{{#Wiki_filter:ES-301 | {{#Wiki_filter:ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: | ||
* 8 for RO, 7 for SRO-I, and 2 or 3 for SRO-U System/JPM Title | Braidwood Date of Examination: | ||
: a. SIM-101: Perform an Emergency Boration (CVCS) | 5/18/20 Exam Level: RO SRO-I SRO-U Operating Test Number: | ||
: b. SIM-224: Align Ventilation Systems for Emergency Operation | 19-1 NRC Control Room Systems: | ||
: c. SIM-410P: Place 1A RH Train in Shutdown Cooling (RHRS) | * 8 for RO, 7 for SRO-I, and 2 or 3 for SRO-U System/JPM Title Type Code* | ||
: d. SIM-402Sa: Start a Turbine Driven FW Pump (MFW) | Safety Function | ||
: e. SIM-512: Swap Containment Chillers (CCS) | : a. SIM-101: Perform an Emergency Boration (CVCS) | ||
: f. SIM-600: Unload and Shutdown 1A D/G (ED/G) | APE024 AA1.17 - 3.9 / 3.9 A, D, S 1 | ||
: g. SIM-702: Perform a Calorimetric Surveillance (NIS) | : b. SIM-224: Align Ventilation Systems for Emergency Operation (ESFAS) 013 A4.01 - 4.5 / 4.8 A, D, EN, P, S | ||
: h. SIM-801: Respond to an RCP Thermal Barrier Leak (CCWS) | 2 | ||
: i. IP-206: Locally Reset Phase A (ESFAS) | : c. SIM-410P: Place 1A RH Train in Shutdown Cooling (RHRS) 005 A4.01 - 3.6 / 3.4 D, L, S 4P | ||
: j. IP-400S: Locally Start 2B AF Pump (AFW) | : d. SIM-402Sa: Start a Turbine Driven FW Pump (MFW) 059 A4.01 - 3.1 / 3.1 A, M, S 4S | ||
: k. IP-601: Locally Recover from a Loss of DC Bus 211 (DC) | : e. SIM-512: Swap Containment Chillers (CCS) 022 A4.02 - 3.2 / 3.1 N, S 5 | ||
: f. | |||
* Type Codes | SIM-600: Unload and Shutdown 1A D/G (ED/G) 064 A4.07 - 3.4 / 3.4 D, S 6 | ||
(L)ow-Power/Shutdown | : g. SIM-702: Perform a Calorimetric Surveillance (NIS) 015 A1.01 - 3.5 / 3.8 A, D, P, S 7 | ||
: h. SIM-801: Respond to an RCP Thermal Barrier Leak (CCWS) 008 A4.01 - 3.3 / 3.1 A, D, S 8 | |||
In-Plant Systems: 3 for RO, 3 for SRO-I, and 3 or 2 for SRO-U | |||
: i. | |||
IP-206: Locally Reset Phase A (ESFAS) 013 A4.02 - 4.3 / 4.4 A, D, E 2 | |||
: j. | |||
IP-400S: Locally Start 2B AF Pump (AFW) | |||
EPEE05 EA1.1 - 4.1 / 4.0 D, E, R 4S | |||
: k. IP-601: Locally Recover from a Loss of DC Bus 211 (DC) | |||
APE058 AA1.03 - 3.1 / 3.3 D, E 6 | |||
All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions, all five SRO-U systems must serve different safety functions, and in-plant systems and functions may overlap those tested in the control room. | |||
* Type Codes Criteria for R /SRO-I/SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (EN)gineered safety feature (L)ow-Power/Shutdown (N)ew or (M)odified from bank including 1(A) | |||
(P)revious 2 exams (R)CA (S)imulator 4-6/4-6 /2-3 9/ 8/ 4 1/ 1/ 1 1/ 1/ 1 (control room system) 1/ 1/ 1 2/ 2/ 1 3/ 3/ 2 (randomly selected) 1/ 1/ 1 | |||
ES-301 | ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: | ||
* 8 for RO, 7 for SRO-I, and 2 or 3 for SRO-U System/JPM Title | Braidwood Date of Examination: | ||
: a. SIM-101: Perform an Emergency Boration (CVCS) | 5/18/20 Exam Level: RO SRO-I SRO-U Operating Test Number: | ||
: b. SIM-224: Align Ventilation Systems for Emergency Operation | 19-1 NRC Control Room Systems: | ||
: c. SIM-410P: Place 1A RH Train in Shutdown Cooling (RHRS) | * 8 for RO, 7 for SRO-I, and 2 or 3 for SRO-U System/JPM Title Type Code* | ||
: d. SIM-402Sa: Start a Turbine Driven FW Pump (MFW) | Safety Function | ||
: e. SIM-512: Swap Containment Chillers (CCS) | : a. SIM-101: Perform an Emergency Boration (CVCS) | ||
: g. SIM-702: Perform a Calorimetric Surveillance (NIS) | APE024 AA1.17 - 3.9 / 3.9 A, D, S 1 | ||
: h. SIM-801: Respond to an RCP Thermal Barrier Leak (CCWS) | : b. SIM-224: Align Ventilation Systems for Emergency Operation (ESFAS) 013 A4.01 - 4.5 / 4.8 A, D, EN, P, S | ||
: i. IP-206: Locally Reset Phase A (ESFAS) | 2 | ||
: j. IP-400S: Locally Start 2B AF Pump (AFW) | : c. SIM-410P: Place 1A RH Train in Shutdown Cooling (RHRS) 005 A4.01 - 3.6 / 3.4 D, L, S 4P | ||
: k. IP-601: Locally Recover from a Loss of DC Bus 211 (DC) | : d. SIM-402Sa: Start a Turbine Driven FW Pump (MFW) 059 A4.01 - 3.1 / 3.1 A, M, S 4S | ||
: e. SIM-512: Swap Containment Chillers (CCS) 022 A4.02 - 3.2 / 3.1 N, S 5 | |||
* Type Codes | : g. SIM-702: Perform a Calorimetric Surveillance (NIS) 015 A1.01 - 3.5 / 3.8 A, D, P, S 7 | ||
(L)ow-Power/Shutdown | : h. SIM-801: Respond to an RCP Thermal Barrier Leak (CCWS) 008 A4.01 - 3.3 / 3.1 A, D, S 8 | ||
In-Plant Systems: 3 for RO, 3 for SRO-I, and 3 or 2 for SRO-U | |||
: i. | |||
IP-206: Locally Reset Phase A (ESFAS) 013 A4.02 - 4.3 / 4.4 A, D, E 2 | |||
: j. | |||
IP-400S: Locally Start 2B AF Pump (AFW) | |||
EPEE05 EA1.1 - 4.1 / 4.0 D, E, R 4S | |||
: k. IP-601: Locally Recover from a Loss of DC Bus 211 (DC) | |||
APE058 AA1.03 - 3.1 / 3.3 D, E 6 | |||
All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions, all five SRO-U systems must serve different safety functions, and in-plant systems and functions may overlap those tested in the control room. | |||
* Type Codes Criteria for R /SRO-I/SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (EN)gineered safety feature (L)ow-Power/Shutdown (N)ew or (M)odified from bank including 1(A) | |||
(P)revious 2 exams (R)CA (S)imulator 4-6/4-6 /2-3 9/ 8/ 4 1/ 1/ 1 1/ 1/ 1 (control room system) 1/ 1/ 1 2/ 2/ 1 3/ 3/ 2 (randomly selected) 1/ 1/ 1}} | |||
Latest revision as of 16:40, 27 November 2024
| ML22174A067 | |
| Person / Time | |
|---|---|
| Site: | Braidwood |
| Issue date: | 12/20/2019 |
| From: | Randy Baker NRC/RGN-III/DRS/OLB |
| To: | Exelon Generation Co |
| Baker R | |
| Shared Package | |
| ML19121A241 | List: |
| References | |
| Download: ML22174A067 (2) | |
Text
ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility:
Braidwood Date of Examination:
5/18/20 Exam Level: RO SRO-I SRO-U Operating Test Number:
19-1 NRC Control Room Systems:
- 8 for RO, 7 for SRO-I, and 2 or 3 for SRO-U System/JPM Title Type Code*
Safety Function
- a. SIM-101: Perform an Emergency Boration (CVCS)
APE024 AA1.17 - 3.9 / 3.9 A, D, S 1
- b. SIM-224: Align Ventilation Systems for Emergency Operation (ESFAS) 013 A4.01 - 4.5 / 4.8 A, D, EN, P, S
2
- c. SIM-410P: Place 1A RH Train in Shutdown Cooling (RHRS) 005 A4.01 - 3.6 / 3.4 D, L, S 4P
- e. SIM-512: Swap Containment Chillers (CCS) 022 A4.02 - 3.2 / 3.1 N, S 5
- f.
SIM-600: Unload and Shutdown 1A D/G (ED/G) 064 A4.07 - 3.4 / 3.4 D, S 6
- g. SIM-702: Perform a Calorimetric Surveillance (NIS) 015 A1.01 - 3.5 / 3.8 A, D, P, S 7
- h. SIM-801: Respond to an RCP Thermal Barrier Leak (CCWS) 008 A4.01 - 3.3 / 3.1 A, D, S 8
In-Plant Systems: 3 for RO, 3 for SRO-I, and 3 or 2 for SRO-U
- i.
IP-206: Locally Reset Phase A (ESFAS) 013 A4.02 - 4.3 / 4.4 A, D, E 2
- j.
IP-400S: Locally Start 2B AF Pump (AFW)
EPEE05 EA1.1 - 4.1 / 4.0 D, E, R 4S
APE058 AA1.03 - 3.1 / 3.3 D, E 6
All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions, all five SRO-U systems must serve different safety functions, and in-plant systems and functions may overlap those tested in the control room.
- Type Codes Criteria for R /SRO-I/SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (EN)gineered safety feature (L)ow-Power/Shutdown (N)ew or (M)odified from bank including 1(A)
(P)revious 2 exams (R)CA (S)imulator 4-6/4-6 /2-3 9/ 8/ 4 1/ 1/ 1 1/ 1/ 1 (control room system) 1/ 1/ 1 2/ 2/ 1 3/ 3/ 2 (randomly selected) 1/ 1/ 1
ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility:
Braidwood Date of Examination:
5/18/20 Exam Level: RO SRO-I SRO-U Operating Test Number:
19-1 NRC Control Room Systems:
- 8 for RO, 7 for SRO-I, and 2 or 3 for SRO-U System/JPM Title Type Code*
Safety Function
- a. SIM-101: Perform an Emergency Boration (CVCS)
APE024 AA1.17 - 3.9 / 3.9 A, D, S 1
- b. SIM-224: Align Ventilation Systems for Emergency Operation (ESFAS) 013 A4.01 - 4.5 / 4.8 A, D, EN, P, S
2
- c. SIM-410P: Place 1A RH Train in Shutdown Cooling (RHRS) 005 A4.01 - 3.6 / 3.4 D, L, S 4P
- e. SIM-512: Swap Containment Chillers (CCS) 022 A4.02 - 3.2 / 3.1 N, S 5
- g. SIM-702: Perform a Calorimetric Surveillance (NIS) 015 A1.01 - 3.5 / 3.8 A, D, P, S 7
- h. SIM-801: Respond to an RCP Thermal Barrier Leak (CCWS) 008 A4.01 - 3.3 / 3.1 A, D, S 8
In-Plant Systems: 3 for RO, 3 for SRO-I, and 3 or 2 for SRO-U
- i.
IP-206: Locally Reset Phase A (ESFAS) 013 A4.02 - 4.3 / 4.4 A, D, E 2
- j.
IP-400S: Locally Start 2B AF Pump (AFW)
EPEE05 EA1.1 - 4.1 / 4.0 D, E, R 4S
APE058 AA1.03 - 3.1 / 3.3 D, E 6
All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions, all five SRO-U systems must serve different safety functions, and in-plant systems and functions may overlap those tested in the control room.
- Type Codes Criteria for R /SRO-I/SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (EN)gineered safety feature (L)ow-Power/Shutdown (N)ew or (M)odified from bank including 1(A)
(P)revious 2 exams (R)CA (S)imulator 4-6/4-6 /2-3 9/ 8/ 4 1/ 1/ 1 1/ 1/ 1 (control room system) 1/ 1/ 1 2/ 2/ 1 3/ 3/ 2 (randomly selected) 1/ 1/ 1