ML23047A402: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:APPENDIX R Significant Enforcement Actions Issued, Fiscal Year 2022 Significant (escalated) enforcement actions include notices of violation (NOVs) for severity level (SL) I, II, or III violations; NOVs associated with inspection findings that the significance determination process (SDP) categorizes as White, Yellow, or Red; civil penalties (CPs); and enforcement-related orders. The NRC Enforcement Policy also allows related violations to be categorized collectively as a single problem. Escalated enforcement actions are issued to reactor, materials, and individual licensees; nonlicensees; and fuel cycle facility licensees.
{{#Wiki_filter:APPENDIX R Significant Enforcement Actions Issued, Fiscal Year 2022
Action #        Name                                              Type        Issue Date      Enforcement Action IA-21-043        Ms. Lilly Porter                                Individual  10/7/2021      SLIII/NOV EA-21-058        Empire Paving Inc.                              Materials    11/8/2021      SLIII Problem/NOV; SLIII/NOV EA-21-109        Southern Nuclear Operating Co. (Vogtle Electric Reactor      11/17/2021      (2) White/NOV Generating Plant)
EA-21-102        BRL-NDT Services                                Materials    11/26/2021      SLIII Problem/NOV/SLIV IA-21-049        Ms. Peggy Lucky                                Individual  11/26/2021      SLIII/NOV EA-21-034        Mountain View Hospital                          Materials    12/15/2021      SLIII Problem/NOV; (4) SLIV EA-20-125        Entergy Operations, Inc. (Grand Gulf Nuclear    Reactor      12/15/2021      SLIII/NOV Station)
IA-20-054        Mr. Maurice Omaits                              Individual  12/15/2021      SLIII/NOV EA-21-115        Department of Army                              Materials    1/3/2022        SLIII/NOV EA-21-026        Southern Nuclear Operating Co. (Vogtle Electric Reactor      1/4/2022        SLIII/NOV Generating Plant)
IA-21-050        Mr. Michael Giles                              Individual  1/4/2022        SLIII/NOV EA-21-119        KRONUS, Inc.                                    Materials    1/25/2022      SLIII/NOV EA-21-041        Holtec Decommissioning International LLC        Reactor      1/26/2022      Confirmatory Order result of an (Oyster Creek Nuclear Generating Station)                                    ADR mediation/CP $50,000 IA-21-040        Mr. Kevin Wright                                Individual  1/26/2022      SLIII/NOV IA-21-051        Mr. Magnus Quitmeyer                            Individual  1/27/2022      SLIII/NOV EA-21-114        Union Carbide Corporation                      Materials    2/14/2022      SLIII/NOV; (3) SLIV EA-21-134        Geotechnical and Materials Engineers, Inc.      Materials    2/14/2022      SLIII Problem/NOV/SLIV EA-21-120        Marian Medical LLC                              Materials    2/16/2022      SLIII Problem/NOV/CP $7,000 EA-21-133        Acuren Inspection, Inc.                        Materials    2/28/2022      SLIII Problem/NOV/CP $16,000 EA-21-155        Energy Harbor Nuclear Corp. (Davis-Besse        Reactor      3/1/2022        White/NOV Nuclear Power Station)
EA-21-045        Steel City Gamma, LLC                          Materials    3/2/2022        SLII Problem/NOV/CP $25,600 IA-21-062        Mr.Joseph Berkich                              Individual  3/2/2022        Order banning for 5 years EA-21-146        Somat Engineering Inc.                          Materials    3/3/2022        Confirmatory Order result of an ADR mediation EA-21-103        Cultilux                                        Materials    3/14/2022      SLIII Problem/NOV EA-21-145        Northwest Inspection, Inc.                      Materials    3/14/2022      SLIII/NOV APPENDICES l 131


APPENDIX R Significant Enforcement Actions Issued, Fiscal Year 2022 (continued)
Significant (escalated) enforcement actions include notices of violation (NOVs) for severity level (SL) I, II, or III violations; NOVs associated with inspection findings that the significance determination process (SDP) categorizes as White, Yellow, or Red; civil penalties (CPs); and enforcement-related orders. The NRC Enforcement Policy also allows related violations to be categorized collectively as a single problem. Escalated enforcement actions are issued to reactor, materials, and individual licensees; nonlicensees; and fuel cycle facility licensees.
Action #     Name                                         Type       Issue Date Enforcement Action EA-21-100     Kakivik Asset Management, LLC               Materials   4/5/2022 SLIII Problem/NOV EA-21-059     U.S. Department of Veterans Affairs         Materials   4/21/2022 Confirmatory Order result of an ADR mediation EA-21-132     Defense Health Agency                       Materials   4/27/2022 SLIII/NOV/CP $3,500 EA-22-001     University of Wyoming                       Materials   5/17/2022 SLIII Problem/NOV EA-21-027     Avera McKennan                               Materials   5/19/2022 Confirmatory Order result of an ADR mediation IA-21-060     Ms. Shannon Gray                             Individual 5/19/2022 Confirmatory Order result of an ADR mediation IA-21-061     Ms. Traci Hollingshead                       Individual 5/19/2022 Confirmatory Order result of an ADR mediation EA-21-125     Industrial Nuclear Company, Inc.             Materials   5/27/2022 SLIII/NOV/SLIV EA-22-022     Core Engineering & Consulting, Inc.         Materials   6/2/2022 (2) SLIII/NOV IA-22-025     Mr. Matthew Carberry                         Individual 6/7/2022 SLIII/NOV EA-21-129     Advanced Inspection Technologies             Materials   6/14/2022 SLIII/NOV/CP $8,000 IA-21-069     Ms. Sharon Busby                             Individual 6/14/2022 SLIII/NOV EA-22-021     Niowave, Inc.                               Materials   6/30/2022 SLIII Problem/NOV EA-22-020     Alt and Witzig Engineering, Inc.             Materials   7/11/2022 SLIII Problem/NOV/CP $8,000 EA-21-148     U.S. Department of Commerce (National Insti- Reactor     8/1/2022 Confirmatory Order result of an tute of Standards and Technology)                                 ADR mediation EA-22-018     Testing Engineers & Consultants, Inc.       Materials   8/11/2022 (3) SLIII/NOV/CP $24,000 IA-22-027     Mr. Ronald Salgado                           Individual 8/12/2022 SLIII/NOV EA-21-167     Indiana University                           Materials   9/1/2022 SLIII Problem/NOV/CP $8,000 IA-22-005     Dr. Sabah Butty                             Individual 9/1/2022 SLIII/NOV IA-22-006     Dr. Maximilian Pyko                         Individual 9/1/2022 SLIII/NOV EA-22-033     Waterford Steam Electric Station, Unit 3     Reactor     9/12/2022 White/NOV EA-22-007     Air Force Medical Readiness Agency           Materials   9/22/2022 SLIII/NOV; (3) SLIII Problem/
 
NOV/CP $96,000 132 l APPENDICES}}
Action # Name Type Issue Date Enforcement Action
 
IA-21-043 Ms. Lilly Porter Individual 10/7/2021 SLIII/NOV EA-21-058 Empire Paving Inc. Materials 11/8/2021 SLIII Problem/NOV; SLIII/NOV EA-21-109 Southern Nuclear Operating Co. (Vogtle Electric Reactor 11/17/2021 (2) White/NOV Generating Plant)
EA-21-102 BRL-NDT Services Materials 11/26/2021 SLIII Problem/NOV/SLIV IA-21-049 Ms. Peggy Lucky Individual 11/26/2021 SLIII/NOV EA-21-034 Mountain View Hospital Materials 12/15/2021 SLIII Problem/NOV; (4) SLIV EA-20-125 Entergy Operations, Inc. (Grand Gulf Nuclear Reactor 12/15/2021 SLIII/NOV Station)
IA-20-054 Mr. Maurice Omaits Individual 12/15/2021 SLIII/NOV EA-21-115 Department of Army Materials 1/3/2022 SLIII/NOV EA-21-026 Southern Nuclear Operating Co. (Vogtle Electric Reactor 1/4/2022 SLIII/NOV Generating Plant)
IA-21-050 Mr. Michael Giles Individual 1/4/2022 SLIII/NOV
 
EA-21-119 KRONUS, Inc. Materials 1/25/2022 SLIII/NOV EA-21-041 Holtec Decommissioning International LLC Reactor 1/26/2022 Confirmatory Order result of an (Oyster Creek Nuclear Generating Station) ADR mediation/CP $50,000 IA-21-040 Mr. Kevin Wright Individual 1/26/2022 SLIII/NOV IA-21-051 Mr. Magnus Quitmeyer Individual 1/27/2022 SLIII/NOV EA-21-114 Union Carbide Corporation Materials 2/14/2022 SLIII/NOV; (3) SLIV EA-21-134 Geotechnical and Materials Engineers, Inc. Materials 2/14/2022 SLIII Problem/NOV/SLIV EA-21-120 Marian Medical LLC Materials 2/16/2022 SLIII Problem/NOV/CP $7,000 EA-21-133 Acuren Inspection, Inc. Materials 2/28/2022 SLIII Problem/NOV/CP $16,000 EA-21-155 Energy Harbor Nuclear Corp. (Davis-Besse Reactor 3/1/2022 White/NOV Nuclear Power Station)
EA-21-045 Steel City Gamma, LLC Materials 3/2/2022 SLII Problem/NOV/CP $25,600
 
IA-21-062 Mr.Joseph Berkich Individual 3/2/2022 Order banning for 5 years EA-21-146 Somat Engineering Inc. Materials 3/3/2022 Confirmatory Order result of an ADR mediation EA-21-103 Cultilux Materials 3/14/2022 SLIII Problem/NOV EA-21-145 Northwest Inspection, Inc. Materials 3/14/2022 SLIII/NOV
 
APPENDICES l 131 APPENDIX R Significant Enforcement Actions Issued, Fiscal Year 2022 (continued)
 
Action # Name Type Issue Date Enforcement Action
 
EA-21-100 Kakivik Asset Management, LLC Materials 4/5/2022 SLIII Problem/NOV
 
EA-21-059 U.S. Department of Veterans Affairs Materials 4/21/2022 Confirmatory Order result of an ADR mediation EA-21-132 Defense Health Agency Materials 4/27/2022 SLIII/NOV/CP $3,500 EA-22-001 University of Wyoming Materials 5/17/2022 SLIII Problem/NOV
 
EA-21-027 Avera McKennan Materials 5/19/2022 Confirmatory Order result of an ADR mediation IA-21-060 Ms. Shannon Gray Individual 5/19/2022 Confirmatory Order result of an ADR mediation IA-21-061 Ms. Traci Hollingshead Individual 5/19/2022 Confirmatory Order result of an ADR mediation EA-21-125 Industrial Nuclear Company, Inc. Materials 5/27/2022 SLIII/NOV/SLIV EA-22-022 Core Engineering & Consulting, Inc. Materials 6/2/2022 (2) SLIII/NOV IA-22-025 Mr. Matthew Carberry Individual 6/7/2022 SLIII/NOV EA-21-129 Advanced Inspection Technologies Materials 6/14/2022 SLIII/NOV/CP $8,000 IA-21-069 Ms. Sharon Busby Individual 6/14/2022 SLIII/NOV EA-22-021 Niowave, Inc. Materials 6/30/2022 SLIII Problem/NOV EA-22-020 Alt and Witzig Engineering, Inc. Materials 7/11/2022 SLIII Problem/NOV/CP $8,000 EA-21-148 U.S. Department of Commerce (National Insti-Reactor 8/1/2022 Confirmatory Order result of an tute of Standards and Technology) ADR mediation EA-22-018 Testing Engineers & Consultants, Inc. Materials 8/11/2022 (3) SLIII/NOV/CP $24,000 IA-22-027 Mr. Ronald Salgado Individual 8/12/2022 SLIII/NOV EA-21-167 Indiana University Materials 9/1/2022 SLIII Problem/NOV/CP $8,000 IA-22-005 Dr. Sabah Butty Individual 9/1/2022 SLIII/NOV IA-22-006 Dr. Maximilian Pyko Individual 9/1/2022 SLIII/NOV EA-22-033 Waterford Steam Electric Station, Unit 3 Reactor 9/12/2022 White/NOV EA-22-007 Air Force Medical Readiness Agency Materials 9/22/2022 SLIII/NOV; (3) SLIII Problem/
NOV/CP $96,000
 
132 l APPENDICES}}

Latest revision as of 07:21, 15 November 2024

App R Pages from Final_Section 6-2022-23-18
ML23047A402
Person / Time
Issue date: 02/28/2023
From: Couret I
Office of Public Affairs
To:
References
NUREG-1350, Vol. 34
Download: ML23047A402 (1)


Text

APPENDIX R Significant Enforcement Actions Issued, Fiscal Year 2022

Significant (escalated) enforcement actions include notices of violation (NOVs) for severity level (SL) I, II, or III violations; NOVs associated with inspection findings that the significance determination process (SDP) categorizes as White, Yellow, or Red; civil penalties (CPs); and enforcement-related orders. The NRC Enforcement Policy also allows related violations to be categorized collectively as a single problem. Escalated enforcement actions are issued to reactor, materials, and individual licensees; nonlicensees; and fuel cycle facility licensees.

Action # Name Type Issue Date Enforcement Action

IA-21-043 Ms. Lilly Porter Individual 10/7/2021 SLIII/NOV EA-21-058 Empire Paving Inc. Materials 11/8/2021 SLIII Problem/NOV; SLIII/NOV EA-21-109 Southern Nuclear Operating Co. (Vogtle Electric Reactor 11/17/2021 (2) White/NOV Generating Plant)

EA-21-102 BRL-NDT Services Materials 11/26/2021 SLIII Problem/NOV/SLIV IA-21-049 Ms. Peggy Lucky Individual 11/26/2021 SLIII/NOV EA-21-034 Mountain View Hospital Materials 12/15/2021 SLIII Problem/NOV; (4) SLIV EA-20-125 Entergy Operations, Inc. (Grand Gulf Nuclear Reactor 12/15/2021 SLIII/NOV Station)

IA-20-054 Mr. Maurice Omaits Individual 12/15/2021 SLIII/NOV EA-21-115 Department of Army Materials 1/3/2022 SLIII/NOV EA-21-026 Southern Nuclear Operating Co. (Vogtle Electric Reactor 1/4/2022 SLIII/NOV Generating Plant)

IA-21-050 Mr. Michael Giles Individual 1/4/2022 SLIII/NOV

EA-21-119 KRONUS, Inc. Materials 1/25/2022 SLIII/NOV EA-21-041 Holtec Decommissioning International LLC Reactor 1/26/2022 Confirmatory Order result of an (Oyster Creek Nuclear Generating Station) ADR mediation/CP $50,000 IA-21-040 Mr. Kevin Wright Individual 1/26/2022 SLIII/NOV IA-21-051 Mr. Magnus Quitmeyer Individual 1/27/2022 SLIII/NOV EA-21-114 Union Carbide Corporation Materials 2/14/2022 SLIII/NOV; (3) SLIV EA-21-134 Geotechnical and Materials Engineers, Inc. Materials 2/14/2022 SLIII Problem/NOV/SLIV EA-21-120 Marian Medical LLC Materials 2/16/2022 SLIII Problem/NOV/CP $7,000 EA-21-133 Acuren Inspection, Inc. Materials 2/28/2022 SLIII Problem/NOV/CP $16,000 EA-21-155 Energy Harbor Nuclear Corp. (Davis-Besse Reactor 3/1/2022 White/NOV Nuclear Power Station)

EA-21-045 Steel City Gamma, LLC Materials 3/2/2022 SLII Problem/NOV/CP $25,600

IA-21-062 Mr.Joseph Berkich Individual 3/2/2022 Order banning for 5 years EA-21-146 Somat Engineering Inc. Materials 3/3/2022 Confirmatory Order result of an ADR mediation EA-21-103 Cultilux Materials 3/14/2022 SLIII Problem/NOV EA-21-145 Northwest Inspection, Inc. Materials 3/14/2022 SLIII/NOV

APPENDICES l 131 APPENDIX R Significant Enforcement Actions Issued, Fiscal Year 2022 (continued)

Action # Name Type Issue Date Enforcement Action

EA-21-100 Kakivik Asset Management, LLC Materials 4/5/2022 SLIII Problem/NOV

EA-21-059 U.S. Department of Veterans Affairs Materials 4/21/2022 Confirmatory Order result of an ADR mediation EA-21-132 Defense Health Agency Materials 4/27/2022 SLIII/NOV/CP $3,500 EA-22-001 University of Wyoming Materials 5/17/2022 SLIII Problem/NOV

EA-21-027 Avera McKennan Materials 5/19/2022 Confirmatory Order result of an ADR mediation IA-21-060 Ms. Shannon Gray Individual 5/19/2022 Confirmatory Order result of an ADR mediation IA-21-061 Ms. Traci Hollingshead Individual 5/19/2022 Confirmatory Order result of an ADR mediation EA-21-125 Industrial Nuclear Company, Inc. Materials 5/27/2022 SLIII/NOV/SLIV EA-22-022 Core Engineering & Consulting, Inc. Materials 6/2/2022 (2) SLIII/NOV IA-22-025 Mr. Matthew Carberry Individual 6/7/2022 SLIII/NOV EA-21-129 Advanced Inspection Technologies Materials 6/14/2022 SLIII/NOV/CP $8,000 IA-21-069 Ms. Sharon Busby Individual 6/14/2022 SLIII/NOV EA-22-021 Niowave, Inc. Materials 6/30/2022 SLIII Problem/NOV EA-22-020 Alt and Witzig Engineering, Inc. Materials 7/11/2022 SLIII Problem/NOV/CP $8,000 EA-21-148 U.S. Department of Commerce (National Insti-Reactor 8/1/2022 Confirmatory Order result of an tute of Standards and Technology) ADR mediation EA-22-018 Testing Engineers & Consultants, Inc. Materials 8/11/2022 (3) SLIII/NOV/CP $24,000 IA-22-027 Mr. Ronald Salgado Individual 8/12/2022 SLIII/NOV EA-21-167 Indiana University Materials 9/1/2022 SLIII Problem/NOV/CP $8,000 IA-22-005 Dr. Sabah Butty Individual 9/1/2022 SLIII/NOV IA-22-006 Dr. Maximilian Pyko Individual 9/1/2022 SLIII/NOV EA-22-033 Waterford Steam Electric Station, Unit 3 Reactor 9/12/2022 White/NOV EA-22-007 Air Force Medical Readiness Agency Materials 9/22/2022 SLIII/NOV; (3) SLIII Problem/

NOV/CP $96,000

132 l APPENDICES