| number = ML20247P657
| number = ML20247P657
| issue date = 07/31/1989
| issue date = 07/31/1989
| title = Provides Evaluation of Util Proposed Revised PASS Test Procedure,Per 890726 Ltr.Util Commitments to Document Changes to PASS Sampling Program Acceptable
| title = Provides Evaluation of Util Proposed Revised PASS Test Procedure,Per .Util Commitments to Document Changes to PASS Sampling Program Acceptable
| author name = Kintner L
| author name = Kintner L
| author affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
| author affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
Line 12: Line 12:
| case reference number = TASK-2.B.3, TASK-TM
| case reference number = TASK-2.B.3, TASK-TM
| document report number = TAC-73833, NUDOCS 8908040254
| document report number = TAC-73833, NUDOCS 8908040254
| title reference date = 07-26-1989
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE
| page count = 3
| page count = 3
| project = TAC:73833
| stage = Other
}}
}}


=Text=
=Text=
{{#Wiki_filter:w                                                                                                   ,
{{#Wiki_filter:w
    .,  ,J         <
,J yo
yo       ,
'," 'G' j;.
          '," 'G' j;. g[og
g[og UNITED STATES NUCLEAR REGULATORY COMMISSION t
                        .,          ;                                                                                                                                                                  UNITED STATES NUCLEAR REGULATORY COMMISSION t       ;-                  y                                                                                                                                                             WASHINGTON, D. C. 20555 b                 +g,,,,.                                                                                                                                                                             July 31, 1989 l               . Docket No. 50-416 Mr. W. T. Cottle Vice President, Nuclear Operations System Energy Resources, loc.
y WASHINGTON, D. C. 20555 b
+g,,,,.
July 31, 1989 l
. Docket No. 50-416 Mr. W. T. Cottle Vice President, Nuclear Operations System Energy Resources, loc.
Post Office Box 23054 Jackson, Mississippi 39205
Post Office Box 23054 Jackson, Mississippi 39205


==Dear Mr. Cottle:==
==Dear Mr. Cottle:==
==SUBJECT:==
==SUBJECT:==
GRAND GULF NUCLEAR STATION, UNIT 1 - POST ACCIDENT SAMPLING SYSTEM SURVEILLANCE TESTS (TAC 73833)
GRAND GULF NUCLEAR STATION, UNIT 1 - POST ACCIDENT SAMPLING SYSTEM SURVEILLANCE TESTS (TAC 73833)
By {{letter dated|date=July 26, 1989|text=letter dated July 26, 1989}}, System Energy Resources, Inc. (thelicensee) comnitted to revise its post accident sampling system (PASS), test procedure for Grand Gulf Nuclear Station (GGNS), Unit 1.
By {{letter dated|date=July 26, 1989|text=letter dated July 26, 1989}}, System Energy Resources, Inc.
(thelicensee) comnitted to revise its post accident sampling system (PASS), test procedure for Grand Gulf Nuclear Station (GGNS), Unit 1.
The licensee's commitment resulted from a telephone conference call between
The licensee's commitment resulted from a telephone conference call between
                            ' the licensee ~and NRC. staff on July 11, 1989 to discuss the staff's position regarding the PASS sampling program in Section II.B.3(1)(c) of the staff's e                             Safety Evaluation Report, Supplement No. 4 (SSER 4). The purpose of this
' the licensee ~and NRC. staff on July 11, 1989 to discuss the staff's position regarding the PASS sampling program in Section II.B.3(1)(c) of the staff's e
                            -letter is to provide staff's evaluation of the licensee's proposed revised test procedure.
Safety Evaluation Report, Supplement No. 4 (SSER 4). The purpose of this
-letter is to provide staff's evaluation of the licensee's proposed revised test procedure.
The NRC staff has reviewed the licensee's {{letter dated|date=July 26, 1989|text=letter dated July 26, 1989}} regarding
The NRC staff has reviewed the licensee's {{letter dated|date=July 26, 1989|text=letter dated July 26, 1989}} regarding
                            .the; proposed revision to the PASS test procedure. The semiannual testing of the PASS includes. obtaining the sample from the PASS panel as well as analysis of the sample for determining operability and for a training purpose. The licensee's present procedure requires monthly analysis of PASS reactor coolant samples from the reactor coolant system when the reactor is pressurized, with at least one of these samples taken from a jet pump diffuser instrument line each six. months. The revised procedure would require semiannual sampling from the suppression pool, RHR loop A, or RHR loop B to demonstrate capability to obtain post accident samples under conditions when the reactor coolant system
.the; proposed revision to the PASS test procedure. The semiannual testing of the PASS includes. obtaining the sample from the PASS panel as well as analysis of the sample for determining operability and for a training purpose. The licensee's present procedure requires monthly analysis of PASS reactor coolant samples from the reactor coolant system when the reactor is pressurized, with at least one of these samples taken from a jet pump diffuser instrument line each six. months. The revised procedure would require semiannual sampling from the suppression pool, RHR loop A, or RHR loop B to demonstrate capability to obtain post accident samples under conditions when the reactor coolant system
                            .is<depressurized. The licensee has implemented a revised PASS sampling program requiring semiannual sampling and analysis from one of the three sampling points that can be used to obtain a depressurized sample. The sampling point will be rotated for each semiannual PASS testing interval: 1.e, suppression pool, then RHR. loop A and then the RHR loop B. The staff concludes that the revised semiannual PASS sampling and analysis from each of the three sampling
.is<depressurized. The licensee has implemented a revised PASS sampling program requiring semiannual sampling and analysis from one of the three sampling points that can be used to obtain a depressurized sample. The sampling point will be rotated for each semiannual PASS testing interval:
!                .            points on rotational basis, as well as the monthly PASS reactor coolant sample,
1.e, suppression pool, then RHR. loop A and then the RHR loop B.
,.                            reets the requirements of NUREG-0737, Item II.B.3, from the standpoint of E                             demonstrating operability and for providing adequate training.
The staff concludes that the revised semiannual PASS sampling and analysis from each of the three sampling points on rotational basis, as well as the monthly PASS reactor coolant sample, reets the requirements of NUREG-0737, Item II.B.3, from the standpoint of E
The licensee has committed to revise GGNS Unit 1 Administrative Procedure 08-S-03-10. " Chemistry Sampling Program," to include the additional sampling points. In addition, the revised procedure will require the licensee to 8908040254 890731 PDR P
demonstrating operability and for providing adequate training.
ADOCK 05000416                                                                                                                                                           i [)
The licensee has committed to revise GGNS Unit 1 Administrative Procedure 08-S-03-10. " Chemistry Sampling Program," to include the additional sampling points.
In addition, the revised procedure will require the licensee to 8908040254 890731 PDR ADOCK 05000416
[)
i P
PDC
PDC


g ,         ,n n                           -
g,,n n
~
~
          -jf
-jf
  +, p g..,
+, p g..,
s      .Mr. W. T. Cottle                                                           July 31. 1989 telephone NRC Region II in the event one of the sample lines is found to be
.Mr. W. T. Cottle s July 31. 1989 telephone NRC Region II in the event one of the sample lines is found to be
                    . inoperable and cannot be restored to operability within 24 hours. . A description f       of the revised PASS sampling program will also be included in an update of the UFSAR. The staff concludes that the licensee's commitments to document the changes' to the PASS sampling program are acceptable.
. inoperable and cannot be restored to operability within 24 hours.. A description f
of the revised PASS sampling program will also be included in an update of the UFSAR. The staff concludes that the licensee's commitments to document the changes' to the PASS sampling program are acceptable.
Sincerely.
Sincerely.
Ronnie Lo/for                           i tester L. Kintner, Senior Froject Manager Project Directorate.II-1 Division of Reactor Projects-I/II cc:             See next page DISTRIBUTION vischaefUe'
Ronnie Lo/for i
                  .NRC PDR Local PDR PDII-l' Reading S. Varga                     14-E-4 G. Lainas                     14-H-3 E. Adensam P. Anderson-L. Kirtner OGC                           15-B-18 E. Jordan                     MNBB-3302 B. Grimes                     9-A-2 CYChen                       9 1 5                                                 ,
tester L. Kintner, Senior Froject Manager Project Directorate.II-1 Division of Reactor Projects-I/II cc:
ACRS 10          (g )       P-315 GRAND GULF FILE PAnderso                     AKintner: sw   CYCheng             Adensam
See next page DISTRIBUTION vischaefUe'
                      }/f/89                     f 7 / 31/89
.NRC PDR Local PDR PDII-l' Reading S. Varga 14-E-4 G. Lainas 14-H-3 E. Adensam P. Anderson-L. Kirtner OGC 15-B-18 E. Jordan MNBB-3302 B. Grimes 9-A-2 CYChen 9 1 5 ACRS (g )
                                                                  }A(/89             f/3//89 I
10 P-315 GRAND GULF FILE PAnderso AKintner: sw CYCheng Adensam
_._m._ _ . _ __
}/f/89 f 7 / 31/89
}A(/89 f/3//89 I
_._m._


L !
L
( ~.
(
]   .. . . . .
~.
Mr. W. T. Cottle System Energy Pesources, Inc.       Grand Gulf Nuclear Station (GGNS) cc:
]
Mr. T. H. Cloninger                 Mr. C. R. Hutchinson Vice President, Nuclear Engineering GGNS General Manager
Mr. W. T. Cottle System Energy Pesources, Inc.
                            & Support'.                       System Energy Resources, Inc.
Grand Gulf Nuclear Station (GGNS) cc:
System Energy Resources, Inc.       P. O. Box 756 P. O. Box 31995 .                   Port Gibson, Mississippi 39150 Jackson, Mississippi 39286 Robert B. McGenee, Esquire         The Honorable William J. Guste, Jr.
Mr. T. H. Cloninger Mr. C. R. Hutchinson Vice President, Nuclear Engineering GGNS General Manager
Wise, Carter, Child, and           Attorney General Caraway                           Department of Justice P. O. Box 651'                     State of Louisiana Jackson, Mississippi 39205           Baton Rouge, Louisiana 70804 Nicholas S. Reynolds, Esquire       Office of the Governor Bishop, Liberman, Cook, Purcell     State of Mississippi and Reynolds                     Jackson, Mississippi 39201 1400 L Street, N.W. - 12th Floor Washington, D.C. 20005-3502       Attorney General Gartin Building Mr. Ralph T. Lally                   Jackson, Mississippi 39205
& Support'.
                    . Manager of Quality Assurance Entergy Services, Inc.               Mr. Jack McMillan, Director P. O. Box 31995                       Division of Solid Waste Management Jackson, Mississippi 39286           Mississippi Department of Natural Resources P. O. Box 10385 Mr. John G. Cesare                   Jackson, Mississippi 39209 Director, Nuclear Licensing System Energy Resources, Inc.         Alton B. Cobb, M.D.
System Energy Resources, Inc.
P. 0. Box 469                         State Health Officer Port Gibson, Mississippi 39150       State Board of Health P. O. Box 1700 Mr. C. B. Hogg, Project Manager       Jackson, Mississippi 39205 Bechtel Power Corporation P. O. Box 2166                         President Houston, Texas 77252-2166             Claiborne County Board of Supervisors Port Gibson, Mississippi 39150 Mr. H. 0.-Christensen Senior Resident Inspector             Regional Administrator, Region II U.S. Nuclear Regulatory Comission     U. S. Nuclear Rcgulatory Comission Route 2, Box 399                       101 Marietta Street Port Cibson, Mississippi 39150         Suite 2900 Atlanta, Georgia 30323
System Energy Resources, Inc.
      . . _ _ _ _ _ _ _ _}}
P. O. Box 756 P. O. Box 31995.
Port Gibson, Mississippi 39150 Jackson, Mississippi 39286 Robert B. McGenee, Esquire The Honorable William J. Guste, Jr.
Wise, Carter, Child, and Attorney General Caraway Department of Justice P. O. Box 651' State of Louisiana Jackson, Mississippi 39205 Baton Rouge, Louisiana 70804 Nicholas S. Reynolds, Esquire Office of the Governor Bishop, Liberman, Cook, Purcell State of Mississippi and Reynolds Jackson, Mississippi 39201 1400 L Street, N.W. - 12th Floor Washington, D.C.
20005-3502 Attorney General Gartin Building Mr. Ralph T. Lally Jackson, Mississippi 39205
. Manager of Quality Assurance Entergy Services, Inc.
Mr. Jack McMillan, Director P. O. Box 31995 Division of Solid Waste Management Jackson, Mississippi 39286 Mississippi Department of Natural Resources P. O. Box 10385 Mr. John G. Cesare Jackson, Mississippi 39209 Director, Nuclear Licensing System Energy Resources, Inc.
Alton B. Cobb, M.D.
P. 0. Box 469 State Health Officer Port Gibson, Mississippi 39150 State Board of Health P. O. Box 1700 Mr. C. B. Hogg, Project Manager Jackson, Mississippi 39205 Bechtel Power Corporation P. O. Box 2166 President Houston, Texas 77252-2166 Claiborne County Board of Supervisors Port Gibson, Mississippi 39150 Mr. H. 0.-Christensen Senior Resident Inspector Regional Administrator, Region II U.S. Nuclear Regulatory Comission U. S. Nuclear Rcgulatory Comission Route 2, Box 399 101 Marietta Street Port Cibson, Mississippi 39150 Suite 2900 Atlanta, Georgia 30323
.. _ _ _ _ _ _ _ _}}

Latest revision as of 19:17, 1 December 2024

Provides Evaluation of Util Proposed Revised PASS Test Procedure,Per .Util Commitments to Document Changes to PASS Sampling Program Acceptable
ML20247P657
Person / Time
Site: Grand Gulf 
Issue date: 07/31/1989
From: Kintner L
Office of Nuclear Reactor Regulation
To: Cottle W
SYSTEM ENERGY RESOURCES, INC.
References
TASK-2.B.3, TASK-TM TAC-73833, NUDOCS 8908040254
Download: ML20247P657 (3)


Text

w

,J yo

'," 'G' j;.

g[og UNITED STATES NUCLEAR REGULATORY COMMISSION t

y WASHINGTON, D. C. 20555 b

+g,,,,.

July 31, 1989 l

. Docket No. 50-416 Mr. W. T. Cottle Vice President, Nuclear Operations System Energy Resources, loc.

Post Office Box 23054 Jackson, Mississippi 39205

Dear Mr. Cottle:

SUBJECT:

GRAND GULF NUCLEAR STATION, UNIT 1 - POST ACCIDENT SAMPLING SYSTEM SURVEILLANCE TESTS (TAC 73833)

By letter dated July 26, 1989, System Energy Resources, Inc.

(thelicensee) comnitted to revise its post accident sampling system (PASS), test procedure for Grand Gulf Nuclear Station (GGNS), Unit 1.

The licensee's commitment resulted from a telephone conference call between

' the licensee ~and NRC. staff on July 11, 1989 to discuss the staff's position regarding the PASS sampling program in Section II.B.3(1)(c) of the staff's e

Safety Evaluation Report, Supplement No. 4 (SSER 4). The purpose of this

-letter is to provide staff's evaluation of the licensee's proposed revised test procedure.

The NRC staff has reviewed the licensee's letter dated July 26, 1989 regarding

.the; proposed revision to the PASS test procedure. The semiannual testing of the PASS includes. obtaining the sample from the PASS panel as well as analysis of the sample for determining operability and for a training purpose. The licensee's present procedure requires monthly analysis of PASS reactor coolant samples from the reactor coolant system when the reactor is pressurized, with at least one of these samples taken from a jet pump diffuser instrument line each six. months. The revised procedure would require semiannual sampling from the suppression pool, RHR loop A, or RHR loop B to demonstrate capability to obtain post accident samples under conditions when the reactor coolant system

.is<depressurized. The licensee has implemented a revised PASS sampling program requiring semiannual sampling and analysis from one of the three sampling points that can be used to obtain a depressurized sample. The sampling point will be rotated for each semiannual PASS testing interval:

1.e, suppression pool, then RHR. loop A and then the RHR loop B.

The staff concludes that the revised semiannual PASS sampling and analysis from each of the three sampling points on rotational basis, as well as the monthly PASS reactor coolant sample, reets the requirements of NUREG-0737, Item II.B.3, from the standpoint of E

demonstrating operability and for providing adequate training.

The licensee has committed to revise GGNS Unit 1 Administrative Procedure 08-S-03-10. " Chemistry Sampling Program," to include the additional sampling points.

In addition, the revised procedure will require the licensee to 8908040254 890731 PDR ADOCK 05000416

[)

i P

PDC

g,,n n

~

-jf

+, p g..,

.Mr. W. T. Cottle s July 31. 1989 telephone NRC Region II in the event one of the sample lines is found to be

. inoperable and cannot be restored to operability within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.. A description f

of the revised PASS sampling program will also be included in an update of the UFSAR. The staff concludes that the licensee's commitments to document the changes' to the PASS sampling program are acceptable.

Sincerely.

Ronnie Lo/for i

tester L. Kintner, Senior Froject Manager Project Directorate.II-1 Division of Reactor Projects-I/II cc:

See next page DISTRIBUTION vischaefUe'

.NRC PDR Local PDR PDII-l' Reading S. Varga 14-E-4 G. Lainas 14-H-3 E. Adensam P. Anderson-L. Kirtner OGC 15-B-18 E. Jordan MNBB-3302 B. Grimes 9-A-2 CYChen 9 1 5 ACRS (g )

10 P-315 GRAND GULF FILE PAnderso AKintner: sw CYCheng Adensam

}/f/89 f 7 / 31/89

}A(/89 f/3//89 I

_._m._

L

(

~.

]

Mr. W. T. Cottle System Energy Pesources, Inc.

Grand Gulf Nuclear Station (GGNS) cc:

Mr. T. H. Cloninger Mr. C. R. Hutchinson Vice President, Nuclear Engineering GGNS General Manager

& Support'.

System Energy Resources, Inc.

System Energy Resources, Inc.

P. O. Box 756 P. O. Box 31995.

Port Gibson, Mississippi 39150 Jackson, Mississippi 39286 Robert B. McGenee, Esquire The Honorable William J. Guste, Jr.

Wise, Carter, Child, and Attorney General Caraway Department of Justice P. O. Box 651' State of Louisiana Jackson, Mississippi 39205 Baton Rouge, Louisiana 70804 Nicholas S. Reynolds, Esquire Office of the Governor Bishop, Liberman, Cook, Purcell State of Mississippi and Reynolds Jackson, Mississippi 39201 1400 L Street, N.W. - 12th Floor Washington, D.C.

20005-3502 Attorney General Gartin Building Mr. Ralph T. Lally Jackson, Mississippi 39205

. Manager of Quality Assurance Entergy Services, Inc.

Mr. Jack McMillan, Director P. O. Box 31995 Division of Solid Waste Management Jackson, Mississippi 39286 Mississippi Department of Natural Resources P. O. Box 10385 Mr. John G. Cesare Jackson, Mississippi 39209 Director, Nuclear Licensing System Energy Resources, Inc.

Alton B. Cobb, M.D.

P. 0. Box 469 State Health Officer Port Gibson, Mississippi 39150 State Board of Health P. O. Box 1700 Mr. C. B. Hogg, Project Manager Jackson, Mississippi 39205 Bechtel Power Corporation P. O. Box 2166 President Houston, Texas 77252-2166 Claiborne County Board of Supervisors Port Gibson, Mississippi 39150 Mr. H. 0.-Christensen Senior Resident Inspector Regional Administrator, Region II U.S. Nuclear Regulatory Comission U. S. Nuclear Rcgulatory Comission Route 2, Box 399 101 Marietta Street Port Cibson, Mississippi 39150 Suite 2900 Atlanta, Georgia 30323

.. _ _ _ _ _ _ _ _