ML20249B663: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:- _ _ _ - _ .                                      ._.
{{#Wiki_filter:- _ _ _ - _.
June 19,1998 l
June 19,1998 l
Mr. Robert E. Grazio, Director                                                                                                             )
Mr. Robert E. Grazio, Director
Nuclear Regblatory Affairs l                       Crystal River Unit 3 Florida Power Corporation 15760 W. Power Line Street Crystal River, Florida S4428-6708
)
Nuclear Regblatory Affairs l
Crystal River Unit 3 Florida Power Corporation 15760 W. Power Line Street Crystal River, Florida S4428-6708


==Dear Mr. Grazio:==
==Dear Mr. Grazio:==
 
In response to your {{letter dated|date=May 21, 1998|text=letter dated May 21,1998}}, requesting an exception to 10 CFR 50.4 (b)(6) that requires the Crystal River Unit 3 Updated Final Cafety Analysis Report (UFSAR) to be submitted in paper format, Florida Power Corporation (i PC) is hereby granted approval to submit the original and two paper copies and 10 CD-ROM copies of updates to the FSAR as
In response to your letter dated May 21,1998, requesting an exception to 10 CFR 50.4 (b)(6) that requires the Crystal River Unit 3 Updated Final Cafety Analysis Report (UFSAR) to be submitted in paper format, Florida Power Corporation (i PC) is hereby granted approval to submit the original and two paper copies and 10 CD-ROM copies of updates to the FSAR as
- follows: the signed original, one paper copy, and nine CD-ROM copies to the Document Control Desk, U.S. Nuclear Regulatory Commission, Washington DC 20555-0001, one paper copy to the appropriate Regional Administrator, and one CD-ROM copy to the Senior Resident inspector pursuant to 10 CFR 50.4(e).
                      - follows: the signed original, one paper copy, and nine CD-ROM copies to the Document Control Desk, U.S. Nuclear Regulatory Commission, Washington DC 20555-0001, one paper copy to the appropriate Regional Administrator, and one CD-ROM copy to the Senior Resident inspector pursuant to 10 CFR 50.4(e).
The NRC reserves the right to modify or rescind this exception upon written notification. Please contact Keith R. Snaw viiny staff if you have any questions or require additionalinformation.
The NRC reserves the right to modify or rescind this exception upon written notification. Please contact Keith R. Snaw viiny staff if you have any questions or require additionalinformation.
Mr. Shaw may be reached at (301) 415-3801 or e-mail krs@nrc. gov.
Mr. Shaw may be reached at (301) 415-3801 or e-mail krs@nrc. gov.
Sincerely, i
Sincerely, N
N                                                        \
\\
Brenda J. Shelton, Chief g
i Brenda J. Shelton, Chief g
Records Management Branch Information Management Division Office of the Chief Information Officer
Records Management Branch Information Management Division Office of the Chief Information Officer f
                                                                                                                                                        /dl p f
/dl p 9806240030 980619
9806240030 DR             980619 ADOCK 05000302                                                                                   /   @y; PDR DOCUMENT NAME: P.\FPCEXMPT.APR T* Factive e cop? Of this document. Indicate in the bor: *C" e Copy without attachmenUenclosure "E" e Copy w:th attachmenvenclosure "N" = No cT. v OFFICE OClO/DPSS a                                    / OClO/ISB               AEOD/lRD                       NRR                       OClO/ASIB NAME                 KRShaw f/d k                        R,APowell             FJCongel                       LWiens                     DLGraser DATE                 06// //98                          06/ /98               06/ /98                       06/ /98                   06/ /98 OFFICE OGC                                               OClO/3MB                                     I NAME-                 MPSiemien                           BJSP{silfpat DATE                 06/ /98                     _
@y; DR ADOCK 05000302
087/9/98 '
/
OFFICIAL RECORD COPY L.....             . . . . . . . . . ~ . . . .             ..          .            .  . . _
PDR DOCUMENT NAME: P.\\FPCEXMPT.APR T* Factive e cop? Of this document. Indicate in the bor: *C" e Copy without attachmenUenclosure "E" e Copy w:th attachmenvenclosure "N" = No cT. v OFFICE OClO/DPSS
/
OClO/ISB AEOD/lRD NRR OClO/ASIB a
NAME KRShaw f/dk R,APowell FJCongel LWiens DLGraser DATE 06/ //98
/
06/ /98 06/ /98 06/ /98 06/ /98 OFFICE OGC OClO/3MB I
NAME-MPSiemien BJSP{silfpat DATE 06/ /98 087/9/98 '
OFFICIAL RECORD COPY L.....
......... ~....


  /                       ,    Mr. Robert E. Grazio, Director
/
                        .      Nuclear Regulatory Affairs Crystal River Unit 3 Florida Power Corporation 15760 W. Power Line Street Crystal River, Florida 34428-6708
Mr. Robert E. Grazio, Director Nuclear Regulatory Affairs Crystal River Unit 3 Florida Power Corporation 15760 W. Power Line Street Crystal River, Florida 34428-6708


==Dear Mr. Grazio:==
==Dear Mr. Grazio:==
 
In response to your {{letter dated|date=May 21, 1998|text=letter dated May 21,1998}}, requesting an exception to 10 CFR 50.4 (b)(6) that requires the Crystal River Unit 3 Updated Final Safety Analysis Report (UFSAR) to be submittee. in paper format, Florida Power Corporation (FPC) is hereby granted approval to submit the original and two paper copies and 10 CD-ROM copies of updates to the FSAR as follows: the signed original, one paper copy, and nine CD-ROM copies to the Document Control Desk, U.S. Nuclear Regulatory Commission, Washington DC 20555-0001, one paper copy to l
In response to your letter dated May 21,1998, requesting an exception to 10 CFR 50.4 (b)(6) that requires the Crystal River Unit 3 Updated Final Safety Analysis Report (UFSAR) to be submittee. in paper format, Florida Power Corporation (FPC) is hereby granted approval to submit the original and two paper copies and 10 CD-ROM copies of updates to the FSAR as follows: the signed original, one paper copy, and nine CD-ROM copies to the Document Control Desk, U.S. Nuclear Regulatory Commission, Washington DC 20555-0001, one paper copy to l                               the appropriate Regional Administrator, and one CD-ROM copy to the Senior Resident inspector pursuant to 10 CFR 50.4(c).
the appropriate Regional Administrator, and one CD-ROM copy to the Senior Resident inspector pursuant to 10 CFR 50.4(c).
The NRC reserves the right to modify or rescind this exemption upon wntten notification. Please contact Keith R. Shaw of my staff if you have any questions or require additional information.
The NRC reserves the right to modify or rescind this exemption upon wntten notification. Please contact Keith R. Shaw of my staff if you have any questions or require additional information.
Mr. Shaw may be reached at (301) 415-3801 or e-mail krs@nrc. gov.
Mr. Shaw may be reached at (301) 415-3801 or e-mail krs@nrc. gov.
Sincerely, Brenda J. Shelton, Chief Records Management Branch Information Management Division Office of the Chief Information Officer
Sincerely, Brenda J. Shelton, Chief Records Management Branch Information Management Division Office of the Chief Information Officer
                                                                                                                                                                \
\\
DOCUMENT NAME: P:\FPCEXMPT.APR T'a receive a copo of this document, Indicate in the box: "C" a Copy without attachmenvenclosure "E" = Copy with attachment / enclosure "N" a too copy OFFICE OClO/DPSS                         l   OClO/ISB               l ,, ,AEOD/lRD                       NRR                   l       OClO/ASIB NAME KRShaw                                   RAPo W / FJCongel                                           LWiens                         DLGraser DATE                 06/ /98                 06L5/98                     06/ /98                       06/ /98                       06/ /98 OFFICE OGC                                     OCIO/RMB NAME MPSiemien                               BJShelton DATE                 06/ /98                 06/ /98 OFFICIAL RECORD COPY
DOCUMENT NAME: P:\\FPCEXMPT.APR T'a receive a copo of this document, Indicate in the box: "C" a Copy without attachmenvenclosure "E" = Copy with attachment / enclosure "N" a too copy OFFICE OClO/DPSS l
OClO/ISB l,,,AEOD/lRD NRR l
OClO/ASIB NAME KRShaw RAPo W / FJCongel LWiens DLGraser DATE 06/ /98 06L5/98 06/ /98 06/ /98 06/ /98 OFFICE OGC OCIO/RMB NAME MPSiemien BJShelton DATE 06/ /98 06/ /98 OFFICIAL RECORD COPY


l 7     ,
l 7
                      ' Mr, Robert E. Grczio, Director Nuclear Regulatory Affairs Crystal River Unit 3 Florida Power Corporation 15760 W. Power Line Street Crystbl Rivet, Florida 34428-6708
' Mr, Robert E. Grczio, Director Nuclear Regulatory Affairs Crystal River Unit 3 Florida Power Corporation 15760 W. Power Line Street Crystbl Rivet, Florida 34428-6708


==Dear Mr. Grazio:==
==Dear Mr. Grazio:==
 
In response to your {{letter dated|date=May 21, 1998|text=letter dated May 21,1998}}, requesting an exception to 10 CFR 50.4 (b)(6) th61 requires the Crystal River Unit 3 Updated Final Safety Analysis Report (UFSAR) to be submitted in paper format, Florida Power Corporation (FPC) is hereby granted approval to submit the original and two paper copies and 10 CD-ROM copies of updates to the FSAR as follows' the signed original, one paper cow and nine CD-ROM copies to the Document Control Desk, U.S. Nuclear Regulatory Commission, Washington DC 20555-0001, one paper copy to the appropriate Regional Administrator, and one CD-ROM copy to the Senior Resident inspector pursuant to 10 CFR 50 4(c).
In response to your letter dated May 21,1998, requesting an exception to 10 CFR 50.4 (b)(6) th61 requires the Crystal River Unit 3 Updated Final Safety Analysis Report (UFSAR) to be submitted in paper format, Florida Power Corporation (FPC) is hereby granted approval to submit the original and two paper copies and 10 CD-ROM copies of updates to the FSAR as follows' the signed original, one paper cow and nine CD-ROM copies to the Document Control Desk, U.S. Nuclear Regulatory Commission, Washington DC 20555-0001, one paper copy to the appropriate Regional Administrator, and one CD-ROM copy to the Senior Resident inspector pursuant to 10 CFR 50 4(c).
The NRC reserves the right to modify or rescind this exception upon written notification. Please contact Keith R. Shaw of my staff if you have any questions or require additional information.
The NRC reserves the right to modify or rescind this exception upon written notification. Please contact Keith R. Shaw of my staff if you have any questions or require additional information.
Mr. Shaw may be reached at (301) 415-3801 or e-mail krs@nrc. gov.
Mr. Shaw may be reached at (301) 415-3801 or e-mail krs@nrc. gov.
Sincerely, Brenda J. Shelton, Chief Records Management Branch Information Management Division Office of the Chief Information Officer DOCUMENT NAME: P;\FPCEXMPT.APR n ,.c.i, . con           , o, ini. ooc om.ni. inoic.i. in in. no.: c . cnny ..,nno, .,i.cnm nv.ncin.or. c . cony .,,n .,,.cnm.nt noo.u,. v . uc cony OFFICE OClO/DPSS                                             OClO/ISB                       AEOD/lRD             s     NRR                       OCIO/ASIB NAME KRShaw                                                 RAPowell                       FJCongel         ]/[/       LWiens                     DLGraser DATE                   06/ /98                             06/ /98                       06//6/98       VM           06/ /98                   06/ /98 OFFICE                 OGC                           __
Sincerely, Brenda J. Shelton, Chief Records Management Branch Information Management Division Office of the Chief Information Officer DOCUMENT NAME: P;\\FPCEXMPT.APR n,.c.i,. con, o, ini. ooc om.ni. inoic.i. in in. no.: c. cnny..,nno,.,i.cnm nv.ncin.or.
OCIO/RMB                                         _                            [!
c. cony.,,n.,,.cnm.nt noo.u,. v. uc cony OFFICE OClO/DPSS OClO/ISB AEOD/lRD s NRR OCIO/ASIB NAME KRShaw RAPowell FJCongel
NAME                     MPSiemien                           BJShelton DATE-                   06/ /98                             06/ /98 OFFICIAL RECORD COPY                                                               ,
]/[/
LWiens DLGraser DATE 06/ /98 06/ /98 06//6/98 VM 06/ /98 06/ /98 OFFICE OGC OCIO/RMB
[!
NAME MPSiemien BJShelton DATE-06/ /98 06/ /98 OFFICIAL RECORD COPY


f
f
            .    " Mr. Robert E. Grazio, Dir:ctor Nuclear Regulatory Affairs Crystal River Unit 3 Florida Power Corporation l                 15760 W. Power Line Street Crystal River, Florida 34428-6708
" Mr. Robert E. Grazio, Dir:ctor Nuclear Regulatory Affairs Crystal River Unit 3 Florida Power Corporation l
15760 W. Power Line Street Crystal River, Florida 34428-6708


==Dear Mr. Grazio:==
==Dear Mr. Grazio:==
In response to your {{letter dated|date=May 21, 1998|text=letter dated May 21,1998}}, requesting an exception to 10 CFR 50.4 (b)(6) that requires the Crystal River Unit 3 Updated Final Safety Analysis Report (UFSAR) to be submitted in paper format, Florida Power Corporation (FPC) is hereby granted approval to j
submit the original and two paper copies and 10 CD-ROM copies of updates to the FSAR as follows: the signed original, one paper copy, and nine CD-R.OM copies to the Document Control Desk, U.S. Nuclear Regulatory Commission, Washington DC 20555-0001, one paper copy to the appropriate Regional Administrator, and one CD-ROM copy to the Senior Resident inspector j
pursuant to 10 CFR 50.4(c).
The NRC reserves the right to modify or rescind this exemption upon written notification. Please contact Keith R. Shaw of my staffif you have any questions or require additionalinformation.
Mr. Shaw may be reached at (301) 415-3801 or e-mail krs@nrc. gov.
Sincerely, 1
Brenda J. Shelton, Chief Records Management Branch information Management Division Office of'the Chief Information Officer DOCUMENT NAME: P:\\FPCEXMPT.APR to rec *1ve a cop 9 of thle document. Indicate in the bos: "C"
* Copy without attachmentenclosure "E" = Cop" with attachment / enc!wn
''N" = No copy OFFICE OClO/DPSS OClO/ISB AEOD/lRD NRR C OClO/ASIB j
NAME KRShaw RAPowell FJCongel LWieng////w DLGraser DATE 06/ /98 06/ /98 06/ /98 06/g/9'8 06/ /98 m
OFFICE OGC OClOiRMB NAME MPSiemien BJShelton DATE 06/ /98 06/ /98 OFFICIAL RECORD COPY


In response to your letter dated May 21,1998, requesting an exception to 10 CFR 50.4 (b)(6) that requires the Crystal River Unit 3 Updated Final Safety Analysis Report (UFSAR) to be submitted in paper format, Florida Power Corporation (FPC) is hereby granted approval to                                                    j submit the original and two paper copies and 10 CD-ROM copies of updates to the FSAR as follows: the signed original, one paper copy, and nine CD-R.OM copies to the Document Control Desk, U.S. Nuclear Regulatory Commission, Washington DC 20555-0001, one paper copy to the appropriate Regional Administrator, and one CD-ROM copy to the Senior Resident inspector                                                j pursuant to 10 CFR 50.4(c).
' Mr. Robert E, Grczio. Director Nuclear Regulatory Affairs Crystal River Unit 3 Florida Power Corporation 15760 W. Power Line Street Crystbl Rivet Fiorida 34428-0708
The NRC reserves the right to modify or rescind this exemption upon written notification. Please                                            '
contact Keith R. Shaw of my staffif you have any questions or require additionalinformation.
Mr. Shaw may be reached at (301) 415-3801 or e-mail krs@nrc. gov.                                                                          !
Sincerely,                                                          ;
1 Brenda J. Shelton, Chief Records Management Branch information Management Division Office of'the Chief Information Officer DOCUMENT NAME: P:\FPCEXMPT.APR to rec *1ve a cop 9 of thle document. Indicate in the bos: "C"
* Copy without attachmentenclosure "E" = Cop" with attachment / enc!wn ''N" = No copy OFFICE OClO/DPSS                                    OClO/ISB                      AEOD/lRD                      NRR            j        C OClO/ASIB NAME KRShaw                                        RAPowell                      FJCongel                      LWieng////w                  DLGraser DATE            06/ /98                            06/ /98                      06/ /98                      06/g/9'8                      06/ /98 m
OFFICE OGC                                          OClOiRMB NAME MPSiemien                                      BJShelton                                                      ,
DATE            06/ /98                            06/ /98                                                                                              ,
OFFICIAL RECORD COPY
 
                                              ' Mr. Robert E, Grczio. Director Nuclear Regulatory Affairs Crystal River Unit 3 Florida Power Corporation 15760 W. Power Line Street Crystbl Rivet Fiorida 34428-0708


==Dear Mr. Grazio:==
==Dear Mr. Grazio:==
 
In response to your {{letter dated|date=May 21, 1998|text=letter dated May 21,1998}}, requesting an exception to 10 CFR 50.4 (b)(6) that requires the Crystal River Unit 3 Updated Final Safety Analysis Report (UFSAR) to be submitted in paper format, Florida Power Corporation (FPC) is hereby granted approval to submit the original and two paper copies and 10 CD ROM copies of updates to the FSAR as follows: the signed original, one paper copy, and nine CD-ROM copies to the Document Control Desk, U.S. Nuclear Regulatory Commission Washington DC 20555-0001, one paper copy to the appropriate Regional Administrator, and one CD-ROM copy to the Senior Resident inspector pursuant to 10 CFR 50.4(c).
In response to your letter dated May 21,1998, requesting an exception to 10 CFR 50.4 (b)(6) that requires the Crystal River Unit 3 Updated Final Safety Analysis Report (UFSAR) to be submitted in paper format, Florida Power Corporation (FPC) is hereby granted approval to submit the original and two paper copies and 10 CD ROM copies of updates to the FSAR as follows: the signed original, one paper copy, and nine CD-ROM copies to the Document Control Desk, U.S. Nuclear Regulatory Commission Washington DC 20555-0001, one paper copy to the appropriate Regional Administrator, and one CD-ROM copy to the Senior Resident inspector pursuant to 10 CFR 50.4(c).
The NRC reserves tne right to modify or rescind this exemption upon written notification. Please contact Keith R. Shaw of my staff if you have any questions or r2 quire additionalinformation.
The NRC reserves tne right to modify or rescind this exemption upon written notification. Please contact Keith R. Shaw of my staff if you have any questions or r2 quire additionalinformation.
Mr. Shaw may be reached at (301) 415 3801 or e-mail krs@nrc. gov.
Mr. Shaw may be reached at (301) 415 3801 or e-mail krs@nrc. gov.
Sincerely, Brenda J Shelton, Chief Records Management Branch Information Management Division Office of the Chief Information Officer i
Sincerely, Brenda J Shelton, Chief Records Management Branch Information Management Division Office of the Chief Information Officer i
i DOCUMENT NAME: P;\FPCEXMPT.APR vo ,.c.iv. . u,p ,                             oe in,. axum.ni, ina.i. in in. no.: c . c<cy .i nm,i .it.cnm           ni-<i,,.u,. v . c<4 , .,en .ei.,:,,n.,,i,.,<;o.u,. u no enny             #b   ,
i DOCUMENT NAME: P;\\FPCEXMPT.APR vo,.c.iv.. u,p, oe in,. axum.ni, ina.i. in in. no.: c. c<cy.i nm,i.it.cnm ni-<i,,.u,. v. c<4,.,en.ei.,:,,n.,,i,.,<;o.u,.
OFFICE OClO/DPSS                                                       l     OClO/ISB                               AEOD/lRD                     NRR                           O,ClO/ASIB,,   //
u no enny
NAME KRShaw                                                                   RAPowell                               FJCongol                     LWiens                         Q(Graser 9//8
#b OFFICE OClO/DPSS l
(    DATE                                        06/ /98                           06/ /98                             __
OClO/ISB AEOD/lRD NRR O,ClO/ASIB,, //
06/ /98                     .
NAME KRShaw RAPowell FJCongol LWiens Q(Graser 9//8
06/ _ / 98__                  06/ &/98 1      _
_ 98__
OFFICE                                       OGC                               OClO/RMB NAME                                         MPSiernien                       BJSheiton DATE                                         06/ /98                           06/ /98 OFFICIAL RECORD COPY o                                                                                                                                                                                                             I
06/ &/98 1
 
(
  .
DATE 06/ /98 06/ /98 06/ /98 06/
/
OFFICE OGC OClO/RMB NAME MPSiernien BJSheiton DATE 06/ /98 06/ /98 OFFICIAL RECORD COPY o
I
* Mr. Robert E. Grazio, Director Nuclear Regulatory Affairs Crystal River Unit 3 Florida Power Corporation 15760 W. Power Line Street Crystal River, Florida 34428-6708
* Mr. Robert E. Grazio, Director Nuclear Regulatory Affairs Crystal River Unit 3 Florida Power Corporation 15760 W. Power Line Street Crystal River, Florida 34428-6708


==Dear Mr. Grazio:==
==Dear Mr. Grazio:==
 
In response to your {{letter dated|date=May 21, 1998|text=letter dated May 21,1998}}, requesting an exception to 10 CFR 50.4 (b)(6) that requires the Crystal River Unit 3 Updated Final Safety Analysis Report (UFSAR) to be submitted in paper format, Florida Power Corporation (FPC) is hereby granted approval to submit the original and two paper copiec and 10 CD-ROM copies of updates to the FSAR as follows: the signed original, one paper copy, and nine CD-ROM copies to the Document Control Desk, U.S. Nuclear Regulatory Commission, Washington DC 20555-0001, one paper copy to the appropriate Regional Administrator, and one CD-ROM copy to the Senior Resident Inspector pursuant to 10 CFR 50.4(c).
In response to your letter dated May 21,1998, requesting an exception to 10 CFR 50.4 (b)(6) that requires the Crystal River Unit 3 Updated Final Safety Analysis Report (UFSAR) to be submitted in paper format, Florida Power Corporation (FPC) is hereby granted approval to submit the original and two paper copiec and 10 CD-ROM copies of updates to the FSAR as follows: the signed original, one paper copy, and nine CD-ROM copies to the Document Control Desk, U.S. Nuclear Regulatory Commission, Washington DC 20555-0001, one paper copy to the appropriate Regional Administrator, and one CD-ROM copy to the Senior Resident Inspector pursuant to 10 CFR 50.4(c).
The NRC reserves the right to modify or rescind this exemption upon written notification. Please contact Keith R. Shaw of my staff if you have any questions or require additional information.
The NRC reserves the right to modify or rescind this exemption upon written notification. Please contact Keith R. Shaw of my staff if you have any questions or require additional information.
Mr. Shaw may be reached at (301) 415-3801 or e-mail krs@nrc. gov.
Mr. Shaw may be reached at (301) 415-3801 or e-mail krs@nrc. gov.
Sincerely, I
Sincerely, I
r Brenda J. Shelton, Chief Records Management Branch Information Management Division Office of the Chief information Officer l;
r Brenda J. Shelton, Chief Records Management Branch Information Management Division Office of the Chief information Officer l
DOCUMENT NAME: P.\FPCEXMPT.APR
DOCUMENT NAME: P.\\FPCEXMPT.APR
  .To receive a cop 9 of this document. Indicate in the bos: "C" a Copy without at'achment'enclosuse T a Cocyr with attachment' enclosure "N" = No copy OFFICE OCIO/DPSS                             l         OCIO/ISB                                                       AEOD/lRD             NRR             l OCIO/ASIB l NAME KRShaw                                           RAPowell                                                       FJCongel             LWiens             DLGraser DATE           06/ /98                               06/ 19 8                                                       06/ /98               06/ /98           06/ /98 OFFICE         OGC                 uf             C OCIO/RMB NAME           MPSiemienM "                           BJShelton DATE       _
.To receive a cop 9 of this document. Indicate in the bos: "C" a Copy without at'achment'enclosuse T a Cocyr with attachment' enclosure "N" = No copy OFFICE OCIO/DPSS l
06//[p/98                             06/ /98 OFFICIAL RECORD COPY
OCIO/ISB AEOD/lRD NRR l
OCIO/ASIB l NAME KRShaw RAPowell FJCongel LWiens DLGraser DATE 06/ /98 06/ 19 8 06/ /98 06/ /98 06/ /98 OFFICE OGC uf C OCIO/RMB NAME MPSiemienM "
BJShelton DATE 06//[p/98 06/ /98 OFFICIAL RECORD COPY
_ _ _ _ _ _- -_b
_ _ _ _ _ _- -_b
* i Fisrida Power fl"$ ".,*J,7f
 
i Fisrida Power fl"$ ".,*J,7f
:",10,%".*'. -
:",10,%".*'. -
1 I
1 I
May 21,1998 3F0598-12 U.S. Nuclear Regulatory Commission Records Management Branch Information Management Division Office of the Chief Information Officer Washington, DC 20555-0001 Attention:       Mrs. B. J. Shelton Chief, Records Management Branch
May 21,1998 3F0598-12 U.S. Nuclear Regulatory Commission Records Management Branch Information Management Division Office of the Chief Information Officer Washington, DC 20555-0001 Attention:
Mrs. B. J. Shelton Chief, Records Management Branch


==Subject:==
==Subject:==
Line 118: Line 137:


==Dear Mrs. Shelton:==
==Dear Mrs. Shelton:==
As required by Title 10 of the Code of Federal Regulations, Florida Power Corporation (FPC) submits updates to the Crysta! River Unit 3 (CR-3) Final Safety Analysis Report (FSAR) to the Nuclear Regulatory Commission (NRC) pursuant to 10 CFR 50.71(e) and in accordance with 10 CFR 50.4(b)(6). By this letter, FPC is requesting approval of an Exception Request to permit FPC to submit future updates to the CR-3 FSAR in CD-ROM format in lieu of paper copies in accordance with 10 CFR 50.4(c).
i Pursuant to 10 CFR 50.4(b)(6), the signed original and 10 conies of the updated Final Safety Q Analysis Report are submitted to the NRC Document Control Desk, one copy is sent to the appropriate Regional Office and one copy to the NRC Resident Inspector. It is FPC's desire to continue to provide the signed original paper copy to the NRC Document Control Desk, one paper copy to the NRR Project Manager, one paper copy to the Regional Administrator, Region II, and to substitute the remaining paper copies with CD-ROMS. The Annual Safety k
Evaluation Report submitted in accordance with 10 CFR 50.59(b)(2) and the Final Safety Q
Analysis Report Summary will continue to be provided in paper copy format.
4 i
In the above referenced letter, FPC provided six CD-ROMS containing Revision 24 to the CR-3 FSAR of which five were to be distributed to the Region II Branch Chief. The remaining CD-ROM was designated for the NRR Project Manager. The above referenced l
letter also identified that a CD-ROM was provided to the CR-3 Senior Resident Inspector under separate cover.
b CRYSTAL RIVER ENERGY COMPLEX: 157so W. Power une street. Crystat puver. norida 34428 470s (352)79544s6 A Roride Progress Company E___ __ _


As required by Title 10 of the Code of Federal Regulations, Florida Power Corporation (FPC) submits updates to the Crysta! River Unit 3 (CR-3) Final Safety Analysis Report (FSAR) to the Nuclear Regulatory Commission (NRC) pursuant to 10 CFR 50.71(e) and in accordance with 10 CFR 50.4(b)(6). By this letter, FPC is requesting approval of an Exception Request to permit FPC to submit future updates to the CR-3 FSAR in CD-ROM format in lieu of paper copies in accordance with 10 CFR 50.4(c).                                                                      i Pursuant to 10 CFR 50.4(b)(6), the signed original and 10 conies of the updated Final Safety Q Analysis Report are submitted to the NRC Document Control Desk, one copy is sent to the appropriate Regional Office and one copy to the NRC Resident Inspector. It is FPC's desire to continue to provide the signed original paper copy to the NRC Document Control Desk, one paper copy to the NRR Project Manager, one paper copy to the Regional Administrator, Region II, and to substitute the remaining paper copies with CD-ROMS. The Annual Safety                      k Evaluation Report submitted in accordance with 10 CFR 50.59(b)(2) and the Final Safety                      Q 4
- =
Analysis Report Summary will continue to be provided in paper copy format.                                    i In the above referenced letter, FPC provided six CD-ROMS containing Revision 24 to the CR-3 FSAR of which five were to be distributed to the Region II Branch Chief. The remaining CD-ROM was designated for the NRR Project Manager. The above referenced l        letter also identified that a CD-ROM was provided to the CR-3 Senior Resident Inspector under separate cover.                                                                                          .
i b.S. Nuclear Regul: tory Commission 3F0598-12 Page 2 of 2
CRYSTAL RIVER ENERGY COMPLEX: 157so W. Power une street . Crystat puver. norida 34428 470s (352)79544s6 b
~
A Roride Progress Company E___ __ _                                                                                                                ;
Future habmittals to the updated CR-3 FSAR on CD-ROM will be complete reissues to the Final Safety Analysis Report. FPC anticipates the file size will remain viithin the capacity of a single CD-RO.u.
 
Tht: CD-ROM that contained Revision 24 to the FSAR utilized 150 megabytes (MB) of the 650MB capacity.
  -=       '-      .
i       -  b.S. Nuclear Regul: tory Commission
        ~
3F0598-12 Page 2 of 2 Future habmittals to the updated CR-3 FSAR on CD-ROM will be complete reissues to the Final Safety Analysis Report. FPC anticipates the file size will remain viithin the capacity of a '
single CD-RO.u. Tht: CD-ROM that contained Revision 24 to the FSAR utilized 150 megabytes (MB) of the 650MB capacity.
Future updates to the CR-3 FSAR on CD-ROMS will include an Adobe Acrobat Reader software program in facilitate their use. The FSAR files on the CD-ROMS will be in the PDF file format which can read by utilizing the Adobe Acrobat Reader software program.
Future updates to the CR-3 FSAR on CD-ROMS will include an Adobe Acrobat Reader software program in facilitate their use. The FSAR files on the CD-ROMS will be in the PDF file format which can read by utilizing the Adobe Acrobat Reader software program.
Contained within the CD-ROM will be an ASCII based README file that is provided for installation information. The CD-ROMS will be prepared to the ISO 9660 (8+3 restricted character set) standard.
Contained within the CD-ROM will be an ASCII based README file that is provided for installation information. The CD-ROMS will be prepared to the ISO 9660 (8+3 restricted character set) standard.
Line 135: Line 157:
If you have any questions regarding this submittal, please contact Ms. Sherry Bernhoft, Manager Nuclear Licensing at (352) 563-4566.
If you have any questions regarding this submittal, please contact Ms. Sherry Bernhoft, Manager Nuclear Licensing at (352) 563-4566.
Sincerely,
Sincerely,
                    .)
.)
4Q (5 3 Robert E. Grazio Director, Nuclear Regulatory Affairs REG /Irm xe:     Regional Administrator, Region II NRR Project Manager Senior Resident Inspector 4
4Q (5 3 Robert E. Grazio Director, Nuclear Regulatory Affairs REG /Irm xe:
Regional Administrator, Region II NRR Project Manager Senior Resident Inspector 4
b________li__.___________}}
b________li__.___________}}

Latest revision as of 14:03, 30 November 2024

Grants Approval for FPC to Submit Original & Two Paper Copies & Ten CD-ROM Copies of Updates to Fsar,As Listed.Nrc Reserves Right to Modify or Rescind Exception Upon Written Notification
ML20249B663
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 06/19/1998
From: Shelton B
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
To: Grazio R
FLORIDA POWER CORP.
References
NUDOCS 9806240030
Download: ML20249B663 (7)


Text

- _ _ _ - _.

June 19,1998 l

Mr. Robert E. Grazio, Director

)

Nuclear Regblatory Affairs l

Crystal River Unit 3 Florida Power Corporation 15760 W. Power Line Street Crystal River, Florida S4428-6708

Dear Mr. Grazio:

In response to your letter dated May 21,1998, requesting an exception to 10 CFR 50.4 (b)(6) that requires the Crystal River Unit 3 Updated Final Cafety Analysis Report (UFSAR) to be submitted in paper format, Florida Power Corporation (i PC) is hereby granted approval to submit the original and two paper copies and 10 CD-ROM copies of updates to the FSAR as

- follows: the signed original, one paper copy, and nine CD-ROM copies to the Document Control Desk, U.S. Nuclear Regulatory Commission, Washington DC 20555-0001, one paper copy to the appropriate Regional Administrator, and one CD-ROM copy to the Senior Resident inspector pursuant to 10 CFR 50.4(e).

The NRC reserves the right to modify or rescind this exception upon written notification. Please contact Keith R. Snaw viiny staff if you have any questions or require additionalinformation.

Mr. Shaw may be reached at (301) 415-3801 or e-mail krs@nrc. gov.

Sincerely, N

\\

i Brenda J. Shelton, Chief g

Records Management Branch Information Management Division Office of the Chief Information Officer f

/dl p 9806240030 980619

@y; DR ADOCK 05000302

/

PDR DOCUMENT NAME: P.\\FPCEXMPT.APR T* Factive e cop? Of this document. Indicate in the bor: *C" e Copy without attachmenUenclosure "E" e Copy w:th attachmenvenclosure "N" = No cT. v OFFICE OClO/DPSS

/

OClO/ISB AEOD/lRD NRR OClO/ASIB a

NAME KRShaw f/dk R,APowell FJCongel LWiens DLGraser DATE 06/ //98

/

06/ /98 06/ /98 06/ /98 06/ /98 OFFICE OGC OClO/3MB I

NAME-MPSiemien BJSP{silfpat DATE 06/ /98 087/9/98 '

OFFICIAL RECORD COPY L.....

......... ~....

/

Mr. Robert E. Grazio, Director Nuclear Regulatory Affairs Crystal River Unit 3 Florida Power Corporation 15760 W. Power Line Street Crystal River, Florida 34428-6708

Dear Mr. Grazio:

In response to your letter dated May 21,1998, requesting an exception to 10 CFR 50.4 (b)(6) that requires the Crystal River Unit 3 Updated Final Safety Analysis Report (UFSAR) to be submittee. in paper format, Florida Power Corporation (FPC) is hereby granted approval to submit the original and two paper copies and 10 CD-ROM copies of updates to the FSAR as follows: the signed original, one paper copy, and nine CD-ROM copies to the Document Control Desk, U.S. Nuclear Regulatory Commission, Washington DC 20555-0001, one paper copy to l

the appropriate Regional Administrator, and one CD-ROM copy to the Senior Resident inspector pursuant to 10 CFR 50.4(c).

The NRC reserves the right to modify or rescind this exemption upon wntten notification. Please contact Keith R. Shaw of my staff if you have any questions or require additional information.

Mr. Shaw may be reached at (301) 415-3801 or e-mail krs@nrc. gov.

Sincerely, Brenda J. Shelton, Chief Records Management Branch Information Management Division Office of the Chief Information Officer

\\

DOCUMENT NAME: P:\\FPCEXMPT.APR T'a receive a copo of this document, Indicate in the box: "C" a Copy without attachmenvenclosure "E" = Copy with attachment / enclosure "N" a too copy OFFICE OClO/DPSS l

OClO/ISB l,,,AEOD/lRD NRR l

OClO/ASIB NAME KRShaw RAPo W / FJCongel LWiens DLGraser DATE 06/ /98 06L5/98 06/ /98 06/ /98 06/ /98 OFFICE OGC OCIO/RMB NAME MPSiemien BJShelton DATE 06/ /98 06/ /98 OFFICIAL RECORD COPY

l 7

' Mr, Robert E. Grczio, Director Nuclear Regulatory Affairs Crystal River Unit 3 Florida Power Corporation 15760 W. Power Line Street Crystbl Rivet, Florida 34428-6708

Dear Mr. Grazio:

In response to your letter dated May 21,1998, requesting an exception to 10 CFR 50.4 (b)(6) th61 requires the Crystal River Unit 3 Updated Final Safety Analysis Report (UFSAR) to be submitted in paper format, Florida Power Corporation (FPC) is hereby granted approval to submit the original and two paper copies and 10 CD-ROM copies of updates to the FSAR as follows' the signed original, one paper cow and nine CD-ROM copies to the Document Control Desk, U.S. Nuclear Regulatory Commission, Washington DC 20555-0001, one paper copy to the appropriate Regional Administrator, and one CD-ROM copy to the Senior Resident inspector pursuant to 10 CFR 50 4(c).

The NRC reserves the right to modify or rescind this exception upon written notification. Please contact Keith R. Shaw of my staff if you have any questions or require additional information.

Mr. Shaw may be reached at (301) 415-3801 or e-mail krs@nrc. gov.

Sincerely, Brenda J. Shelton, Chief Records Management Branch Information Management Division Office of the Chief Information Officer DOCUMENT NAME: P;\\FPCEXMPT.APR n,.c.i,. con, o, ini. ooc om.ni. inoic.i. in in. no.: c. cnny..,nno,.,i.cnm nv.ncin.or.

c. cony.,,n.,,.cnm.nt noo.u,. v. uc cony OFFICE OClO/DPSS OClO/ISB AEOD/lRD s NRR OCIO/ASIB NAME KRShaw RAPowell FJCongel

]/[/

LWiens DLGraser DATE 06/ /98 06/ /98 06//6/98 VM 06/ /98 06/ /98 OFFICE OGC OCIO/RMB

[!

NAME MPSiemien BJShelton DATE-06/ /98 06/ /98 OFFICIAL RECORD COPY

f

" Mr. Robert E. Grazio, Dir:ctor Nuclear Regulatory Affairs Crystal River Unit 3 Florida Power Corporation l

15760 W. Power Line Street Crystal River, Florida 34428-6708

Dear Mr. Grazio:

In response to your letter dated May 21,1998, requesting an exception to 10 CFR 50.4 (b)(6) that requires the Crystal River Unit 3 Updated Final Safety Analysis Report (UFSAR) to be submitted in paper format, Florida Power Corporation (FPC) is hereby granted approval to j

submit the original and two paper copies and 10 CD-ROM copies of updates to the FSAR as follows: the signed original, one paper copy, and nine CD-R.OM copies to the Document Control Desk, U.S. Nuclear Regulatory Commission, Washington DC 20555-0001, one paper copy to the appropriate Regional Administrator, and one CD-ROM copy to the Senior Resident inspector j

pursuant to 10 CFR 50.4(c).

The NRC reserves the right to modify or rescind this exemption upon written notification. Please contact Keith R. Shaw of my staffif you have any questions or require additionalinformation.

Mr. Shaw may be reached at (301) 415-3801 or e-mail krs@nrc. gov.

Sincerely, 1

Brenda J. Shelton, Chief Records Management Branch information Management Division Office of'the Chief Information Officer DOCUMENT NAME: P:\\FPCEXMPT.APR to rec *1ve a cop 9 of thle document. Indicate in the bos: "C"

  • Copy without attachmentenclosure "E" = Cop" with attachment / enc!wn

N" = No copy OFFICE OClO/DPSS OClO/ISB AEOD/lRD NRR C OClO/ASIB j

NAME KRShaw RAPowell FJCongel LWieng////w DLGraser DATE 06/ /98 06/ /98 06/ /98 06/g/9'8 06/ /98 m

OFFICE OGC OClOiRMB NAME MPSiemien BJShelton DATE 06/ /98 06/ /98 OFFICIAL RECORD COPY

' Mr. Robert E, Grczio. Director Nuclear Regulatory Affairs Crystal River Unit 3 Florida Power Corporation 15760 W. Power Line Street Crystbl Rivet Fiorida 34428-0708

Dear Mr. Grazio:

In response to your letter dated May 21,1998, requesting an exception to 10 CFR 50.4 (b)(6) that requires the Crystal River Unit 3 Updated Final Safety Analysis Report (UFSAR) to be submitted in paper format, Florida Power Corporation (FPC) is hereby granted approval to submit the original and two paper copies and 10 CD ROM copies of updates to the FSAR as follows: the signed original, one paper copy, and nine CD-ROM copies to the Document Control Desk, U.S. Nuclear Regulatory Commission Washington DC 20555-0001, one paper copy to the appropriate Regional Administrator, and one CD-ROM copy to the Senior Resident inspector pursuant to 10 CFR 50.4(c).

The NRC reserves tne right to modify or rescind this exemption upon written notification. Please contact Keith R. Shaw of my staff if you have any questions or r2 quire additionalinformation.

Mr. Shaw may be reached at (301) 415 3801 or e-mail krs@nrc. gov.

Sincerely, Brenda J Shelton, Chief Records Management Branch Information Management Division Office of the Chief Information Officer i

i DOCUMENT NAME: P;\\FPCEXMPT.APR vo,.c.iv.. u,p, oe in,. axum.ni, ina.i. in in. no.: c. c<cy.i nm,i.it.cnm ni-<i,,.u,. v. c<4,.,en.ei.,:,,n.,,i,.,<;o.u,.

u no enny

  1. b OFFICE OClO/DPSS l

OClO/ISB AEOD/lRD NRR O,ClO/ASIB,, //

NAME KRShaw RAPowell FJCongol LWiens Q(Graser 9//8

_ 98__

06/ &/98 1

(

DATE 06/ /98 06/ /98 06/ /98 06/

/

OFFICE OGC OClO/RMB NAME MPSiernien BJSheiton DATE 06/ /98 06/ /98 OFFICIAL RECORD COPY o

I

  • Mr. Robert E. Grazio, Director Nuclear Regulatory Affairs Crystal River Unit 3 Florida Power Corporation 15760 W. Power Line Street Crystal River, Florida 34428-6708

Dear Mr. Grazio:

In response to your letter dated May 21,1998, requesting an exception to 10 CFR 50.4 (b)(6) that requires the Crystal River Unit 3 Updated Final Safety Analysis Report (UFSAR) to be submitted in paper format, Florida Power Corporation (FPC) is hereby granted approval to submit the original and two paper copiec and 10 CD-ROM copies of updates to the FSAR as follows: the signed original, one paper copy, and nine CD-ROM copies to the Document Control Desk, U.S. Nuclear Regulatory Commission, Washington DC 20555-0001, one paper copy to the appropriate Regional Administrator, and one CD-ROM copy to the Senior Resident Inspector pursuant to 10 CFR 50.4(c).

The NRC reserves the right to modify or rescind this exemption upon written notification. Please contact Keith R. Shaw of my staff if you have any questions or require additional information.

Mr. Shaw may be reached at (301) 415-3801 or e-mail krs@nrc. gov.

Sincerely, I

r Brenda J. Shelton, Chief Records Management Branch Information Management Division Office of the Chief information Officer l

DOCUMENT NAME: P.\\FPCEXMPT.APR

.To receive a cop 9 of this document. Indicate in the bos: "C" a Copy without at'achment'enclosuse T a Cocyr with attachment' enclosure "N" = No copy OFFICE OCIO/DPSS l

OCIO/ISB AEOD/lRD NRR l

OCIO/ASIB l NAME KRShaw RAPowell FJCongel LWiens DLGraser DATE 06/ /98 06/ 19 8 06/ /98 06/ /98 06/ /98 OFFICE OGC uf C OCIO/RMB NAME MPSiemienM "

BJShelton DATE 06//[p/98 06/ /98 OFFICIAL RECORD COPY

_ _ _ _ _ _- -_b

i Fisrida Power fl"$ ".,*J,7f

",10,%".*'. -

1 I

May 21,1998 3F0598-12 U.S. Nuclear Regulatory Commission Records Management Branch Information Management Division Office of the Chief Information Officer Washington, DC 20555-0001 Attention:

Mrs. B. J. Shelton Chief, Records Management Branch

Subject:

Request for Exception to 10 CFR 50.4(c) for Updates to the Final Safety Analysis Report

Reference:

FPC to NRC letter, 3F0298-25, dated February 23,1998, " Final Safety Analysis Report, Revision 24, Distribution of CD-ROMS"

Dear Mrs. Shelton:

As required by Title 10 of the Code of Federal Regulations, Florida Power Corporation (FPC) submits updates to the Crysta! River Unit 3 (CR-3) Final Safety Analysis Report (FSAR) to the Nuclear Regulatory Commission (NRC) pursuant to 10 CFR 50.71(e) and in accordance with 10 CFR 50.4(b)(6). By this letter, FPC is requesting approval of an Exception Request to permit FPC to submit future updates to the CR-3 FSAR in CD-ROM format in lieu of paper copies in accordance with 10 CFR 50.4(c).

i Pursuant to 10 CFR 50.4(b)(6), the signed original and 10 conies of the updated Final Safety Q Analysis Report are submitted to the NRC Document Control Desk, one copy is sent to the appropriate Regional Office and one copy to the NRC Resident Inspector. It is FPC's desire to continue to provide the signed original paper copy to the NRC Document Control Desk, one paper copy to the NRR Project Manager, one paper copy to the Regional Administrator, Region II, and to substitute the remaining paper copies with CD-ROMS. The Annual Safety k

Evaluation Report submitted in accordance with 10 CFR 50.59(b)(2) and the Final Safety Q

Analysis Report Summary will continue to be provided in paper copy format.

4 i

In the above referenced letter, FPC provided six CD-ROMS containing Revision 24 to the CR-3 FSAR of which five were to be distributed to the Region II Branch Chief. The remaining CD-ROM was designated for the NRR Project Manager. The above referenced l

letter also identified that a CD-ROM was provided to the CR-3 Senior Resident Inspector under separate cover.

b CRYSTAL RIVER ENERGY COMPLEX: 157so W. Power une street. Crystat puver. norida 34428 470s (352)79544s6 A Roride Progress Company E___ __ _

- =

i b.S. Nuclear Regul: tory Commission 3F0598-12 Page 2 of 2

~

Future habmittals to the updated CR-3 FSAR on CD-ROM will be complete reissues to the Final Safety Analysis Report. FPC anticipates the file size will remain viithin the capacity of a single CD-RO.u.

Tht: CD-ROM that contained Revision 24 to the FSAR utilized 150 megabytes (MB) of the 650MB capacity.

Future updates to the CR-3 FSAR on CD-ROMS will include an Adobe Acrobat Reader software program in facilitate their use. The FSAR files on the CD-ROMS will be in the PDF file format which can read by utilizing the Adobe Acrobat Reader software program.

Contained within the CD-ROM will be an ASCII based README file that is provided for installation information. The CD-ROMS will be prepared to the ISO 9660 (8+3 restricted character set) standard.

The CD-ROM does not contain any FPC or third party copyright restrictions that would prohibit the NRC from making and providing copies of the CD-ROM to members of the public. The Adobe Acrobat Reader contains a license agreement that allows distribution of copies provided the license agreement is included with the copy. The license agreement is contained within the CD-ROM as part of the installation software.

The next update to the CR-3 FSAR is scheduled for August 2,1998. It is requested that this Exception Request be approved prior to July 10, 1998, to allow sufficient time to process the copies for the scheduled August 2,1998 submittal.

If you have any questions regarding this submittal, please contact Ms. Sherry Bernhoft, Manager Nuclear Licensing at (352) 563-4566.

Sincerely,

.)

4Q (5 3 Robert E. Grazio Director, Nuclear Regulatory Affairs REG /Irm xe:

Regional Administrator, Region II NRR Project Manager Senior Resident Inspector 4

b________li__.___________