{{#Wiki_filter:Westinghouse Non-Proprietary Class 3 Westinghouse Electric Company Nuclear Fuel Columbia Fuel Fabrication Facility 5801 Bluff Road Hopkins, South Carolina 29061 USA ATTN: Document Control Desk | {{#Wiki_filter:Westinghouse Non-Proprietary Class 3 | ||
Office of Nuclear Material Safety and Safeguards | |||
Westinghouse Electric Company Nuclear Fuel Columbia Fuel Fabrication Facility 5801 Bluff Road Hopkins, South Carolina 29061 USA | |||
ATTN: Document Control Desk Direct tel: +1.720.467.5413 Director, Division of Fuel Management Direct fax: | |||
Office of Nuclear Material Safety and Safeguards e-mail: Sloma1t@westinghouse.com U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Your ref: Docket No. 71-9239 Our ref: LTR-LCPT-22-02 | |||
March 3, 2022 | |||
==Subject:== | ==Subject:== | ||
Line 23: | Line 29: | ||
==Dear Director,== | ==Dear Director,== | ||
In accordance with 10CFR71.38, Westinghouse hereby requests renewal of NRC Certificate of Compliance (CoC) USA/9239/AF Revision 19 that expires 31 March 2022. T here are no changes to the package approval or application Safety Analysis Report (SAR) Revision 14 that are not already consolidated in the application and authorized in the existing certificate as identified in the current certificate reference section. | |||
Westinghouse has a quality assurance program, approved by the Commission, which satisfies the provisions of subpart H (Quality Assurance) of Pa rt 71. Further, Westinghouse complies with the terms and conditions of the applicable requirements of subparts A (General Provisions), G (Operating Controls and Procedures) of Part 71. | |||
One copy of the renewal request is submitted electronically via NRC E lectronic Information Exchange (EIE) system and emailed to the Project Manager, Pierre Saverot. Additional copies or electronic submissions are available upon request. Resubmission of SAR Rev. 14 is available upon request. Should you have any questions, or require additional information, please contact any me. | |||
Best regards, Tanya Sloma-DeLosier Package Licensing Program Manager Licensing, Compliance, and Package Technology Westinghouse Electric Company LLC | |||
cc: W. Stilwell, Westinghouse -USA P. Saverot, US NRC | |||
* Electronically approved records are authenticated in the electronic document management system. | |||
© 2022 Westinghouse Electric Company LLC All Rights Reserved}} | |||
Latest revision as of 14:38, 18 November 2024
ML22063A330 | |
Person / Time | |
---|---|
Site: | 07109239 |
Issue date: | 03/03/2022 |
From: | Sloma-Delosier T Westinghouse |
To: | Document Control Desk, Office of Nuclear Material Safety and Safeguards |
References | |
LTR-LCPT-22-02 | |
Download: ML22063A330 (1) | |
Text
Westinghouse Non-Proprietary Class 3
Westinghouse Electric Company Nuclear Fuel Columbia Fuel Fabrication Facility 5801 Bluff Road Hopkins, South Carolina 29061 USA
ATTN: Document Control Desk Direct tel: +1.720.467.5413 Director, Division of Fuel Management Direct fax:
Office of Nuclear Material Safety and Safeguards e-mail: Sloma1t@westinghouse.com U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Your ref: Docket No. 71-9239 Our ref: LTR-LCPT-22-02
March 3, 2022
Subject:
Request for Renewal of Certificate of Compliance USA/9239/AF for Model No. MCC-3, MCC-4, and MCC-5 Packages
Dear Director,
In accordance with 10CFR71.38, Westinghouse hereby requests renewal of NRC Certificate of Compliance (CoC) USA/9239/AF Revision 19 that expires 31 March 2022. T here are no changes to the package approval or application Safety Analysis Report (SAR) Revision 14 that are not already consolidated in the application and authorized in the existing certificate as identified in the current certificate reference section.
Westinghouse has a quality assurance program, approved by the Commission, which satisfies the provisions of subpart H (Quality Assurance) of Pa rt 71. Further, Westinghouse complies with the terms and conditions of the applicable requirements of subparts A (General Provisions), G (Operating Controls and Procedures) of Part 71.
One copy of the renewal request is submitted electronically via NRC E lectronic Information Exchange (EIE) system and emailed to the Project Manager, Pierre Saverot. Additional copies or electronic submissions are available upon request. Resubmission of SAR Rev. 14 is available upon request. Should you have any questions, or require additional information, please contact any me.
Best regards, Tanya Sloma-DeLosier Package Licensing Program Manager Licensing, Compliance, and Package Technology Westinghouse Electric Company LLC