ML24059A211: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:. Annu<!l Report                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                     Page     1 of 6
{{#Wiki_filter:. Annu<!l Report Page 1 of 6 2003 Current FY Report: Review of Federal Advisory Committee ll/24/200311:29:39 AM Committee Menu I. Department or Agency
: 2. Fiscal Year 2003 Nuclear Regulatory Commission
: 3. Committee or SubCommittee 3b. GSA Committee No.
Advisory Committee on Reactor Safeguards 207
: 4. Is this New During Fiscal Year?
: 5. Current Charter
: 6. Expected Renewal Date
: 7. Expected Term Date No 12/19/2002 12/19/2004 Sa. Was Terminated During FY?
Sb. Specific Termination Authority Sc.Actual Termination Date No
: 9. Agency Recommendation for Next FY Continue
!Oa.Legislation Req to Terminate?
!Ob.Legislation Pending?
No
: 11. Establishment Authority
: 12. Specific Establishment Authority Statutory(Congress Created)
: 13. Effective Date
: 14. Committee Type Continuing 14c. Presidential?
42 U.S.C. Sect. 2039 & 2232 1/1/1957
: 15. Description of Committee 16a. Total Number of Reports 34 16b. Report Titles and Dates Scientific Technical Program Advisory Board Draft Regulatory Guide DG-1120 and Standard Review Plan Section 15.0.2 Concerning NRC Reviews of Transient and Accident Analysis Methods Confirmatory Research Program on High-Burnup Fuel Draft Report, "Guidance for Performance-Based Regulations" Recommendations Prop. by RES for Resolving GSI-189, Susceptability of Ice Condenser & Mark III Contnmnts to Early Failure fm Hydrogen Combustion During Severe..
Draft Commission Paper on Policy Issues Related to Non-Light-Water Reactor Designs Report on the Safety Aspects of the License Renewal Applications for the North Anna Power /stations Units 1&2 and the Surry Power Station Units 1&2 Framatome ANP S-RELAP5 Realistic Large-Break Loss-of-Coolant Accident Code Draft Final American Nuclear Society External Events Probabilistic Risk Assessment Methodology Standard Draft Final Regulatoty Guide DG-1077, "Guidance for Environmental Qualification of Microprocessor-Based Equipment Important to Safety in Nuclear Power Plants" Report on the Safety Aspects of the License Renewal Application for the McGuire Nuclear Station Units 1&2 and Catawba Nuclear Station Units 1&2 Proposed Resolution of Generic Safety Issue-191, Assessment of Debris Accumulation on PWR Sump Performance Pressurized Thermal Shock (PTS) Reevaluation Project: Technical Bases for Potential Revision to PTS Screening Criteria Draft Review Standard, RS-002, Processing Applications for Early Site Permits Reactor Oversight Process Draft Final Regulatory Guide DG-1119, Guidelines for Evaluating Electromagnetic and Radio-Frequency in Safety Related Instrumentation and Control Systems Report on the Safety Aspects of the License Renewal Application for the Peach Bottom Atomic Power Station Units 2&3 Proposed NRC Generic Letter 2003-XX: Control Room Habitability Draft Final Risk-Informed Revision to 10 CFR 50.44, "Combustible Gas Control in Containment" No 10/1/2002 10/17/2002 10/17/2002 11/13/2002 12/13/2002 12/18/2002 12/20/2002 12/20/2002 2/14/2003 2/14/2003 2/20/2003 2/21/2003 3/12/2003 3/13/2003 3/13/2003 3/14/2003 4/17/2003 4/21/2003 Prop. Resolution of Public Comments on Draft Reg. Guide DG-1122, An Approach for Determining the 412112003 http://www.fido.gov/facadatabase/rptannualreport.asp 11/24/2003


2003     Current                          FY      Report:                     Review        of Federal                  Advisory                  Committee                                                                                                                                                                                                                                                                                                           Committee     Menu
. Annu~l Report Technical Adequacy of PRA Results for Risk-Informed Activities NUREG/CR-6813, Issues and Recommendations for Advancement of PRA Technology in Risk-Informed Decision Making Improvement of the Quality of Risk Information for Regulatory Decisionmaking Vessel Head Penetration Cracking and Reactor Pressure Vessel Degradation Draft Final Regulatory Guide 1.178 and Standard Review Plan Section 3.9.8 for Risk-Informed Inservice Inspection of Piping NUREG-1635 Vol. 5, Review and Evaluation of the Nuclear Regulatory Commission Safety Research Program, A Report to the USNRC Update to License Renewal Guidance Documents: Response to Staff Requirements Memorandum Dated July 17, 2002 Safety Culture Proposed Criteria for the Treatment of Individual Requirements in a Regulatory Analysis 4/29/2003 5/16/2003 5/16/2003 5/16/2003 5/31/2003 6/24/2003 7/16/2003 7/17/2003 Security of Nuclear Facilities 7/18/2003 Report on the Safety Aspects of the License Renewal Application for the St. Lucie Nuclear Plant Units 911712003 1 and2 Draft Final Regulatory Guide X.XXX, An Approach for Determining the Technical Adequacy of PRA 912212003 Results for Risk-Informed Activities Draft Final Revision 1 to Regulatory Guide 1.53, "Application of the Single Failure Criterion to Safety 912212003 Systems" Draft Final Review Standard for Extended Power Uprates, RS-001 9/24/2003 Proposed Recommendations for Resolving Generic Issue 186, "Potential Risk and Consequences of Heavy Load Drops in Nuclear Power Plants" 9/24/2003 Draft Final Revision 3 to Regulatory Guide 1.82, "Water Sources for Long-Term Recirculation Cooling 913012003 Following a Loss-of-Coolant Accident" 17a Open:
46 Meeting Purposes and Dates Plant License Renewal Subcommittee Planning & Procedures Subcommittee Reactor Fuels Subcommittee Planning & Procedures Subcommittee 496th Full Committee 17b. Closed:
4 17c. Partially Closed:
10/8/2002 10/8/2002 10/9/2002 10/9/2002 10/9/2002 10/9/2002 10/9/2002 10/9/2002 10/10/2002 10/12/2002 Workshop on Nuclear Regulatory Decisionmaking Process 10/15/200210/18/2002 Tour of Mixed-Oxide Fuel Fabrication Facility 10/21/2002 10/21/2002 Meeting with SKB-SKI Representatives and Tour of Storage Facilities Quadripartite Meeting Plant License Renewal Subcommittee Safeguards & Security Subcommittee Joint Reliability & Probabilistic Risk Assessment and Plant Operations Subcommittees Thermal-Hydraulic Phenomena Subcommittee Safety Research Program Subcommittee Planning & Procedures Subcommittee 497th Full Committee Thermal-Hydraulic Phenomena Subcommittee Planning & Procedures Subcommittee Safety Research Program Subcommittee 498th Full Committee http://www.fido.gov/facadatabase/rptannualreport. asp 10/21/2002 10/23/2002 10/23/2002 10/25/2002 10/30/2002 10/30/2002 10/31/2002 10/31/2002 11/1/2002 11/1/2002 11/5/2002 11/5/2002 11/6/2002 11/6/2002 11/6/2002 11/6/2002 11n 12002 111912002 11/12/2002 11/14/2002 12/4/2002 12/4/2002 12/4/2002 12/4/2002 121512002 12n 12002 9
17d. Total Meetings 59 Page 2 of 6 11/24/2003


ll/24/200311:29:39              AM I. Department      or  Agency                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            2. Fiscal  Year Nuclear            Regulatory                      Commission                                                                                                                                                                                                                                                                                                                                                                                                      2003
. Annu~l Report Thermal-Hydraulic Phenomena Subcommittee Joint Reliability & Probabilistic Risk Assessment and Plant Operations Subcommittees 12/11/2002 12/12/2002 1/21/2003 1/21/2003 Safety Research Program Subcommittee 1/22/2003 1/22/2003 Reliability & Probabilistic Risk Assessment Subcommittee 1/22/2003 1/22/2003 Reliability & Probabilistic Risk Assessment Subcommittee 1/23/2003 1/24/2003 Thermal-Hydraulic Phenomena Subcommittee Materials & Metallurgy Subcommittee Planning & Procedures Subcommittee 499th Full Committee Symposim on Role of Advisory Committee in Nuclear Regulation and Safety 500th Full Committee Thermal-Hydraulic Phenomena Subcommittee Plant License Renewal Subcommittee Planning & Procedures Subcommittee 501st Full Committee Reactor Fuels Subcommittee Materials & Metallurgy Subcommittee Safeguards & Security Subcommittee Planning & Procedures Subcommittee 2/4/2003 2/4/2003 2/5/2003 2/5/2003 2/5/2003 2/5/2003 2/6/2003 2/8/2003 3/4/2003 3/5/2003 3/6/2003 3/8/2003 3/19/2003 3/20/2003 4/9/2003 4/9/2003 4/9/2003 4/9/2003 4/10/2003 4/12/2003 4/21/2003 4/21/2003 4/22/2003 4/23/2003 4/24/2003 4/24/2003 5/7/2003 5/7/2003 Reliability & Probabilistic Risk Assessment Subcommittee 5/7/2003 5/7/2003 502nd Full Committee 5/7/2003 5/9/2003 Safeguards & Security Subcommittee Peach Bottom Site Visit Plant Operations Subcommittee Plant License Renewal Subcommittee Planning & Procedures Subcommittee 503rd Full Committee Thermal-Hydraulic Phenomena Subcommittee Joint Reliability & Probabilistic Risk Assessment and Plant Operations Subcommittees Planning & Procedures Subcommittee 504th Full Committee Thermal-Hydraulic Phenomena Subcommittee Future Plant Designs Subcommittee Thermal-Hydraulic Phenomena Subcommittee Fire Protection Subcommittee Planning & Procedures Subcommittee 505th Full Committee Reactor Fuels Subcommittee Plant License Renewal Subcommittee 18a( l) Personnel Pmts to Non-Federal Members 18a(2) Personnel Pmts to Federal Members I 8a(3) Personnel Pmts to Federal Staff 18a(4) Personnel Pmts to Non-member Consultants I 8b( I) Travel and Per Diem to Non-Federal Members I 8b(2) Travel and Per Diem to Federal Members http://www.fido.gov/facadatabase/rptannualreport.asp 5/21/2003 5/23/2003 6/9/2003 6/9/2003 6/10/2003 6/10/2003 6/11/2003 6/11/2003 6/11/2003 6/11/2003 6/12/2003 6/13/2003 7/8/2003 7/3/2003 7/8/2003 7/8/2003 7/8/2003 7/9/2003 7/9/2003 7/11/2003 7/16/2003 7/17/2003 7/17/2003 7/18/2003 8/19/2003 8/20/2003 9/9/2003 9/9/2003 9/10/2003 9/10/2003 9/10/2003 9/13/2003 9/29/2003 9/30/2003 9/30/2003 9/30/2003 Current Fiscal Year
: 3. Committee          or  SubCommittee                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          3b . GSA    Committee      No.
$592,054
Advisory              Committee                    on    Reactor            Safeguards                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          207 4  . Is  this    New    During    Fiscal Year?                                                                                                    5. Current    Charter                                                                                                                                                                                                                                                                                                                        6. Expected    Renewal      Date                                                                                                                                                                                          7 . Expected    Term    Date No                                                                                                                                                                                                                                                                                                                                                                      12/19/2002                                                                                                                                                                                                                                                                                                                                             12/19/2004 Sa. Was Terminated          During    FY?                                                                                                                                                                                                                                                                                                                                                                                                                                                                Sb. Specific    Termination        Authority                                                                                                                                                                                                                                                                                                                                                                        Sc.Actual  Termination        Date No
$0
: 9. Agency      Recommendati            o n for  Next  FY                                                                                                                                  !Oa.Legislation    Req    to Terminate      ?                                                                                                                                                                                                                                                                                  !Ob.Legislation    Pending?
$1,879,876
Continue                                                                                                                                                                    No
$39,996
: 11. Establishment        Authority                                                                                                    Statutory(Congress                                    Created) 12 . Specific    Establishment          Authority                                                                                                                                                      13. Effective        Date                                                                                                                                                                                                14. Committee        Typ  e 14c. Presidential?
$279,466
42  U.S.C.      Sect. 2039    & 2232                                                                                                                                                                                                                                                      1/1/1957 Continuing                                                                                No
$0 Next Fiscal Year
: 15. Description    of Committee                                                                                                  Scientific        Technical              Program Advisory                Board 16a. Total    Number      of Reports 34 16b. Report Titl  es  and    Dates Draft          Regulatory                      Guide        DG-1120    and        Standard                      Review        Plan        Section        15.0.2  Concerning                  NRC        Reviews                                                                                                                                                                                                                    10/1/2002 of Transient                and        Accident          Analysis          Methods Confirmatory                              Research                Program                  on    High-Burnup                      Fuel                                                                                                                                                                                                                                                                                                    10/17/2002 Draft            Report,                "Guidance                    for      Performance-Based                                  Regulations"                                                                                                                                                                                                                                                                                              10/17/2002 Recommendations                              Prop.            by      RES      for        Resolving          GSI-189,        Susceptability                  of Ice    Condenser                  & Mark          III                                                                                                                                                                                                                11/13/2002 Contnmnts                          to    Early            Failure                fm        Hydrogen                Combustion                    During            Severe ..
$616,920
Draft            Commission                    Paper            on    Policy        Issues        Related              to    Non-Light-Water                          Reactor              Designs                                                                                                                                                                                                                                        12/13/2002 Report            on     the      Safety           Aspects      of the      License         Renewal         Applications                for        the      North            Anna          Power      /stations                                                                                                                                                                                                                          12/18/2002 Units        1&2   and        the      Surry              Power        Station            Units        1&2 Framatome                ANP  S-RELAP5          Realistic Large-Break                                                                                                                                                              Loss-of-Coolant          Accident        Code                                                                                                                                                        12/20/2002 Draft      Final      American            Nuclear      Society    External            Events        Probabilistic               Risk   Assessment           Methodology                                                                                                                                                                                                                                                                12/20/2002 Standard Draft    Final      Regulatoty              Guide    DG-1077,    "Guidance            for    Environmental                      Qualification            of                                                                                                                                                                                                                                                                            2/14/2003 Microprocessor-Based                    Equipment              Important                to Safety      in  Nuclear      Power    Plants" Report      on  the  Safety        Aspects    of the    License    Renewal      Application          for  the  McGuire          Nuclear        Station                                                                                                                                                                                                                                                                              2/14/2003 Units    1&and     Catawba          Nuclear      Station        Units    1&2 Proposed          Resolution        of Generic      Safety      Issue-191,    Assessment        of Debris      Accumulation                on  PWR  Sump                                                                                                                                                                                                                                                                          2/20/2003 Performance Pressurized                Thermal            Shock      (PTS)   Reevaluation              Project:            Technical        Bases  for    Potential            Revision      to   PTS                                                                                                                                                                                                                                                2/21/2003 Screening        Criteria Draft        Review    Standard,              RS-002,  Processing        Applications          for    Early        Site  Permits                                                                                                                                                                                                                                                                                                        3/12/2003 Reactor        Oversight            Process                                                                                                                                                                                                                                                                                                                                                                                              3/13/2003 Draft    Final      Regulatory              Guide    DG-1119,  Guidelines        for    Evaluating              Electromagnetic                  and    Radio                                                                                                                                                                                                                                                                      3/13/2003 Frequency              in  Safety        Related        Instrumentation                        and    Control          Systems Report        on the                                                    Safety        Aspects    of the  License    Renewal      Application          for    the    Peach      Bottom        Atomic      Power                                                                                                                                                                                                                        3/14/2003 Station        Units      2&3 Proposed          NRC    Generic      Letter        2003-XX:  Control          Room      Habitability                                                                                                                                                                                                                                                                                                                                  4/17/2003 Draft      Final      Risk-Informed                      Revision    to  10 CFR    50.44,   "Combustible                Gas    Control          in  Containment"                                                                                                                                                                                                                                                                      4/21/2003
$0
$1,958,831
$31,984
$279,466
$0 Page 3 of 6 11/24/2003  


Prop.           Resolution            of Public          Comments                    on   Draft            Reg. Guide          DG-1122,     An    Approach                  for       Determining                      the                                                                                                                                                                                                       412112003
Annual Report l 8b(3) Travel and Per Diem to Federal Staff 18b(4) Travel and Per Diem to Non-Member Consultants 18c.Other(rents,user charges,graphics,printing,mail etc.)
18d Total
: 19. Federal Staff Support Years 20a. How does the Committee accomplish its purpose?
$34,141
$37,555
$25,050
$18,685
$397,390
$397,390
$3,247,973
$3,340,831 22.3 23.3 The Advisory Committee on Reactor Safeguards (ACRS) reports to the Nuclear Regulatory Commission (NRC) and provides the Commission with independent reviews of, and advice on, the safety of proposed or existing NRC-licensed reactor facilities and the adequacy of applicable safety standards. The ACRS was established as a statutory committee by a 1957 amendment to the Atomic Energy Act of 1954. With the enactment of the Energy Reorganization Act of 1974, the licensing functions of the Atomic Energy Commission (AEC) were transferred intact from the AEC to the NRC. The ACRS has continued in the same advisory role to the NRC with its responsibility changing with the needs of the Commission. Some ACRS tasks are mandated by statute or regulation, some are in response to direction by the Commission, or requests from the NRC staff, or other stakeholders, and some are self initiated in response to ACRS concerns on important regulatory and safety-related matters. The ACRS, upon request from the Department of Energy (DOE), provides advice on the safety of U.S.
naval reactor designs. Upon request, the ACRS also provides technical advice to the Defense Nuclear Facilities Safety Board. The ACRS and its subcommittees meet regularly in public, Federal Advisory Committee Act (FACA)-regulated meetings to work on matters within the scope of the ACRS responsibilities. ACRS meeting agenda, meeting transcripts, and letter reports are available for downloading or viewing on the Internet at http://www.nrc.gov/reading-nn/adams.html or http://www.nrc.gov/reading-rm/doc-collections/. The ACRS and its subcommittees held 53 meetings during FY 2003, including 10 Full Committee meetings that were attended by all ACRS members. In addition, the ACRS held a symposium on role of advisory committees in nuclear regulation and safety. The ACRS members are chosen for their technical expertise relevant to the safety issues important to the Commission. Consultants are used on occasion to augment the expertise of the ACRS members. The Committee has a full-time staff that provides technical support and administrative services in compliance with FACA requirements. ACRS subcommittees normally consist of three to six ACRS members with the expertise needed to review in detail the regulatory and safety issues and to formulate proposed positions and actions, as appropriate, for deliberation by the Full Committee. Stakeholder participation in ACRS meetings is encouraged and routinely occurs. The Committee's advice, in the form of written reports, is only produced by the Full Committee and reports on significant regulatory matters are discussed with the Commission in public meetings.
The ACRS conducts an ongoing review of its plans and schedules to ensure that regulatory matters within its scope of responsibility are being properly addressed and within its resources, and on schedules that are consistent with the needs of its stakeholders. Input from the Commission, the NRC staff, and affected stakeholders is used in this process. A Memorandum of Understanding with the NRC Executive Director for Operations (EDO) provides a framework for NRC staff interaction with the ACRS. The ACRS conducts formal self assessments to improve its effectiveness and efficiency. A report is provided to the Commission on the outcome of this process. The focus of the ACRS work during FY 2003 was on risk-informed and performance-based regulatory initiatives, license renewal applications, review standard for extended core power uprates, framework for advanced reactor licensing, early site permit review standard, future plant designs, reactor oversight process, reactor vessel head penetration cracking and reactor vessel head degradation, pressurized water reactor sump performance, safeguards and security matters, improvement of the quality of risk information for regulatory decisionmaking, probabilistic risk assessment quality, safety culture, and the NRC safety research program.
20b. How does the Committee balance its membership?
The Commission appoints ACRS members with the scientific and engineering expertise needed to address the safety issues of importance to the Commission. Members are sought who can provide an independent perspective on nuclear safety issues, outstanding scientific and technical ability, balanced and mature judgment, and a willingness to devote the time required to the demanding work involved. Members are appointed for 4-year terms and, absent unusual circumstances, do not serve more than three terms. Members are reappointed at the end of a 4-year term only if there is a compelling continuing need for their expertise. Vacancies in the ACRS membership are filled from the pool of applicants which exists after solicitations of interest are published in the Federal Register, trade and professional society publications, and the press. Recommendations to the Commission as to the selection of qualified candidates from this pool are made by the ACRS Member Candidate Screening Panel. The ACRS normally provides input to this Panel. During FY 2003, the membership was comprised of individuals with diverse employment backgrounds and included those experienced in the areas of nuclear power plant operations; probabilistic risk assessment; analysis of severe reactor accident phenomena; design of nuclear power plant structures, systems, and components; chemical engineering; materials and metallurgy; and thermal-hydraulics and computational fluid dynamics. The diversity of viewpoints represented by current members is based on special http://www. fido. gov /facadatabase/rptannualreport. asp Page 4 of 6 11/24/2003


http://www.fi  do    .gov/facadatabase/rptannualreport.asp                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                           11/24/2003
Annual Report fields of interest, employment experience, and technical expertise. These member attributes provide the Committee with the balance of highly qualified technical expertise and diverse safety perspectives necessary to carry out the Committee's statutory responsibilities effectively.
. Annu    ~l Report                                                                                                                                                                                                                                                                                                          Page  2  of 6
20c. How frequent and relevant are the Committee meetings?
The ACRS and its subcommittees held 53 meetings during FY 2003, of which 10 were Full Committee meetings.
The number of meetings held in a reporting period is directly related to the number of nuclear safety matters to be reviewed as required by statute; the number of rules and regulatory guidance referred to the Committee for review and comment; the number of special reviews requested by the Commission, EDO, or other Federal Government organizations; and other safety issues of particular concern to the Committee and its stakeholders.
All of the Committee members normally meet 10 times a year for 3 or 4 days in Full Committee meetings, to consider important safety-related nuclear issues, generic issues, significant regulatory matters, rules, and regulatory guidance. The ACRS subcommittees, which are normally comprised of three to six members with the relevant expertise, meet as necessary with stakeholders to conduct in-depth reviews of particular matters for later consideration by the full membership during Full Committee meetings. Although not required by the revised FACA, subcommittee meetings are conducted under the same FACA procedures as the Full Committee meetings to facilitate public participation and to provide a forum for stakeholders to express their views on regulatory matters being considered by the ACRS. These meetings are utilized to make efficient use of Committee resources.
Reviews are conducted during each Full Committee meeting to assess the relevance of proposed review topics, resource needs, and the priority of each activity. These assessments have the benefit of input from the Commission, EDO, and other stakeholders. The self-assessment conducted by the ACRS for its CY 2002 and CY 2003 activities involved collection of input from a variety of stakeholders. This information was used to assess the relevance of ACRS activities. All ACRS meetings for this reporting period addressed either matters for which ACRS review was required by statute or regulation, specific requests from either the Commission or the EDO, or other important regulatory matters within the ACRS scope of responsibility.
20d. Why can 1 the advice or information this committee provides be obtained elsewhere?
The ACRS is an independent body of recognized experts in the field of nuclear reactor safety whose Congressional mandate is to provide the Commission with independent advice. Particular duties of the ACRS (e.g., review of operating reactor license renewal applications, core power uprates, advanced reactor designs, safeguards and security issues, and rules and regulations) are dictated by statute or regulation. In addition, functional arrangements exist wherein, upon request, the ACRS also provides advice to the U.S. Navy, the Department of Energy, and the Defense Nuclear Facilities Safety Board. The Commission has its own expert staff on whom it relies in the day-to-day regulation of nuclear power facilities. The ACRS provides the Commission and the NRC staff with an independent, critical review of high-level regulatory issues under consideration by the NRC and independent technical insights as to important matters needing Commission attention. The ACRS members are part-time special government employees with other full-time interests and activities in related fields, and provide a breadth of experience, an independent perspective on issues, and technical knowledge that is not duplicated by the NRC's full-time government employees. A standing committee such as the ACRS remains current with respect to nuclear safety issues of importance to the NRC, including those related to reactor operating experience, regulatory reform, and NRC's needs for safety research, and provides an independent, collegial judgment regarding these issues that other part-time consultants could not provide. The ACRS meetings provide an important forum to stakeholders to express freely their concerns on safety issues and regulatory process. A number of important safety initiatives have had their origins in ACRS deliberations. Through the ACRS, the public and the Congress are ensured of an independent technical review and evaluation of the safety of NRC-licensed reactor facilities, proposed reactor designs, significant regulatory issues, and other significant safety issues, and of an opportunity for stakeholder input.
20e. Why is it necessary to close and/or partially close committee meetings?
During this period, the Committee held 10 full Committee meetings and one special symposium. Of these 10 meetings, 5 meetings were partially closed to protect proprietary information (5 U.S.C. 552b(c)(4) and 1 to discuss information classified as national security information as well as unclassified safeguards information (5 U.S.C.
552b(c)(l) and (3), and 3 meetings were completely closed to discuss information classified as national security information as well as unclassified safeguards information (5 U.S.C. 552b(c)(l) and (3).
: 21. Remarks None Designated Federal Official: Michele S Kelton DFO Committee Members Start End Occupation Apostolakis, Dr. 6/4/1995 6/2/2007 Professor, Nuclear Engineering Department, Massachusetts Institute of George E.
Technology http://www. fido. gov /facadatabase/rptannualreport.asp Page 5 of 6 11/24/2003  


Technical        Adequacy          of PRA    Results      for    Risk-Informed                  Activities NUREG/CR-6813, Issues    and   Recommendations                  for    Advancement                of PRA    Technology        in  Risk                                                                                                                                  4/29/2003 Informed              Decision    Making Improvement                    of the  Quality        of Risk    Information                for    Regulatory              Decisionmaking                                                                                                                                5/16/2003 Vessel  Head    Penetration                Cracking          and    Reactor          Pressure            Vessel Degradation                                                                                                                                                5/16/2003 Draft      Final      Regulatory              Guide        1.178 and  Standard            Review     Plan    Section      3.9.8 for    Risk-Informed                                                                                                                      5/16/2003 Inservice          Inspection          of Piping NUREG-1635          Vol. 5,   Review  and  Evaluation              of the    Nuclear         Regulatory              Commission            Safety       Research                                                                                                            5/31/2003 Program,               A  Report        to  the    USNRC Update          to  License    Renewal      Guidance        Documents:              Response      to Staff    Requirements                  Memorandum                                                                                                                  6/24/2003 Dated    July        17, 2002 Safety      Culture                                                                                                                                                                                                                                                        7/16/2003 Proposed          Criteria          for    the  Treatment              of Individual              Requirements                    in  a    Regulatory              Analysis                                                                                              7/17/2003 Security        of Nuclear        Facilities                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      7/18/2003 Report        on the    Safety      Aspects    of the  License      Renewal      Application          for    the  St. Lucie    Nuclear         Plant      Units                                      911712003 1 and2 Draft      Final      Regulatory              Guide      X.XXX, An  Approach            for  Determining                the  Technical        Adequacy          of PRA                                        912212003 Results      for    Risk-Informed                    Activities Draft      Final      Revision        1 to  Regulatory              Guide        1.53, "Application            of the  Single    Failure        Criterion                to Safety                                  912212003 Systems" Draft      Final      Review    Standard          for    Extended          Power      Uprates,           RS-001                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          9/24/2003 Proposed          Recommendations                  for    Resolving      Generic        Issue      186,  "Potential              Risk  and    Consequences          of Heavy        Load    Drops      in  Nuclear        Power      Plants"                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                9/24/2003 Draft      Final      Revision        3 to  Regulatory              Guide      1.82,  "Water        Sources      for    Long-Term            Recirculation                  Cooling        913012003 Following    a    Loss-of-Coolant            Accident"
Annual Report
~
Bonaca, Dr.
Mario V.
Ford, Dr. Peter F.
Kress, Dr.
Thomas S.
Leitch, Mr.
GrahamB.
Powers,Dr.
Dana A.
Ransom, Dr.
Victor H.
Rosen, Mr.
Stephen L.
1/6/1999 1/5/2007 Retired, Director, Nuclear Engineering Department, Northeast Utilities 3/23/2001 3/22/2005 Consultant and retired Program Manager, General Electric Research and Development Center 9/4/1991 9/3/2007 Retired, Head of Applied Systems Technology Section, Oak Ridge National Laboratory 7/10/2000 7/9/2004 Retired, Vice-President, Limerick Generating Station, PECO Energy; Retired Vice-President, Maine Yankee Atomic Power Co., Member, Offisite Safety Review Committee, Calvert Cliffs Nuclear Power Plant 6/6/1994 6/5/2006 Senior Scientist, Nuclear Facilities Safety Department, Sandia National Laboratories 3/2/2002 3/6/2006 Professor Emeritus, Purdue School of Nuclear Engineering 6/12/2001 6/11/2005 Retired, Manager, Risk Management and Industry Relations, STP Nuclear Operating Company at South Texas Project Electric Generating Station Shack, Dr.
8/1/1993 7/31/2005 Associate Director, Energy Technology Division, Argonne National William J.
Laboratory Sieber, Mr. John 7/12/1999 7/11/2007 Retired, Senior Vice-President, Nuclear Power Division, Duquesne Light D.
Company Wallis, Dr.
1/23/1998 1/22/2006 Retired, Professor, Thayer School of Engineering, Dartmouth College GrahamB.
Total Count of Committee Members 11 http://www.fido.gov/facadatabase/rptannualreport.asp Page 6 of 6 11/24/2003  


17a O  pe n:                                                                                                                                                                                                                                                                                                                                                                                                                                                     46 17b. C  lo sed :                                                       4                                                                                                             17c. P artia  lly  C lose d  : 9                                                                                                                                                                                                                     17d . T o tal Meeti  ngs        59 Meet  in  g  Purp oses  and    D ates
Annual Keport 2003 Current FY Report: Review of Federal Advisory Committee 12/18/2003 4:25:52 PM I. Depanment or Agency Nuclear Regulatory Commission
: 3. Committee or SubCommittee Advisory Committee on the Medical Uses of Isotopes
: 4. Is this New During Fiscal Year?
: 5. Current Chaner
: 6. Expected Renewal Date No 9/25/2003 3/20/2004 8a. Was Tenn inated During FY?
8b. Specific Termination Authority No 42 u.s.c. 2201 Pagel of 2 Committee Menu
: 2. Fiscal Year 2003 3b. GSA Committee No.
1102
: 7. Expected Tenn Date 3/20/2004 Sc. Actual Termination Date
: 9. Agency Recommendation for Next FY Continue I0a.Legislation Req to Terminate?
I Ob.Legislation Pending?
No
: 11. Establishment Authori ty Agency Authority
: 12. Specific Establishment Authority 42 u.s.c. 2201
: 13. Effective Date 7/1/1958 Scientific Technical Program Advisory Board
: 14. Committee Type Continuing
: 15. Description of Committee 16a. Total Number of Repon s 3
16b. Repon Tit les and Dates Minutes of October 28, 2002 Meeting Minutes of the May 20-21, 2003 Meeting Minutes of the July 17, 2003 Meeting 17a Open:
1 Meeting Purposes and Dates 17b. Closed:
1 To discuss various medical-related issues and initiatives.
Discussion of internal administrative matters and 17c. Panially Closed:
10/28/2002 10/28/2002 safeguards information (closed session) and discussion of 5/20/2003 5/21/2003 various medical-related issues and initiatives.
This was a teleconference meeting in which the Agreement States and the NRC/ACMUI engaged in detailed discussion of the NRC staff's draft amendments to the training and experience (T &E) requirements for Authorized Users (A Us), Authorized Medical Physicists (A MPs), Authorized Nuclear Pharmacists (ANPs), and Radiation Safety Officers (RSOs). This meeting was closed due to the predecisional nature of the discussion.
I 8a( I) Personnel Pmts to Non-Federal Members I 8a(2) Personnel Pmts to Federal Members I 8a(3) Personnel Pmts to Federal Staff I Sa( 4) Personnel Pmts to Non-member Consultants I 8b( I) Travel and Per Diem to Non-Federal Members I 8b(2) Travel and Per Diem to Federal Members I 8b(3) Travel and Per Diem to Federal Staff I 8b(4) Travel and Per Diem to Non-Member Consultants I 8c.Other(rents.user charges.graphics.printing.mail etc.)
18d Total 7/17/2003 7/17/2003 Current Fiscal Year
$0
$26,656
$116,000
$0
$11,353
$0
$0
$0
$0
$154,009 http://www.fido.gov/facadatabase/rptannualreport.asp 1
14c. Presidentiai0 No 1/14/2003 7/20/2003 9/17/2003 17d. Total Meetings 3 Nex t Fiscal Y ear
$0
$28,000
$119,000
$0
$12,000
$0
$0
$0
$0
$159,000 12/1 8/2003


Plant      License    Renewal      Subcommittee                                                                                                          10/8/2002 10/8/2002 Planning            & Procedures              Subcommittee                                                                                                10/9/2002 10/9/2002 Reactor          Fuels    Subcommittee                                                                                                                    10/9/2002 10/9/2002 Planning            &  Procedures              Subcommittee                                                                                                10/9/2002 10/9/2002 496th    Full    Committee                                                                                                                                10/10/2002 10/12/2002 Workshop            on  Nuclear         Regulatory              Decisionmaking              Process                    10/15/200210/18/2002 Tour    of Mixed-Oxide        Fuel    Fabrication              Facility                                                                                                                                                                                                                              10/21/2002 10/21/2002 Meeting      with  SKB-SKI        Representatives                and  Tour    of                                                                      10/21/2002  10/23/2002 Storage        Facilities Quadripartite                    Meeting                                                                                                                  10/23/2002 10/25/2002 Plant      License    Renewal      Subcommittee                                                                                                          10/30/2002 10/30/2002 Safeguards                & Security          Subcommittee                                                                                                10/31/2002 10/31/2002 Joint        Reliability            & Probabilistic                Risk  Assessment        and                                                          11/1/2002 11/1/2002 Plant      Operations              Subcommittees Thermal-Hydraulic                            Phenomena            Subcommittee                                                                            11/5/2002 11/5/2002 Safety       Research        Program            Subcommittee                                                                                            11/6/2002 11/6/2002 Planning            &  Procedures            Subcommittee                                                                                                11/6/2002 11/6/2002 497th    Full    Committee                                                                                                                              11n 12002 111912002 Thermal-Hydraulic                            Phenomena            Subcommittee                                                                            11/12/2002 11/14/2002 Planning            &  Procedures            Subcommittee                                                                                                12/4/2002 12/4/2002 Safety        Research        Program            Subcommittee                                                                                            12/4/2002 12/4/2002 498th    Full    Committee                                                                                                                              121512002 12n 12002
Annual Keport
: 19. Federal StaffSu ppon Years 1.5 1.5 20a. How does the Committee accomplish its purpose?
The NRC staff believes that licensees, the general public, and medical professionals benefit when recognized experts provide advice to the staff. This advice enables staff to develop rules that will maintain public safety, while not inappropriately intruding upon the practice of medicine. The Staff provides a summary of issues to be addressed during meetings, and the ACMUI discusses the issues and gives advice and makes recommendations to the Staff. Furthermore, the ACMUI keeps staff abreast of new developments. This ongoing communication helps ensure that staff is aware of important issues during critical stages rule development. When issues that need special emphasis arise, working groups and subcommittees are formed.
20b. How does the Committee balance its membership?
Membership is balanced by placing individuals of diverse specialty on the committee. For instance, there are members who represent both diagnostic and therapeutic applications of medicine. There are members who have a regulatory function within their specialties. There is a member who represents medicine from an administrative standpoint, and there is a patient advocate member, who represents patients' interests. ACMUI members also perform regular self-evaluations, in which they give feedback on the appropriateness of the committee's composition.
20c. How frequent and relevant are the Committee meetings?
Committee meetings are generally held semi-annually. The committee will hold more frequent meetings when important issues emerge, or when issues need timely resolution.
20d. Why can't the advice or infomiation this committee provides be obtained elsewhere?
NRC continues to strive to achieve its goal of creating risk-informed, performance-based regulations that provide for the health and safety of the public while imposing no unnecessary burden on licensees. Furthermore, the medical profession continues to see regular advances that create unique regulatory challenges. The advice and recommendations from medical professionals who are exposed to these advances is crucial to the NRC staff's ability to continue to regulate effectively.
20e. Why is it necessary to close and/or partially close committee meetings?
Meetings are closed to conduct annual ethics briefings, conduct reviews of paperwork of a personal and confidential nature, and to discuss administrative matters that are purely internal to Committee business. It would be inappropriate to conduct these types of meetings openly. They must be conducted privately to allow Committee members the freedom to ask and answer personal questions and to protect individuals' privacy.
2 1. Remarks None Designated Federal Official: Mr. Thomas H Essig DFO Committee Members Cerqueira M.D., Dr. Manuel D.
Diamond M.D., Dr. David A.
Eggli M.D., Dr. Douglas F.
Hess, Ms. Maureen Hobson, Ms. Nekita Lieto, Mr. Ralph P.
Malmud M.D., Dr. Leon S.
McBurney, Ms. Ruth Nag M.D., Dr. Subir Schwarz M.S., Ms. Sally W.
Vetter Ph.D., Dr. Richard J.
Williamson Ph.D., Dr. Jeffrey F.
Total Count of Committee Members Start End Occupation 5/13/1998 9/30/2004 Nuclear Cardiologist 11/8/2000 9/30/2006 Radiation Oncologist 4/11/2002 4/11/2005 1/1/2003 1/1/2006 Nuclear Medicine Physician Food and Drug Administration Representative 5/13/1998 9/30/2004 Patient Advocate 9/27/2001 9/27/2004 Medical Physicist-Nuclear Medicine 9/27/2001 9/27/2004 Hospital Administrator 5/13/1998 9/30/2004 State Representative 11/8/2000 9/30/2006 Radiation Oncologist 11/8/2000 9/30/2006 Nuclear Pharmacist 11/8/2000 9/30/2006 Radiation Safety Officer 11/8/2000 9/30/2006 Therapy Physicist 12 http://www. fi do.gov/facadatabase/rptannualreport.asp Page 2 of 2 12/18/2003


http://www.fido.gov/facadatabase/rptannualreport. asp                                                                                                                                                                                                                                                                       11/24/2003
Annual Report Page 1 of 4 2003 Current FY Report: Review of Federal Advisory Committee 11/24/2003 11:26:05 AM Committee Menu I. Department or Agency Nuclear Regulatory Commission
. Annu    ~l Report                                                                                                                                                                                                            Page  3  of 6
: 3. Committee or Subcommittee Advisory Committee on Nuclear Waste
: 2. Fiscal Year 2003 3b. GSA Committee No.
1100
: 4. Is this New During Fiscal Year?
: 5. Current Charter
: 6. Expected Renewal Date
: 7. Expected Term Date No 7/17/2002 7/17/2004 Sa. Was Terminated During FY?
Sb. Specific Termination Authority Sc.Actual Termination Date No 42 u.s.c. 2201
: 9. Agency Recommendation for Next FY Continue
!Oa.Legislation Reg to Terminate?
!Ob.Legislation Pending?
No
: 11. Establishment Authority Agency Authority
: 12. Specific Establishment Authority
: 13. Effective Date
: 14. Commi11ee Type Continuing 14c. Presidential?
42 u.s.c. 2201
: 15. Description of Committee 16a. Total Number of Reports 9
16b. Report Titles and Dates Orphan Sources 1/6/1988 Scientific Technical Program Advisory Board Capabilities of Engineered and Natural Barriers ACNW Meeting in Nevada, September 23-26, 2002 Review and Evaluation of the U.S. Nuclear Regulatory Commission's Waste Safety Research Program Transportation Working Group Meeting Comments on the National Academies' Study, "One Step At A Time: The Staged Development of Geologic Repositories for High-Level Radioactive Wastes" Total System Performance Assessment Working Group Session, March 25-26, 2003 Fiscal Years 2003 and 2004 Action Plan for the Advisory Committee on Nuclear Waste High-Level Waste: Risk-Significance Ranking of Agreements and the Use of Risk Information to Resolve Issues No 10/17/2002 12/6/2002 12/13/2002 12/30/2002 ln/2003 6/9/2003 6/12/2003 6/23/2003 8/13/2003 17a Open:
16 17b. Closed:
0 17c. Partially Closed:
0 17d. Total Meetings 16 Meeting Purposes and Dates 138th Full Committee & Workshop on Transportation of Nuclear Materials Planning & Procedures Planning & Procedures 139th Full Committee Planning & Procedures 140th Full Committee and Working Group on NRC and DOE Performance Assessments: Assumptions and Differences Planning & Procedures 141st Full Committee Planning & Procedures 142nd Full Committee Planning & Procedures 11/19/2002 11/21/2002 11/20/2002 11/20/2002 12/17/2002 12/17/2002 12/17/2002 12/19/2002 3/25/2003 3/25/2003 3/25/2003 3/27/2003 4/22/2003 4/22/2003 4/22/2003 4/23/2003 5/28/2003 5/28/2003 5/28/2003 5/30/2003 6/24/2003 6/24/2003 http://www. fido. gov /facadatabase/rptannualreport. asp 11/24/2003  


Thermal-Hydraulic                                    Phenomena                    Subcommittee              12/11/2002 12/12/2002 Joint          Reliability                  & Probabilistic                      Risk      Assessment              and 1/21/2003  1/21/2003 Plant          Operations                    Subcommittees Safety      Research          Program          Subcommittee                                                                                                                                                                                                                                                                                                                                                    1/22/2003 1/22/2003 Reliability            &  Probabilistic                Risk  Assessment        Subcommittee                                    1/22/2003 1/22/2003 Reliability            &  Probabilistic                Risk    Assessment        Subcommittee                                      1/23/2003 1/24/2003 Thermal-Hydraulic                          Phenomena              Subcommittee                            2/4/2003  2/4/2003 Materials              & Metallurgy              Subcommittee                                              2/5/2003 2/5/2003 Planning           & Procedures               Subcommittee                                                2/5/2003  2/5/2003 499th    Full   Committee                                                                                 2/6/2003  2/8/2003 Symposim              on  Role  of Advisory          Committee            in  Nuclear                    3/4/2003 3/5/2003 Regulation        and   Safety 500th  Full    Committee                                                                                 3/6/2003  3/8/2003 Thermal-Hydraulic                          Phenomena            Subcommittee                              3/19/2003 3/20/2003 Plant    License      Renewal      Subcommittee                                                            4/9/2003 4/9/2003 Planning          &  Procedures              Subcommittee                                                4/9/2003 4/9/2003 501st  Full    Committee                                                                                    4/10/2003 4/12/2003 Reactor        Fuels    Subcommittee                                                                      4/21/2003 4/21/2003 Materials              & Metallurgy              Subcommittee                                                4/22/2003 4/23/2003 Safeguards              &  Security          Subcommittee                                                  4/24/2003 4/24/2003 Planning          &  Procedures              Subcommittee                                                  5/7/2003 5/7/2003 Reliability            & Probabilistic                Risk    Assessment        Subcommittee                                      5/7/2003  5/7/2003 502nd    Full    Committee                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                           5/7/2003 5/9/2003 Safeguards                   &  Security              Subcommittee                                          5/21/2003 5/23/2003 Peach        Bottom            Site    Visit                                                                6/9/2003 6/9/2003 Plant          Operations                  Subcommittee                                                    6/10/2003 6/10/2003 Plant          License        Renewal          Subcommittee                                                6/11/2003 6/11/2003 Planning                &  Procedures                    Subcommittee                                        6/11/2003 6/11/2003 503rd        Full      Committee                                                                           6/12/2003 6/13/2003 Thermal-Hydraulic                                    Phenomena                    Subcommittee              7/8/2003 7/3/2003 Joint            Reliability                & Probabilistic                      Risk      Assessment              and 7/8/2003 7/8/2003 Plant          Operations                    Subcommittees Planning                & Procedures                    Subcommittee                                      7/8/2003 7/9/2003 504th      Full      Committee                                                                           7/9/2003 7/11/2003 Thermal-Hydraulic                                      Phenomena                  Subcommittee            7/16/2003 7/17/2003 Future              Plant          Designs      Subcommittee                                            7/17/2003 7/18/2003 Thermal-Hydraulic                                    Phenomena                    Subcommittee              8/19/2003 8/20/2003 Fire        Protection                Subcommittee                                                        9/9/2003 9/9/2003 Planning                &  Procedures                    Subcommittee                                      9/10/2003 9/10/2003 505th      Full      Committee                                                                           9/10/2003 9/13/2003 Reactor              Fuels      Subcommittee                                                              9/29/2003 9/30/2003 Plant          License        Renewal          Subcommittee                                              9/30/2003 9/30/2003
Annual Report 143rd Full Committee 144th Full Committee Planning & Procedures Planning & Procedures 145th Full Committee 18a( 1) Personnel Pmts to Non-Federal Members I 8a(2) Personnel Pmts to Federal Members 18a(3) Personnel Pmts to Federal Staff 18a(4) Personnel Pmts to Non-member Consultants l 8b( 1) Travel and Per Diem to Non-Federal Members l 8b(2) Travel and Per Diem to Federal Members 18b(3) Travel and Per Diem to Federal Staff 18b(4) Travel and Per Diem to Non-Member Consultants I 8c.Other(rents,user charges,graphics,printing,mail etc.)
18d Total
: 19. Federal Staff Support Years 20a. How does the Committee accomplish its purpose?
6/24/2003 6/25/2003 7/29/2003 7/31/2003 7/29/2003 7/29/2003 9/23/2003 9/23/2003 9/23/2003 9/24/2003 Current Fiscal Year
$186,647
$0
$488,193
$0
$61,221
$0
$16,315
$1,007
$16,104
$769,487 4.5 Next Fiscal Year
$194,486
$0
$508,697
$5,136
$74,946
$0
$17,947
$12,087
$16,104
$829,403 5.5 The Committee reports to and provides the Commission with independent review of and advice on technical matters related to nuclear waste management. The bases of ACNW reviews include 10 CFR Parts 61, 63, 71, and 72, and other applicable regulations and legislative mandates. The ACNW undertakes studies and activities related to the transportation, storage, and disposal of high-and low-level radioactive waste, including the interim storage of spent nuclear fuel; materials safety; decommissioning; application of risk-informed and performance-based regulations; and evaluation of licensing documents, rules, regulatory guidance, and other issues, as requested by the Commission. The Committee interacts with representatives of the public, NRC, the Advisory Committee on Reactor Safeguards, other Federal agencies, State and local agencies, Native American Nations, and private, international, and other affected organizations as appropriate to fulfill its responsibilities. The Committee issues written reports, providing advice on matters within its scope of responsibility and meets periodically with the Commissioners in public meetings to discuss issues of mutual interest. The focus of the ACNW work during FY 2003 has been on the proposed high-level waste repository at Yucca Mountain, Nevada, and on issues related to the decommissioning of nuclear facilities. The ACNW members are chosen for their technical expertise relevant to waste management issues important to the Commission. Consultants are used on occasion to augment the expertise of the ACNW members in specific areas. The Committee has a full-time staff that provides technical support, administrative services, and assures compliance with FACA requirements. ACNW working groups, comprised of the ACNW members and consultants with the appropriate expertise, are used on occasion to address specific technical issues in depth. These working groups meet in public meetings and their activities are also conducted under FACA requirements. Stakeholder participation in ACNW meetings is encouraged and routinely occurs.
ACNW meeting agenda, meeting transcripts, and letter reports are available for downloading or viewing on the Internet at http://www.nrc.gov/reading-rm/adams.html or http://www.nrc.gov/reading-rm/doc-collections/. The ACNW issues an Action Plan for Commission approval and conducts a self assessment which includes the use of extensive stakeholder input. The ACNW conducts ongoing reviews of its plans and schedules to assure that it properly addresses regulatory matters within its scope of responsibility and on schedules that are consistent with the needs of its stakeholders. Input from the Commission, the NRC staff, and affected stakeholders is used in this process. A Memorandum of Understanding with the NRC staff provides a framework for interactions between the ACNW and the staff.
20b. How does the Committee balance its membership?
The Commission appoints ACNW members with the scientific and engineering expertise needed to address the waste management issues of importance to the Commission. Members are sought who can provide an independent perspective on waste management issues, and who possess outstanding scientific and technical ability, balanced and mature judgment, and a willingness to devote the time required to carry out the timely completion of the Committee's work. Members are appointed for 4-year terms and, absent unusual circumstances, do not serve more than two terms. Members are reappointed at the end of a 4-year term only if there is a compelling continuing need for their expertise. Vacancies in the ACNW membership are filled from the pool of applicants which exists after solicitations of interest are published in the Federal Register, trade and professional society publications, and the http://www.fido.gov/facadatabase/rptannualreport. asp Page 2 of 4 11/24/2003  


C  urre  nt  Fi  sc  al    Year                    Next Fisc al Year 18a(    l  ) Perso nn  el  Pmt  s   to No  n-Fede  ral  Memb  ers                                                                $592,054                                                $616,920 18a(2)    Perso nn e l Pmt  s to Federal  Mem  be rs                                                                                        $0                                                        $0 I 8 a(3)   Perso  nn e l Pmt  s to Fede  ral  St  aff                                                                          $1,879,876                                              $1,958,831 18a(4)  Perso nn e l Pmt  s  to   No n-m  emb  er Co ns ult a nts                                                                  $39,996                                                  $31,984 I 8b( I ) Tra  ve    l  and Pe r  Di  em  t o  No n-Fede ral  M e mb  e rs                                                        $279 ,466                                                $279,466 I 8 b(2)            Tr av el  a nd  Pe r  D ie m  to   Fed e ral    Memb  ers                                                                $0                                                        $0
Annual Report press. Recommendations to the Commission as to the selection of qualified candidates from this pool are made by the ACNW Member Candidate Screening Panel. The ACNW members normally provide input to this Panel. The diversity of viewpoints represented by current members is based on special fields of interest, professional experience, and technical expertise. These member attributes provide the Committee with the balance of highly qualified technical expertise and diverse perspectives necessary to effectively carry out the Committee's statutory requirements. At the end of FY 2003, the Committee included two members from academia, one member from a national laboratory, and two members from private industry. During FY 2003, the ACNW included members experienced in radioactive waste management, chemistry, health physics, nuclear engineering, risk assessment, environmental engineering, performance assessment, hydrology, research, and technical management. There has been a systematic effort to obtain members with backgrounds that can address the difficult and diverse questions associated with radioactive waste management. This concentration of the relevant scientific proficiency within the Committee, together with a diversity of viewpoints and perspectives, provides assurance that adequate, independent, and open discussion and analysis of the potential hazards associated with the management of nuclear waste can take place.
20c. How frequent and relevant are the Committee meetings?
Normally, all ACNW members meet 8 times a year for 2-3 days in Committee meetings. In FY 2003, the ACNW held 8 Committee meetings. The number of meetings held is directly related to the scope of NRC's efforts on the high-level waste geologic repository and other issues involving waste management, the number of criteria, guides, and technical positions referred to the ACNW for review and comment, the number of special reviews requested by the NRC staff, and the number of important topics of concern to the Committee and its stakeholders. The A CNW Action Plan for Fiscal Years 2003 and 2004 formed the basis for the selection of issues to be addressed during its 2003 meetings. The Committee intends to meet once each year in the vicinity of Yucca Mountain in Nevada to provide an opportunity for local stakeholders to participate in its meetings. Such a meeting was held on November 19 and 20, 2003. The written reports that contain the ACNW's advice are issued during Committee meetings. When resources are available, the ACNW holds working group meetings on particularly complex issues.
At these meetings, additional time and expertise can be brought to bear on an issue and the subject developed for the Committee consideration. Reviews are conducted during each Committee meeting to assess the relevance of proposed meetings and review topics, resource needs, and the priority of each activity. These assessments have the benefit of input from the Commission, NRC's Executive Director for Operations (EDO), and other stakeholders.
The ACNW also conducts a self assessment once every 2 years. These self assessments involve collection of input from a variety of stakeholders. This information is used to assess the relevance of ACNW activities. All ACNW meetings for this reporting period addressed matters delineated in the ACNW's Action Plan, specific requests from either the Commission or the EDO, or other important regulatory matters within the ACNW's scope of responsibility.
20d. Why can't the advice or information this committee provides be obtained elsewhere?
The ACNW is an independent body of recognized experts in the field of nuclear waste management whose mandate is to provide the Commission with independent advice. The ACNW provides the public assurance that an independent technical review and evaluation of nuclear waste safety issues is accomplished and an opportunity for public input is assured. Decisions relating to waste management that are expected to be before the Commission include the licensing of the proposed Yucca Mountain high-level waste repository, the West Valley Demonstration Project and West Valley Site and other site decommissionings, nuclear reactor decommissioning, and low-level waste management. The Commission has its own expert staff of NRC employees on whom it relies in its day-to-day operations. However, the Commission has no other advisory committee with the broadly based expertise of the ACNW that could be called upon for independent and informed assessment of safety issues related to high-and low-level waste management. In addition, since members are part-time advisors with other interests and activities in related fields, they provide a breadth of experience, an independent perspective on issues, and technical knowledge that is not duplicated by the NRC staff. The ACNW provides the Commission with both an independent, critical review of high-level regulatory issues under consideration by the NRC and independent technical insights on important matters needing Commission attention. In addition, a standing committee such as the ACNW, supported by a technical staff, remains currently informed with respect to nuclear waste issues of importance to the Commission, including NRC-sponsored safety research, and provides an informed, collegial judgment regarding these issues that would not be obtained by use of individual part-time consultants on a case-by-case basis.
20e. Why is it necessary to close and/or partially close committee meetings?
During this period, the Committee held 8 Full Committee meetings. All portions of these meetings were open to public attendance.
: 21. Remarks NONE http://www.fido.gov/facadatabase/rptannualreport.asp Page 3 of 4 11/24/2003


http://www.fido.gov/facadatabase/rptannualreport.asp                                                                                                                                                                       11/24/2003
Annual Report Designated Federal Official: Michele Kelton DFO Committee Members Garrick, Dr. B.
.. Annu    a l  Report                                                                                                                                                                                                                                                                Page    4  of 6
John Hornberger, Dr.
GeorgeM.
Levenson, Mr.
Milton Ryan, Dr. Michael T.
Weiner, Dr. Ruth Wymer,Dr.
RaymondG.
Start End Occupation 3/6/1994 6/30/2007 Consultant 9/23/1996 6/30/2004 Professor, Dept. of Environmental Sciences, University of Virginia 5/l 7 /2000 10/10/2003 Consultant 6/26/2002 6/25/2006 Consultant 9/15/2003 9/14/2007 Consultant 10/11/1997 3/30/2003 Retired, Distinguished Scientist in the International Technology Programs Division of Martin Marietta Energy Systems, Inc.
Total Count of Committee Members 6
Page 4 of 4 http://www.fido.gov/facadatabase/rptannualreport.asp 11/24/2003  


l 8b (3) Trave  l and   Per Di  em  to   Federal   S taff                                                                                                              $34,141                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        $37 ,555 18b(4) Trave  l  an d  Pe r  Di e m t o  Non- Memb  er Consult ants                                                                                                    $25,050                                                                                                                                                                                                                                                                                                                                                                                                                        $18,685 18c .O th e r(rents ,use r c harges, graphic  s ,print  ing, m  ai  l etc .)                                                                                       $397,390                                                                                                                                                                                                                                                                                                                                                                                                $397,390 18d                                                                                                                  T o tal                                        $3,247,973                                                                                                                                                                                                                                                                                                                                                                                  $3,340,831
Annual Report Page 1 of 2 2003 Current FY Report: Review of Federal Advisory Committee 12/1/2003 4:10:04 PM Committee Menu I. Department or Agency Nuclear Regulatory Commission
: 19. Federal  St aff Support    Ye ars                                                                                                                                            22.3                                                                                                                                                                                                                                                                                                                                                                                                                                                                        23.3
: 3. Committee or SubCommittee Licensing Support System Advisory Review Panel
: 4. Is this New During Fiscal Year?
No 8a. Was Terminated During FY?
No
: 9. Agency Recommendation for Next FY Continue
: 11. Establishment Authority
: 5. Current Charter
: 6. Expected Renewal Date 12/12/2002 12/12/2004 8b. Specific Termination Authority 42 u.s.c. 2201
!Oa.Legislation Req to Terminate?
Agency Authority
: 12. Specific Establishment Authority 42 u.s.c. 2201
: 13. Effective Date 1/19/1975 Non Scientific Program Advisory Board
: 14. Committee Type Continuing
: 15. Description of Committee 16a. Total Number of Reports 1
16b. Report Titles and Dates Report/Transcript of June 3, 2003 Meeting 17aOpen:
1 17b. Closed:
0 17c. Partially Closed:
0 Meeting Purposes and Dates Review Alternatives and Proposed Guidelines for
: 2. Fiscal Year 2003 3b. GSA Committee No.
1104
: 7. Expected Term Date 12/14/2006 Sc.Actual Termination Date I Ob.Legislation Pending?
14c. Presidential?
No 6/3/2003 17d. Total Meetings 1 submitti?g electroni~ documents through N_RC's 61312003 S:00:00 AM 6/3/2003 5:00:00 PM Electromc Information Exchange for the High Level Waste Adjudicatory Proceeding l 8a(l) Personnel Pmts to Non-Federal Members l 8a(2) Personnel Pmts to Federal Members l 8a(3) Personnel Pmts to Federal Staff 18a(4) Personnel Pmts to Non-member Consultants l 8b(l) Travel and Per Diem to Non-Federal Members l 8b(2) Travel and Per Diem to Federal Members l 8b(3) Travel and Per Diem to Federal Staff 18b(4) Travel and Per Diem to Non-Member Consultants 18c.Other(rents,user charges,graphics,printing,mail etc.)
18d Total
: 19. Federal Staff Support Years 20a. How does the Committee accomplish its purpose?
Current Fiscal Year Next Fiscal Year
$0
$0
$6,000
$8,000
$6,000
$8,000
$0
$0
$0
$1,000
$4,857
$7,000
$0
$2,000
$0
$0
$2,692
$3,000
$19,549
$29,000 0.0 0.0 The Nuclear Regulatory Commission relies on the Licensing Support Network Advisory Review Panel (LSNARP) for advice and recommendations on the design and operation of the searchable electronic database (Licensinf Support Network (LSN)) for documents that will relevant to the licensing of a geologic repository for the storage of high level nuclear waste. The document collection will contain electronic copies of all of the material that will be used by parties in the NRC's licensing proceeding for a high level radioactive waste repository. The LSN is in operation and has been loaded with approximately 10,000 documents as of the end of FY-2003. During the year the Committee provided advice on guidelines to electronically transmit large and complex documents. DOE also http://www.fido.gov/facadatabase/rptannualreport.asp 12/01/2003


20a . How  doe  s th  e Committ    ee  ac compli    sh  it s  purp ose?
Annual Report advised that estimates of the size of its document collection had risen from 10,000 to 3 - 4 million and the LSN is now being re-configured to accomidate the increased volumn. Document loading should be completed by June 2004 in anticipation of the Department of Energy's submittal of a License Application in December 2004.
The  Advisory            Committee              on  Reactor        Safeguards              (ACRS)      reports          to  the   Nuclear        Regulatory                Commission              (NRC) and  provides          the    Commission              with    independent                  reviews      of, and   advice        on,    the safety      of proposed          or existing    NRC licensed      reactor          facilities      and  the   adequacy            of applicable            safety      standards.               The  ACRS      was  established            as  a statutory              committee              by   a    1957  amendment                  to  the  Atomic        Energy          Act  of 1954. With      the   enactment              of the    Energy Reorganization                    Act  of 1974,  the   licensing      functions          of the   Atomic        Energy          Commission              (AEC)    were    transferred intact      from the                                                                                   AEC      to   the   NRC. The  ACRS    has  continued            in the same      advisory              role    to  the   NRC    with    its responsibility              changing          with    the    needs    of the    Commission.              Some    ACRS      tasks    are  mandated              by  statute          or regulation,           some    are  in  response          to  direction            by   the   Commission,              or requests          from          the   NRC    staff,    or other stakeholders,                and  some    are  self initiated          in  response to                                                                                                                                          ACRS    concerns          on important              regulatory                and  safety-related matters.             The  ACRS,     upon      request        from        the   Department                of Energy          (DOE),      provides          advice      on the   safety      of U.S.
20b. How does the Committee balance its membership?
naval        reactor          designs.      Upon      request,          the  ACRS    also  provides            technical          advice        to  the  Defense    Nuclear          Facilities Safety        Board.        The    ACRS    and  its  subcommittees                  meet      regularly                in  public,        Federal          Advisory            Committee              Act (FACA)-regulated                  meetings          to work    on  matters            within      the   scope    of the   ACRS      responsibilities.             ACRS      meeting agenda,        meeting        transcripts,                  and  letter        reports          are  available          for    downloading            or viewing      on  the   Internet          at http://www.nrc.gov/reading-nn/adams                  .html      or http://www.nrc.gov/reading-rm/doc-collections/. The  ACRS    and   its subcommittees                    held    53  meetings          during        FY  2003, including            10 Full      Committee               meetings         that    were    attended              by    all ACRS    members.              In  addition,           the  ACRS    held    a  symposium                on  role    of advisory              committees            in nuclear          regulation and   safety.        The  ACRS      members              are  chosen    for   their      technical          expertise          relevant            to   the safety        issues  important              to the    Commission            . Consultants              are  used    on occasion      to  augment            the   expertise        of the   ACRS    members.              The Committee              has  a  full-time          staff    that    provides            technical        support        and    administrative                        services        in  compliance              with FACA    requirements.                    ACRS    subcommittees                    normally              consist    of three        to six  ACRS    members              with    the   expertise needed        to   review    in detail        the    regulatory                and  safety      issues  and    to  formulate proposed                                                                                                                                                                              positions      and    actions,      as appropriate,                  for  deliberation                    by   the   Full    Committee.             Stakeholder              participation                  in ACRS    meetings            is  encouraged and    routinely            occurs.       The     Committee                  's advice,       in  the   form        of written          reports,             is only    produced              by    the   Full Committee              and    reports          on significant            regulatory              matters            are  discussed        with    the   Commission            in  public        meetings.
The membership of the LSNARP is balanced by being drawn from among the full spectrum of potential parties to NRC's anticipated licensing proceeding for the burial of high level radioactive waste. Since the burial site under review is in Nevada, the membership includes the State of Nevada, local county governments of both Nevada and California, Indian tribes, represented by the National Congress of American Indians and the Nevada Nuclear Waste Task force. It also includes the nuclear industry, the potential licensee (DOE) and the licensing agency (NRC). Input by these representatives is essential to the success of the LSN project. During this year an effort was made to bring additional tribal representation to the Committee.
The  ACRS    conducts        an  ongoing        review      of its  plans    and   schedules        to  ensure        that    regulatory                matters            within        its  scope of responsibility              are    being    properly            addressed            and    within      its  resources,          and    on schedules      that    are    consistent          with the   needs    of its  stakeholders.                 Input      from        the    Commission,             the   NRC    staff  , and   affected      stakeholders                    is  used    in  this process.        A  Memorandum                  of Understanding                      with    the   NRC    Executive          Director          for Operations                                                                        (EDO)    provides            a framework              for    NRC  staff  interaction                  with    the   ACRS. The  ACRS      conducts        formal          self assessments              to improve            its effectiveness        and    efficiency.        A  report        is  provided              to   the   Commission                on  the   outcome        of this    process.       The   focus    of the  ACRS      work    during        FY 2003   was  on  risk-informed                  and    performance-based                          regulatory                initiatives,             license renewal        applications,               review      standard          for  extended        core    power      uprates,           framework                for advanced                                                                reactor          licensing, early      site    permit          review      standard,             future          plant      designs,       reactor        oversight              process,       reactor            vessel  head      penetration cracking          and    reactor          vessel    head      degradation,                 pressurized                water      reactor        sump        performance,                 safeguards              and security            matters,             improvement                    of the    quality        of risk    information                for    regulatory                decisionmaking                  , probabilistic                risk assessment            quality,         safety      culture,           and  the  NRC    safety        research            program.
20c. How frequent and relevant are the Committee meetings?
20b. How  does  the  Committ    ee  balance    its  me  mb    ership  ?
The full LSNARP met once on June 3, 2003 in Las Vegas to review guidelines and possible rule changes for electronic submittals of adjudicatory material to the HL W proceeding when it starts. During the year, the LSN Administrator also met with individual representatives of the potential parties to the HL W proceeding to assist in their setting up local document repositories that could be accessed by the LSN.
The    Commission            appoints          ACRS      members              with    the  scientific      and    engineering            expertise        needed        to  address          the safety      issues  of importance                    to  the Commission.                                                                 Members          are  sought        who  can    provide        an independent                perspective on  nuclear        safety        issues,   outstanding                scientific    and    technical          ability, balanced                                                                                                                      and  mature        judgment,             and  a willingness        to  devote      the    time        required            to  the  demanding              work    involved.            Members          are  appointed            for    4-year        terms and,     absent        unusual          circumstances,                     do  not  serve      more      than    three      terms.         Members          are    reappointed                at the    end    of a 4-year        term        only    if there        is  a    compelling          continuing            need    for    their      expertise.           Vacancies      in  the    ACRS    membership are  filled    from the                                                                                              pool  of applicants                which    exists  after      solicitations            of interest          are  published          in  the    Federal Register        , trade      and  professional              society      publications,            and    the    press.       Recommendations                      to  the Commission                                                                      as  to  the selection      of qualified        candidates              from this                                                                                                  pool  are  made      by  the    ACRS    Member          Candidate            Screening          Panel.     The ACRS    normally              provides          input      to  this    Panel. During        FY  2003 , the  membership                      was  comprised            of indi    v iduals      with diverse          employment                backgrounds                and  included        those    experienced            in  the  areas      of nuclear          power      plant      operations; probabilistic                risk    assessment;                analysis        of severe      reactor        accident          phenomena;                  design    of nuclear        power      plant structures                  , systems,         and  components;                  chemical        engineering;              material              s and  metallurgy;                and    thermal-hydraulics and    computational                    fluid      dynamics.             The    diversity            of viewpoints            represented                  by    current        members                is  based    on special
20d. Why can't the advice or information this committee provides be obtained elsewhere?
The advice provided by the state, county and tribal governmental units, together with other potential users of the LSN, is unique to this particular computer application. It is not available from other existing committees or within the NRC itself. NRC considers it essential that advice on the design of the software and hardware should come from representatives of the future hands-on users of the LSN. During this reporting period, the Licensing Support Network became fully operational and the Advisory Review Panel began to address implementational and operational issues and rule changes the appear to be necessary to accomidate the state of the electronic document processing capabilities of the NRC and potential parties.
20e. Why is it necessary to close and/or partially close committee meetings?
The LSSARP did not hold any closed meetings in FY 2003.
: 21. Remarks NONE Designated Federal Official: Dr. Andrew L Bates DFO Committee Members Start Bates, Andrew L 6/15/2000 Bradshaw, Les 1/15/1993 Brandt,Joy 10/1/2000 Clark, Ray 7/1/1999 Fiorenzi, Leonard 7/1/1999 Frishman, Steve 7/1/1999 Graser, Daniel 10/1/1999 Holden, Robert 7/1/1999 Kalt, Alan 7/1/1999 Kraft, Steven 1/1/1998 Larson, Josie 10/1/2002 Leake, Harry 6/1/2002 Linehan,John 6/1/2003 Mathias, Linda 10/1/2001 McCorkell, George 10/1/2000 Murphy, Malachy 12/18/1989 Pitts, Jason 10/1/2001 Remus, Andrew 10/1/2001 Treichel, Judy 1/1/1998 von Tresenhausen, Engelbrech 7/1/2001 Total Count of Committee Members End Occupation 9/30/2006 US Nuclear Regulatory Commission 9/30/2006.,...Nye County, Nevada 9/30/2006 "'l.,ander County, Nevada 9/30/2006 US EPA 9/30/2006 ~ ureka County, Nevada 9/30/2006.... State Of Nevada 5/31/2003 US Nuclear regulatory Commission 9/30/2006 National Congress of American Indians -
9/30/2006....-Churchill County, Nevada 9/30/2006 ~
uclear Energy Institute - Energy Coalition 9/30/2006 "'White Plan County, Nevada 9/30/2006 US Departmant of Energy 9/30/2006 U S Nuclear Regulatory Commission 9/30/2006 v Mineral County, Nevada 9/30/2006 v Esmeralda County, Nevada 9/30/2006 ye County, Nevada 9/30/2006..-i,incoln County, Nevada 9/30/2006 Inyo County, Nevada 9/30/2006 Nevada Nuclear Waste Task Force 9/30/2006 Clark County Nevada 20 http://www.fido.gov/facadatabase/rptannualreport.asp Page 2 of 2 12/01/2003


http    ://www. fido. g ov /faca  d a tabase/rptannualreport. a s p                                                                                                                                                                                                              11/24/2 003 Annual      Report .                                                                                                                                                                                                                             Page  5   of 6
Annual Report Page 1 of 2 2003 Current FY Report: Review of Federal Advisory Committee 12/16/2003 4:06:46 PM Committee Menu I. Department or Agency Nuclear Regulatory Commission
: 3. Committee or SubCommittee PEER REVIEW COMMITTEE FOR SOURCE TERM MODELING
: 4. Is this New During Fiscal Year?
: 5. Current Chan er
: 6. Expected Renewal Date Yes Sa. Was Terminated During FY?
No
: 9. Agency Reconunendation for Next FY Continue
: 11. Establishment Authority
: 12. Specific Establislunent Authority 42 u.s.c. 2201 I 5. Description of Committee I 6a. Total Number of Reports 1
I 6b. Repon Titles and Dates 10/10/2002 10/10/2004 Sb. Specific Termination Authority 42 u.s.c. 2201
!0a.Legislation Req to Terminate?
No Agency Authority
: 13. Effective Date 7/1/1958 Scientific Technical Program Advisory Board
: 14. Conunittee Type Continuing
: 2. Fiscal Year 2003 3b. GSA Committee No.
13888
: 7. Expected Term Date 9/30/2004 Sc.Actual Termination Date I Ob.Legislation Pending?
14c. Presidential?
No Peer Review Committee Report for "NRC Spent Fuel Source Term Guidance Document" 9/30/2003 17a Open:
0 17b. Closed:
4 Meeting Purposes and Dates The Committee reviewed SNL activities and aided SNL in development of guidance documents on source terms to 17c. Panially Closed:
0 17d. Total Meetings 4 assist the NRC in evaluations of the impact of specific terrorist activities targeted at a range of spent fuel storage casks and radioactive material transport packages 1/28/2003 8:30:00 AM 1/29/2003 5:00:00 PM including those for spent fuel.
The Committee reviewed SNL activities and aided SNL in development of guidance documents on source terms to assist the NRC in evaluations of the impact of specific terrorist activities targeted at a range of spent fuel storage casks and radioactive material transport packages including those for spent fuel.
The Committee reviewed SNL activities and aided SNL in development of guidance documents on source terms that 4/8/2003 4/9/2003 will assist the NRC in evaluations of the impact of specific 9/16/2003 9/18/2003 terrorist activities targeted at a range of spent fuel storage casks and radioactive material (RAM) transport packages.
The Committee reviewed Sandia National Laboratories (SNL) activities and aided SNL in development of guidance documents for estimating source terms resulting from 9/25/2003 9/26/2003 sabotage attacks on spent fuel transportation and storage containers.
18a( I) Personnel Pmts to Non-Federal Members I 8a(2) Personnel Pnlts to Federal Members I 8a(3) Personnel Pmts to Federal Staff I 8a(4) Personnel Pmts to Non-member Consultants http://www.fido.gov/facadatabase/rptannualreport.asp Current Fiscal Year
$228,850
$39,333
$0
$0 Next Fiscal Year
$250,000
$50,000
$0
$0 12/16/2003


fields    of interest,          employment                  experience,          and   technical        expertise.          These    member          attributes                provide          the    Committee with    the    balance      of highly      qualified            technical          expertise        and    diverse        safety        perspectives              necessary            to carry        out  the Committee's                statutory                responsibilities                  effectively.
Annual Report 18b(I) Travel and Per Diem to Non-Federal Members I 8b(2) Travel and Per Diem to Federal Members 18b(3) Travel and Per Diem to Federal Staff
20c. How  frequent  and relevant    are  the  Committee          meetings?
$27,355
The  ACRS    and   its  subcommittees                    held    53 meetings        during        FY  2003,   of which      10 were    Full    Committee                meetings.
$30,000
The    number        of meetings        held    in  a    reporting              period        is  directly          related          to    the  number          of nuclear        safety      matters              to  be reviewed          as  required            by  statute;            the    number        of rules    and   regulatory                guidance          referred            to   the    Committee              for review      and  comment;              the  number        of special        reviews      requested            by  the    Commission,             EDO,   or other    Federal Government                  organizations;                  and    other    safety      issues  of particular              concern            to  the    Committee              and  its  stakeholders.
$0
All  of the    Committee            members              normally              meet        10  times      a  year      for    3  or 4  days      in  Full    Committee              meetings,           to consider        important            safety-related                    nuclear          issues,   generic      issues,    significant            regulatory              matters,              rules,      and regulatory                guidance.         The  ACRS      subcommittees,                      which  are  normally                comprised            of three        to  six  members              with  the relevant            expertise,        meet    as  necessary              with    stakeholders                  to  conduct        in-depth              reviews      of particular              matters            for    later consideration                  by    the  full    membership                  during        Full    Committee               meetings.            Although        not  required            by  the   revised FACA,    subcommittee                  meetings          are  conducted            under      the   same      FACA    procedures              as  the  Full      Committee                meetings to  facilitate          public      participation                  and  to  provide            a forum        for  stakeholders                  to  express      their      views  on  regulatory matters            being    considered          by    the   ACRS.      These      meetings      are  utilized          to  make        efficient      use  of Committee              resources.
$10,000 I 8b(4) Travel and Per Diem to Non-Member Consultants 18c.Other(rents,user charges,graphics,printing,mail etc.)
Reviews    are  conducted          during        each      Full    Committee               meeting          to   assess    the     relevance          of proposed            review topics, resource            needs,    and   the  priority            of each    activity.            These    assessments            have      the    benefit      of input    from        the  Commission, EDO,    and   other    stakeholders.                 The   self-assessment              conducted            by    the    ACRS    for    its  CY  2002 and   CY 2003  activities involved            collection    of input    from        a    variety            of stakeholders.                 This    information                    was  used      to  assess    the   relevance          of ACRS    activities.            All  ACRS      meetings         for    this    reporting            period        addressed              either        matters          for    which    ACRS      review was    required            by  statute        or regulation,                specific    requests        from        either        the   Commission            or the  EDO,    or other important              regulatory              matters            within        the  ACRS    scope  of responsibility.
$0
20d. Why   can 1 the advice   or information        this committee         provides     be obtained   elsewhere?
$0
The   ACRS      is  an independent              body      of recognized          experts      in the  field    of nuclear          reactor        safety        whose    Congressional mandate              is  to  provide          the Commission                                                                          with  independent                advice.        Particular              duties      of the  ACRS      (e.g., review      of operating              reactor          license    renewal        applications,               core    power      uprates,           advanced            reactor          designs,    safeguards            and security            issues,   and   rules      and    regulations)              are    dictated            by  statute          or  regulation.            In addition,          functional arrangements                      exist  wherein,        upon      request,          the   ACRS    also  provides            advice        to  the    U.S. Navy,      the  Department              of Energy,          and    the  Defense    Nuclear          Facilities        Safety      Board.        The    Commission              has  its  own  expert      staff    on  whom    it relies    in the  day-to-day                regulation            of nuclear          power    facilities.      The  ACRS      provides          the    Commission            and  the  NRC staff    with    an independent,                critical review                                                                                                                    of high-level        regulatory                issues    under      consideration              by  the    NRC  and independent                  technical        insights        as    to important              matters            needing        Commission              attention.             The  ACRS    members            are part-time                special    government                  employees            with    other      full-time          interests            and    activities          in  related        fields,   and  provide          a breadth        of experience,        an independent                perspective            on issues,   and    technical          knowledge        that    is  not  duplicated            by  the NRC's      full-time          government                  employees.              A standing          committee            such      as  the  ACRS      remains          current        with      respect        to nuclear        safety        issues    of importance                    to  the  NRC,   including        those      related          to  reactor          operating            experience,           regulatory reform,          and  NRC's      needs    for    safety        research,           and  provides          an independent,                   collegial  judgment            regarding              these issues    that    other      part-time              consultants              could    not  provide.          The  ACRS      meetings          provide        an  important              forum          to stakeholders                  to  express      freely        their      concerns          on safety      issues  and    regulatory                  process.        A number        of important              safety initiatives              have    had  their      origins        in ACRS      deliberations.              Through          the    ACRS,     the    public    and  the    Congress        are ensured        of an independent                technical            review      and  evaluation            of the  safety      of NRC-licensed          reactor          facilities, proposed            reactor        designs,    significant            regulatory                issues,  and  other    significant          safety        issues,  and  of an opportunity for    stakeholder              input.
$0
20e. Why      is  it  necessary    to  close  and/or partially      close  committee        meetings?
$0
During        this    period,        the    Committee                held      10 full    Committee              meetings          and    one  special      symposium.              Of these      10 meetings,            5 meetings        were    partially                closed    to  protect          proprietary                  information                        (5  U.S.C. 552b(c)(4)    and    1 to  discuss information                  classified    as  national            security          information                as  well  as  unclassified          safeguards            information                        (5  U.S.C.
$0
552b(c)(l)            and      (3), and  3  meetings            were    completely            closed    to  discuss      information                  classified    as  national          security information                    as  well as  unclassified          safeguards              information                      (5  U.S.C. 552b(c)(l)            and      (3).
$0 18d Total
: 21. Remarks None
$295,538
 
$340,000 I 9. Federal Staff Support Years 0.3 20a. How does the Committee accomplish its purpose?
Designated    Federal  Official  :                      Michele      S  Kelton      DFO Committee          Members                                          Start                                                                                                                    End                                                                                                                    Occupation Apostolakis,          Dr.                  6/4/1995  6/2/2007    Professor,          Nuclear        Engineering              Department,                  Massachusetts              Institute            of George      E.                                                                                                                                                                                                                                                                                                                                                                                                                                              Technology
The Committee will develop guidance documents that will assist the NRC in evaluating the impact of specific terrorist activities targeted at a range of spent fuel storage casks and radioactive material (RAM) transport packages, including spent fuel. The guidance will provide the NRC the bases for improving the allocation of resources for protecting radioactive materials and for responding to terrorist attacks.
 
20b. How does the Committee balance its membership?
http://www. fido. gov /facadatabase/rptannualreport.asp                                                                                                                                                                                          11/24/2003 Annual      Report .                          ~                                                                                                                                                                                                                                                              Page  6  of 6
0.3 Membership on the committee will be balanced to obtain the range of scientific and technical expertise needed to calculte and develop guidelines for radioacctive source terms (radiation doses and contamination). The expertise needed includes individuals with experience in structural, nuclear, and thermal engineering, fuel performance and source term evaluations, consequence analyses, weapons and explosives, and transportation of radioactive material.
 
20c. How frequent and relevant are the Committee meetings?
Bonaca,      Dr.                            1/6/1999 1/5/2007  Retired,          Director          ,      Nuclear        Engineering          Department,                  Northeast            Utilities Mario        V.
It is estimated that the full Committee will meet 6 times a year with approximately 4 working group meetings each year.
Ford,    Dr. Peter                      3/23/2001 3/22/2005 Consultant            and  retired          Program          Manager,            General          Electric        Research        and F.                                                                                            Development              Center Kress,    Dr.                              9/4/1991 9/3/2007  Retired,          Head    of Applied      Systems          Technology          Section,    Oak  Ridge    National Thomas            S.                                                                          Laboratory Leitch,      Mr.                          7/10/2000 7/9/2004  Retired,          Vice-President,            Limerick            Generating              Station,        PECO      Energy; GrahamB.                                                                                      Retired          Vice-President,            Maine      Yankee    Atomic        Power      Co., Member,            Offisite Safety        Review      Committee,              Calvert          Cliffs  Nuclear        Power    Plant Powers,Dr.                                  6/6/1994 6/5/2006 Senior      Scientist,      Nuclear        Facilities      Safety      Department,                Sandia        National Dana    A.                                                                                    Laboratories Ransom,          Dr.                      3/2/2002 3/6/2006  Professor          Emeritus,            Purdue        School  of Nuclear        Engineering Victor      H.
20d. Why can't the advice or infonnation this committee provides be obtained elsewhere?
Rosen,    Mr.                              6/12/2001 6/11/2005 Retired,          Manager,          Risk    Management              and  Industry              Relations,      STP  Nuclear Stephen          L.                                                                            Operating            Company            at South      Texas    Project          Electric        Generating            Station Shack,      Dr.                                                                                                                  8/1/1993 7/31/2005 Associate      Director,          Energy          Technology          Division,      Argonne        National William      J.                                                                                                                                                                                                                                                                                                                                                                                                Laboratory Sieber,      Mr. John        7/12/1999 7/11/2007 Retired,          Senior      Vice-President,            Nuclear        Power      Division,    Duquesne        Light D.                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        Company Wallis,    Dr.                                                                                                              1/23/1998 1/22/2006 Retired,          Professor,        Thayer          School  of Engineering,            Dartmouth                    College GrahamB.
The range of wxpertise needed by the committee in explosives, military weapons structural, nuclear, and thermal engineering, fuel performance and source term evaluations, and consequence analyses is not available within the NRC.
Total  Count  of Committee        Members                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    11
20e. Why is it necessary to close and/or partially close committee meetings?
 
Meetings will be closed to discuss classified material related to national security.
http://www.fido    .gov/facadatabase/rptannualreport.asp                                                                                                                                                                                                                                                      11/24/2003 Annual      Keport                                                                                                                                                                                                                                                                                                                                                                                        Pagel            of 2
2 1. Remarks None Designated Federal Official: TBD Committee Members Start End Occupation Anderson, Charles 10/10/2002 9/30/2004 SwRI Baker, Ernie 10/10/2002 9/30/2004 ARDEC Beyer, Carl 10/10/2002 9/30/2004 PNNL Darrow, Elizabeth 10/10/2002 9/30/2004 USEC Einziger, Robert E 10/10/2003 9/30/2004 Independent Consultant Haschke, John 10/10/2002 9/30/2004 LLNL Holm, Judith 10/10/2002 9/30/2004 DOE Interrante, Charles 10/10/2002 9/30/2004 NRC Tinkler, Charles 10/10/2002 9/30/2004 NRC Total Count of Committee Members 9
 
http://www.fido.gov/facadatabase/rptannualreport.asp Page 2 of 2 12/16/2003}}
2003    Current                            FY      Report:                      Review        of Federal                  Advisory                    Committee                                                                                                                                                                                                      Committee      Menu 12/18/2003 4:25:52                                                                                                                                                                                                                                PM I . De pa nm    e nt    o r  Agenc  y                                                                                                                                                                                                                                                                                                              2. Fi  sca l  Yea  r Nuclear          Regulatory                      Commission                                                                                                                                                                                                                                                                                                        2003
: 3. C ommi      tt  ee  or S u bC omm      ittee                                                                                                                                                                                                                                                                          3b . GSA    Comm      ittee    No.
Advisory              Committee                      on    the      Medical          Uses  of Isotopes                                                                                                                                                                                                                                                          1102
: 4.      Is  thi s  Ne  w  Du rin g    Fi  sca  l  Year?                                                                                                                                                                                                                  5. C  urre  nt  C h a n  e  r                                                                                                                                                                                                                                                                                                            6.      Expect  ed    Re  new  al    Dat e 7. Exp ected T enn  Da te No                                                                                                                                                                                                                                                                                                                                                                  9/25/2003                                                                                                                                                                                                                                                                                                                                        3/20/2004 3/20/2004 8a. Was  Te n n    in a ted  Dur  ing    FY?                                                                                                                                                                                                                                                                                                                                                                                                                                                              8b. Sp ecific    Te rmination          Au  th  or ity Sc. Actua l T ermination          Dat  e No                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          42  u.s.c.                  2201 9 . Agency        Recomm      e ndation      fo  r  Nex  t  FY                                                                                  I0a.L  eg  is la tion  Req  to  Term  in  a te?                                                                                                                                                                                                                                                                                            I Ob .Le gi  slat  ion    Pe  nd  ing?
Continue                                                                                                                                No
: 11. Es tab  li    shme  n t  Au  tho  ri    ty                                                                                                                                                                                                                        Agency        Authority
: 12. Sp ec  ifi c  Establi  s  hm    e nt      Auth  o rit y                                                                                                  13. Effectiv    e  Dat e                                              14 . C  ommi        tt  ee T  y pe                                                14c. Pres  id e ntia  i0 42    u.s.c.                    2201                                                                                  7/1/1958                                                                Continuing                                                                                  No
 
15  . Des  crip tio n of C ommitt      ee                                                              Scientific          Technical            Program Advisory                Board 16a . To tal  Num    be  r of Re  po n    s 3
16b. Re pon    T  it    les and Dates Minutes          of October              28,  2002  Meeting                                                                                                                                                                                                                                              1/14/2003 Minutes        of the      May        20-21,    2003  Meeting                                                                                                                                                                                                                                          7/20/2003 Minutes          of the      July              17,  2003  Meeting                                                                                                                                                                                                                                        9/17/2003 17a  Ope  n:                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        1 17b . C  lo sed  :                                                            1 17c . Pani  a  ll  y C  losed: 1 17d  . T ota  l  Mee tings      3 Mee  ting  Purpo  ses  a  nd    Dates
 
To    discuss        various              medical-related                            issues    and          initiatives.                                                                      10/28/2002    10/28/2002 Discussion      of internal                administrative                              matters                    and s afeguards                information                        (closed    session)      and          discussion        of                                    5/20/2003 5/21/2003 various            medical-related                            issues      and          initiatives.
This        was  a    teleconference                  meeting                in      which        the      Agreement States        and            the      NRC/ACMUI      engaged              in    detailed discussion        of the        NRC      staff's          draft            amendments                              to      the training                and        experience                  (T &E)      requirements                              for                                                                    7/17/2003 7/17/2003 Authorized                  Users        (A Us),  Authorized                    Medical              Ph      y  sicists (A MPs),      Authorized                    Nuclear            Pharmacists                          (ANPs    ),  and Radiation                Safety          Officers            (RSOs).        This        meeting              was    closed due        to    the      predecisional                    nature              of the      discussion.
 
Curr e  nt    Fis ca l Yea  r                                                                  Ne  x    t    Fi  s  cal      Y    ea  r I 8a( I  ) Pe rsonn  e l  Pmt  s to    Non - Fed e  ral    Me mb  e  rs                                                                                                                                                                                              $0                                                                                                  $0 I 8a(  2) Pe rsonn  e l  Pmt    s to    Fed e ral  Memb  e rs                                                                                                                                                                                      $26,656                                                                                              $28 ,000 I 8a(3)    Pe  rsonn  e l Pm  ts  to  Fede  ra  l S taff                                                                                                                                                                                        $116  ,000                                                                                          $119 ,000 I Sa( 4)    Pe rs onn  e l Pm    ts  to      No  n- m  e mb    e r C on  sult a  nt s                                                                                                                                                                                $0                                                                                                  $0 I 8b ( I ) Tra  ve  l a nd  Pe  r  Di  e  m    to    Non-F  ed e ral    Me mb  e  rs                                                                                                                                                              $11  ,353                                                                                          $12 ,000
 
I 8b  (2) Trav    el a nd  Pe  r  Di  e m    to    Fed e  ra  l  Me mb  e rs                                                                                                                                                                                      $0                                                                                                  $0 I 8 b(3)  Trav    e l and    Pe  r  D ie m    to    Fed e  ra  l Staff                                                                                                                                                                                              $0                                                                                                  $0 I 8 b(4)  Trav    e l and    Pe  r  Di  e m    to    Non  -  Me  mb  e  r C on  sultant  s                                                                                                                                                                          $0                                                                                                  $0 I 8c. Oth e r(re nt  s .use r  ch arges.g    ra ph  ics. print  in  g. mail    e tc .)                                                                                                                                                                          $0                                                                                                  $0 18d                                                                                                                  T ota  l                                                                                                                  $154,009                                                                                            $159 ,000
 
http://www.fid  o.g  o  v  /faca  d atab  as  e/rpta nnu  a  lreport.a      s p                                                                                                                                                                                                                                                                                                                      12/18/200  3 Annual        Keport                                                                                                                                                                                                                                                                      Page    2  of 2
: 19. Federal  StaffSu          ppo  n    Years                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  1.5                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                              1.5
 
20a. How    do  es  the  Committee          accompli      sh  it s  purpo  se?
The    NRC  staff    believes    that      licensees,    the    general        public,      and      medical        professionals            benefit        when    recognized experts        provide          advice      to  the  staff.      This    advice        enables      staff      to  develop        rules    that      will  maintain            public    safety,      while not  inappropriately                      intruding              upon      the  practice          of medicine.        The  Staff    provides          a  summary                of issues  to    be addressed            during          meetings,        and    the  ACMUI      discusses      the    issues  and    gives    advice      and    makes        recommendations                        to the  Staff. Furthermore,                      the  ACMUI      keeps    staff  abreast          of new  developments.                This    ongoing    communication                    helps ensure        that    staff      is  aware      of important                issues  during        critical      stages      rule    development.                  When      issues  that      need special    emphasis          arise,      working        groups      and    subcommittees                are  formed.
20b.      Ho w does      th e  Com  mitt    ee  balanc                              e  it  s  membership?
Membership                    is  balanced              by    placing        individuals          of diverse        specialty        on  the  committee.            For  instance,        there      are members who                                                                                                                                                represent            both    diagnostic        and    therapeutic                applications          of medicine.        There      are    members              who  have      a regulatory                function          within    their      specialties.        There          is  a    member                who  represents              medicine        from      an  administrative standpoint,              and    there        is  a  patient          advocate          member,                who  represents            patients'              interests.          ACMUI      members              also perform            regular          self-evaluations,                in  which    they        give  feedback          on  the  appropriateness                    of the    committee's composition.
20c. How    fr eq  ue nt    and    re  lev    ant  are  th  e Committee            m  ee ting  s?
Committee                meetings      are  generally            held    semi-annually.                  The  committee              will hold    more      frequent            meetings        when important                issues  emerge,      or  when    issues    need    timely          resolution.
20d. Wh y  can'  t th e  advice      or infomia      ti  on thi s comm          itt ee  pro  v  id es    be obtained      elsewhe    re?
NRC    continues            to strive          to  achieve        its  goal  of creating            risk-informed,                performance-based                          regulations          that      provide for    the    health      and    safety      of the  public        while  imposing          no  unnecessary              burden          on    licensees. Furthermore,                        the medical        profession        continues          to  see  regular          advances            that      create      unique        regulatory                challenges.      The    advice      and recommendations                    from        medical        professionals              who  are  exposed      to    these  advances                is  crucial          to  the NRC                                                          staff's ability        to  continue        to  regulate          effectively.
20e. Wh  y    is    it      necessary        to clo se  and/or pa rtially      close  committee            m ee tin gs?
Meetings    are  closed    to  conduct        annual        ethics      briefings,        conduct          reviews    of paperwork              of a  personal        and confidential          nature,          and      to  discuss    administrative                      matters            that    are    purely internal                                                                                                                                                    to  Committee              business.      It would be  inappropriate                          to  conduct        these    types    of meetings        openly.        They      must        be  conducted            privately              to  allow  Committee members              the    freedom            to  ask  and    answer        personal          questions        and      to    protect        individuals'                  privacy.
 
2    1. Rema    rk  s None
 
Designated        Fed era  l Official:                  Mr. Thomas            H  Essig  DFO Committee            Me mb  ers                                                        Start                                                                                                                                              End                                                                                                                                        Occupation Cerqueira                M.D.,  Dr. Manuel          D.                              5/13/1998      9/30/2004      Nuclear        Cardiologist Diamond          M.D.,    Dr. David        A.                                      11/8/2000      9/30/2006      Radiation            Oncologist Eggli  M.D.  , Dr. Douglas    F.                                                  4/11/2002                              4/11/2005 Nuclear      Medicine      Physician Hess,  Ms. Maureen                                                                  1/1/2003                          1/1/2006          Food    and    Drug    Administration                      Representative Hobson      , Ms. Nekita                                                              5/13/1998      9/30/2004      Patient        Advocate Lieto,    Mr.      Ralph        P.                                                      9/27/2001      9/27/2004      Medical      Physicist-Nuclear                  Medicine Malmud            M.D.,  Dr. Leon    S.                                          9/27/2001      9/27/2004      Hospital      Administrator McBurney,                Ms. Ruth                                                    5/13/1998      9/30/2004      State    Representative Nag  M.D.,    Dr. Subir                                                              11/8/2000      9/30/2006      Radiation            Oncologist Schwarz            M.S.,  Ms. Sally      W.                                        11/8/2000    9/30/2006      Nuclear      Pharmacist Vetter      Ph.D.,    Dr. Richard        J.                                        11/8/2000    9/30/2006      Radiation            Safety      Officer Williamson            Ph.D.,  Dr. Jeffrey          F.                            11/8/2000      9/30/2006      Therapy              Physicist Total    Coun  t of Commi        tt  ee  Members                                                                                      12
 
http://www. fi do    .g ov/facadatabase/rptannualreport.asp                                                                                                                                                                                                                              12/18/2003 Annual      Report                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            Page      1 of 4
 
2003      Current                            FY      Report:                        Review        of Federal Advisory                                                                                                                                                                                                          Committee                                                                                                                                              Committee    Menu 11/24/2003 11:26:05      AM I. Department        or  Agency                                                                                                                                                                                                                                                                                                                                                                                                                        2. Fiscal  Year Nuclear            Regulatory                    Commission                                                                                                                                                                                                                                                                                                                                                                                                                    2003
: 3. Committee or                                                                                                                          Subcommittee                                                                                                                                                                                                                                                                    3b. GSA    Committee          No  .
Advisory                Committee                      on    Nuclear            Waste                                                                                                                                                                                                                                                                                                                                                                                          1100
: 4. Is    this    New    During    Fiscal    Year?                                                                                                                                                                                                                                    5. Current    Charter                                                                                                                                                                                                                                                                                                                6. Expected    Renewal      Date                                                                                                                                                                                          7 . Expected    Term    Date No                                                                                                                                                                                                                                                                                                                                                                      7/17/2002                                                                                                                                                                                                                                                                                                                                                    7/17/2004 Sa. Was  Terminated          During  FY?                                                                                                                                                                                                                                                                                                                                                                                                                                                                Sb. Specific    Termination        Authority                                                                                                                                                                                                                                                                                                                                                                      Sc.Actual  Termination        Date No                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            42 u.s.c.                  2201
: 9. Agency      Recommendation            for    Next    FY                                                                                                                                      !Oa.Legislation      Reg  to  Terminate?                                                                                                                                                                                                                                                                                        !Ob.Legislation    Pending?
Continue                                                                                                                                                                          No
: 11. Establishment        Authority                                                                                                                                                                                                                          Agency        Authority
: 12. Specific      Establishment        Authority                                                                                                                                                                                                                                                                                                                                                                                                                                                                        13. Effective        Date                                                                                                                                                                                                  14. Commi11ee Type 14c. Presidential?
42 u.s.c.                  2201                                                                                                                          1/6/1988                                                                                      Continuing                                                                                                                No
: 15. Description    of Committee                                                                                                    Scientific        Technical              Program Advisory              Board 16a. Total    Number    of Reports 9
16b. Report  Titles    and    Dates Orphan                Sources                                                                                                                                                                                                                                                                                                                                                                                                                          10/17/2002 Capabilities                of Engineered                  and        Natural                Barriers                                                                                                                                                                                                                                                                                                                                                  12/6/2002 ACNW        Meeting            in    Nevada,            September                    23-26, 2002                                                                                                                                                                                                                                                                                                                                                        12/13/2002 Review      and        Evaluation                  of the      U.S. Nuclear              Regulatory                    Commission's                      Waste          Safety          Research              Program                                                                                                                                                                                                                            12/30/2002 Transportation                                Working              Group            Meeting                                                                                                                                                                                                                                                                                                                                                          ln/2003 Comments              on  the  National        Academies'            Study,          "One    Step    At  A Time:        The  Staged      Development              of                                                                                                                                                                                                                                                                            6/9/2003 Geologic      Repositories              for      High-Level              Radioactive                  Wastes" Total        System            Performance                        Assessment            Working              Group              Session,      March              25-26,  2003                                                                                                                                                                                                                                                                    6/12/2003 Fiscal      Years          2003  and        2004  Action        Plan        for      the      Advisory                Committee                  on  Nuclear            Waste                                                                                                                                                                                                                                                                  6/23/2003 High-Level              Waste:              Risk-Significance                  Ranking            of Agreements                and        the      Use  of Risk      Information                              to                                                                                                                                                                                                                                    8/13/2003 Resolve        Issues 17a Open:                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        16                                                                                                17b. Closed:                                                              0                                                                                                                              17c . Partially    Closed:                                                                                              0                                                                                                                                                                                                                      17d. Total    Meetings            16 Meeting    Purposes      and    Dates
 
138th      Full        Committee                    &  Workshop                on  Transportation                            of                                                                                                                          11/19/2002 11/21/2002 Nuclear              Materials Planning                &  Procedures                                                                                                                                                                                                                      11/20/2002  11/20/2002 Planning                  &  Procedures                                                                                                                                                                                                                      12/17/2002  12/17/2002 139th      Full        Committee                                                                                                                                                                                                                            12/17/2002 12/19/2002 Planning                &  Procedures                                                                                                                                                                                                                      3/25/2003 3/25/2003 140th      Full        Committee                  and        Working              Group                on    NRC      and DOE      Performance                        Assessments:                Assumptions                  and                                                                                                                                                  3/25/2003 3/27/2003 Differences Planning                &  Procedures                                                                                                                                                                                                                      4/22/2003 4/22/2003 141st    Full      Committee                                                                                                                                                                                                                              4/22/2003 4/23/2003 Planning                  &  Procedures                                                                                                                                                                                                                      5/28/2003 5/28/2003 142nd      Full        Committee                                                                                                                                                                                                                            5/28/2003 5/30/2003 Planning                  &  Procedures                                                                                                                                                                                                                      6/24/2003 6/24/2003
 
http://www. fido. gov /facadatabase/rptannualreport. asp                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          11/24/2003 Annual      Report                                                                                                                                                                                                          Page  2  of 4
 
143rd      Full    Committee                                                                              6/24/2003 6/25/2003 144th    Full    Committee                                                                                7/29/2003 7/31/2003 Planning              & Procedures                                                                        7/29/2003 7/29/2003 Planning              & Procedures                                                                          9/23/2003 9/23/2003 145th    Full    Committee                                                                                9/23/2003 9/24/2003
 
Curr ent  Fiscal    Year                            Next  Fiscal  Year 18 a( 1) Perso nn  el  Pmt  s  to  Non  -Federal      Memb  ers                                                                    $186,647                                                $194,486
 
I 8 a(  2 ) Pe rso nn e l Pmt  s  to  Federal  Member  s                                                                                      $0                                                      $0 18a( 3  ) Pe rsonn e l Pmt  s  to    Federal  Staff                                                                                  $488,193                                                $508,697 18a( 4  ) Perso nn el  Pmt  s  to  No  n-m  ember    Co ns  ultant s                                                                            $0                                              $5,136 l 8b  ( 1) Tra  ve    l and  P er  Di e m  t  o Non-Fed    eral  Memb  e rs                                                            $61,221                                                  $74,946 l 8b (2 ) Trav    e  l and  P er  Diem      to  Federal  Memb  ers                                                                              $0                                                      $0 18b(3)  Trav    e l  and  Per  Di  em    to  Federal    St aff                                                                      $16,315                                                  $17,947 18b(4 ) Trav    e l  and  Per  Di e m  to  Non-Memb      er Consult    a  nt s                                                          $1,007                                                $12,087 I 8c  .Oth  er(re nt s, us e r char ges  ,graphics    ,printin  g,  mail    etc .)                                                      $16,104                                                  $16,104 18d                                                                                                                    Total          $769,487                                                $829,403 19 . Fede ral  St aff Supp  o rt    Ye ars                                                                                                        4.5                                                    5.5
 
20a . How  does  th e  Committ    ee  acc omplish      its purp  ose?
The    Committee              reports            to  and    provides            the    Commission              with    independent                  review      of and  advice      on  technical matters            related          to  nuclear          waste    management.                    The  bases    of ACNW      reviews        include          10  CFR  Parts        61, 63, 71,  and 72,  and    other    applicable            regulations            and  legislative        mandates.              The  ACNW    undertakes                studies      and    activities          related to  the    transportation,                      storage,        and    disposal        of high-            and    low-level      radioactive                waste,    including        the  interim          storage of spent      nuclear          fuel;    materials              safety;          decommissioning;                  application              of risk-informed                  and    performance-based regulations;              and  evaluation              of licensing      documents,              rules,      regulatory                guidance,          and  other      issues,    as  requested            by the  Commission.              The    Committee              interacts              with    representatives                    of the    public,      NRC,    the  Advisory          Committee              on Reactor        Safeguards,              other      Federal          agencies,      State    and  local  agencies,        Native      American              Nations,      and    private, international,                  and    other      affected        organizations                  as  appropriate                to  fulfill    its  responsibilities.              The    Committee              issues written          reports,            providing            advice      on matters            within      its  scope  of responsibility                and    meets      periodically            with    the Commissioners                in  public      meetings          to  discuss      issues  of mutual          interest.            The  focus    of the    ACNW    work    during          FY 2003  has    been    on  the    proposed          high-level          waste    repository              at Yucca      Mountain,              Nevada,        and  on issues    related          to  the decommissioning                of nuclear          facilities.      The  ACNW    members            are    chosen    for    their      technical        expertise        relevant          to waste    management                  issues  important                to  the    Commission.            Consultants              are  used    on  occasion      to  augment            the    expertise of the  ACNW    members            in specific    areas.        The    Committee            has    a  full-time          staff    that    provides            technical        support, administrative                        services,      and    assures          compliance              with    FACA    requirements.                    ACNW      working        groups,        comprised            of the  ACNW    members              and  consultants              with    the  appropriate                expertise,          are  used    on occasion      to  address          specific technical          issues    in  depth.        These    working        groups        meet      in  public      meetings        and  their      activities        are  also  conducted under      FACA      requirements.                    Stakeholder                participation                  in  ACNW      meetings            is  encouraged            and    routinely            occurs.
ACNW    meeting        agenda,          meeting        transcripts,                  and  letter        reports          are  available          for  downloading          or viewing    on  the Internet          at http://www.nrc.gov/reading-rm/adams.html                      or http://www.nrc.gov/reading-rm/doc-collections/. The ACNW    issues    an  Action    Plan    for    Commission              approval            and  conducts            a  self assessment              which    includes      the    use  of extensive        stakeholder              input.        The  ACNW      conducts        ongoing      reviews      of its  plans      and  schedules to                                                                                                                                                    assure        that    it properly              addresses          regulatory                matters              within      its  scope  of responsibility                and  on schedules        that    are  consistent        with the    needs    of its  stakeholders.                Input      from          the Commission,                                                                  the  NRC    staff,      and  affected        stakeholders                is  used    in  this process.        A Memorandum                  of Understanding                      with    the  NRC  staff    provides            a  framework                for    interactions              between      the ACNW    and    the  staff.
20b . Ho w does  th  e Co  mm    itt  ee  b alance  it s  me  mb  e rs hip  ?
 
The    Commission            appoints          ACNW      members                with    the  scientific      and    engineering              expertise          needed        to  address          the waste    management                  issues  of importance                    to  the    Commission            . Members          are  sought        who  can    provide        an independent perspective              on  waste    management                  issues,    and    who  possess  outstanding                scientific      and    technical        ability        ,  balanced and  mature        judgment,              and  a    willingness        to  devote        the    time      required            to  carry        out  the    timely        completion          of the Committee's                  work.      Members          are  appointed            for    4-year        terms        and,    absent        unusual          circumstances,                do  not  serve      more than      two  terms.          Members          are    reappointed                at the  end  of a  4-year        term        only    if there        is  a  compelling        continuing            need for    their      expertise.          Vacancies      in  the  ACNW      membership                  are  filled    from        the    pool  of applicants              which    exists  after solicitations          of interest        are    published            in  the  Federal          Register,        trade      and    professional            society      publications,            and  the
 
http    ://www.fido.gov/facadatab ase/rptannualreport. as p                                                                                                                                                                  11/24/2003 Annual      Report                                                                                                                                                                                                              Page    3  of 4
 
press.        Recommendations                          to  the    Commission              as  to  the  selection      of qualified        candidates              from        this pool                                                              are  made      by the  ACNW    Member          Candidate            Screening          Panel.      The  ACNW    members              normally              provide          input      to  this    Panel. The diversity              of viewpoints          represented                by  current          members                  is  based      on special      fields    of interest,            professional experience,            and  technical        expertise.          These    member            attributes                provide          the  Committee                with    the    balance      of highly qualified          technical          expertise        and    diverse          perspectives                necessary            to  effectively        carry        out  the  Committee's                statutory requirements.                      At  the  end  of FY  2003,  the    Committee                included          two  members            from        academia,              one  member          from      a national          laboratory,                  and    two  members              from        private          industry.              During        FY  2003,  the  ACNW    included          members experienced              in  radioactive              waste    management,                    chemistry,                health          physics,      nuclear        engineering,              risk    assessment, environmental                        engineering,          performance                  assessment,              hydrology,              research            , and    technical        management.                  There      has been    a  systematic              effort      to  obtain        members              with    backgrounds                that    can    address          the  difficult        and  diverse        questions associated            with      radioactive              waste    management.                    This    concentration                of the    relevant            scientific      proficiency            within    the Committee,                together          with    a  diversity            of viewpoints          and    perspectives,              provides          assurance            that    adequate, independent,                  and    open    discussion      and  analysis          of the    potential          hazards            associated            with    the  management                of nuclear waste    can  take      place  .
20c. How  frequent    and  re le v ant  are  th e Committ    ee  meetings    ?
Normally,                all  ACNW      members            meet      8  times        a  year      for    2-3  days    in  Committee                meetings.          In FY  2003,  the  ACNW held    8  Committee                meetings.        The  number        of meetings          held    is  directly          related          to  the  scope    of NRC's      efforts      on  the high-level          waste      geologic  repository              and  other      issues    involving          waste    management,                    the  number          of criteria            , guides, and    technical          positions        referred              to  the    ACNW    for    review      and  comment,            the    number        of special        reviews        requested by  the    NRC    staff,    and  the  number          of important                topics    of concern          to  the    Committee              and  its  stakeholders.                The A CNW  Action      Plan    for    Fiscal    Years        2003  and  2004  formed          the    basis  for    the  selection      of issues    to  be addressed during        its  2003  meetings.        The    Committee              intends            to  meet      once  each    year      in  the    vicinity          of Yucca    Mountain          in Nevada        to  provide          an opportunity                  for    local  stakeholders                    to  participate                in  its  meetings.          Such    a  meeting          was  held  on November                    19 and    20, 2003. The    written          reports          that    contain          the  ACNW's        advice      are  issued      during          Committee meetings.          When      resources        are    available,            the  ACNW    holds      working      group        meetings        on particularly                    complex      issues.
At these      meetings,          additional            time      and    expertise          can    be  brought          to  bear    on an issue    and  the  subject          developed      for the    Committee                consideration.                Reviews    are  conducted            during      each    Committee              meeting            to  assess    the    relevance        of proposed            meetings        and    review      topics,      resource            needs,    and    the    priority            of each    activity.            These    assessments          have    the benefit      of input      from        the  Commission,            NRC's        Executive          Director          for    Operations                (EDO),    and  other    stakeholders.
The    ACNW    also  conducts        a  self assessment            once    every          2 years.        These    self assessments              involve        collection    of input from          a  variety            of stakeholders.              This    information                      is  used      to  assess    the    relevance          of ACNW    activities.            All ACNW meetings        for    this    reporting            period      addressed              matters            delineated            in  the  ACNW's        Action      Plan,      specific    requests      from either        the    Commission            or the  EDO,    or other      important              regulatory              matters            within      the  ACNW's        scope  of responsibility.
20d . Why  can  't th e  ad v  ice or inform  atio n thi  s co mm    itt ee  provi  des  be obt  ained elsew he re?
The    ACNW      is  an independent                body      of recognized            experts        in the  field    of nuclear          waste    management                      whose mandate              is  to  provide          the    Commission              with    independent                advice.      The  ACNW    provides          the    public      assurance          that  an independent                technical          review    and    evaluation              of nuclear          waste    safety      issues    is  accomplished              and  an opportunity              for public      input      is  assured.          Decisions    relating            to    waste    management                  that    are    expected        to  be  before      the Commission include        the    licensing      of the  proposed          Yucca    Mountain              high-level        waste    repository,              the  West    Valley      Demonstration Project        and  West    Valley    Site  and  other    site  decommissionings,                  nuclear          reactor        decommissioning,                  and    low-level waste    management.                    The    Commission            has    its    own  expert      staff  of NRC    employees          on  whom      it relies    in  its  day-to-day operations.                However,          the    Commission            has    no  other      advisory            committee            with    the    broadly            based      expertise        of the ACNW      that    could      be called    upon    for  independent              and    informed              assessment          of safety        issues    related          to  high-          and low-level      waste      management.                In  addition,            since    members            are    part-time              advisors            with    other    interests          and  activities in  related            fields,      they      provide          a    breadth          of exper      ience,    an  independent                perspective            on issues,    and  technical knowledge        that    is  not  duplicated            by  the    NRC    staff.      The    ACNW    provides          the Commission                                                                        with    both    an independent,                  critical          review    of high-level        regulatory                  issues    under      consideration                by    the    NRC  and  independent technical          insights        on  important              matters            needing        Commission              attention.            In  addition,            a  standing          committee            such  as the  ACNW,      supported              by    a  technical        staff,      remains            currently              informed            with    respect          to  nuclear          waste    issues of importance                    to  the    Commission,            including          NRC-sponsored                  safety        research,          and  provides          an informed,              collegial judgment            regarding              these  issues    that    would      not  be obtained            by    use  of individual              part-time                consultants            on a  case by-case basis.
20e . Why  is it    necessary      to  cl  ose and/or parti all  y  cl  os e co mmitt    ee  me  etings  ?
During        this period,                                                                      the    Committee            held    8 Full    Committee                meetings.          All  portions          of these    meetings          were  open    to public      attendance.
 
2    1. Remar    ks NONE
 
http    ://www.fido.gov/facadatabase/rptannualreport.a      s p                                                                                                                                                                  11/24/2003 Annual    Report .                  .,                                                                                                                                                                                                                                                                                                                                                                                                                      Page 4  of 4
 
Designated Federal Official:                    Michele        Kelton      DFO Committee Members                                                            Start                                                                                                                                                            End                                                                                                                                                                Occupation Garrick,                Dr.        B.                                      3/6/1994                      6/30/2007    Consultant John Hornberger,                      Dr.                                        9/23/1996    6/30/2004  Professor,              Dept.      of Environmental                          Sciences,    University              of Virginia GeorgeM.
Levenson,            Mr.                                                    5/l 7 /2000                10/10/2003 Consultant Milton Ryan,        Dr.        Michael                                            6/26/2002                      6/25/2006 Consultant T.
Weiner,          Dr.        Ruth                                            9/15/2003  9/14/2007    Consultant Wymer,Dr.                                                                    10/11/1997 3/30/2003    Retired,              Distinguished              Scientist            in    the      International                        Technology RaymondG.                                                                                                                                                      Programs                    Division      of Martin              Marietta                  Energy            Systems,              Inc.
Total Count of Committee Members                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    6
 
http://www.fido.gov/facadatabase/rptannualreport.asp                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          11/24/2003 Annual      Report                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  Page      1 of 2
 
2003    Current                        FY      Report:                        Review        of Federal                  Advisory                    Committee                                                                                                                                                                                                                                                                                                                                                                        Committee      Menu
 
12/1/2003 4:10:04        PM I. Department      or  Agency                                                                                                                                                                                                                                                                                                                                                                                                                                                                      2. Fiscal  Year Nuclear            Regulatory                    Commission                                                                                                                                                                                                                                                                                                                                                                                                                                                                    2003
: 3. Committee or                                                                                                                                    SubCommittee                                                                                                                                                                                                                                                                                                  3b. GSA    Committee        No.
Licensing            Support                System            Advisory                Review        Panel                                                                                                                                                                                                                                                                                                                                                                                                                      1104 4 . Is    this  New    During  Fiscal    Year?                                                                                                                5. Current    Charter                                                                                                                                                                                                                                                                          6. Expected      Renewal      Date 7. Expected  Term      Date No                                                                                                              12/12/2002                                                                                                                                                                                                                                                                                                                          12/12/2004 12/14/2006 8a. Was Terminated          During    FY?                                                                                                                                                                            8b. Specific    Termination        Authority                                                                                                                                                                        Sc .Actual  Termination        Date No                                                                                                                                                                                    42 u.s.c.                  2201 9 . Agency      Recommendation            for    Next    FY                                                                                                                                                            !Oa.Legislation      Req  to  Terminate?                                                                                                                                                        I Ob.Legislation  Pending?
Continue
: 11. Establishment        Authority                                                                                                                      Agency        Authority
: 12. Specific    Establishment        Authority                                                                                                                                                                                      13. Effective      Date                                                                                14. Committee        Type                                                                                            14c. Presidential?
42 u.s.c.                  2201                                                                                                                                        1/19/1975                                                                                                  Continuing                                                                                                                          No
 
15  . Description    of Committee                                                                                                                    Non    Scientific          Program Advisory                Board 16a. Total    Number    of Reports 1
16b. Report  Titles    and    Dates Report/Transcript                      of June          3, 2003  Meeting                                                                                                                                                                                                                                                                                                                                                                                  6/3/2003
 
17aOpen:                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  1                                                                                    17b. Closed:                                                                  0                                                                                                                                        17c . Partially      Closed:                                                                                                        0 17d . Total  Meetings          1 Meeting    Purposes    and    Dates
 
Review        Alternatives                    and        Proposed              Guidelines              for submitti?g                      electroni~                                                          documents                  through                                                          N_RC's                                                                              61312003 S:00:00      AM    6/3/2003 5:00:00        PM Electromc                  Information                        Exchange            for      the                                                                                                High                      Level        Waste Adjudicatory                        Proceeding
 
Current    Fiscal    Year                                                                                                                                                                                                                  Next    Fiscal          Year l 8a(l)    Personnel      Pmts    to    Non-Federal      Members                                                                                                                                                                                                                                                                                                                      $0                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        $0 l 8a(2)  Personnel      Pmts    to  Federal    Members                                                                                                                                                                                                                                                                                                            $6,000                                                                                                                                                                                                                                                                                                                                                                                                  $8,000 l 8a(3)    Personnel    Pmts      to    Federal    Staff                                                                                                                                                                                                                                                                                                              $6,000                                                                                                                                                                                                                                                                                                                                                                                                          $8,000 18a(4)  Personnel    Pmts      to    Non-member        Consultants                                                                                                                                                                                                                                                                                                                      $0                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        $0 l 8b(l)      Travel        and  Per  Diem    to  Non  -Federal    Members                                                                                                                                                                                                                                                                                                              $0                                                                                                                                                                                                                                                                                                                                                                                                  $1,000 l 8b(2)  Travel        and  Per  Diem    to  Federal    Members                                                                                                                                                                                                                                                                                                  $4,857                                                                                                                                                                                                                                                                                                                                                                                                          $7,000
 
l 8b(3)  Travel        and  Per  Diem    to  Federal    Staff                                                                                                                                                                                                                                                                                                                        $0                                                                                                                                                                                                                                                                                                                                                                                                        $2,000 18b(4) Travel        and  Per  Diem    to  Non-Member      Consultants                                                                                                                                                                                                                                                                                                                  $0                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        $0
 
18c.Other(rents      ,user charges,graphics          ,printing          ,mail    etc  .)                                                                                                                                                                                                                                                                              $2,692                                                                                                                                                                                                                                                                                                                                                                                                                  $3,000 18d                                                                                                            Total                                                                                                                                                                                                                                            $19,549                                                                                                                                                                                                                                                                                                                                                                                          $29,000
: 19. Federal    Staff  Support    Years                                                                                                                                                                                                                                                                                                                                              0.0                                                                                                                                                                                                                                                                                                                                                                                                                                                                        0.0
 
20a. How  does    the Committee          accomplish        its  purpose?
 
The      Nuclear Regulatory                                                                                                                                                            Commission                  relies      on    the      Licensing        Support                Network              Advisory                Review      Panel        (LSNARP) for      advice          and          recommendations                              on    the      design      and          operation              of the    searchable                    electronic            database                (Licensinf Support                Network            (LSN))    for      documents                  that          will  relevant                  to    the    licensing        of a  geologic    repository                    for      the      storage          of high      level      nuclear              waste.      The      document                collection          will contain            electronic            copies    of all    of the      material                  that          will be used        by      parties              in    the      NRC's          licensing        proceeding                for      a    high      level    radioactive                      waste        repository.                  The      LSN    is  in operation                    and      has        been      loaded          with      approximately                              10,000  documents                as    of the      end    of FY-2003.      During          the    year            the Committee                    provided                advice on                                                                                                                      guidelines            to    electronically                  transmit                  large          and        complex          documents.                  DOE    also
 
http://www.fido.gov/facadatabase/rptannualreport.asp                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  12/01/2003 Annual      Report                                                                                                                                                                                                                                                                                                                                                                                                    Page    2  of 2
 
advised        that    estimates          of the  size  of its  document              collection    had    risen    from        10,000  to  3  -        4  million      and  the  LSN is now  being    re-configured                  to  accomidate            the  increased            volumn.          Document          loading      should be                                                                                                                  completed          by  June 2004 in anticipation                of the  Department              of Energy's            submittal              of a  License    Application          in December            2004.
20b. How does  th e Committ    ee balance  it s  me  mb  ership ?
The    membership                  of the  LSNARP      is  balanced          by being                                                drawn        from        among        the  full    spectrum            of potential        parties        to NRC's      anticipated                licensing      proceeding        for    the  burial        of high    level    radioactive            waste.      Since    the  burial      site  under review      is  in  Nevada,        the  membership                  includes the                                                                                                                                  State      of Nevada,        local county                                                                                  governments                  of both    Nevada      and California,            Indian        tribes,        represented                  by  the  National          Congress        of American          Indians          and  the    Nevada        Nuclear Waste      Task    force.      It also  includes      the    nuclear        industry,                the    potential          licensee  (DOE)    and  the  licensing    agency (NRC). Input      by    these    representatives                      is  essential to                                                                                                                                    the  success  of the    LSN  project.          During        this    year      an  effort    was made      to  bring      additional            tribal        representation                      to  the    Committee.
20c  . How    fr equ  ent  and  re lev    ant are  th  e Co mmitt  ee m ee tings?
The  full  LSNARP      met    once  on June    3, 2003 in Las    Vegas    to  review      guidelines      and    possible      rule    changes    for electronic        submittals              of adjudicatory                  material              to  the    HL W    proceeding          when  it starts.        During        the  year,      the    LSN Administrator                      also  met      with  individual              representatives                    of the  potential          parties        to  the  HL W  proceeding          to  assist in their    setting      up  local    document            repositories            that    could      be accessed      by    the  LSN.
20d . Why    can    't the  advice    or information      this committ    ee  provides    be  obtained  elsewher  e?
The    advice      provided              by    the  state      , county      and    tribal        governmental                    units,      together          with    other      potential        users      of the LSN,  is  unique          to  this    particular              computer            application.              It is  not  available          from      other      existing      committees          or within the  NRC    itself. NRC    considers        it essential      that    advice      on  the  design    of the  software        and  hardware            should      come from        representatives                    of the  future          hands-on          users      of the    LSN. During        this    reporting            period,        the    Licensing    Support Network          became        fully    operational              and    the    Advisory              Review    Panel      began      to address          implementational                      and operational                issues  and    rule    changes      the  appear        to  be necessary          to  accomidate            the  state      of the  electronic      document processing        capabilities          of the  NRC    and    potential          parties.
20e. Wh y    is  it nec e ssary    to clo se and/or partially  close co mmitt    ee  m ee ting s?
The    LSSARP        did    not  hold    any    closed  meetings        in FY  2003.
 
2  1. Re m arks NONE
 
Des  ign ated  Fe  deral  Officia l:              Dr. Andrew        L    Bates  DFO Com    mitt ee  Mem    bers                                                                                                                                                                                                                                                                                                                                                                                      Start End                                                                                                                                                                Occ  up atio n Bates,    Andrew          L                                                                                                                                                                                                                                                                                                                                                  6/15/2000 9/30/2006                US  Nuclear        Regulatory                Commission Bradshaw,            Les                                                                                                                                                                                                                                                                                                                                                                                      1/15/1993 9/30/2006 .,...Nye County,        Nevada Brandt,Joy                                                                                                                                                                                                                                                                                                                                                                                                                                                    10/1/2000 9/30/2006 "'l.,ander County,        Nevada Clark      , Ray                                                                                                                                                                                                                                                                                                                                                                                                                                                  7/1/1999 9/30/2006                US  EPA Fiorenzi,          Leonard                                                                                                                                                                                                                                                                                                                                      7/1/1999 9/30/2006 ~                          ureka County,        Nevada Frishman,                Steve                                                                                                                                                                                                                                                                                                                                                                7/1/1999 9/30/2006 .... State    Of Nevada Graser,          Daniel                                                                                                                                                                                                                                                                                                                                                                                      10/1/1999 5/31/2003              US  Nuclear      regulatory                  Commission Holden      ,  Robert                                                                                                                                                                                                                                                                                                                                                                                7/1/1999 9/30/2006            National        Congress      of American            Indians                                    -
Kalt,    Alan                                                                                                                                                                                                                                                                                                                                                                                                                                                          7/1/1999 9/30/2006 ....-Churchill County,        Nevada Kraft,        Steven                                                                                                                                                                                                                                                                                                                                                                                                                          1/1/1998 9/30/2006 ~                                uclear Energy          Institute              -        Energy          Coalition Larson,          Josie                                                                                                                                                                                                                                                                                                                                                                                                            10/1/2002 9/30/2006 "'W  hite Plan    County,          Nevada Leake,      Harry                                                                                                                                                                                                                                                                                                                                                                                                                  6/1/2002 9/30/2006                US  Departmant              of Energy Linehan,John                                                                                                                                                                                                                                                                                                                                                                                                              6/1/2003 9/30/2006            U S Nuclear      Regulatory                Commission Mathias,          Linda                                                                                                                                                                                                                                                                                                                                                                                    10/1/2001 9/30/2006 v Mineral        County,        Nevada McCorkell,          George                                                                                                                                                                                                                                                                                                              10/1/2000 9/30/2006 v Esmeralda              County,          Nevada Murphy,              Malachy                                                                                                                                                                                                                                                                                                                                  12/18/1989 9/30/2006                                                ye    County,        Nevada Pitts,    Jason                                                                                                                                                                                                                                                                                                                                                                                                                                                              10/1/2001 9/30/2006 ..-i,incoln County,        Nevada Remus,        Andrew                                                                                                                                                                                                                                                                                                                                                                        10/1/2001 9/30/2006      Inyo County,        Nevada Treichel,        Judy                                                                                                                                                                                                                                                                                                                                                                                                      1/1/1998 9/30/2006            Nevada        Nuclear        Waste      Task    Force von    Tresenhausen,                  Engelbrech                                                                                                                  7/1/2001 9/30/2006      Clark                                      County        Nevada Total  Count  of Committ    ee  Me mb  ers                                                                                                                                                          20
 
http://www.fido    .gov/facadataba  se/rptannualreport.asp                                                                                                                                                                                                                                                                                                                                                            12/01/2003 Annual        Report                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          Page      1 of 2
 
2003      Current                          FY      Report:                      Review        of Federal                  Advisory                      Committee                                                                                                                                                                                                                      Committee      Menu
 
12/16/2003 4:06:46        PM I . Department        or  Age n cy                                                                                                                                                                                                                                                                                                                                2. Fiscal  Y ear Nuclear Regulatory                                                                                                                                                              Commission                                                                                                                                                                                            2003
: 3. Com  mittee      or S  ubComm        ittee                                                                                                                                                                                                                                                                                          3b. GSA    Comm        ittee    No.
PEER            REVIEW              COMMITTEE                          FOR        SOURCE            TERM          MODELING                                                                                                                                                                                                                                                    13888 4 . Is  this    New    During      Fi sca  l Year?                                                                                                                                                                                                              5. Current      C han er                                                                                                                                                                                                                                                                                                                      6.      Expect  ed  Re newa  l Date 7. Expected Term Date Yes                                                                                  10/10/2002                                                                                                                                                                                                                                                                                                                                10/10/2004 9/30/2004 Sa. W as  Terminat      ed  During      FY?                                                                                                                Sb. S  pecific  Term      in  a ti  on  Authority                                                                                                        Sc.Actua    l Terminat        ion  Date No                                                                                                                                  42  u.s.c.                  2201
: 9. Agency        Reconunendatio          n  for    Next    FY                                                                                            ! 0a.Legis      lation    Req    to  Terminate?                                                                                            I Ob.Legis  lation    Pending    ?
Continue                                                                                                                                      No
: 11. Estab    li  shm  e nt    Authority                                                                    Agency        Authority
: 12. Specific      Establi    slunent      Authority                                                                                                                  13. Effec  ti    ve    Dat  e                                            14  . Conunit    tee Typ  e                                                          14c . Pres  idential?
42  u.s.c.                  2201                                                                                          7/1/1958                                                                    Continuing                                                                                        No
 
I 5. Des  cription    of Committee                                                                      Scientific          Technical            Program Advisory                Board I 6a. Total    Number    of Re ports 1
I 6b. Repon    Titles    and    Date s Peer        Review        Committee                  Report            for          "NRC            Spent        Fuel      Source          Term              Guidance                Document"                                                                                                                                                                                                                                                            9/30/2003
 
17a Open:                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            0                                                                                17b. C lo sed:                                                                4 17c. Pania      ll  y C  losed:                                                                                                    0                                                                                                                                                                                                        17d. Total Mee tings      4 Meet  in g  Purpose  s a  nd  Dates
 
The        Committee                    reviewed            SNL    activities and                                                                                                                                                                            aided        SNL      in development                of guidance documents                                                                                                                                                                                                      on    source          terms                to assist        the      NRC        in    evaluations                of the      impact          of specific                                                                                            1/28/2003 8:30:00          AM      1/29/2003 5:00:00        PM terrorist                    activities            targeted                    at      a    range          of spent          fuel    storage casks      and          radioactive                  material                  transport                        packages including              those      for      spent          fuel.
The      Committee                  reviewed            SNL    activities and                                                                                                                                                                        aided        SNL      in development                of guidance documents                                                                                                                                                                                                      on    source          terms                to assist        the      NRC          in    evaluations                of the      impact          of specific                                                                                        4/8/2003  4/9/2003 terrorist                    activities            targeted                    at      a    range          of spent          fuel    storage casks      and          radioactive                  material                  transport                      packages including              those    for      spent        fuel.
The      Committee                    reviewed            SNL      activities              and          aided          SNL      in development                of guidance              documents                  on  source          terms              that will  assist          the      NRC        in    evaluations                of the      impact          of specific                                9/16/2003 9/18/2003 terrorist                    activities            targeted                  at      a    range          of spent        fuel    storage casks        and          radioactive                  material                      (RAM)      transport packages.
The        Committee                  reviewed            Sandia            National              Laboratories (SNL)    activities            and          aided        SNL      in    development                of guidance documents                      for      estimating                source          terms              resulting              from                                                                                                    9/25/2003 9/26/2003 sabotage              attacks              on    spent          fuel      transportation                                  and        storage containers.
 
Curren    t  Fisca  l  Yea  r                                                                      Next  Fiscal    Year 18a(    I  )  Pers  onn e l Pmt    s to    Non-Fe deral      Members                                                                                                                                                                                      $228,850                                                                                                  $250,000 I 8a(2) Perso  nnel Pnlts to    Federal      Members                                                                                                                                                                                                              $39,333                                                                                                  $50,000 I 8a(3)    Pe rso nn el Pmts    to  Fede  ral Staff                                                                                                                                                                                                                            $0                                                                                                        $0 I 8a(4)    Pe  rson  nel    Pmts    to    Non-member          Consu    ltant  s                                                                                                                                                                                              $0                                                                                                        $0
 
http://www.fido.gov/facadatabase/rptannualreport.asp                                                                                                                                                                                                                                                                                                                                                                          12/16/2003 Annu  al Report                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    Page  2  of 2
 
18b(I)      T  rave    l and    Per  Diem    to    Non-Federa      l Members                                                                                                                                                                                                                                                                                                  $27  ,355                                                                                                                                                                                                                                                                                                                                                                                                                                                                        $30,000 I 8b(2)    Travel        and  Per    Diem      to    Federa  l  Membe    rs                                                                                                                                                                                                                                                                                                                              $0                                                                                                                                                                                                                                                                                                                                                                                                    $10,000 18b(3)    Trave      l a  nd  Pe r  Diem      to  Federa    l Staff                                                                                                                                                                                                                                                                                                                                        $0                                                                                                                                                    $0 I 8b(4)    Trave      l and    Pe  r  Diem    to  No n-  Member    Consul    ta n ts                                                                                                                                                                                                                                                                                                                    $0                                                                                                                                                    $0 18c .O  th er(rents,      u se r  c harges,grap        hi    cs  , printin  g,ma      il  e tc.)                                                                                                                                                                                                                                                                                                            $0                                                                                                                                                    $0 18d                                                                                                                          To  ta l                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                $295,538                                                                                                                                                                                                                                                                                                                                                                                      $340,000
 
I 9. Fede  ra l S t aff S  u pport    Yea  rs                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            0.3 0.3
 
20a. H ow  does    the  Comm      ittee  accom      pl  is  h  it s  p u rp ose?
The      Committee                        will develop          guidance documents                                                                                                                                                                                          that            will  assist        the      NRC        in    evaluating                      the      impact          of specific terrorist                    activities              targeted                  at      a    range          of spent          fuel    storage            casks        and          radioactive                  material                    (RAM)      transport packages,                including  spent                    fuel. The      guidance                will  provide                the      NRC        the      bases      for      improving                    the      allocation          of resources                  for      protecting                  radioactive                    materials                    and        for        responding                      to    terrorist                    attacks.
20b. How  does      th e  Com  mitt    ee  ba  la nce  it  s  membe      rshi    p?
Membership                        on      the    committee                  will    be    balanced                  to    obtain            the        range        of scientific        and          technical          expertise            needed        to calculte          and          develop          guidelines          for        radioacctive                    source            terms              (radiation                  doses      and        contamination).                              The      expertise needed          includes            individuals                  with      experience                  in    structural,                          nuclear,                and        thermal                  engineering                ,  fuel    performance                        and source          term            evaluations,                consequence              analyses            ,  weapons          and          explosives        , and          transportation                            of radioactive material.
20c . How    frequen    t  and    re levant      are  the  Committee          mee  ti  ngs?
It is  estimated                  that          the      full      Committee                    will  meet        6 times        a    year            with      approximately                            4  working            group            meetings          each year.
20d. Wh y  can't      the  advice      or  infonna        ti    on    thi  s  comm      ittee  prov    ides  be ob ta  in  ed  e lsew  here?
The      range          of wxpertise            needed            by        the    committee                      in      explosives,          military                  weapons          structural,                          nuclear            , and          thermal engineering,                  fuel    performance                          and        source            term            evaluations,                    and        consequence              analyses                is  not      available                within        the NRC.
20e. Wh  y    is  it    necessary        to c lose  and/or partia    ll  y  close  comm      ittee    meeti    ngs?
Meetings            will    be      closed      to    discuss        classified          material                    related                to      national            security.
 
2    1. Remarks None
 
Designated      Federa      l Official:                              TBD Committee            Membe    rs                                                                                                                                                                                                                                                                                                                                            Start                                                                                                                                                                                                                                                                                        End                                                                                                                                                                                                                      Occ  u pa t ion Anderson,                  Charles                                                                                                                                                                                                                                                                            10/10/2002                                                                                                                          9/30/2004                                                                                                          SwRI Baker,          Ernie                                                                                                                                                                                                                                                                                                                                                                          10/10/2002                                                                                                                          9/30/2004                                                                                                      ARDEC Beyer        , Carl                                                                                                                                                                                                                                                                                                                                                                                                10/10/2002                                                                                                                          9/30/2004                                                                                                        PNNL Darrow,              Elizabeth                                                                                                                                                                                                                                                                                        10/10/2002                                                                                                                          9/30/2004                                                                                                          USEC Einziger,                Robert              E                                                                                                                                                                                                                                                                    10/10/2003                                                                                                                        9/30/2004                                                                                                        Independent                        Consultant Haschke,            John                                                                                                                                                                                                                                                                                                                                            10/10/2002                                                                                                                          9/30/2004                                                                                                            LLNL Holm,        Judith                                                                                                                                                                                                                                                                                                                                                                          10/10/2002                                                                                                                          9/30/2004                                                                                                        DOE Interrante,                          Charles                                                                                                                                                                                                                                                                      10/10/2002                                                                                                                          9/30/2004                                                                                                                    NRC Tinkler,                Charles                                                                                                                                                                                                                                                                                                                    10/10/2002                                                                                                                        9/30/2004                                                                                                              NRC
 
To tal Co u nt  o  f Com    m    itt ee  Me  mb  e rs                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      9
 
http  ://www.fido.gov/facadatabase/rptannualreport.asp                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                           12/16/2003}}

Latest revision as of 19:55, 24 November 2024

2003 Annual Report - Review of Federal Advisory Committee
ML24059A211
Person / Time
Issue date: 12/01/2003
From:
NRC/SECY
To:
References
Download: ML24059A211 (16)


Text

. Annu<!l Report Page 1 of 6 2003 Current FY Report: Review of Federal Advisory Committee ll/24/200311:29:39 AM Committee Menu I. Department or Agency

2. Fiscal Year 2003 Nuclear Regulatory Commission
3. Committee or SubCommittee 3b. GSA Committee No.

Advisory Committee on Reactor Safeguards 207

4. Is this New During Fiscal Year?
5. Current Charter
6. Expected Renewal Date
7. Expected Term Date No 12/19/2002 12/19/2004 Sa. Was Terminated During FY?

Sb. Specific Termination Authority Sc.Actual Termination Date No

9. Agency Recommendation for Next FY Continue

!Oa.Legislation Req to Terminate?

!Ob.Legislation Pending?

No

11. Establishment Authority
12. Specific Establishment Authority Statutory(Congress Created)
13. Effective Date
14. Committee Type Continuing 14c. Presidential?

42 U.S.C. Sect. 2039 & 2232 1/1/1957

15. Description of Committee 16a. Total Number of Reports 34 16b. Report Titles and Dates Scientific Technical Program Advisory Board Draft Regulatory Guide DG-1120 and Standard Review Plan Section 15.0.2 Concerning NRC Reviews of Transient and Accident Analysis Methods Confirmatory Research Program on High-Burnup Fuel Draft Report, "Guidance for Performance-Based Regulations" Recommendations Prop. by RES for Resolving GSI-189, Susceptability of Ice Condenser & Mark III Contnmnts to Early Failure fm Hydrogen Combustion During Severe..

Draft Commission Paper on Policy Issues Related to Non-Light-Water Reactor Designs Report on the Safety Aspects of the License Renewal Applications for the North Anna Power /stations Units 1&2 and the Surry Power Station Units 1&2 Framatome ANP S-RELAP5 Realistic Large-Break Loss-of-Coolant Accident Code Draft Final American Nuclear Society External Events Probabilistic Risk Assessment Methodology Standard Draft Final Regulatoty Guide DG-1077, "Guidance for Environmental Qualification of Microprocessor-Based Equipment Important to Safety in Nuclear Power Plants" Report on the Safety Aspects of the License Renewal Application for the McGuire Nuclear Station Units 1&2 and Catawba Nuclear Station Units 1&2 Proposed Resolution of Generic Safety Issue-191, Assessment of Debris Accumulation on PWR Sump Performance Pressurized Thermal Shock (PTS) Reevaluation Project: Technical Bases for Potential Revision to PTS Screening Criteria Draft Review Standard, RS-002, Processing Applications for Early Site Permits Reactor Oversight Process Draft Final Regulatory Guide DG-1119, Guidelines for Evaluating Electromagnetic and Radio-Frequency in Safety Related Instrumentation and Control Systems Report on the Safety Aspects of the License Renewal Application for the Peach Bottom Atomic Power Station Units 2&3 Proposed NRC Generic Letter 2003-XX: Control Room Habitability Draft Final Risk-Informed Revision to 10 CFR 50.44, "Combustible Gas Control in Containment" No 10/1/2002 10/17/2002 10/17/2002 11/13/2002 12/13/2002 12/18/2002 12/20/2002 12/20/2002 2/14/2003 2/14/2003 2/20/2003 2/21/2003 3/12/2003 3/13/2003 3/13/2003 3/14/2003 4/17/2003 4/21/2003 Prop. Resolution of Public Comments on Draft Reg. Guide DG-1122, An Approach for Determining the 412112003 http://www.fido.gov/facadatabase/rptannualreport.asp 11/24/2003

. Annu~l Report Technical Adequacy of PRA Results for Risk-Informed Activities NUREG/CR-6813, Issues and Recommendations for Advancement of PRA Technology in Risk-Informed Decision Making Improvement of the Quality of Risk Information for Regulatory Decisionmaking Vessel Head Penetration Cracking and Reactor Pressure Vessel Degradation Draft Final Regulatory Guide 1.178 and Standard Review Plan Section 3.9.8 for Risk-Informed Inservice Inspection of Piping NUREG-1635 Vol. 5, Review and Evaluation of the Nuclear Regulatory Commission Safety Research Program, A Report to the USNRC Update to License Renewal Guidance Documents: Response to Staff Requirements Memorandum Dated July 17, 2002 Safety Culture Proposed Criteria for the Treatment of Individual Requirements in a Regulatory Analysis 4/29/2003 5/16/2003 5/16/2003 5/16/2003 5/31/2003 6/24/2003 7/16/2003 7/17/2003 Security of Nuclear Facilities 7/18/2003 Report on the Safety Aspects of the License Renewal Application for the St. Lucie Nuclear Plant Units 911712003 1 and2 Draft Final Regulatory Guide X.XXX, An Approach for Determining the Technical Adequacy of PRA 912212003 Results for Risk-Informed Activities Draft Final Revision 1 to Regulatory Guide 1.53, "Application of the Single Failure Criterion to Safety 912212003 Systems" Draft Final Review Standard for Extended Power Uprates, RS-001 9/24/2003 Proposed Recommendations for Resolving Generic Issue 186, "Potential Risk and Consequences of Heavy Load Drops in Nuclear Power Plants" 9/24/2003 Draft Final Revision 3 to Regulatory Guide 1.82, "Water Sources for Long-Term Recirculation Cooling 913012003 Following a Loss-of-Coolant Accident" 17a Open:

46 Meeting Purposes and Dates Plant License Renewal Subcommittee Planning & Procedures Subcommittee Reactor Fuels Subcommittee Planning & Procedures Subcommittee 496th Full Committee 17b. Closed:

4 17c. Partially Closed:

10/8/2002 10/8/2002 10/9/2002 10/9/2002 10/9/2002 10/9/2002 10/9/2002 10/9/2002 10/10/2002 10/12/2002 Workshop on Nuclear Regulatory Decisionmaking Process 10/15/200210/18/2002 Tour of Mixed-Oxide Fuel Fabrication Facility 10/21/2002 10/21/2002 Meeting with SKB-SKI Representatives and Tour of Storage Facilities Quadripartite Meeting Plant License Renewal Subcommittee Safeguards & Security Subcommittee Joint Reliability & Probabilistic Risk Assessment and Plant Operations Subcommittees Thermal-Hydraulic Phenomena Subcommittee Safety Research Program Subcommittee Planning & Procedures Subcommittee 497th Full Committee Thermal-Hydraulic Phenomena Subcommittee Planning & Procedures Subcommittee Safety Research Program Subcommittee 498th Full Committee http://www.fido.gov/facadatabase/rptannualreport. asp 10/21/2002 10/23/2002 10/23/2002 10/25/2002 10/30/2002 10/30/2002 10/31/2002 10/31/2002 11/1/2002 11/1/2002 11/5/2002 11/5/2002 11/6/2002 11/6/2002 11/6/2002 11/6/2002 11n 12002 111912002 11/12/2002 11/14/2002 12/4/2002 12/4/2002 12/4/2002 12/4/2002 121512002 12n 12002 9

17d. Total Meetings 59 Page 2 of 6 11/24/2003

. Annu~l Report Thermal-Hydraulic Phenomena Subcommittee Joint Reliability & Probabilistic Risk Assessment and Plant Operations Subcommittees 12/11/2002 12/12/2002 1/21/2003 1/21/2003 Safety Research Program Subcommittee 1/22/2003 1/22/2003 Reliability & Probabilistic Risk Assessment Subcommittee 1/22/2003 1/22/2003 Reliability & Probabilistic Risk Assessment Subcommittee 1/23/2003 1/24/2003 Thermal-Hydraulic Phenomena Subcommittee Materials & Metallurgy Subcommittee Planning & Procedures Subcommittee 499th Full Committee Symposim on Role of Advisory Committee in Nuclear Regulation and Safety 500th Full Committee Thermal-Hydraulic Phenomena Subcommittee Plant License Renewal Subcommittee Planning & Procedures Subcommittee 501st Full Committee Reactor Fuels Subcommittee Materials & Metallurgy Subcommittee Safeguards & Security Subcommittee Planning & Procedures Subcommittee 2/4/2003 2/4/2003 2/5/2003 2/5/2003 2/5/2003 2/5/2003 2/6/2003 2/8/2003 3/4/2003 3/5/2003 3/6/2003 3/8/2003 3/19/2003 3/20/2003 4/9/2003 4/9/2003 4/9/2003 4/9/2003 4/10/2003 4/12/2003 4/21/2003 4/21/2003 4/22/2003 4/23/2003 4/24/2003 4/24/2003 5/7/2003 5/7/2003 Reliability & Probabilistic Risk Assessment Subcommittee 5/7/2003 5/7/2003 502nd Full Committee 5/7/2003 5/9/2003 Safeguards & Security Subcommittee Peach Bottom Site Visit Plant Operations Subcommittee Plant License Renewal Subcommittee Planning & Procedures Subcommittee 503rd Full Committee Thermal-Hydraulic Phenomena Subcommittee Joint Reliability & Probabilistic Risk Assessment and Plant Operations Subcommittees Planning & Procedures Subcommittee 504th Full Committee Thermal-Hydraulic Phenomena Subcommittee Future Plant Designs Subcommittee Thermal-Hydraulic Phenomena Subcommittee Fire Protection Subcommittee Planning & Procedures Subcommittee 505th Full Committee Reactor Fuels Subcommittee Plant License Renewal Subcommittee 18a( l) Personnel Pmts to Non-Federal Members 18a(2) Personnel Pmts to Federal Members I 8a(3) Personnel Pmts to Federal Staff 18a(4) Personnel Pmts to Non-member Consultants I 8b( I) Travel and Per Diem to Non-Federal Members I 8b(2) Travel and Per Diem to Federal Members http://www.fido.gov/facadatabase/rptannualreport.asp 5/21/2003 5/23/2003 6/9/2003 6/9/2003 6/10/2003 6/10/2003 6/11/2003 6/11/2003 6/11/2003 6/11/2003 6/12/2003 6/13/2003 7/8/2003 7/3/2003 7/8/2003 7/8/2003 7/8/2003 7/9/2003 7/9/2003 7/11/2003 7/16/2003 7/17/2003 7/17/2003 7/18/2003 8/19/2003 8/20/2003 9/9/2003 9/9/2003 9/10/2003 9/10/2003 9/10/2003 9/13/2003 9/29/2003 9/30/2003 9/30/2003 9/30/2003 Current Fiscal Year

$592,054

$0

$1,879,876

$39,996

$279,466

$0 Next Fiscal Year

$616,920

$0

$1,958,831

$31,984

$279,466

$0 Page 3 of 6 11/24/2003

Annual Report l 8b(3) Travel and Per Diem to Federal Staff 18b(4) Travel and Per Diem to Non-Member Consultants 18c.Other(rents,user charges,graphics,printing,mail etc.)

18d Total

19. Federal Staff Support Years 20a. How does the Committee accomplish its purpose?

$34,141

$37,555

$25,050

$18,685

$397,390

$397,390

$3,247,973

$3,340,831 22.3 23.3 The Advisory Committee on Reactor Safeguards (ACRS) reports to the Nuclear Regulatory Commission (NRC) and provides the Commission with independent reviews of, and advice on, the safety of proposed or existing NRC-licensed reactor facilities and the adequacy of applicable safety standards. The ACRS was established as a statutory committee by a 1957 amendment to the Atomic Energy Act of 1954. With the enactment of the Energy Reorganization Act of 1974, the licensing functions of the Atomic Energy Commission (AEC) were transferred intact from the AEC to the NRC. The ACRS has continued in the same advisory role to the NRC with its responsibility changing with the needs of the Commission. Some ACRS tasks are mandated by statute or regulation, some are in response to direction by the Commission, or requests from the NRC staff, or other stakeholders, and some are self initiated in response to ACRS concerns on important regulatory and safety-related matters. The ACRS, upon request from the Department of Energy (DOE), provides advice on the safety of U.S.

naval reactor designs. Upon request, the ACRS also provides technical advice to the Defense Nuclear Facilities Safety Board. The ACRS and its subcommittees meet regularly in public, Federal Advisory Committee Act (FACA)-regulated meetings to work on matters within the scope of the ACRS responsibilities. ACRS meeting agenda, meeting transcripts, and letter reports are available for downloading or viewing on the Internet at http://www.nrc.gov/reading-nn/adams.html or http://www.nrc.gov/reading-rm/doc-collections/. The ACRS and its subcommittees held 53 meetings during FY 2003, including 10 Full Committee meetings that were attended by all ACRS members. In addition, the ACRS held a symposium on role of advisory committees in nuclear regulation and safety. The ACRS members are chosen for their technical expertise relevant to the safety issues important to the Commission. Consultants are used on occasion to augment the expertise of the ACRS members. The Committee has a full-time staff that provides technical support and administrative services in compliance with FACA requirements. ACRS subcommittees normally consist of three to six ACRS members with the expertise needed to review in detail the regulatory and safety issues and to formulate proposed positions and actions, as appropriate, for deliberation by the Full Committee. Stakeholder participation in ACRS meetings is encouraged and routinely occurs. The Committee's advice, in the form of written reports, is only produced by the Full Committee and reports on significant regulatory matters are discussed with the Commission in public meetings.

The ACRS conducts an ongoing review of its plans and schedules to ensure that regulatory matters within its scope of responsibility are being properly addressed and within its resources, and on schedules that are consistent with the needs of its stakeholders. Input from the Commission, the NRC staff, and affected stakeholders is used in this process. A Memorandum of Understanding with the NRC Executive Director for Operations (EDO) provides a framework for NRC staff interaction with the ACRS. The ACRS conducts formal self assessments to improve its effectiveness and efficiency. A report is provided to the Commission on the outcome of this process. The focus of the ACRS work during FY 2003 was on risk-informed and performance-based regulatory initiatives, license renewal applications, review standard for extended core power uprates, framework for advanced reactor licensing, early site permit review standard, future plant designs, reactor oversight process, reactor vessel head penetration cracking and reactor vessel head degradation, pressurized water reactor sump performance, safeguards and security matters, improvement of the quality of risk information for regulatory decisionmaking, probabilistic risk assessment quality, safety culture, and the NRC safety research program.

20b. How does the Committee balance its membership?

The Commission appoints ACRS members with the scientific and engineering expertise needed to address the safety issues of importance to the Commission. Members are sought who can provide an independent perspective on nuclear safety issues, outstanding scientific and technical ability, balanced and mature judgment, and a willingness to devote the time required to the demanding work involved. Members are appointed for 4-year terms and, absent unusual circumstances, do not serve more than three terms. Members are reappointed at the end of a 4-year term only if there is a compelling continuing need for their expertise. Vacancies in the ACRS membership are filled from the pool of applicants which exists after solicitations of interest are published in the Federal Register, trade and professional society publications, and the press. Recommendations to the Commission as to the selection of qualified candidates from this pool are made by the ACRS Member Candidate Screening Panel. The ACRS normally provides input to this Panel. During FY 2003, the membership was comprised of individuals with diverse employment backgrounds and included those experienced in the areas of nuclear power plant operations; probabilistic risk assessment; analysis of severe reactor accident phenomena; design of nuclear power plant structures, systems, and components; chemical engineering; materials and metallurgy; and thermal-hydraulics and computational fluid dynamics. The diversity of viewpoints represented by current members is based on special http://www. fido. gov /facadatabase/rptannualreport. asp Page 4 of 6 11/24/2003

Annual Report fields of interest, employment experience, and technical expertise. These member attributes provide the Committee with the balance of highly qualified technical expertise and diverse safety perspectives necessary to carry out the Committee's statutory responsibilities effectively.

20c. How frequent and relevant are the Committee meetings?

The ACRS and its subcommittees held 53 meetings during FY 2003, of which 10 were Full Committee meetings.

The number of meetings held in a reporting period is directly related to the number of nuclear safety matters to be reviewed as required by statute; the number of rules and regulatory guidance referred to the Committee for review and comment; the number of special reviews requested by the Commission, EDO, or other Federal Government organizations; and other safety issues of particular concern to the Committee and its stakeholders.

All of the Committee members normally meet 10 times a year for 3 or 4 days in Full Committee meetings, to consider important safety-related nuclear issues, generic issues, significant regulatory matters, rules, and regulatory guidance. The ACRS subcommittees, which are normally comprised of three to six members with the relevant expertise, meet as necessary with stakeholders to conduct in-depth reviews of particular matters for later consideration by the full membership during Full Committee meetings. Although not required by the revised FACA, subcommittee meetings are conducted under the same FACA procedures as the Full Committee meetings to facilitate public participation and to provide a forum for stakeholders to express their views on regulatory matters being considered by the ACRS. These meetings are utilized to make efficient use of Committee resources.

Reviews are conducted during each Full Committee meeting to assess the relevance of proposed review topics, resource needs, and the priority of each activity. These assessments have the benefit of input from the Commission, EDO, and other stakeholders. The self-assessment conducted by the ACRS for its CY 2002 and CY 2003 activities involved collection of input from a variety of stakeholders. This information was used to assess the relevance of ACRS activities. All ACRS meetings for this reporting period addressed either matters for which ACRS review was required by statute or regulation, specific requests from either the Commission or the EDO, or other important regulatory matters within the ACRS scope of responsibility.

20d. Why can 1 the advice or information this committee provides be obtained elsewhere?

The ACRS is an independent body of recognized experts in the field of nuclear reactor safety whose Congressional mandate is to provide the Commission with independent advice. Particular duties of the ACRS (e.g., review of operating reactor license renewal applications, core power uprates, advanced reactor designs, safeguards and security issues, and rules and regulations) are dictated by statute or regulation. In addition, functional arrangements exist wherein, upon request, the ACRS also provides advice to the U.S. Navy, the Department of Energy, and the Defense Nuclear Facilities Safety Board. The Commission has its own expert staff on whom it relies in the day-to-day regulation of nuclear power facilities. The ACRS provides the Commission and the NRC staff with an independent, critical review of high-level regulatory issues under consideration by the NRC and independent technical insights as to important matters needing Commission attention. The ACRS members are part-time special government employees with other full-time interests and activities in related fields, and provide a breadth of experience, an independent perspective on issues, and technical knowledge that is not duplicated by the NRC's full-time government employees. A standing committee such as the ACRS remains current with respect to nuclear safety issues of importance to the NRC, including those related to reactor operating experience, regulatory reform, and NRC's needs for safety research, and provides an independent, collegial judgment regarding these issues that other part-time consultants could not provide. The ACRS meetings provide an important forum to stakeholders to express freely their concerns on safety issues and regulatory process. A number of important safety initiatives have had their origins in ACRS deliberations. Through the ACRS, the public and the Congress are ensured of an independent technical review and evaluation of the safety of NRC-licensed reactor facilities, proposed reactor designs, significant regulatory issues, and other significant safety issues, and of an opportunity for stakeholder input.

20e. Why is it necessary to close and/or partially close committee meetings?

During this period, the Committee held 10 full Committee meetings and one special symposium. Of these 10 meetings, 5 meetings were partially closed to protect proprietary information (5 U.S.C. 552b(c)(4) and 1 to discuss information classified as national security information as well as unclassified safeguards information (5 U.S.C.

552b(c)(l) and (3), and 3 meetings were completely closed to discuss information classified as national security information as well as unclassified safeguards information (5 U.S.C. 552b(c)(l) and (3).

21. Remarks None Designated Federal Official: Michele S Kelton DFO Committee Members Start End Occupation Apostolakis, Dr. 6/4/1995 6/2/2007 Professor, Nuclear Engineering Department, Massachusetts Institute of George E.

Technology http://www. fido. gov /facadatabase/rptannualreport.asp Page 5 of 6 11/24/2003

Annual Report

~

Bonaca, Dr.

Mario V.

Ford, Dr. Peter F.

Kress, Dr.

Thomas S.

Leitch, Mr.

GrahamB.

Powers,Dr.

Dana A.

Ransom, Dr.

Victor H.

Rosen, Mr.

Stephen L.

1/6/1999 1/5/2007 Retired, Director, Nuclear Engineering Department, Northeast Utilities 3/23/2001 3/22/2005 Consultant and retired Program Manager, General Electric Research and Development Center 9/4/1991 9/3/2007 Retired, Head of Applied Systems Technology Section, Oak Ridge National Laboratory 7/10/2000 7/9/2004 Retired, Vice-President, Limerick Generating Station, PECO Energy; Retired Vice-President, Maine Yankee Atomic Power Co., Member, Offisite Safety Review Committee, Calvert Cliffs Nuclear Power Plant 6/6/1994 6/5/2006 Senior Scientist, Nuclear Facilities Safety Department, Sandia National Laboratories 3/2/2002 3/6/2006 Professor Emeritus, Purdue School of Nuclear Engineering 6/12/2001 6/11/2005 Retired, Manager, Risk Management and Industry Relations, STP Nuclear Operating Company at South Texas Project Electric Generating Station Shack, Dr.

8/1/1993 7/31/2005 Associate Director, Energy Technology Division, Argonne National William J.

Laboratory Sieber, Mr. John 7/12/1999 7/11/2007 Retired, Senior Vice-President, Nuclear Power Division, Duquesne Light D.

Company Wallis, Dr.

1/23/1998 1/22/2006 Retired, Professor, Thayer School of Engineering, Dartmouth College GrahamB.

Total Count of Committee Members 11 http://www.fido.gov/facadatabase/rptannualreport.asp Page 6 of 6 11/24/2003

Annual Keport 2003 Current FY Report: Review of Federal Advisory Committee 12/18/2003 4:25:52 PM I. Depanment or Agency Nuclear Regulatory Commission

3. Committee or SubCommittee Advisory Committee on the Medical Uses of Isotopes
4. Is this New During Fiscal Year?
5. Current Chaner
6. Expected Renewal Date No 9/25/2003 3/20/2004 8a. Was Tenn inated During FY?

8b. Specific Termination Authority No 42 u.s.c. 2201 Pagel of 2 Committee Menu

2. Fiscal Year 2003 3b. GSA Committee No.

1102

7. Expected Tenn Date 3/20/2004 Sc. Actual Termination Date
9. Agency Recommendation for Next FY Continue I0a.Legislation Req to Terminate?

I Ob.Legislation Pending?

No

11. Establishment Authori ty Agency Authority
12. Specific Establishment Authority 42 u.s.c. 2201
13. Effective Date 7/1/1958 Scientific Technical Program Advisory Board
14. Committee Type Continuing
15. Description of Committee 16a. Total Number of Repon s 3

16b. Repon Tit les and Dates Minutes of October 28, 2002 Meeting Minutes of the May 20-21, 2003 Meeting Minutes of the July 17, 2003 Meeting 17a Open:

1 Meeting Purposes and Dates 17b. Closed:

1 To discuss various medical-related issues and initiatives.

Discussion of internal administrative matters and 17c. Panially Closed:

10/28/2002 10/28/2002 safeguards information (closed session) and discussion of 5/20/2003 5/21/2003 various medical-related issues and initiatives.

This was a teleconference meeting in which the Agreement States and the NRC/ACMUI engaged in detailed discussion of the NRC staff's draft amendments to the training and experience (T &E) requirements for Authorized Users (A Us), Authorized Medical Physicists (A MPs), Authorized Nuclear Pharmacists (ANPs), and Radiation Safety Officers (RSOs). This meeting was closed due to the predecisional nature of the discussion.

I 8a( I) Personnel Pmts to Non-Federal Members I 8a(2) Personnel Pmts to Federal Members I 8a(3) Personnel Pmts to Federal Staff I Sa( 4) Personnel Pmts to Non-member Consultants I 8b( I) Travel and Per Diem to Non-Federal Members I 8b(2) Travel and Per Diem to Federal Members I 8b(3) Travel and Per Diem to Federal Staff I 8b(4) Travel and Per Diem to Non-Member Consultants I 8c.Other(rents.user charges.graphics.printing.mail etc.)

18d Total 7/17/2003 7/17/2003 Current Fiscal Year

$0

$26,656

$116,000

$0

$11,353

$0

$0

$0

$0

$154,009 http://www.fido.gov/facadatabase/rptannualreport.asp 1

14c. Presidentiai0 No 1/14/2003 7/20/2003 9/17/2003 17d. Total Meetings 3 Nex t Fiscal Y ear

$0

$28,000

$119,000

$0

$12,000

$0

$0

$0

$0

$159,000 12/1 8/2003

Annual Keport

19. Federal StaffSu ppon Years 1.5 1.5 20a. How does the Committee accomplish its purpose?

The NRC staff believes that licensees, the general public, and medical professionals benefit when recognized experts provide advice to the staff. This advice enables staff to develop rules that will maintain public safety, while not inappropriately intruding upon the practice of medicine. The Staff provides a summary of issues to be addressed during meetings, and the ACMUI discusses the issues and gives advice and makes recommendations to the Staff. Furthermore, the ACMUI keeps staff abreast of new developments. This ongoing communication helps ensure that staff is aware of important issues during critical stages rule development. When issues that need special emphasis arise, working groups and subcommittees are formed.

20b. How does the Committee balance its membership?

Membership is balanced by placing individuals of diverse specialty on the committee. For instance, there are members who represent both diagnostic and therapeutic applications of medicine. There are members who have a regulatory function within their specialties. There is a member who represents medicine from an administrative standpoint, and there is a patient advocate member, who represents patients' interests. ACMUI members also perform regular self-evaluations, in which they give feedback on the appropriateness of the committee's composition.

20c. How frequent and relevant are the Committee meetings?

Committee meetings are generally held semi-annually. The committee will hold more frequent meetings when important issues emerge, or when issues need timely resolution.

20d. Why can't the advice or infomiation this committee provides be obtained elsewhere?

NRC continues to strive to achieve its goal of creating risk-informed, performance-based regulations that provide for the health and safety of the public while imposing no unnecessary burden on licensees. Furthermore, the medical profession continues to see regular advances that create unique regulatory challenges. The advice and recommendations from medical professionals who are exposed to these advances is crucial to the NRC staff's ability to continue to regulate effectively.

20e. Why is it necessary to close and/or partially close committee meetings?

Meetings are closed to conduct annual ethics briefings, conduct reviews of paperwork of a personal and confidential nature, and to discuss administrative matters that are purely internal to Committee business. It would be inappropriate to conduct these types of meetings openly. They must be conducted privately to allow Committee members the freedom to ask and answer personal questions and to protect individuals' privacy.

2 1. Remarks None Designated Federal Official: Mr. Thomas H Essig DFO Committee Members Cerqueira M.D., Dr. Manuel D.

Diamond M.D., Dr. David A.

Eggli M.D., Dr. Douglas F.

Hess, Ms. Maureen Hobson, Ms. Nekita Lieto, Mr. Ralph P.

Malmud M.D., Dr. Leon S.

McBurney, Ms. Ruth Nag M.D., Dr. Subir Schwarz M.S., Ms. Sally W.

Vetter Ph.D., Dr. Richard J.

Williamson Ph.D., Dr. Jeffrey F.

Total Count of Committee Members Start End Occupation 5/13/1998 9/30/2004 Nuclear Cardiologist 11/8/2000 9/30/2006 Radiation Oncologist 4/11/2002 4/11/2005 1/1/2003 1/1/2006 Nuclear Medicine Physician Food and Drug Administration Representative 5/13/1998 9/30/2004 Patient Advocate 9/27/2001 9/27/2004 Medical Physicist-Nuclear Medicine 9/27/2001 9/27/2004 Hospital Administrator 5/13/1998 9/30/2004 State Representative 11/8/2000 9/30/2006 Radiation Oncologist 11/8/2000 9/30/2006 Nuclear Pharmacist 11/8/2000 9/30/2006 Radiation Safety Officer 11/8/2000 9/30/2006 Therapy Physicist 12 http://www. fi do.gov/facadatabase/rptannualreport.asp Page 2 of 2 12/18/2003

Annual Report Page 1 of 4 2003 Current FY Report: Review of Federal Advisory Committee 11/24/2003 11:26:05 AM Committee Menu I. Department or Agency Nuclear Regulatory Commission

3. Committee or Subcommittee Advisory Committee on Nuclear Waste
2. Fiscal Year 2003 3b. GSA Committee No.

1100

4. Is this New During Fiscal Year?
5. Current Charter
6. Expected Renewal Date
7. Expected Term Date No 7/17/2002 7/17/2004 Sa. Was Terminated During FY?

Sb. Specific Termination Authority Sc.Actual Termination Date No 42 u.s.c. 2201

9. Agency Recommendation for Next FY Continue

!Oa.Legislation Reg to Terminate?

!Ob.Legislation Pending?

No

11. Establishment Authority Agency Authority
12. Specific Establishment Authority
13. Effective Date
14. Commi11ee Type Continuing 14c. Presidential?

42 u.s.c. 2201

15. Description of Committee 16a. Total Number of Reports 9

16b. Report Titles and Dates Orphan Sources 1/6/1988 Scientific Technical Program Advisory Board Capabilities of Engineered and Natural Barriers ACNW Meeting in Nevada, September 23-26, 2002 Review and Evaluation of the U.S. Nuclear Regulatory Commission's Waste Safety Research Program Transportation Working Group Meeting Comments on the National Academies' Study, "One Step At A Time: The Staged Development of Geologic Repositories for High-Level Radioactive Wastes" Total System Performance Assessment Working Group Session, March 25-26, 2003 Fiscal Years 2003 and 2004 Action Plan for the Advisory Committee on Nuclear Waste High-Level Waste: Risk-Significance Ranking of Agreements and the Use of Risk Information to Resolve Issues No 10/17/2002 12/6/2002 12/13/2002 12/30/2002 ln/2003 6/9/2003 6/12/2003 6/23/2003 8/13/2003 17a Open:

16 17b. Closed:

0 17c. Partially Closed:

0 17d. Total Meetings 16 Meeting Purposes and Dates 138th Full Committee & Workshop on Transportation of Nuclear Materials Planning & Procedures Planning & Procedures 139th Full Committee Planning & Procedures 140th Full Committee and Working Group on NRC and DOE Performance Assessments: Assumptions and Differences Planning & Procedures 141st Full Committee Planning & Procedures 142nd Full Committee Planning & Procedures 11/19/2002 11/21/2002 11/20/2002 11/20/2002 12/17/2002 12/17/2002 12/17/2002 12/19/2002 3/25/2003 3/25/2003 3/25/2003 3/27/2003 4/22/2003 4/22/2003 4/22/2003 4/23/2003 5/28/2003 5/28/2003 5/28/2003 5/30/2003 6/24/2003 6/24/2003 http://www. fido. gov /facadatabase/rptannualreport. asp 11/24/2003

Annual Report 143rd Full Committee 144th Full Committee Planning & Procedures Planning & Procedures 145th Full Committee 18a( 1) Personnel Pmts to Non-Federal Members I 8a(2) Personnel Pmts to Federal Members 18a(3) Personnel Pmts to Federal Staff 18a(4) Personnel Pmts to Non-member Consultants l 8b( 1) Travel and Per Diem to Non-Federal Members l 8b(2) Travel and Per Diem to Federal Members 18b(3) Travel and Per Diem to Federal Staff 18b(4) Travel and Per Diem to Non-Member Consultants I 8c.Other(rents,user charges,graphics,printing,mail etc.)

18d Total

19. Federal Staff Support Years 20a. How does the Committee accomplish its purpose?

6/24/2003 6/25/2003 7/29/2003 7/31/2003 7/29/2003 7/29/2003 9/23/2003 9/23/2003 9/23/2003 9/24/2003 Current Fiscal Year

$186,647

$0

$488,193

$0

$61,221

$0

$16,315

$1,007

$16,104

$769,487 4.5 Next Fiscal Year

$194,486

$0

$508,697

$5,136

$74,946

$0

$17,947

$12,087

$16,104

$829,403 5.5 The Committee reports to and provides the Commission with independent review of and advice on technical matters related to nuclear waste management. The bases of ACNW reviews include 10 CFR Parts 61, 63, 71, and 72, and other applicable regulations and legislative mandates. The ACNW undertakes studies and activities related to the transportation, storage, and disposal of high-and low-level radioactive waste, including the interim storage of spent nuclear fuel; materials safety; decommissioning; application of risk-informed and performance-based regulations; and evaluation of licensing documents, rules, regulatory guidance, and other issues, as requested by the Commission. The Committee interacts with representatives of the public, NRC, the Advisory Committee on Reactor Safeguards, other Federal agencies, State and local agencies, Native American Nations, and private, international, and other affected organizations as appropriate to fulfill its responsibilities. The Committee issues written reports, providing advice on matters within its scope of responsibility and meets periodically with the Commissioners in public meetings to discuss issues of mutual interest. The focus of the ACNW work during FY 2003 has been on the proposed high-level waste repository at Yucca Mountain, Nevada, and on issues related to the decommissioning of nuclear facilities. The ACNW members are chosen for their technical expertise relevant to waste management issues important to the Commission. Consultants are used on occasion to augment the expertise of the ACNW members in specific areas. The Committee has a full-time staff that provides technical support, administrative services, and assures compliance with FACA requirements. ACNW working groups, comprised of the ACNW members and consultants with the appropriate expertise, are used on occasion to address specific technical issues in depth. These working groups meet in public meetings and their activities are also conducted under FACA requirements. Stakeholder participation in ACNW meetings is encouraged and routinely occurs.

ACNW meeting agenda, meeting transcripts, and letter reports are available for downloading or viewing on the Internet at http://www.nrc.gov/reading-rm/adams.html or http://www.nrc.gov/reading-rm/doc-collections/. The ACNW issues an Action Plan for Commission approval and conducts a self assessment which includes the use of extensive stakeholder input. The ACNW conducts ongoing reviews of its plans and schedules to assure that it properly addresses regulatory matters within its scope of responsibility and on schedules that are consistent with the needs of its stakeholders. Input from the Commission, the NRC staff, and affected stakeholders is used in this process. A Memorandum of Understanding with the NRC staff provides a framework for interactions between the ACNW and the staff.

20b. How does the Committee balance its membership?

The Commission appoints ACNW members with the scientific and engineering expertise needed to address the waste management issues of importance to the Commission. Members are sought who can provide an independent perspective on waste management issues, and who possess outstanding scientific and technical ability, balanced and mature judgment, and a willingness to devote the time required to carry out the timely completion of the Committee's work. Members are appointed for 4-year terms and, absent unusual circumstances, do not serve more than two terms. Members are reappointed at the end of a 4-year term only if there is a compelling continuing need for their expertise. Vacancies in the ACNW membership are filled from the pool of applicants which exists after solicitations of interest are published in the Federal Register, trade and professional society publications, and the http://www.fido.gov/facadatabase/rptannualreport. asp Page 2 of 4 11/24/2003

Annual Report press. Recommendations to the Commission as to the selection of qualified candidates from this pool are made by the ACNW Member Candidate Screening Panel. The ACNW members normally provide input to this Panel. The diversity of viewpoints represented by current members is based on special fields of interest, professional experience, and technical expertise. These member attributes provide the Committee with the balance of highly qualified technical expertise and diverse perspectives necessary to effectively carry out the Committee's statutory requirements. At the end of FY 2003, the Committee included two members from academia, one member from a national laboratory, and two members from private industry. During FY 2003, the ACNW included members experienced in radioactive waste management, chemistry, health physics, nuclear engineering, risk assessment, environmental engineering, performance assessment, hydrology, research, and technical management. There has been a systematic effort to obtain members with backgrounds that can address the difficult and diverse questions associated with radioactive waste management. This concentration of the relevant scientific proficiency within the Committee, together with a diversity of viewpoints and perspectives, provides assurance that adequate, independent, and open discussion and analysis of the potential hazards associated with the management of nuclear waste can take place.

20c. How frequent and relevant are the Committee meetings?

Normally, all ACNW members meet 8 times a year for 2-3 days in Committee meetings. In FY 2003, the ACNW held 8 Committee meetings. The number of meetings held is directly related to the scope of NRC's efforts on the high-level waste geologic repository and other issues involving waste management, the number of criteria, guides, and technical positions referred to the ACNW for review and comment, the number of special reviews requested by the NRC staff, and the number of important topics of concern to the Committee and its stakeholders. The A CNW Action Plan for Fiscal Years 2003 and 2004 formed the basis for the selection of issues to be addressed during its 2003 meetings. The Committee intends to meet once each year in the vicinity of Yucca Mountain in Nevada to provide an opportunity for local stakeholders to participate in its meetings. Such a meeting was held on November 19 and 20, 2003. The written reports that contain the ACNW's advice are issued during Committee meetings. When resources are available, the ACNW holds working group meetings on particularly complex issues.

At these meetings, additional time and expertise can be brought to bear on an issue and the subject developed for the Committee consideration. Reviews are conducted during each Committee meeting to assess the relevance of proposed meetings and review topics, resource needs, and the priority of each activity. These assessments have the benefit of input from the Commission, NRC's Executive Director for Operations (EDO), and other stakeholders.

The ACNW also conducts a self assessment once every 2 years. These self assessments involve collection of input from a variety of stakeholders. This information is used to assess the relevance of ACNW activities. All ACNW meetings for this reporting period addressed matters delineated in the ACNW's Action Plan, specific requests from either the Commission or the EDO, or other important regulatory matters within the ACNW's scope of responsibility.

20d. Why can't the advice or information this committee provides be obtained elsewhere?

The ACNW is an independent body of recognized experts in the field of nuclear waste management whose mandate is to provide the Commission with independent advice. The ACNW provides the public assurance that an independent technical review and evaluation of nuclear waste safety issues is accomplished and an opportunity for public input is assured. Decisions relating to waste management that are expected to be before the Commission include the licensing of the proposed Yucca Mountain high-level waste repository, the West Valley Demonstration Project and West Valley Site and other site decommissionings, nuclear reactor decommissioning, and low-level waste management. The Commission has its own expert staff of NRC employees on whom it relies in its day-to-day operations. However, the Commission has no other advisory committee with the broadly based expertise of the ACNW that could be called upon for independent and informed assessment of safety issues related to high-and low-level waste management. In addition, since members are part-time advisors with other interests and activities in related fields, they provide a breadth of experience, an independent perspective on issues, and technical knowledge that is not duplicated by the NRC staff. The ACNW provides the Commission with both an independent, critical review of high-level regulatory issues under consideration by the NRC and independent technical insights on important matters needing Commission attention. In addition, a standing committee such as the ACNW, supported by a technical staff, remains currently informed with respect to nuclear waste issues of importance to the Commission, including NRC-sponsored safety research, and provides an informed, collegial judgment regarding these issues that would not be obtained by use of individual part-time consultants on a case-by-case basis.

20e. Why is it necessary to close and/or partially close committee meetings?

During this period, the Committee held 8 Full Committee meetings. All portions of these meetings were open to public attendance.

21. Remarks NONE http://www.fido.gov/facadatabase/rptannualreport.asp Page 3 of 4 11/24/2003

Annual Report Designated Federal Official: Michele Kelton DFO Committee Members Garrick, Dr. B.

John Hornberger, Dr.

GeorgeM.

Levenson, Mr.

Milton Ryan, Dr. Michael T.

Weiner, Dr. Ruth Wymer,Dr.

RaymondG.

Start End Occupation 3/6/1994 6/30/2007 Consultant 9/23/1996 6/30/2004 Professor, Dept. of Environmental Sciences, University of Virginia 5/l 7 /2000 10/10/2003 Consultant 6/26/2002 6/25/2006 Consultant 9/15/2003 9/14/2007 Consultant 10/11/1997 3/30/2003 Retired, Distinguished Scientist in the International Technology Programs Division of Martin Marietta Energy Systems, Inc.

Total Count of Committee Members 6

Page 4 of 4 http://www.fido.gov/facadatabase/rptannualreport.asp 11/24/2003

Annual Report Page 1 of 2 2003 Current FY Report: Review of Federal Advisory Committee 12/1/2003 4:10:04 PM Committee Menu I. Department or Agency Nuclear Regulatory Commission

3. Committee or SubCommittee Licensing Support System Advisory Review Panel
4. Is this New During Fiscal Year?

No 8a. Was Terminated During FY?

No

9. Agency Recommendation for Next FY Continue
11. Establishment Authority
5. Current Charter
6. Expected Renewal Date 12/12/2002 12/12/2004 8b. Specific Termination Authority 42 u.s.c. 2201

!Oa.Legislation Req to Terminate?

Agency Authority

12. Specific Establishment Authority 42 u.s.c. 2201
13. Effective Date 1/19/1975 Non Scientific Program Advisory Board
14. Committee Type Continuing
15. Description of Committee 16a. Total Number of Reports 1

16b. Report Titles and Dates Report/Transcript of June 3, 2003 Meeting 17aOpen:

1 17b. Closed:

0 17c. Partially Closed:

0 Meeting Purposes and Dates Review Alternatives and Proposed Guidelines for

2. Fiscal Year 2003 3b. GSA Committee No.

1104

7. Expected Term Date 12/14/2006 Sc.Actual Termination Date I Ob.Legislation Pending?

14c. Presidential?

No 6/3/2003 17d. Total Meetings 1 submitti?g electroni~ documents through N_RC's 61312003 S:00:00 AM 6/3/2003 5:00:00 PM Electromc Information Exchange for the High Level Waste Adjudicatory Proceeding l 8a(l) Personnel Pmts to Non-Federal Members l 8a(2) Personnel Pmts to Federal Members l 8a(3) Personnel Pmts to Federal Staff 18a(4) Personnel Pmts to Non-member Consultants l 8b(l) Travel and Per Diem to Non-Federal Members l 8b(2) Travel and Per Diem to Federal Members l 8b(3) Travel and Per Diem to Federal Staff 18b(4) Travel and Per Diem to Non-Member Consultants 18c.Other(rents,user charges,graphics,printing,mail etc.)

18d Total

19. Federal Staff Support Years 20a. How does the Committee accomplish its purpose?

Current Fiscal Year Next Fiscal Year

$0

$0

$6,000

$8,000

$6,000

$8,000

$0

$0

$0

$1,000

$4,857

$7,000

$0

$2,000

$0

$0

$2,692

$3,000

$19,549

$29,000 0.0 0.0 The Nuclear Regulatory Commission relies on the Licensing Support Network Advisory Review Panel (LSNARP) for advice and recommendations on the design and operation of the searchable electronic database (Licensinf Support Network (LSN)) for documents that will relevant to the licensing of a geologic repository for the storage of high level nuclear waste. The document collection will contain electronic copies of all of the material that will be used by parties in the NRC's licensing proceeding for a high level radioactive waste repository. The LSN is in operation and has been loaded with approximately 10,000 documents as of the end of FY-2003. During the year the Committee provided advice on guidelines to electronically transmit large and complex documents. DOE also http://www.fido.gov/facadatabase/rptannualreport.asp 12/01/2003

Annual Report advised that estimates of the size of its document collection had risen from 10,000 to 3 - 4 million and the LSN is now being re-configured to accomidate the increased volumn. Document loading should be completed by June 2004 in anticipation of the Department of Energy's submittal of a License Application in December 2004.

20b. How does the Committee balance its membership?

The membership of the LSNARP is balanced by being drawn from among the full spectrum of potential parties to NRC's anticipated licensing proceeding for the burial of high level radioactive waste. Since the burial site under review is in Nevada, the membership includes the State of Nevada, local county governments of both Nevada and California, Indian tribes, represented by the National Congress of American Indians and the Nevada Nuclear Waste Task force. It also includes the nuclear industry, the potential licensee (DOE) and the licensing agency (NRC). Input by these representatives is essential to the success of the LSN project. During this year an effort was made to bring additional tribal representation to the Committee.

20c. How frequent and relevant are the Committee meetings?

The full LSNARP met once on June 3, 2003 in Las Vegas to review guidelines and possible rule changes for electronic submittals of adjudicatory material to the HL W proceeding when it starts. During the year, the LSN Administrator also met with individual representatives of the potential parties to the HL W proceeding to assist in their setting up local document repositories that could be accessed by the LSN.

20d. Why can't the advice or information this committee provides be obtained elsewhere?

The advice provided by the state, county and tribal governmental units, together with other potential users of the LSN, is unique to this particular computer application. It is not available from other existing committees or within the NRC itself. NRC considers it essential that advice on the design of the software and hardware should come from representatives of the future hands-on users of the LSN. During this reporting period, the Licensing Support Network became fully operational and the Advisory Review Panel began to address implementational and operational issues and rule changes the appear to be necessary to accomidate the state of the electronic document processing capabilities of the NRC and potential parties.

20e. Why is it necessary to close and/or partially close committee meetings?

The LSSARP did not hold any closed meetings in FY 2003.

21. Remarks NONE Designated Federal Official: Dr. Andrew L Bates DFO Committee Members Start Bates, Andrew L 6/15/2000 Bradshaw, Les 1/15/1993 Brandt,Joy 10/1/2000 Clark, Ray 7/1/1999 Fiorenzi, Leonard 7/1/1999 Frishman, Steve 7/1/1999 Graser, Daniel 10/1/1999 Holden, Robert 7/1/1999 Kalt, Alan 7/1/1999 Kraft, Steven 1/1/1998 Larson, Josie 10/1/2002 Leake, Harry 6/1/2002 Linehan,John 6/1/2003 Mathias, Linda 10/1/2001 McCorkell, George 10/1/2000 Murphy, Malachy 12/18/1989 Pitts, Jason 10/1/2001 Remus, Andrew 10/1/2001 Treichel, Judy 1/1/1998 von Tresenhausen, Engelbrech 7/1/2001 Total Count of Committee Members End Occupation 9/30/2006 US Nuclear Regulatory Commission 9/30/2006.,...Nye County, Nevada 9/30/2006 "'l.,ander County, Nevada 9/30/2006 US EPA 9/30/2006 ~ ureka County, Nevada 9/30/2006.... State Of Nevada 5/31/2003 US Nuclear regulatory Commission 9/30/2006 National Congress of American Indians -

9/30/2006....-Churchill County, Nevada 9/30/2006 ~

uclear Energy Institute - Energy Coalition 9/30/2006 "'White Plan County, Nevada 9/30/2006 US Departmant of Energy 9/30/2006 U S Nuclear Regulatory Commission 9/30/2006 v Mineral County, Nevada 9/30/2006 v Esmeralda County, Nevada 9/30/2006 ye County, Nevada 9/30/2006..-i,incoln County, Nevada 9/30/2006 Inyo County, Nevada 9/30/2006 Nevada Nuclear Waste Task Force 9/30/2006 Clark County Nevada 20 http://www.fido.gov/facadatabase/rptannualreport.asp Page 2 of 2 12/01/2003

Annual Report Page 1 of 2 2003 Current FY Report: Review of Federal Advisory Committee 12/16/2003 4:06:46 PM Committee Menu I. Department or Agency Nuclear Regulatory Commission

3. Committee or SubCommittee PEER REVIEW COMMITTEE FOR SOURCE TERM MODELING
4. Is this New During Fiscal Year?
5. Current Chan er
6. Expected Renewal Date Yes Sa. Was Terminated During FY?

No

9. Agency Reconunendation for Next FY Continue
11. Establishment Authority
12. Specific Establislunent Authority 42 u.s.c. 2201 I 5. Description of Committee I 6a. Total Number of Reports 1

I 6b. Repon Titles and Dates 10/10/2002 10/10/2004 Sb. Specific Termination Authority 42 u.s.c. 2201

!0a.Legislation Req to Terminate?

No Agency Authority

13. Effective Date 7/1/1958 Scientific Technical Program Advisory Board
14. Conunittee Type Continuing
2. Fiscal Year 2003 3b. GSA Committee No.

13888

7. Expected Term Date 9/30/2004 Sc.Actual Termination Date I Ob.Legislation Pending?

14c. Presidential?

No Peer Review Committee Report for "NRC Spent Fuel Source Term Guidance Document" 9/30/2003 17a Open:

0 17b. Closed:

4 Meeting Purposes and Dates The Committee reviewed SNL activities and aided SNL in development of guidance documents on source terms to 17c. Panially Closed:

0 17d. Total Meetings 4 assist the NRC in evaluations of the impact of specific terrorist activities targeted at a range of spent fuel storage casks and radioactive material transport packages 1/28/2003 8:30:00 AM 1/29/2003 5:00:00 PM including those for spent fuel.

The Committee reviewed SNL activities and aided SNL in development of guidance documents on source terms to assist the NRC in evaluations of the impact of specific terrorist activities targeted at a range of spent fuel storage casks and radioactive material transport packages including those for spent fuel.

The Committee reviewed SNL activities and aided SNL in development of guidance documents on source terms that 4/8/2003 4/9/2003 will assist the NRC in evaluations of the impact of specific 9/16/2003 9/18/2003 terrorist activities targeted at a range of spent fuel storage casks and radioactive material (RAM) transport packages.

The Committee reviewed Sandia National Laboratories (SNL) activities and aided SNL in development of guidance documents for estimating source terms resulting from 9/25/2003 9/26/2003 sabotage attacks on spent fuel transportation and storage containers.

18a( I) Personnel Pmts to Non-Federal Members I 8a(2) Personnel Pnlts to Federal Members I 8a(3) Personnel Pmts to Federal Staff I 8a(4) Personnel Pmts to Non-member Consultants http://www.fido.gov/facadatabase/rptannualreport.asp Current Fiscal Year

$228,850

$39,333

$0

$0 Next Fiscal Year

$250,000

$50,000

$0

$0 12/16/2003

Annual Report 18b(I) Travel and Per Diem to Non-Federal Members I 8b(2) Travel and Per Diem to Federal Members 18b(3) Travel and Per Diem to Federal Staff

$27,355

$30,000

$0

$10,000 I 8b(4) Travel and Per Diem to Non-Member Consultants 18c.Other(rents,user charges,graphics,printing,mail etc.)

$0

$0

$0

$0

$0

$0 18d Total

$295,538

$340,000 I 9. Federal Staff Support Years 0.3 20a. How does the Committee accomplish its purpose?

The Committee will develop guidance documents that will assist the NRC in evaluating the impact of specific terrorist activities targeted at a range of spent fuel storage casks and radioactive material (RAM) transport packages, including spent fuel. The guidance will provide the NRC the bases for improving the allocation of resources for protecting radioactive materials and for responding to terrorist attacks.

20b. How does the Committee balance its membership?

0.3 Membership on the committee will be balanced to obtain the range of scientific and technical expertise needed to calculte and develop guidelines for radioacctive source terms (radiation doses and contamination). The expertise needed includes individuals with experience in structural, nuclear, and thermal engineering, fuel performance and source term evaluations, consequence analyses, weapons and explosives, and transportation of radioactive material.

20c. How frequent and relevant are the Committee meetings?

It is estimated that the full Committee will meet 6 times a year with approximately 4 working group meetings each year.

20d. Why can't the advice or infonnation this committee provides be obtained elsewhere?

The range of wxpertise needed by the committee in explosives, military weapons structural, nuclear, and thermal engineering, fuel performance and source term evaluations, and consequence analyses is not available within the NRC.

20e. Why is it necessary to close and/or partially close committee meetings?

Meetings will be closed to discuss classified material related to national security.

2 1. Remarks None Designated Federal Official: TBD Committee Members Start End Occupation Anderson, Charles 10/10/2002 9/30/2004 SwRI Baker, Ernie 10/10/2002 9/30/2004 ARDEC Beyer, Carl 10/10/2002 9/30/2004 PNNL Darrow, Elizabeth 10/10/2002 9/30/2004 USEC Einziger, Robert E 10/10/2003 9/30/2004 Independent Consultant Haschke, John 10/10/2002 9/30/2004 LLNL Holm, Judith 10/10/2002 9/30/2004 DOE Interrante, Charles 10/10/2002 9/30/2004 NRC Tinkler, Charles 10/10/2002 9/30/2004 NRC Total Count of Committee Members 9

http://www.fido.gov/facadatabase/rptannualreport.asp Page 2 of 2 12/16/2003