ML22174A067: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot change
StriderTol Bot change
 
(One intermediate revision by the same user not shown)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:ES-301                             Control Room/In-Plant Systems Outline                           Form ES-301-2 Facility:           Braidwood                                     Date of Examination:             5/18/20 Exam Level: RO SRO-I                     SRO-U                 Operating Test Number:           19-1 NRC Control Room Systems:
{{#Wiki_filter:ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility:
* 8 for RO, 7 for SRO-I, and 2 or 3 for SRO-U System/JPM Title                                   Type Code*           Safety Function
Braidwood Date of Examination:
: a. SIM-101: Perform an Emergency Boration (CVCS)                                       A, D, S              1 APE024 AA1.17 - 3.9 / 3.9
5/18/20 Exam Level: RO SRO-I SRO-U Operating Test Number:
: b. SIM-224: Align Ventilation Systems for Emergency Operation                       A, D, EN, P,            2 (ESFAS)                                                                               S 013 A4.01 - 4.5 / 4.8
19-1 NRC Control Room Systems:
: c. SIM-410P: Place 1A RH Train in Shutdown Cooling (RHRS)                             D, L, S            4P 005 A4.01 - 3.6 / 3.4
* 8 for RO, 7 for SRO-I, and 2 or 3 for SRO-U System/JPM Title Type Code*
: d. SIM-402Sa: Start a Turbine Driven FW Pump (MFW)                                     A, M, S            4S 059 A4.01 - 3.1 / 3.1
Safety Function
: e. SIM-512: Swap Containment Chillers (CCS)                                             N, S                5 022 A4.02 - 3.2 / 3.1
: a. SIM-101: Perform an Emergency Boration (CVCS)
: f. SIM-600: Unload and Shutdown 1A D/G (ED/G)                                         D, S                6 064 A4.07 - 3.4 / 3.4
APE024 AA1.17 - 3.9 / 3.9 A, D, S 1
: g. SIM-702: Perform a Calorimetric Surveillance (NIS)                                 A, D, P, S              7 015 A1.01 - 3.5 / 3.8
: b. SIM-224: Align Ventilation Systems for Emergency Operation (ESFAS) 013 A4.01 - 4.5 / 4.8 A, D, EN, P, S
: h. SIM-801: Respond to an RCP Thermal Barrier Leak (CCWS)                               A, D, S              8 008 A4.01 - 3.3 / 3.1 In-Plant Systems: 3 for RO, 3 for SRO-I, and 3 or 2 for SRO-U
2
: i. IP-206: Locally Reset Phase A (ESFAS)                                             A, D, E              2 013 A4.02 - 4.3 / 4.4
: c. SIM-410P: Place 1A RH Train in Shutdown Cooling (RHRS) 005 A4.01 - 3.6 / 3.4 D, L, S 4P
: j. IP-400S: Locally Start 2B AF Pump (AFW)                                           D, E, R            4S EPEE05 EA1.1 - 4.1 / 4.0
: d. SIM-402Sa: Start a Turbine Driven FW Pump (MFW) 059 A4.01 - 3.1 / 3.1 A, M, S 4S
: k. IP-601: Locally Recover from a Loss of DC Bus 211 (DC)                             D, E                6 APE058 AA1.03 - 3.1 / 3.3
: e. SIM-512: Swap Containment Chillers (CCS) 022 A4.02 - 3.2 / 3.1 N, S 5
* All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions, all five SRO-U systems must serve different safety functions, and in-plant systems and functions may overlap those tested in the control room.
: f.
* Type Codes                                   Criteria for R /SRO-I/SRO-U (A)lternate path                                                     4-6/4-6 /2-3 (C)ontrol room (D)irect from bank                                                     9/ 8/ 4 (E)mergency or abnormal in-plant                                       1/ 1/ 1 (EN)gineered safety feature                                           1/ 1/ 1 (control room system)
SIM-600: Unload and Shutdown 1A D/G (ED/G) 064 A4.07 - 3.4 / 3.4 D, S 6
(L)ow-Power/Shutdown                                                   1/ 1/ 1 (N)ew or (M)odified from bank including 1(A)                           2/ 2/ 1 (P)revious 2 exams                                                    3/ 3/ 2 (randomly selected)
: g. SIM-702: Perform a Calorimetric Surveillance (NIS) 015 A1.01 - 3.5 / 3.8 A, D, P, S 7
(R)CA                                                                  1/ 1/ 1 (S)imulator
: h. SIM-801: Respond to an RCP Thermal Barrier Leak (CCWS) 008 A4.01 - 3.3 / 3.1 A, D, S 8
In-Plant Systems: 3 for RO, 3 for SRO-I, and 3 or 2 for SRO-U
: i.
IP-206: Locally Reset Phase A (ESFAS) 013 A4.02 - 4.3 / 4.4 A, D, E 2
: j.
IP-400S: Locally Start 2B AF Pump (AFW)
EPEE05 EA1.1 - 4.1 / 4.0 D, E, R 4S
: k. IP-601: Locally Recover from a Loss of DC Bus 211 (DC)
APE058 AA1.03 - 3.1 / 3.3 D, E 6
All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions, all five SRO-U systems must serve different safety functions, and in-plant systems and functions may overlap those tested in the control room.
* Type Codes Criteria for R /SRO-I/SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (EN)gineered safety feature (L)ow-Power/Shutdown (N)ew or (M)odified from bank including 1(A)
(P)revious 2 exams (R)CA (S)imulator 4-6/4-6 /2-3 9/ 8/ 4 1/ 1/ 1 1/ 1/ 1 (control room system) 1/ 1/ 1 2/ 2/ 1 3/ 3/ 2 (randomly selected) 1/ 1/ 1  


ES-301                             Control Room/In-Plant Systems Outline                           Form ES-301-2 Facility:           Braidwood                                     Date of Examination:             5/18/20 Exam Level: RO SRO-I                     SRO-U                 Operating Test Number:           19-1 NRC Control Room Systems:
ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility:
* 8 for RO, 7 for SRO-I, and 2 or 3 for SRO-U System/JPM Title                                   Type Code*           Safety Function
Braidwood Date of Examination:
: a. SIM-101: Perform an Emergency Boration (CVCS)                                       A, D, S              1 APE024 AA1.17 - 3.9 / 3.9
5/18/20 Exam Level: RO SRO-I SRO-U Operating Test Number:
: b. SIM-224: Align Ventilation Systems for Emergency Operation                       A, D, EN, P,            2 (ESFAS)                                                                               S 013 A4.01 - 4.5 / 4.8
19-1 NRC Control Room Systems:
: c. SIM-410P: Place 1A RH Train in Shutdown Cooling (RHRS)                             D, L, S            4P 005 A4.01 - 3.6 / 3.4
* 8 for RO, 7 for SRO-I, and 2 or 3 for SRO-U System/JPM Title Type Code*
: d. SIM-402Sa: Start a Turbine Driven FW Pump (MFW)                                     A, M, S            4S 059 A4.01 - 3.1 / 3.1
Safety Function
: e. SIM-512: Swap Containment Chillers (CCS)                                             N, S                5 022 A4.02 - 3.2 / 3.1
: a. SIM-101: Perform an Emergency Boration (CVCS)
: g. SIM-702: Perform a Calorimetric Surveillance (NIS)                                 A, D, P, S              7 015 A1.01 - 3.5 / 3.8
APE024 AA1.17 - 3.9 / 3.9 A, D, S 1
: h. SIM-801: Respond to an RCP Thermal Barrier Leak (CCWS)                               A, D, S              8 008 A4.01 - 3.3 / 3.1 In-Plant Systems: 3 for RO, 3 for SRO-I, and 3 or 2 for SRO-U
: b. SIM-224: Align Ventilation Systems for Emergency Operation (ESFAS) 013 A4.01 - 4.5 / 4.8 A, D, EN, P, S
: i. IP-206: Locally Reset Phase A (ESFAS)                                             A, D, E              2 013 A4.02 - 4.3 / 4.4
2
: j. IP-400S: Locally Start 2B AF Pump (AFW)                                           D, E, R            4S EPEE05 EA1.1 - 4.1 / 4.0
: c. SIM-410P: Place 1A RH Train in Shutdown Cooling (RHRS) 005 A4.01 - 3.6 / 3.4 D, L, S 4P
: k. IP-601: Locally Recover from a Loss of DC Bus 211 (DC)                             D, E                6 APE058 AA1.03 - 3.1 / 3.3
: d. SIM-402Sa: Start a Turbine Driven FW Pump (MFW) 059 A4.01 - 3.1 / 3.1 A, M, S 4S
* All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions, all five SRO-U systems must serve different safety functions, and in-plant systems and functions may overlap those tested in the control room.
: e. SIM-512: Swap Containment Chillers (CCS) 022 A4.02 - 3.2 / 3.1 N, S 5
* Type Codes                                   Criteria for R /SRO-I/SRO-U (A)lternate path                                                     4-6/4-6 /2-3 (C)ontrol room (D)irect from bank                                                     9/ 8/ 4 (E)mergency or abnormal in-plant                                       1/ 1/ 1 (EN)gineered safety feature                                           1/ 1/ 1 (control room system)
: g. SIM-702: Perform a Calorimetric Surveillance (NIS) 015 A1.01 - 3.5 / 3.8 A, D, P, S 7
(L)ow-Power/Shutdown                                                   1/ 1/ 1 (N)ew or (M)odified from bank including 1(A)                           2/ 2/ 1 (P)revious 2 exams                                                    3/ 3/ 2 (randomly selected)
: h. SIM-801: Respond to an RCP Thermal Barrier Leak (CCWS) 008 A4.01 - 3.3 / 3.1 A, D, S 8
(R)CA                                                                  1/ 1/ 1 (S)imulator}}
In-Plant Systems: 3 for RO, 3 for SRO-I, and 3 or 2 for SRO-U
: i.
IP-206: Locally Reset Phase A (ESFAS) 013 A4.02 - 4.3 / 4.4 A, D, E 2
: j.
IP-400S: Locally Start 2B AF Pump (AFW)
EPEE05 EA1.1 - 4.1 / 4.0 D, E, R 4S
: k. IP-601: Locally Recover from a Loss of DC Bus 211 (DC)
APE058 AA1.03 - 3.1 / 3.3 D, E 6
All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions, all five SRO-U systems must serve different safety functions, and in-plant systems and functions may overlap those tested in the control room.
* Type Codes Criteria for R /SRO-I/SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (EN)gineered safety feature (L)ow-Power/Shutdown (N)ew or (M)odified from bank including 1(A)
(P)revious 2 exams (R)CA (S)imulator 4-6/4-6 /2-3 9/ 8/ 4 1/ 1/ 1 1/ 1/ 1 (control room system) 1/ 1/ 1 2/ 2/ 1 3/ 3/ 2 (randomly selected) 1/ 1/ 1}}

Latest revision as of 16:40, 27 November 2024

Ile RO and SRO ES-301-2
ML22174A067
Person / Time
Site: Braidwood  
Issue date: 12/20/2019
From: Randy Baker
NRC/RGN-III/DRS/OLB
To:
Exelon Generation Co
Baker R
Shared Package
ML19121A241 List:
References
Download: ML22174A067 (2)


Text

ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility:

Braidwood Date of Examination:

5/18/20 Exam Level: RO SRO-I SRO-U Operating Test Number:

19-1 NRC Control Room Systems:

  • 8 for RO, 7 for SRO-I, and 2 or 3 for SRO-U System/JPM Title Type Code*

Safety Function

a. SIM-101: Perform an Emergency Boration (CVCS)

APE024 AA1.17 - 3.9 / 3.9 A, D, S 1

b. SIM-224: Align Ventilation Systems for Emergency Operation (ESFAS) 013 A4.01 - 4.5 / 4.8 A, D, EN, P, S

2

c. SIM-410P: Place 1A RH Train in Shutdown Cooling (RHRS) 005 A4.01 - 3.6 / 3.4 D, L, S 4P
d. SIM-402Sa: Start a Turbine Driven FW Pump (MFW) 059 A4.01 - 3.1 / 3.1 A, M, S 4S
e. SIM-512: Swap Containment Chillers (CCS) 022 A4.02 - 3.2 / 3.1 N, S 5
f.

SIM-600: Unload and Shutdown 1A D/G (ED/G) 064 A4.07 - 3.4 / 3.4 D, S 6

g. SIM-702: Perform a Calorimetric Surveillance (NIS) 015 A1.01 - 3.5 / 3.8 A, D, P, S 7
h. SIM-801: Respond to an RCP Thermal Barrier Leak (CCWS) 008 A4.01 - 3.3 / 3.1 A, D, S 8

In-Plant Systems: 3 for RO, 3 for SRO-I, and 3 or 2 for SRO-U

i.

IP-206: Locally Reset Phase A (ESFAS) 013 A4.02 - 4.3 / 4.4 A, D, E 2

j.

IP-400S: Locally Start 2B AF Pump (AFW)

EPEE05 EA1.1 - 4.1 / 4.0 D, E, R 4S

k. IP-601: Locally Recover from a Loss of DC Bus 211 (DC)

APE058 AA1.03 - 3.1 / 3.3 D, E 6

All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions, all five SRO-U systems must serve different safety functions, and in-plant systems and functions may overlap those tested in the control room.

  • Type Codes Criteria for R /SRO-I/SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (EN)gineered safety feature (L)ow-Power/Shutdown (N)ew or (M)odified from bank including 1(A)

(P)revious 2 exams (R)CA (S)imulator 4-6/4-6 /2-3 9/ 8/ 4 1/ 1/ 1 1/ 1/ 1 (control room system) 1/ 1/ 1 2/ 2/ 1 3/ 3/ 2 (randomly selected) 1/ 1/ 1

ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility:

Braidwood Date of Examination:

5/18/20 Exam Level: RO SRO-I SRO-U Operating Test Number:

19-1 NRC Control Room Systems:

  • 8 for RO, 7 for SRO-I, and 2 or 3 for SRO-U System/JPM Title Type Code*

Safety Function

a. SIM-101: Perform an Emergency Boration (CVCS)

APE024 AA1.17 - 3.9 / 3.9 A, D, S 1

b. SIM-224: Align Ventilation Systems for Emergency Operation (ESFAS) 013 A4.01 - 4.5 / 4.8 A, D, EN, P, S

2

c. SIM-410P: Place 1A RH Train in Shutdown Cooling (RHRS) 005 A4.01 - 3.6 / 3.4 D, L, S 4P
d. SIM-402Sa: Start a Turbine Driven FW Pump (MFW) 059 A4.01 - 3.1 / 3.1 A, M, S 4S
e. SIM-512: Swap Containment Chillers (CCS) 022 A4.02 - 3.2 / 3.1 N, S 5
g. SIM-702: Perform a Calorimetric Surveillance (NIS) 015 A1.01 - 3.5 / 3.8 A, D, P, S 7
h. SIM-801: Respond to an RCP Thermal Barrier Leak (CCWS) 008 A4.01 - 3.3 / 3.1 A, D, S 8

In-Plant Systems: 3 for RO, 3 for SRO-I, and 3 or 2 for SRO-U

i.

IP-206: Locally Reset Phase A (ESFAS) 013 A4.02 - 4.3 / 4.4 A, D, E 2

j.

IP-400S: Locally Start 2B AF Pump (AFW)

EPEE05 EA1.1 - 4.1 / 4.0 D, E, R 4S

k. IP-601: Locally Recover from a Loss of DC Bus 211 (DC)

APE058 AA1.03 - 3.1 / 3.3 D, E 6

All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions, all five SRO-U systems must serve different safety functions, and in-plant systems and functions may overlap those tested in the control room.

  • Type Codes Criteria for R /SRO-I/SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (EN)gineered safety feature (L)ow-Power/Shutdown (N)ew or (M)odified from bank including 1(A)

(P)revious 2 exams (R)CA (S)imulator 4-6/4-6 /2-3 9/ 8/ 4 1/ 1/ 1 1/ 1/ 1 (control room system) 1/ 1/ 1 2/ 2/ 1 3/ 3/ 2 (randomly selected) 1/ 1/ 1