ML23047A402

From kanterella
Jump to navigation Jump to search
App R Pages from Final_Section 6-2022-23-18
ML23047A402
Person / Time
Issue date: 02/28/2023
From: Couret I
Office of Public Affairs
To:
References
NUREG-1350, Vol. 34
Download: ML23047A402 (1)


Text

APPENDIX R Significant Enforcement Actions Issued, Fiscal Year 2022 Significant (escalated) enforcement actions include notices of violation (NOVs) for severity level (SL) I, II, or III violations; NOVs associated with inspection findings that the significance determination process (SDP) categorizes as White, Yellow, or Red; civil penalties (CPs); and enforcement-related orders. The NRC Enforcement Policy also allows related violations to be categorized collectively as a single problem. Escalated enforcement actions are issued to reactor, materials, and individual licensees; nonlicensees; and fuel cycle facility licensees.

Action # Name Type Issue Date Enforcement Action IA-21-043 Ms. Lilly Porter Individual 10/7/2021 SLIII/NOV EA-21-058 Empire Paving Inc. Materials 11/8/2021 SLIII Problem/NOV; SLIII/NOV EA-21-109 Southern Nuclear Operating Co. (Vogtle Electric Reactor 11/17/2021 (2) White/NOV Generating Plant)

EA-21-102 BRL-NDT Services Materials 11/26/2021 SLIII Problem/NOV/SLIV IA-21-049 Ms. Peggy Lucky Individual 11/26/2021 SLIII/NOV EA-21-034 Mountain View Hospital Materials 12/15/2021 SLIII Problem/NOV; (4) SLIV EA-20-125 Entergy Operations, Inc. (Grand Gulf Nuclear Reactor 12/15/2021 SLIII/NOV Station)

IA-20-054 Mr. Maurice Omaits Individual 12/15/2021 SLIII/NOV EA-21-115 Department of Army Materials 1/3/2022 SLIII/NOV EA-21-026 Southern Nuclear Operating Co. (Vogtle Electric Reactor 1/4/2022 SLIII/NOV Generating Plant)

IA-21-050 Mr. Michael Giles Individual 1/4/2022 SLIII/NOV EA-21-119 KRONUS, Inc. Materials 1/25/2022 SLIII/NOV EA-21-041 Holtec Decommissioning International LLC Reactor 1/26/2022 Confirmatory Order result of an (Oyster Creek Nuclear Generating Station) ADR mediation/CP $50,000 IA-21-040 Mr. Kevin Wright Individual 1/26/2022 SLIII/NOV IA-21-051 Mr. Magnus Quitmeyer Individual 1/27/2022 SLIII/NOV EA-21-114 Union Carbide Corporation Materials 2/14/2022 SLIII/NOV; (3) SLIV EA-21-134 Geotechnical and Materials Engineers, Inc. Materials 2/14/2022 SLIII Problem/NOV/SLIV EA-21-120 Marian Medical LLC Materials 2/16/2022 SLIII Problem/NOV/CP $7,000 EA-21-133 Acuren Inspection, Inc. Materials 2/28/2022 SLIII Problem/NOV/CP $16,000 EA-21-155 Energy Harbor Nuclear Corp. (Davis-Besse Reactor 3/1/2022 White/NOV Nuclear Power Station)

EA-21-045 Steel City Gamma, LLC Materials 3/2/2022 SLII Problem/NOV/CP $25,600 IA-21-062 Mr.Joseph Berkich Individual 3/2/2022 Order banning for 5 years EA-21-146 Somat Engineering Inc. Materials 3/3/2022 Confirmatory Order result of an ADR mediation EA-21-103 Cultilux Materials 3/14/2022 SLIII Problem/NOV EA-21-145 Northwest Inspection, Inc. Materials 3/14/2022 SLIII/NOV APPENDICES l 131

APPENDIX R Significant Enforcement Actions Issued, Fiscal Year 2022 (continued)

Action # Name Type Issue Date Enforcement Action EA-21-100 Kakivik Asset Management, LLC Materials 4/5/2022 SLIII Problem/NOV EA-21-059 U.S. Department of Veterans Affairs Materials 4/21/2022 Confirmatory Order result of an ADR mediation EA-21-132 Defense Health Agency Materials 4/27/2022 SLIII/NOV/CP $3,500 EA-22-001 University of Wyoming Materials 5/17/2022 SLIII Problem/NOV EA-21-027 Avera McKennan Materials 5/19/2022 Confirmatory Order result of an ADR mediation IA-21-060 Ms. Shannon Gray Individual 5/19/2022 Confirmatory Order result of an ADR mediation IA-21-061 Ms. Traci Hollingshead Individual 5/19/2022 Confirmatory Order result of an ADR mediation EA-21-125 Industrial Nuclear Company, Inc. Materials 5/27/2022 SLIII/NOV/SLIV EA-22-022 Core Engineering & Consulting, Inc. Materials 6/2/2022 (2) SLIII/NOV IA-22-025 Mr. Matthew Carberry Individual 6/7/2022 SLIII/NOV EA-21-129 Advanced Inspection Technologies Materials 6/14/2022 SLIII/NOV/CP $8,000 IA-21-069 Ms. Sharon Busby Individual 6/14/2022 SLIII/NOV EA-22-021 Niowave, Inc. Materials 6/30/2022 SLIII Problem/NOV EA-22-020 Alt and Witzig Engineering, Inc. Materials 7/11/2022 SLIII Problem/NOV/CP $8,000 EA-21-148 U.S. Department of Commerce (National Insti- Reactor 8/1/2022 Confirmatory Order result of an tute of Standards and Technology) ADR mediation EA-22-018 Testing Engineers & Consultants, Inc. Materials 8/11/2022 (3) SLIII/NOV/CP $24,000 IA-22-027 Mr. Ronald Salgado Individual 8/12/2022 SLIII/NOV EA-21-167 Indiana University Materials 9/1/2022 SLIII Problem/NOV/CP $8,000 IA-22-005 Dr. Sabah Butty Individual 9/1/2022 SLIII/NOV IA-22-006 Dr. Maximilian Pyko Individual 9/1/2022 SLIII/NOV EA-22-033 Waterford Steam Electric Station, Unit 3 Reactor 9/12/2022 White/NOV EA-22-007 Air Force Medical Readiness Agency Materials 9/22/2022 SLIII/NOV; (3) SLIII Problem/

NOV/CP $96,000 132 l APPENDICES