP-ES-0016A-02                 Radiation Monitoring Cabinet I
SEQSP-MS-0007-04 AFW Pump Woodward Governor 7.
: 4. SEQSP-ES-0011-02                 DC Distribution Switch Board                                                 !
SEQSP-MS-0007-02'
: 5. SEQSP-ES-0011-03                 DC Distribution Panel
' Turbine Driven AFW Pu:np
: 6. SEQSP-MS-0007-04                 AFW Pump Woodward Governor
: 8.. SEQSP-MS-0600-029 24" Fisher Butterfly Valve 9.
: 7. SEQSP-MS-0007-02'               ' Turbine Driven AFW Pu:np
SEQSP-WECM-090, Pressurizer PORV
: 8. . SEQSP-MS-0600-029                 24" Fisher Butterfly Valve
: 10. 'SEQSP-WEC-0020M Boric Acid Trt.nsfer Pump
: 9. SEQSP-WECM-090,                   Pressurizer PORV
: 11. SEQSP-WEC-0075M Positive D!splacement Charging Pump
: 10. 'SEQSP-WEC-0020M                       Boric Acid Trt.nsfer Pump
: 12. SEQSP-WECM-031 2-1/2" RLIJ' Centrifugal Charging Pump
: 11. SEQSP-WEC-0075M                         Positive D!splacement Charging Pump
: 13. SEQSP-WEC-0031 Charging Pump 14.. SEQSP-WEC-0032M RHR Pump
: 12. SEQSP-WECM-031                         2-1/2" RLIJ' Centrifugal Charging Pump
'15.
: 13. SEQSP-WEC-0031                         Charging Pump 14.. SEQSP-WEC-0032M                       RHR Pump
SEQSP-WEC-0001M Waste Evaporstor Feed Pump
                  '15.       SEQSP-WEC-0001M                 Waste Evaporstor Feed Pump
: 16. SEQSP-WEC-0003M Waste Gas Decay Tank
: 16. SEQSP-WEC-0003M                       Waste Gas Decay Tank
: 17. SEQSP-WEC-0024M Recycle Holdup Tank Ejector
: 17. SEQSP-WEC-0024M                       Recycle Holdup Tank Ejector
: 18. SEQSP-APR-01 Auxiliary Relay Rack
: 18. SEQSP-APR-01                           Auxiliary Relay Rack
: 19. SEQSP-ES-00088 Battery Charger & Circuit Breaker
: 19. SEQSP-ES-00088                     Battery Charger & Circuit Breaker
: 20. SEQSP-MS-0034-31 Cooler
: 20. SEQSP-MS-0034-31                       Cooler
: 21. SEQSP-MS-0034-46 Intercooler
: 21. SEQSP-MS-0034-46                       Intercooler
: 22. SEQSP-MS-0076-03 MSIV Bypass Valves
: 22. SEQSP-MS-0076-03                       MSIV Bypass Valves
: 23. SEQSP-itS-00158-01 Crane-Deming Fig. 4511 Sump Pumps
: 23. SEQSP-itS-00158-01                     Crane-Deming Fig. 4511 Sump Pumps


g: . ;.                     ;
g:. ;.
1 it i     '
1 it i
p3
p3
                                                                                                            \
\\
lli
s lli
  ' ,- i; Y . :.    .
',- i; Y. :.
        .v-                                                                                               l r
.v-r i
i Package No.                   Description 1
Package No.
Description 1
J
J
: 24. SEQSP-MS-0034       DeLaval. Diesel Engine 1
: 24. SEQSP-MS-0034 DeLaval. Diesel Engine 1
: 25. SEQSP MS-0086-01         Posi-Seal 12",150# Trunnion Valve,                         !'
: 25. SEQSP MS-0086-01 Posi-Seal 12",150# Trunnion Valve, With Limitorque Actuator I
With Limitorque Actuator I
.26.
                  .26.       SEQSP-MS-0022-01 Safeguard System Sequencer
SEQSP-MS-0022-01 Safeguard System Sequencer
: 27. SEQSP-WEC-0038M.         Pressure Safety Valve
: 27. SEQSP-WEC-0038M.
: 28.       SEQSP-WEC-0089M   Air Operated 3-Way Control Valves                         ;
Pressure Safety Valve 28.
: 29. SEQSP-WEC-0009M         Relief Valve, Type-B r
SEQSP-WEC-0089M Air Operated 3-Way Control Valves
: 29. SEQSP-WEC-0009M Relief Valve, Type-B r
1 Y
1 Y
_ -_ _ __ _ _ _ - _ __ j
_ -_ _ __ _ _ _ - _ __ j


F   .                    3a i
F 3
      ,      g+
a i
Mr. William J. Cahill, Jr.               -2 4
g+
Mr. William J. Cahill, Jr.
-2 4
Questions regarding this review should be referred to Jai Rajan at (301) 492-0917.
Questions regarding this review should be referred to Jai Rajan at (301) 492-0917.
or to Melinda Malloy, one of the Comanche Peak project managers at (301) 492-0738.
or to Melinda Malloy, one of the Comanche Peak project managers at (301) 492-0738.
Should you expect any difficulty. in meeting the August 9,1989 deadline, please                   1 inform us immediately.
Should you expect any difficulty. in meeting the August 9,1989 deadline, please 1
Sincerely,
inform us immediately.
';                                                                  Original signed by.                               ,
Sincerely, Original signed by.
Phillip F. McKee                                   '
Phillip F. McKee for Christopher I Grimes, Director Comanche Peak Project Division Office of Nuclear Reactor Regulation j
for Christopher I Grimes, Director Comanche Peak Project Division Office of Nuclear Reactor Regulation               "j


==Enclosure:==
==Enclosure:==
Equipment List for Audit cc:
Equipment List for Audit cc:
                    ' See next page Distribution:
' See next page Distribution:
Docket File NRC PDR Local PDR-ADSP Reading CPPD Reading D. Crutchfield
Docket File NRC PDR Local PDR-ADSP Reading CPPD Reading D. Crutchfield
                  ;T. Quay C. Grimes P. McKee J. Lycns R. Warnick                                                                                         .
;T. Quay C. Grimes P. McKee J. Lycns R. Warnick J. H. Wilson
J. H. Wilson
.M. Malloy 1
                  .M. Malloy                                                                                               1
.M. Fields G. Hubbard O. Rothberg Of*{
                    .M. Fields G. Hubbard O. Rothberg                                         Of*{                                               i L. Marsh                                               I                                           !
L. Marsh I
I J. Rajan                                                                                             l C. Vandenburgh                                                                                       j OGC                                                                                                   l J. Partlow                                                                                           )
J. Rajan I
                                                                                                                          ~
C. Vandenburgh j
E. Jordan B. Grimes /JZwolinski                                                                               I l
OGC J. Partlow
ACRS.(10)
)
                                                                                                  ~
E. Jordan
0FC       :                  :CPPD:NRR       :AD:CPPD:NRR :D         :NRR :D:              :            :
~
  .___;Ogg/           ......            ..___            ...:          .....:.          .i __:.......__..:-____.... .
B. Grimes /JZwolinski l
NAME :0Rajan:cb             : lalloy       ,: Lyons       :      e         :C       e   :            :
I ACRS.(10)
  ....:___.......__:.........s                 , ...........:_......... .:. ...__ ...:. ...___ ..:....___....
~
DATE :8/ U/89               :8/8//89
0FC
:8/Y,/89     :8/ T/89         : 8/44,/89   :    -
:CPPD:NRR
0FFICIAL RECORD COPY l
:AD:CPPD:NRR :D
I m}}
:NRR :D:
.___;Ogg/
.i NAME :0Rajan:cb
: lalloy
,: Lyons e
:C e
....:___.......__:.........s DATE :8/ U/89
:8/8//89
:8/Y,/89
:8/ T/89 8/44,/89 0FFICIAL RECORD COPY l
m I}}

Latest revision as of 02:31, 2 December 2024

Informs of Sqrt Audit of safety-related Electrical & Mechanical Equipment for Plant on 890821-25 by Nrc.Audit Will Be Conducted Using Guidance Contained in Reg Guide 1.100 & Industry Std IEEE-344-1975
ML20245F404
Person / Time
Site: Comanche Peak  
Issue date: 08/04/1989
From: Charemagne Grimes
Office of Nuclear Reactor Regulation
To: William Cahill
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
References
RTR-REGGD-01.100, RTR-REGGD-1.100 NUDOCS 8908140263
Download: ML20245F404 (6)


Text

- _ _ _ - -

'o,,

UNITED STATES A,. f p,.

NUCLEAR REGULATORY COMMISSION

' 7,

j WASHINGTON, D. C. 20555 4

%*****/

August 4, 1989 Docket Nos. 50-445 and 50-446 Mr. William J. Cahill, Jr.

Executive Vice President, Nuclear Texas Utilities Electric Company 400 North Olive Street, L. B. 81 Dallas, Texas 75201

Dear Mr. Cahill:

SUBJECT:

COMANCHE PEAK SQRT AUDIT A Seismic Qualification Review Team (SQRT) audit of the safety-related electrical and mechanical equipment for Comanche Peak is tentatively scheduled to be perfomed by the NRC staff between August 21 and August 25, 1989. The audit will be conducted using the guidance contained in Regulatory Guide 1.100. Industry Standard IEEE-344-1975, and guidance and acceptance criteria in NUREG-0800, Standard Review Plan (SRP), Section 3.10.

The approach in the evaluation for the design adequacy of items from the Equipment Qualification Master List (EQML) will be very similar to the SQRT audit performed in August 1982 at Comanche Peak..

Since 1982, TU Electric has been involved in an extensive corrective action program (CAP), one workscope of which involved equipment qualification. This workscope includes a methodology for correcting generic equipment qualification program deficiencies found by the Comanche Peak Response Team (CPRT). Among these were deficiencies in the identification and classification of require-ments for equipment qualification and in seismic documentation. The NRC staff evaluated the corrective action methodology covered by this workscope and concluded in NUREG-0797 Supplement 19 (SSER 19) that it provides a compre-hensive program for resolving CPRT and staff-identified equipment qualifica-tion issues. SSER 19 states that the adequacy of the program's implementation would be assessed prior to Comanche Peak fuel loading. The upcoming SQRT audit will assess the adequacy of the program's implementation.

The leader of the review team team will be Mr. Jai Rajan of the Mechanical Engineering Branch. He will be assisted by three consultants from EG&G Idaho, Inc.

As a minimum, the audit will include the items listed in the enclosure.

o On August 18, 1989, the team will identify three additional items for i

audit.

TU Electric is requested to submit a completed Seismic Equipment Qualification Summary Package form for each of the items listed in the enclosure by August 9, 1989. The staff has reviewed a copy of TU Electric's sumary package form and found it to be acceptable.

W Yo$ b Y

G

n@

~

' :x&

1 j!,.

Mr. William J. Cahill, Jr..

- 2.-

+ -

. Questions:regarding this_ review should be' referred to Jai Rajan at.(301) 492-0917 or.to Melinda Malloy, one of the Comanche Peak project managers at (301) 492-0738.

Should you expect any difficulty in meeting the August 9, 1989 deadline, please inform us.immediately.

Sincerel Christopher I. Grimes, Director Comanche Peak Project Division Office of Nuclear Reactor Regulation

Enclosure:

Equipment List for Audit cc:

See next page 4

w I

i

'I

\\.

.[

Mr. William J. Cahill, Jr. i cc:

I Asst. Director for Inspec. Programs Roger D. Walker 1

Comanche Peak Project Dtvision Manager, Nuclear Licensing p

U. S. Nuclear Regulatory Commission Texas Utilities Electric Company l

P. O. Box 1029 400 North Olive Street, L.B. 81 Granbury, Texas 76048 Dallas, Texas 75201

' Regional Administrator., Region IV Texas Utilities Electric Company l

U. S. Nuclear Regulatory Commission c/o Bethesda Licensing 611 Ryan Flaza Drive, Suite 1000 3 Metro Center, Suite 610 Arlington, Texas 76011 Bethesda, Maryland 20814 Ms. Billie Pirner Garde, Esq.

William A. Burchette, Esq.

Garde Law Office Counsel for Tex-La Electric 104 East Wisconsin Avenue Cooperative of Texas Appleton, Wisconsin 54911 Heron, Burchette. Ruckert & Rothwell 1025 Thomas Jefferson Street, NW l

Washington, D.C.

20007 Mrs. Juanita Ellis, President GOS ASSOCIATES, INC.

Citizens Association for Sound Energy Suite 720 1426 South Polk 1850 Parkway Place Dallas, Texas 75224 Marietta, Georgia 30067-8237 E. F. Ottney Jack R. Newman P. O. Box 1777 Newman & Holtzinger Glen Rose, Texas 76043 1615 L Street, NW Suite 1000 Washington, DC 20036 Mr. W. J. Cahill, Jr.

Chief, Texas Bureau of Radiation Control Executive Vice President, Nuclear Texas Departraent of Health Texas Utilities Electric Company 1100 West 49th Street 400 No. Olive Street, L.B. 81 Austin, Texas 78756 Dallas, Texas 75201 Honorable George Crump County Judge Glen Rose Texas 76043 l

l

e l

q.:

, t...,

y, i

! c. = 7 ENCLOSURE COMANCHE PEAK EQUIPMENT FOR 3

SEISMIC QUALIFICATION TEAM AUDIT l

1 Package No.

Description

1..SEQSP-ES-0024-01 Solid State Intulation Cabinet by

)

Forney Engineering Company j

i

2. 'SE0SP-MS-0605-01 Main Control Boaro j

.3.

SEQSP-ES-0016A-02 Radiation Monitoring Cabinet I

4.

SEQSP-ES-0011-02 DC Distribution Switch Board 5.

SEQSP-ES-0011-03 DC Distribution Panel 6.

SEQSP-MS-0007-04 AFW Pump Woodward Governor 7.

SEQSP-MS-0007-02'

' Turbine Driven AFW Pu:np

8.. SEQSP-MS-0600-029 24" Fisher Butterfly Valve 9.

SEQSP-WECM-090, Pressurizer PORV

10. 'SEQSP-WEC-0020M Boric Acid Trt.nsfer Pump
11. SEQSP-WEC-0075M Positive D!splacement Charging Pump
12. SEQSP-WECM-031 2-1/2" RLIJ' Centrifugal Charging Pump
13. SEQSP-WEC-0031 Charging Pump 14.. SEQSP-WEC-0032M RHR Pump

'15.

SEQSP-WEC-0001M Waste Evaporstor Feed Pump

16. SEQSP-WEC-0003M Waste Gas Decay Tank
17. SEQSP-WEC-0024M Recycle Holdup Tank Ejector
18. SEQSP-APR-01 Auxiliary Relay Rack
19. SEQSP-ES-00088 Battery Charger & Circuit Breaker
20. SEQSP-MS-0034-31 Cooler
21. SEQSP-MS-0034-46 Intercooler
22. SEQSP-MS-0076-03 MSIV Bypass Valves
23. SEQSP-itS-00158-01 Crane-Deming Fig. 4511 Sump Pumps

g:. ;.

1 it i

p3

\\

s lli

',- i; Y. :.

.v-r i

Package No.

Description 1

J

24. SEQSP-MS-0034 DeLaval. Diesel Engine 1
25. SEQSP MS-0086-01 Posi-Seal 12",150# Trunnion Valve, With Limitorque Actuator I

.26.

SEQSP-MS-0022-01 Safeguard System Sequencer

27. SEQSP-WEC-0038M.

Pressure Safety Valve 28.

SEQSP-WEC-0089M Air Operated 3-Way Control Valves

29. SEQSP-WEC-0009M Relief Valve, Type-B r

1 Y

_ -_ _ __ _ _ _ - _ __ j

F 3

a i

g+

Mr. William J. Cahill, Jr.

-2 4

Questions regarding this review should be referred to Jai Rajan at (301) 492-0917.

or to Melinda Malloy, one of the Comanche Peak project managers at (301) 492-0738.

Should you expect any difficulty. in meeting the August 9,1989 deadline, please 1

inform us immediately.

Sincerely, Original signed by.

Phillip F. McKee for Christopher I Grimes, Director Comanche Peak Project Division Office of Nuclear Reactor Regulation j

Enclosure:

Equipment List for Audit cc:

' See next page Distribution:

Docket File NRC PDR Local PDR-ADSP Reading CPPD Reading D. Crutchfield

T. Quay C. Grimes P. McKee J. Lycns R. Warnick J. H. Wilson

.M. Malloy 1

.M. Fields G. Hubbard O. Rothberg Of*{

L. Marsh I

J. Rajan I

C. Vandenburgh j

OGC J. Partlow

)

E. Jordan

~

B. Grimes /JZwolinski l

I ACRS.(10)

~

0FC

CPPD:NRR
AD:CPPD:NRR :D
NRR :D:

.___;Ogg/

.i NAME :0Rajan:cb

lalloy

,: Lyons e

C e

....:___.......__:.........s DATE :8/ U/89

8/8//89
8/Y,/89
8/ T/89 8/44,/89 0FFICIAL RECORD COPY l