{{#Wiki_filter:Krishna P. Singh Technology Campus, 1 Holtec Blvd., Camden, NJ 08104 Telephone (856) 797-0900 Fax (856) 797-0909 10 CFR 20, Appendix G January 25, 2021 Mr. David C. Lew Regional Administrator, Region 1 U.S. Nuclear Regulatory Commission 2100 Renaissance Blvd, Suite 100 King of Prussia, PA 19406-2713 Oyster Creek Nuclear Generating Station Renewed Facility License No. DPR-16 NRC Docket Nos. 50-219 and 72-15
{{#Wiki_filter:Krishna P. Singh Technology Campus, 1 Holtec Blvd., Camden, NJ 08104 Telephone (856) 797-0900 Fax (856) 797-0909
 
10 CFR 20, Appendix G
 
January 25, 2021
 
Mr. David C. Lew Regional Administrator, Region 1 U.S. Nuclear Regulatory Commission 2100 Renaissance Blvd, Suite 100 King of Prussia, PA 19406-2713
 
Oyster Creek Nuclear Generating Station Renewed Facility License No. DPR-16 NRC Docket Nos. 50-219 and 72-15


==Subject:==
==Subject:==
Late LLRW Shipments Investigation Report Pursuant to 10 CFR 20, Appendix G Pursuant to the provisions 10 Code of Federal Regulations (CFR) 20, Appendix G, Holtec Decommissioning International, LLC (HDI) is submitting a report to identify the results of the investigation performed relative to shipment and transport of low-level radioactive waste (LLRW) from Oyster Creek Nuclear Generating Station (OCNGS) to the Waste Control Specialists, LLC (WCS) disposal facility in Andrews, Texas. The LLRW shipments exceeded the 20-day time limit for notification of receipt from the disposal facility as specified in 10 CFR Part 20, Appendix G.
Late LLRW Shipments Investigation Report Pursuant to 10 CFR 20, Appendix G
 
Pursuant to the provisions 10 Code of Federal Regulations (CFR) 20, Appendix G, Holtec Decommissioning International, LLC (HDI) is submitting a report to identify the results of the investigation performed relative to shipment and transport of low-level radioactive waste (LLRW) from Oyster Creek Nuclear Generating Station (OCNGS) to the Waste Control Specialists, LLC (WCS) disposal facility in Andrews, Texas. The LLRW shipments exceeded the 20-day time limit for notification of receipt from the disposal facility as specified in 10 CFR Part 20, Appendix G.
 
Since December 8, 2020, OCNGS has been shipping various types of LLRW from the facility as a part of facility decommissioning. These various shipments departed the OCNGS via truck, transferred to rail car at the transload facility in Bridgeport, New Jersey, shipped via rail to the Bulk Transfer, LLC facility in Seagrave, Texas, and ultimately, transferred by truck to the WCS facility at Andrews, Texas. Since December 2020, the total transport times for the LLRW shipments have ranged from 30 days to 134 days. Previous late shipment notifications have been submitted to the Nuclear Regulatory Commission in letters dated 30 August, 2021 (ADAMS Ascension No. ML21242A265), 1 December, 2021 (ADAMS Ascension No.
Since December 8, 2020, OCNGS has been shipping various types of LLRW from the facility as a part of facility decommissioning. These various shipments departed the OCNGS via truck, transferred to rail car at the transload facility in Bridgeport, New Jersey, shipped via rail to the Bulk Transfer, LLC facility in Seagrave, Texas, and ultimately, transferred by truck to the WCS facility at Andrews, Texas. Since December 2020, the total transport times for the LLRW shipments have ranged from 30 days to 134 days. Previous late shipment notifications have been submitted to the Nuclear Regulatory Commission in letters dated 30 August, 2021 (ADAMS Ascension No. ML21242A265), 1 December, 2021 (ADAMS Ascension No.
ML21335A255), and 16 December, 2021 (ADAMS Ascension No. ML21350A193).
ML21335A255), and 16 December, 2021 (ADAMS Ascension No. ML21350A193).
10 CFR 20, Appendix G, Requirements for Transfers of Low-Level Radioactive Waste Intended for Disposal at Licensed Land Disposal Facilities and Manifests, Section III.A(9) states for any shipments or any part of a shipment for which acknowledgment of receipt has not been received within the times set forth in this appendix, to conduct an investigation in accordance with Section III.E of this appendix.
10 CFR 20, Appendix G, Requirements for Transfers of Low-Level Radioactive Waste Intended for Disposal at Licensed Land Disposal Facilities and Manifests, Section III.A(9) states for any shipments or any part of a shipment for which acknowledgment of receipt has not been received within the times set forth in this appendix, to conduct an investigation in accordance with Section III.E of this appendix.
Section III.E states that any shipments or part of shipment for which acknowledgement is not received within the times set forth in this section must:
Section III.E states that any shipments or part of shipment for which acknowledgement is not received within the times set forth in this section must:
: 1. Be investigated by the shipper if the shipper has not received notification or receipt within 20 days after transfer; and
: 1. Be investigated by the shipper if the shipper has not received notification or receipt within 20 days after transfer; and
: 2. Be traced and reported. The investigation shall include tracing the shipment and filing a report with the nearest Commission Regional Office listed in Appendix D to this part. Each HDI-OC-22-004 Page 1 of 2
: 2. Be traced and reported. The investigation shall include tracing the shipment and filing a report with the nearest Commission Regional Office listed in Appendix D to this part. Each
 
HDI-OC-22-004 Page 1 of 2 Krishna P. Singh Technology Campus, 1 Holtec Blvd., Camden, NJ 08104 Telephone (856) 797-0900 Fax (856) 797-0909
 
licensee who conducts a trace investigation shall file a written report with the appropriate NRC Regional Office within 2 weeks of completion of the investigation.


Krishna P. Singh Technology Campus, 1 Holtec Blvd., Camden, NJ 08104 Telephone (856) 797-0900 Fax (856) 797-0909 licensee who conducts a trace investigation shall file a written report with the appropriate NRC Regional Office within 2 weeks of completion of the investigation.
OCNGS Radwaste Shippers finalized the trace investigation on January 11, 2022. The investigation revealed that the LLRW shipments took between 37 and 91 days to complete transport from OCNGS to the WCS waste disposal facility in Andrews, Texas. These investigations identified that delays were due to mixed mode transportation and that there were no significant or unusual transport delays encountered.
OCNGS Radwaste Shippers finalized the trace investigation on January 11, 2022. The investigation revealed that the LLRW shipments took between 37 and 91 days to complete transport from OCNGS to the WCS waste disposal facility in Andrews, Texas. These investigations identified that delays were due to mixed mode transportation and that there were no significant or unusual transport delays encountered.
This letter contains no new regulatory commitments.
This letter contains no new regulatory commitments.
If you have any questions or need further information, please contact me at (856) 797-0900, ext.
If you have any questions or need further information, please contact me at (856) 797-0900, ext.
3578.
3578.
Sincerely, Digitally signed by Jean A. Fleming Jean A.      DN: cn=Jean A. Fleming, c=US, o=Holtec Decommissioning International, LLC, ou=Regulatory and Fleming        Environmental Affairs, email=J.Fleming@Holtec.com Date: 2022.01.25 10:36:15 -05'00' Jean A. Fleming HDI Vice President, Regulatory and Environmental Affairs Holtec Decommissioning International, LLC Attachment - Oyster Creek Nuclear Generating Station Investigation Report, LLRW Shipments Exceeded 20 Days cc:     (with Attachment)
 
Sincerely,
 
Jean A. Fleming HDI Vice President, Regulatory and Environmental Affairs Holtec Decommissioning International, LLC
 
Attachment - Oyster Creek Nuclear Generating Station Investigation Report, LLRW Shipments Exceeded 20 Days
 
cc: (with Attachment)
NRC NMSS Project Manager (Oyster Creek Nuclear Generating Station)
NRC NMSS Project Manager (Oyster Creek Nuclear Generating Station)
HDI-OC-22-004 Page 2 of 2


Krishna P. Singh Technology Campus, 1 Holtec Blvd., Camden, NJ 08104 Telephone (856) 797-0900 Fax (856) 797-0909 HDI-OC-22-004 Attachment Oyster Creek Nuclear Generating Station Investigation Report LLRW Shipments Completion Exceeded 20 Days
HDI-OC-22-004 Page 2 of 2 Krishna P. Singh Technology Campus, 1 Holtec Blvd., Camden, NJ 08104 Telephone (856) 797-0900 Fax (856) 797-0909
 
HDI-OC-22-004
 
Attachment
 
Oyster Creek Nuclear Generating Station Investigation Report
 
LLRW Shipments Completion Exceeded 20 Days
 
Krishna P. Singh Technology Campus, 1 Holtec Blvd., Camden, NJ 08104 Telephone (856) 797-0900 Fax (856) 797-0909


Krishna P. Singh Technology Campus, 1 Holtec Blvd., Camden, NJ 08104 Telephone (856) 797-0900 Fax (856) 797-0909 Oyster Creek Nuclear Generating Station LLRW Shipment Exceeded 20 days
Oyster Creek Nuclear Generating Station LLRW Shipment Exceeded 20 days
: 1) WCS Shipping Request (SR-2708-0036 and SR-2708-0037):
: 1) WCS Shipping Request (SR-2708-0036 and SR-2708-0037):
: a. On September 16th thru October 1st, 2021, ten (10) trucks consisting of a total of ten (10) Intermodals of concrete and metal debris for disposal departed from the Oyster Creek Nuclear Generating Station (OCNGS) site at 741 U.S. Route 9 South, Forked River, New Jersey to the Waste Control Specialists, LLC waste disposal facility in Andrews, Texas via the SMS Rail Lines transload facility in Bridgeport, New Jersey and the Greenfield Logistics Transload facility in Seagraves, Texas.
: a. On September 16th thru October 1st, 2021, ten (10) trucks consisting of a total of ten (10) Intermodals of concrete and metal debris for disposal departed from the Oyster Creek Nuclear Generating Station (OCNGS) site at 741 U.S. Route 9 South, Forked River, New Jersey to the Waste Control Specialists, LLC waste disposal facility in Andrews, Texas via the SMS Rail Lines transload facility in Bridgeport, New Jersey and the Greenfield Logistics Transload facility in Seagraves, Texas.
Line 44: Line 78:
: c. OCNGS and WCS receive daily tracking reports from the logistics contractor, Greenfield Logistics, LLC, for all waste shipments transported from the OCNGS site. The location of the subject shipment was verified and traced until receipt at the destination facility. OCNGS and WCS tracked the progress of the shipment through the daily trace reports. At no time was the shipment lost or in an unknown location.
: c. OCNGS and WCS receive daily tracking reports from the logistics contractor, Greenfield Logistics, LLC, for all waste shipments transported from the OCNGS site. The location of the subject shipment was verified and traced until receipt at the destination facility. OCNGS and WCS tracked the progress of the shipment through the daily trace reports. At no time was the shipment lost or in an unknown location.
: d. Below is the summary for the shipment that exceeded the time provided in 10 CFR 20, Appendix G. The summary includes the shipment identification number, rail car identification (ID) number, shipment date, date of receipt at the waste disposal facility and the total number of days the shipment was in transit.
: d. Below is the summary for the shipment that exceeded the time provided in 10 CFR 20, Appendix G. The summary includes the shipment identification number, rail car identification (ID) number, shipment date, date of receipt at the waste disposal facility and the total number of days the shipment was in transit.
Date Received at Shipment                                    Date                          Total Days In Rail Car ID Number                   Waste Control Number                                  Shipped                              Transit Specialists, LLC.
 
SR-2708-0036 and         ITFX4837/DTTX728240       9/16/2021     12/16/2021               91 SR-2708-0037
Shipment Date Date Received at Total Days In Number Rail Car ID Number Shipped Waste Control Transit Specialists, LLC.
SR-2708-0036 and ITFX4837/DTTX728240 9/16/2021 12/16/2021 91 SR-2708-0037
: 2) WCS Shipping Request (SR-2708-0039):
: 2) WCS Shipping Request (SR-2708-0039):
: a. On October 12th thru October 15th, 2021, ten (10) trucks consisting of a total of ten (10) Intermodals of concrete and metal debris for disposal HDI-OC-22-004 Page 1 of 5
: a. On October 12th thru October 15th, 2021, ten (10) trucks consisting of a total of ten (10) Intermodals of concrete and metal debris for disposal HDI-OC-22-004 Page 1 of 5 Krishna P. Singh Technology Campus, 1 Holtec Blvd., Camden, NJ 08104 Telephone (856) 797-0900 Fax (856) 797-0909


Krishna P. Singh Technology Campus, 1 Holtec Blvd., Camden, NJ 08104 Telephone (856) 797-0900 Fax (856) 797-0909 departed from the Oyster Creek Nuclear Generating Station (OCNGS) site at 741 U.S. Route 9 South, Forked River, New Jersey to the Waste Control Specialists, LLC waste disposal facility in Andrews, Texas via the SMS Rail Lines transload facility in Bridgeport, New Jersey and the Greenfield Logistics Transload facility in Seagraves, Texas.
departed from the Oyster Creek Nuclear Generating Station (OCNGS) site at 741 U.S. Route 9 South, Forked River, New Jersey to the Waste Control Specialists, LLC waste disposal facility in Andrews, Texas via the SMS Rail Lines transload facility in Bridgeport, New Jersey and the Greenfield Logistics Transload facility in Seagraves, Texas.
: b. The trucks were released to the transload facility, SMS Rail Lines, on the dates identified above. After release from the OCNGS site, the trucks containing the ten (10) Intermodals of concrete and metal debris were transferred to a multiple unit railcar in Bridgeport, NJ then received at the Greenfield Logistics Transload facility in Seagrave, Texas and transferred back to trucks for delivery/receipt at the WCS waste disposal facility. The overall transit time from initial shipment to receipt at disposal facility was 64 days.
: b. The trucks were released to the transload facility, SMS Rail Lines, on the dates identified above. After release from the OCNGS site, the trucks containing the ten (10) Intermodals of concrete and metal debris were transferred to a multiple unit railcar in Bridgeport, NJ then received at the Greenfield Logistics Transload facility in Seagrave, Texas and transferred back to trucks for delivery/receipt at the WCS waste disposal facility. The overall transit time from initial shipment to receipt at disposal facility was 64 days.
: c. OCNGS and WCS receive daily tracking reports from the logistics contractor, Greenfield Logistics, LLC, for all waste shipments transported from the OCNGS site. The location of the subject shipment was verified and traced until receipt at the destination facility. OCNGS and WCS tracked the progress of the shipment through the daily trace reports. At no time was the shipment lost or in an unknown location.
: c. OCNGS and WCS receive daily tracking reports from the logistics contractor, Greenfield Logistics, LLC, for all waste shipments transported from the OCNGS site. The location of the subject shipment was verified and traced until receipt at the destination facility. OCNGS and WCS tracked the progress of the shipment through the daily trace reports. At no time was the shipment lost or in an unknown location.
: d. Below is the summary for the shipment that exceeded the time provided in 10 CFR 20, Appendix G. The summary includes the shipment identification number, rail car identification (ID) number, shipment date, date of receipt at the waste disposal facility and the total number of days the shipment was in transit.
: d. Below is the summary for the shipment that exceeded the time provided in 10 CFR 20, Appendix G. The summary includes the shipment identification number, rail car identification (ID) number, shipment date, date of receipt at the waste disposal facility and the total number of days the shipment was in transit.
Date Received at Rail Car ID     Date Shipment Number                                   Waste Control       Total Days In Transit Number        Shipped Specialists, LLC.
 
SR-2708-0039       ITFX4739     10/12/2021       12/15/2021                   64
Rail Car ID Date Date Received at Shipment Number Number Shipped Waste Control Total Days In Transit Specialists, LLC.
SR-2708-0039 ITFX4739 10/12/2021 12/15/2021 64
: 3) WCS Shipping Request (SR-2708-0040):
: 3) WCS Shipping Request (SR-2708-0040):
: a. On October 20th thru October 22nd, 2021, nine (9) trucks consisting of a total of ten (10) CVans of metal debris and metal tanks for disposal departed from the Oyster Creek Nuclear Generating Station (OCNGS) site at 741 U.S. Route 9 South, Forked River, New Jersey to the Waste Control Specialists, LLC waste disposal facility in Andrews, Texas via the SMS Rail Lines transload facility in Bridgeport, New Jersey and the Greenfield Logistics Transload facility in Seagraves, Texas.
: a. On October 20th thru October 22nd, 2021, nine (9) trucks consisting of a total of ten (10) CVans of metal debris and metal tanks for disposal departed from the Oyster Creek Nuclear Generating Station (OCNGS) site at 741 U.S. Route 9 South, Forked River, New Jersey to the Waste Control Specialists, LLC waste disposal facility in Andrews, Texas via the SMS Rail Lines transload facility in Bridgeport, New Jersey and the Greenfield Logistics Transload facility in Seagraves, Texas.
: b. The trucks were released to the transload facility, SMS Rail Lines, on the dates identified above. After release from the OCNGS site, the trucks containing the ten (10) CVans of metal debris and metal tanks were HDI-OC-22-004 Page 2 of 5
: b. The trucks were released to the transload facility, SMS Rail Lines, on the dates identified above. After release from the OCNGS site, the trucks containing the ten (10) CVans of metal debris and metal tanks were HDI-OC-22-004 Page 2 of 5 Krishna P. Singh Technology Campus, 1 Holtec Blvd., Camden, NJ 08104 Telephone (856) 797-0900 Fax (856) 797-0909


Krishna P. Singh Technology Campus, 1 Holtec Blvd., Camden, NJ 08104 Telephone (856) 797-0900 Fax (856) 797-0909 transferred to a multiple unit railcar in Bridgeport, NJ then received at the Greenfield Logistics Transload facility in Seagrave, Texas and transferred back to trucks for delivery/receipt at the WCS waste disposal facility. The overall transit time from initial shipment to receipt at disposal facility was 57 days.
transferred to a multiple unit railcar in Bridgeport, NJ then received at the Greenfield Logistics Transload facility in Seagrave, Texas and transferred back to trucks for delivery/receipt at the WCS waste disposal facility. The overall transit time from initial shipment to receipt at disposal facility was 57 days.
: c. OCNGS and WCS receive daily tracking reports from the logistics contractor, Greenfield Logistics, LLC, for all waste shipments transported from the OCNGS site. The location of the subject shipment was verified and traced until receipt at the destination facility. OCNGS and WCS tracked the progress of the shipment through the daily trace reports. At no time was the shipment lost or in an unknown location.
: c. OCNGS and WCS receive daily tracking reports from the logistics contractor, Greenfield Logistics, LLC, for all waste shipments transported from the OCNGS site. The location of the subject shipment was verified and traced until receipt at the destination facility. OCNGS and WCS tracked the progress of the shipment through the daily trace reports. At no time was the shipment lost or in an unknown location.
: d. Below is the summary for the shipment that exceeded the time provided in 10 CFR 20, Appendix G. The summary includes the shipment identification number, rail car identification (ID) number, shipment date, date of receipt at the waste disposal facility and the total number of days the shipment was in transit.
: d. Below is the summary for the shipment that exceeded the time provided in 10 CFR 20, Appendix G. The summary includes the shipment identification number, rail car identification (ID) number, shipment date, date of receipt at the waste disposal facility and the total number of days the shipment was in transit.
Date Received at Shipment         Rail Car ID     Date Waste Control       Total Days In Transit Number            Number        Shipped Specialists, LLC.
 
SR-2708-0040       BNSF238289     10/20/2021       12/17/2021                   57
Shipment Rail Car ID Date Date Received at Number Number Shipped Waste Control Total Days In Transit Specialists, LLC.
 
SR-2708-0040 BNSF238289 10/20/2021 12/17/2021 57
: 4) WCS Shipping Request (SR-2708-0038, SR-2708-0039 and SR-2708-0040):
: 4) WCS Shipping Request (SR-2708-0038, SR-2708-0039 and SR-2708-0040):
: a. On October 5th thru October 19th, 2021, ten (10) trucks consisting of a total of ten (10) Intermodals (IM) of concrete and metal debris for disposal departed from the Oyster Creek Nuclear Generating Station (OCNGS) site at 741 U.S. Route 9 South, Forked River, New Jersey to the Waste Control Specialists, LLC waste disposal facility in Andrews, Texas via the SMS Rail Lines transload facility in Bridgeport, New Jersey and the Greenfield Logistics Transload facility in Seagraves, Texas.
: a. On October 5th thru October 19th, 2021, ten (10) trucks consisting of a total of ten (10) Intermodals (IM) of concrete and metal debris for disposal departed from the Oyster Creek Nuclear Generating Station (OCNGS) site at 741 U.S. Route 9 South, Forked River, New Jersey to the Waste Control Specialists, LLC waste disposal facility in Andrews, Texas via the SMS Rail Lines transload facility in Bridgeport, New Jersey and the Greenfield Logistics Transload facility in Seagraves, Texas.
: b. The trucks were released to the transload facility, SMS Rail Lines, on the dates identified above. After release from the OCNGS site, the trucks containing the ten (10) Intermodals (IM) of concrete and metal debris were transferred to a multiple unit railcar in Bridgeport, NJ then received at the Greenfield Logistics Transload facility in Seagrave, Texas and transferred back to trucks for delivery/receipt at the WCS waste disposal facility. The overall transit time from initial shipment to receipt at disposal facility was 85 days.
: b. The trucks were released to the transload facility, SMS Rail Lines, on the dates identified above. After release from the OCNGS site, the trucks containing the ten (10) Intermodals (IM) of concrete and metal debris were transferred to a multiple unit railcar in Bridgeport, NJ then received at the Greenfield Logistics Transload facility in Seagrave, Texas and transferred back to trucks for delivery/receipt at the WCS waste disposal facility. The overall transit time from initial shipment to receipt at disposal facility was 85 days.
: c. OCNGS and WCS receive daily tracking reports from the logistics contractor, Greenfield Logistics, LLC, for all waste shipments transported from the OCNGS site. The location of the subject shipment was verified HDI-OC-22-004 Page 3 of 5
: c. OCNGS and WCS receive daily tracking reports from the logistics contractor, Greenfield Logistics, LLC, for all waste shipments transported from the OCNGS site. The location of the subject shipment was verified HDI-OC-22-004 Page 3 of 5 Krishna P. Singh Technology Campus, 1 Holtec Blvd., Camden, NJ 08104 Telephone (856) 797-0900 Fax (856) 797-0909


Krishna P. Singh Technology Campus, 1 Holtec Blvd., Camden, NJ 08104 Telephone (856) 797-0900 Fax (856) 797-0909 and traced until receipt at the destination facility. OCNGS and WCS tracked the progress of the shipment through the daily trace reports. At no time was the shipment lost or in an unknown location.
and traced until receipt at the destination facility. OCNGS and WCS tracked the progress of the shipment through the daily trace reports. At no time was the shipment lost or in an unknown location.
: d. Below is the summary for the shipment that exceeded the time provided in 10 CFR 20, Appendix G. The summary includes the shipment identification number, rail car identification (ID) number, shipment date, date of receipt at the waste disposal facility and the total number of days the shipment was in transit.
: d. Below is the summary for the shipment that exceeded the time provided in 10 CFR 20, Appendix G. The summary includes the shipment identification number, rail car identification (ID) number, shipment date, date of receipt at the waste disposal facility and the total number of days the shipment was in transit.
Date Received at Rail Car ID       Date Shipment Number                                   Waste Control       Total Days In Transit Number      Shipped Specialists, LLC.
 
SR-2708-0038, SR-2708-0039 and SR-     ITFX15226     10/5/2021       12/29/2021                   85 2708-0040
Rail Car ID Date Date Received at Shipment Number Number Shipped Waste Control Total Days In Transit Specialists, LLC.
SR-2708-0038, SR-2708-0039 and SR-ITFX15226 10/5/2021 12/29/2021 85 2708-0040
: 5) WCS Shipping Request (SR-2708-0045):
: 5) WCS Shipping Request (SR-2708-0045):
: a. On December 1st thru December 2nd, 2021, five (5) trucks consisting of a total of seven (7) Intermodals (IM) and three (3) CVans of metal debris for disposal departed from the Oyster Creek Nuclear Generating Station (OCNGS) site at 741 U.S. Route 9 South, Forked River, New Jersey to the Waste Control Specialists, LLC waste disposal facility in Andrews, Texas via the SMS Rail Lines transload facility in Bridgeport, New Jersey and the Greenfield Logistics Transload facility in Seagraves, Texas.
: a. On December 1st thru December 2nd, 2021, five (5) trucks consisting of a total of seven (7) Intermodals (IM) and three (3) CVans of metal debris for disposal departed from the Oyster Creek Nuclear Generating Station (OCNGS) site at 741 U.S. Route 9 South, Forked River, New Jersey to the Waste Control Specialists, LLC waste disposal facility in Andrews, Texas via the SMS Rail Lines transload facility in Bridgeport, New Jersey and the Greenfield Logistics Transload facility in Seagraves, Texas.
: b. The trucks were released to the transload facility, SMS Rail Lines, on the dates identified above. After release from the OCNGS site, the trucks containing the seven (7) Intermodals (IM) and three (3) CVans of metal debris were transferred to a multiple unit railcar in Bridgeport, NJ then received at the Greenfield Logistics Transload facility in Seagrave, Texas and transferred back to trucks for delivery/receipt at the WCS waste disposal facility. The overall transit time from initial shipment to receipt at disposal facility was 37 days.
: b. The trucks were released to the transload facility, SMS Rail Lines, on the dates identified above. After release from the OCNGS site, the trucks containing the seven (7) Intermodals (IM) and three (3) CVans of metal debris were transferred to a multiple unit railcar in Bridgeport, NJ then received at the Greenfield Logistics Transload facility in Seagrave, Texas and transferred back to trucks for delivery/receipt at the WCS waste disposal facility. The overall transit time from initial shipment to receipt at disposal facility was 37 days.
: c. OCNGS and WCS receive daily tracking reports from the logistics contractor, Greenfield Logistics, LLC, for all waste shipments transported from the OCNGS site. The location of the subject shipment was verified and traced until receipt at the destination facility. OCNGS and WCS tracked the progress of the shipment through the daily trace reports. At no time was the shipment lost or in an unknown location.
: c. OCNGS and WCS receive daily tracking reports from the logistics contractor, Greenfield Logistics, LLC, for all waste shipments transported from the OCNGS site. The location of the subject shipment was verified and traced until receipt at the destination facility. OCNGS and WCS tracked the progress of the shipment through the daily trace reports. At no time was the shipment lost or in an unknown location.
: d. Below is the summary for the shipment that exceeded the time provided in 10 CFR 20, Appendix G. The summary includes the shipment identification number, rail car identification (ID) number, shipment date, HDI-OC-22-004 Page 4 of 5
: d. Below is the summary for the shipment that exceeded the time provided in 10 CFR 20, Appendix G. The summary includes the shipment identification number, rail car identification (ID) number, shipment date,
 
HDI-OC-22-004 Page 4 of 5 Krishna P. Singh Technology Campus, 1 Holtec Blvd., Camden, NJ 08104 Telephone (856) 797-0900 Fax (856) 797-0909
 
date of receipt at the waste disposal facility and the total number of days the shipment was in transit.
 
Rail Car ID Date Date Received at Shipment Number Number Shipped Waste Control Total Days In Transit Specialists, LLC.
 
SR-2708-0045 ITFX4831 12/1/2021 1/7/2022 37


Krishna P. Singh Technology Campus, 1 Holtec Blvd., Camden, NJ 08104 Telephone (856) 797-0900 Fax (856) 797-0909 date of receipt at the waste disposal facility and the total number of days the shipment was in transit.
HDI-OC-22-004 Page 5 of 5}}
Date Received at Rail Car ID      Date Shipment Number                                Waste Control      Total Days In Transit Number      Shipped Specialists, LLC.
SR-2708-0045      ITFX4831      12/1/2021        1/7/2022                    37 HDI-OC-22-004 Page 5 of 5}}

Revision as of 19:19, 18 November 2024

Late LLRW Shipments Investigation Report Pursuant to 10 CFR 20, Appendix G
ML22025A218
Person / Time
Site: Oyster Creek
Issue date: 01/25/2022
From: Fleming J
Holtec Decommissioning International
To: David Lew
Document Control Desk, Office of Nuclear Material Safety and Safeguards, NRC Region 1
References
HDI-OC-22-004
Download: ML22025A218 (8)


Text

Krishna P. Singh Technology Campus, 1 Holtec Blvd., Camden, NJ 08104 Telephone (856) 797-0900 Fax (856) 797-0909

10 CFR 20, Appendix G

January 25, 2021

Mr. David C. Lew Regional Administrator, Region 1 U.S. Nuclear Regulatory Commission 2100 Renaissance Blvd, Suite 100 King of Prussia, PA 19406-2713

Oyster Creek Nuclear Generating Station Renewed Facility License No. DPR-16 NRC Docket Nos. 50-219 and 72-15

Subject:

Late LLRW Shipments Investigation Report Pursuant to 10 CFR 20, Appendix G

Pursuant to the provisions 10 Code of Federal Regulations (CFR) 20, Appendix G, Holtec Decommissioning International, LLC (HDI) is submitting a report to identify the results of the investigation performed relative to shipment and transport of low-level radioactive waste (LLRW) from Oyster Creek Nuclear Generating Station (OCNGS) to the Waste Control Specialists, LLC (WCS) disposal facility in Andrews, Texas. The LLRW shipments exceeded the 20-day time limit for notification of receipt from the disposal facility as specified in 10 CFR Part 20, Appendix G.

Since December 8, 2020, OCNGS has been shipping various types of LLRW from the facility as a part of facility decommissioning. These various shipments departed the OCNGS via truck, transferred to rail car at the transload facility in Bridgeport, New Jersey, shipped via rail to the Bulk Transfer, LLC facility in Seagrave, Texas, and ultimately, transferred by truck to the WCS facility at Andrews, Texas. Since December 2020, the total transport times for the LLRW shipments have ranged from 30 days to 134 days. Previous late shipment notifications have been submitted to the Nuclear Regulatory Commission in letters dated 30 August, 2021 (ADAMS Ascension No. ML21242A265), 1 December, 2021 (ADAMS Ascension No.

ML21335A255), and 16 December, 2021 (ADAMS Ascension No. ML21350A193).

10 CFR 20, Appendix G, Requirements for Transfers of Low-Level Radioactive Waste Intended for Disposal at Licensed Land Disposal Facilities and Manifests,Section III.A(9) states for any shipments or any part of a shipment for which acknowledgment of receipt has not been received within the times set forth in this appendix, to conduct an investigation in accordance with Section III.E of this appendix.

Section III.E states that any shipments or part of shipment for which acknowledgement is not received within the times set forth in this section must:

1. Be investigated by the shipper if the shipper has not received notification or receipt within 20 days after transfer; and
2. Be traced and reported. The investigation shall include tracing the shipment and filing a report with the nearest Commission Regional Office listed in Appendix D to this part. Each

HDI-OC-22-004 Page 1 of 2 Krishna P. Singh Technology Campus, 1 Holtec Blvd., Camden, NJ 08104 Telephone (856) 797-0900 Fax (856) 797-0909

licensee who conducts a trace investigation shall file a written report with the appropriate NRC Regional Office within 2 weeks of completion of the investigation.

OCNGS Radwaste Shippers finalized the trace investigation on January 11, 2022. The investigation revealed that the LLRW shipments took between 37 and 91 days to complete transport from OCNGS to the WCS waste disposal facility in Andrews, Texas. These investigations identified that delays were due to mixed mode transportation and that there were no significant or unusual transport delays encountered.

This letter contains no new regulatory commitments.

If you have any questions or need further information, please contact me at (856) 797-0900, ext.

3578.

Sincerely,

Jean A. Fleming HDI Vice President, Regulatory and Environmental Affairs Holtec Decommissioning International, LLC

Attachment - Oyster Creek Nuclear Generating Station Investigation Report, LLRW Shipments Exceeded 20 Days

cc: (with Attachment)

NRC NMSS Project Manager (Oyster Creek Nuclear Generating Station)

HDI-OC-22-004 Page 2 of 2 Krishna P. Singh Technology Campus, 1 Holtec Blvd., Camden, NJ 08104 Telephone (856) 797-0900 Fax (856) 797-0909

HDI-OC-22-004

Attachment

Oyster Creek Nuclear Generating Station Investigation Report

LLRW Shipments Completion Exceeded 20 Days

Krishna P. Singh Technology Campus, 1 Holtec Blvd., Camden, NJ 08104 Telephone (856) 797-0900 Fax (856) 797-0909

Oyster Creek Nuclear Generating Station LLRW Shipment Exceeded 20 days

1) WCS Shipping Request (SR-2708-0036 and SR-2708-0037):
a. On September 16th thru October 1st, 2021, ten (10) trucks consisting of a total of ten (10) Intermodals of concrete and metal debris for disposal departed from the Oyster Creek Nuclear Generating Station (OCNGS) site at 741 U.S. Route 9 South, Forked River, New Jersey to the Waste Control Specialists, LLC waste disposal facility in Andrews, Texas via the SMS Rail Lines transload facility in Bridgeport, New Jersey and the Greenfield Logistics Transload facility in Seagraves, Texas.
b. The trucks were released to the transload facility, SMS Rail Lines, on the dates identified above. After release from the OCNGS site, the trucks containing the ten (10) Intermodals of concrete and metal debris were transferred to a multiple unit railcar in Bridgeport, NJ then received at the Greenfield Logistics Transload facility in Seagrave, Texas and transferred back to trucks for delivery/receipt at the WCS waste disposal facility. The overall transit time from initial shipment to receipt at disposal facility was 91 days.
c. OCNGS and WCS receive daily tracking reports from the logistics contractor, Greenfield Logistics, LLC, for all waste shipments transported from the OCNGS site. The location of the subject shipment was verified and traced until receipt at the destination facility. OCNGS and WCS tracked the progress of the shipment through the daily trace reports. At no time was the shipment lost or in an unknown location.
d. Below is the summary for the shipment that exceeded the time provided in 10 CFR 20, Appendix G. The summary includes the shipment identification number, rail car identification (ID) number, shipment date, date of receipt at the waste disposal facility and the total number of days the shipment was in transit.

Shipment Date Date Received at Total Days In Number Rail Car ID Number Shipped Waste Control Transit Specialists, LLC.

SR-2708-0036 and ITFX4837/DTTX728240 9/16/2021 12/16/2021 91 SR-2708-0037

2) WCS Shipping Request (SR-2708-0039):
a. On October 12th thru October 15th, 2021, ten (10) trucks consisting of a total of ten (10) Intermodals of concrete and metal debris for disposal HDI-OC-22-004 Page 1 of 5 Krishna P. Singh Technology Campus, 1 Holtec Blvd., Camden, NJ 08104 Telephone (856) 797-0900 Fax (856) 797-0909

departed from the Oyster Creek Nuclear Generating Station (OCNGS) site at 741 U.S. Route 9 South, Forked River, New Jersey to the Waste Control Specialists, LLC waste disposal facility in Andrews, Texas via the SMS Rail Lines transload facility in Bridgeport, New Jersey and the Greenfield Logistics Transload facility in Seagraves, Texas.

b. The trucks were released to the transload facility, SMS Rail Lines, on the dates identified above. After release from the OCNGS site, the trucks containing the ten (10) Intermodals of concrete and metal debris were transferred to a multiple unit railcar in Bridgeport, NJ then received at the Greenfield Logistics Transload facility in Seagrave, Texas and transferred back to trucks for delivery/receipt at the WCS waste disposal facility. The overall transit time from initial shipment to receipt at disposal facility was 64 days.
c. OCNGS and WCS receive daily tracking reports from the logistics contractor, Greenfield Logistics, LLC, for all waste shipments transported from the OCNGS site. The location of the subject shipment was verified and traced until receipt at the destination facility. OCNGS and WCS tracked the progress of the shipment through the daily trace reports. At no time was the shipment lost or in an unknown location.
d. Below is the summary for the shipment that exceeded the time provided in 10 CFR 20, Appendix G. The summary includes the shipment identification number, rail car identification (ID) number, shipment date, date of receipt at the waste disposal facility and the total number of days the shipment was in transit.

Rail Car ID Date Date Received at Shipment Number Number Shipped Waste Control Total Days In Transit Specialists, LLC.

SR-2708-0039 ITFX4739 10/12/2021 12/15/2021 64

3) WCS Shipping Request (SR-2708-0040):
a. On October 20th thru October 22nd, 2021, nine (9) trucks consisting of a total of ten (10) CVans of metal debris and metal tanks for disposal departed from the Oyster Creek Nuclear Generating Station (OCNGS) site at 741 U.S. Route 9 South, Forked River, New Jersey to the Waste Control Specialists, LLC waste disposal facility in Andrews, Texas via the SMS Rail Lines transload facility in Bridgeport, New Jersey and the Greenfield Logistics Transload facility in Seagraves, Texas.
b. The trucks were released to the transload facility, SMS Rail Lines, on the dates identified above. After release from the OCNGS site, the trucks containing the ten (10) CVans of metal debris and metal tanks were HDI-OC-22-004 Page 2 of 5 Krishna P. Singh Technology Campus, 1 Holtec Blvd., Camden, NJ 08104 Telephone (856) 797-0900 Fax (856) 797-0909

transferred to a multiple unit railcar in Bridgeport, NJ then received at the Greenfield Logistics Transload facility in Seagrave, Texas and transferred back to trucks for delivery/receipt at the WCS waste disposal facility. The overall transit time from initial shipment to receipt at disposal facility was 57 days.

c. OCNGS and WCS receive daily tracking reports from the logistics contractor, Greenfield Logistics, LLC, for all waste shipments transported from the OCNGS site. The location of the subject shipment was verified and traced until receipt at the destination facility. OCNGS and WCS tracked the progress of the shipment through the daily trace reports. At no time was the shipment lost or in an unknown location.
d. Below is the summary for the shipment that exceeded the time provided in 10 CFR 20, Appendix G. The summary includes the shipment identification number, rail car identification (ID) number, shipment date, date of receipt at the waste disposal facility and the total number of days the shipment was in transit.

Shipment Rail Car ID Date Date Received at Number Number Shipped Waste Control Total Days In Transit Specialists, LLC.

SR-2708-0040 BNSF238289 10/20/2021 12/17/2021 57

4) WCS Shipping Request (SR-2708-0038, SR-2708-0039 and SR-2708-0040):
a. On October 5th thru October 19th, 2021, ten (10) trucks consisting of a total of ten (10) Intermodals (IM) of concrete and metal debris for disposal departed from the Oyster Creek Nuclear Generating Station (OCNGS) site at 741 U.S. Route 9 South, Forked River, New Jersey to the Waste Control Specialists, LLC waste disposal facility in Andrews, Texas via the SMS Rail Lines transload facility in Bridgeport, New Jersey and the Greenfield Logistics Transload facility in Seagraves, Texas.
b. The trucks were released to the transload facility, SMS Rail Lines, on the dates identified above. After release from the OCNGS site, the trucks containing the ten (10) Intermodals (IM) of concrete and metal debris were transferred to a multiple unit railcar in Bridgeport, NJ then received at the Greenfield Logistics Transload facility in Seagrave, Texas and transferred back to trucks for delivery/receipt at the WCS waste disposal facility. The overall transit time from initial shipment to receipt at disposal facility was 85 days.
c. OCNGS and WCS receive daily tracking reports from the logistics contractor, Greenfield Logistics, LLC, for all waste shipments transported from the OCNGS site. The location of the subject shipment was verified HDI-OC-22-004 Page 3 of 5 Krishna P. Singh Technology Campus, 1 Holtec Blvd., Camden, NJ 08104 Telephone (856) 797-0900 Fax (856) 797-0909

and traced until receipt at the destination facility. OCNGS and WCS tracked the progress of the shipment through the daily trace reports. At no time was the shipment lost or in an unknown location.

d. Below is the summary for the shipment that exceeded the time provided in 10 CFR 20, Appendix G. The summary includes the shipment identification number, rail car identification (ID) number, shipment date, date of receipt at the waste disposal facility and the total number of days the shipment was in transit.

Rail Car ID Date Date Received at Shipment Number Number Shipped Waste Control Total Days In Transit Specialists, LLC.

SR-2708-0038, SR-2708-0039 and SR-ITFX15226 10/5/2021 12/29/2021 85 2708-0040

5) WCS Shipping Request (SR-2708-0045):
a. On December 1st thru December 2nd, 2021, five (5) trucks consisting of a total of seven (7) Intermodals (IM) and three (3) CVans of metal debris for disposal departed from the Oyster Creek Nuclear Generating Station (OCNGS) site at 741 U.S. Route 9 South, Forked River, New Jersey to the Waste Control Specialists, LLC waste disposal facility in Andrews, Texas via the SMS Rail Lines transload facility in Bridgeport, New Jersey and the Greenfield Logistics Transload facility in Seagraves, Texas.
b. The trucks were released to the transload facility, SMS Rail Lines, on the dates identified above. After release from the OCNGS site, the trucks containing the seven (7) Intermodals (IM) and three (3) CVans of metal debris were transferred to a multiple unit railcar in Bridgeport, NJ then received at the Greenfield Logistics Transload facility in Seagrave, Texas and transferred back to trucks for delivery/receipt at the WCS waste disposal facility. The overall transit time from initial shipment to receipt at disposal facility was 37 days.
c. OCNGS and WCS receive daily tracking reports from the logistics contractor, Greenfield Logistics, LLC, for all waste shipments transported from the OCNGS site. The location of the subject shipment was verified and traced until receipt at the destination facility. OCNGS and WCS tracked the progress of the shipment through the daily trace reports. At no time was the shipment lost or in an unknown location.
d. Below is the summary for the shipment that exceeded the time provided in 10 CFR 20, Appendix G. The summary includes the shipment identification number, rail car identification (ID) number, shipment date,

HDI-OC-22-004 Page 4 of 5 Krishna P. Singh Technology Campus, 1 Holtec Blvd., Camden, NJ 08104 Telephone (856) 797-0900 Fax (856) 797-0909

date of receipt at the waste disposal facility and the total number of days the shipment was in transit.

Rail Car ID Date Date Received at Shipment Number Number Shipped Waste Control Total Days In Transit Specialists, LLC.

SR-2708-0045 ITFX4831 12/1/2021 1/7/2022 37

HDI-OC-22-004 Page 5 of 5