| {{#Wiki_filter:July 19, 2023 Mr. R. Keith Brown, Director Regulatory Affairs Southern Nuclear Operating Company, Inc. | | {{#Wiki_filter:July 19, 2023 |
| | |
| | Mr. R. Keith Brown, Director Regulatory Affairs Southern Nuclear Operating Company, Inc. |
| 3535 Colonnade Parkway, Bin N-274-EC Birmingham, AL 35243 | | 3535 Colonnade Parkway, Bin N-274-EC Birmingham, AL 35243 |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
| VOGTLE ELECTRIC GENERATING PLANT, UNIT 4 ISSUANCE OF AMENDMENT REGARDING LICENSE AMENDMENT REQUEST: TIMING OF UNIT 4 TECHNICAL SPECIFICATIONS EFFECTIVENESS PRIOR TO INITIAL CRITICALITY (EPID L-2023-LLA-0056) | | VOGTLE ELECTRIC GENERATING PLANT, UNIT 4 ISSUANCE OF AMENDMENT REGARDING LICENSE AMENDMENT REQUEST: TIMING OF UNIT 4 TECHNICAL SPECIFICATIONS EFFECTIVENESS PRIOR TO INITIAL CRITICALITY (EPID L-2023-LLA-0056) |
|
| |
|
| ==Dear Mr. Brown:== | | ==Dear Mr. Brown:== |
| | The U.S. Nuclear Regulatory Commission (the Commission or NRC) has issued the enclosed Amendment No. 189 to Combined License (COL) No. NPF-92 for the Vogtle Electric Generating Plant (VEGP), Unit 4. The amendment consists of changes to a COL Condition and COL Appendix A, Technical Specifications (TS) in response to your application dated April 17, 2023, titled, Timing of Unit 4 Technical Specifications Effectiveness Prior to Initial Criticality, designated as License Amendment Request (LAR) 23 -005. Your application was supplemented by {{letter dated|date=June 9, 2023|text=letter dated June 9, 2023}}, titled, Response to Request for Additional Information Regarding License Amendment Request: Timing of Unit 4 Technical Specifications Effectiveness Prior to Initial Criticality (LAR-23-005S1). |
| | |
| | The amendment involves changes to VEGP, Unit 4, COL Condition 2.D.(9) specifically to temporarily delay the effectiveness of certain TS requirements prior to initial criticality of the reactor core while in operating Modes 4, 5, and 6, as well as changes to COL Appendix A, TS Limiting Condition for Operation 3.0.7 to apply these exceptions. The staff notes that SNC included in its LAR and LAR supplement changes to the TS Bases document, which is under SNC control, and that the NRC staff does not re view and the Safety Evaluation will not address those changes. |
|
| |
|
| The U.S. Nuclear Regulatory Commission (the Commission or NRC) has issued the enclosed Amendment No. 189 to Combined License (COL) No. NPF-92 for the Vogtle Electric Generating Plant (VEGP), Unit 4. The amendment consists of changes to a COL Condition and COL Appendix A, Technical Specifications (TS) in response to your application dated April 17, 2023, titled, Timing of Unit 4 Technical Specifications Effectiveness Prior to Initial Criticality, designated as License Amendment Request (LAR) 23-005. Your application was supplemented by {{letter dated|date=June 9, 2023|text=letter dated June 9, 2023}}, titled, Response to Request for Additional Information Regarding License Amendment Request: Timing of Unit 4 Technical Specifications Effectiveness Prior to Initial Criticality (LAR-23-005S1).
| |
| The amendment involves changes to VEGP, Unit 4, COL Condition 2.D.(9) specifically to temporarily delay the effectiveness of certain TS requirements prior to initial criticality of the reactor core while in operating Modes 4, 5, and 6, as well as changes to COL Appendix A, TS Limiting Condition for Operation 3.0.7 to apply these exceptions. The staff notes that SNC included in its LAR and LAR supplement changes to the TS Bases document, which is under SNC control, and that the NRC staff does not review and the Safety Evaluation will not address those changes.
| |
| A copy of the related Safety Evaluation, which includes the evaluation of the changes, is also enclosed. A Notice of Issuance associated with the amendment will be published in the Federal Register. | | A copy of the related Safety Evaluation, which includes the evaluation of the changes, is also enclosed. A Notice of Issuance associated with the amendment will be published in the Federal Register. |
| | |
| In accordance with Title 10 of the Code of Federal Regulations, Part 2, Agency Rules of Practice and Procedure, a copy of this letter will be available electronically for public inspection | | In accordance with Title 10 of the Code of Federal Regulations, Part 2, Agency Rules of Practice and Procedure, a copy of this letter will be available electronically for public inspection |
|
| |
|
| R. Brown in the NRC Public Document Room or from the Publicly Available Records component of the NRCs Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html. | | R. Brown |
| | |
| | in the NRC Public Document Room or from the Publicly Available Records component of the NRCs Agencywide Documents Access and M anagement System (ADAMS). ADAMS is accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html. |
| | |
| Sincerely, | | Sincerely, |
| /RA/
| | |
| William (Billy) Gleaves, Senior Project Manager Vogtle Project Office Office of Nuclear Reactor Regulation Docket No.: 52-026 | | /RA/ |
| | |
| | William (Billy) Gleaves, Senior Project Manager Vogtle Project Office Office of Nuclear Reactor Regulation |
| | |
| | Docket No.: 52-026 |
|
| |
|
| ==Enclosures:== | | ==Enclosures:== |
| : 1. Amendment No. 189 to VEGP Unit 4 COL NPF-92 | | : 1. Amendment No. 189 to VEGP Unit 4 COL NPF-92 |
| : 2. Safety Evaluation cc: ListServ | | : 2. Safety Evaluation |
| | |
| | cc: ListServ |
|
| |
|
| ML23158A205 (package) | | ML23158A205 (package) |
| OFFICE NRR/VPO/VPOB/PM NRR/VPO/VPOB/LA NRR/VPO/VPOB/PM NRR/DSS/STSB/BC NAME WGleaves RButler* CSantos* VCusumano* | | OFFICE NRR/VPO/VPOB/PM NRR/VPO/VPOB/LA NRR/VPO/VPOB/PM NRR/DSS/STSB/BC NAME WGleaves RButler* CSantos* VCusumano* |
| DATE 7/5/2023 07/03/2023 7/19/2023 07/03/2023 OFFICE NRR/DSS/SNRB/BC NRR/DSS/SCPB/BC NRR/VPO/VPOB/D NRR/VPO/VPOB/PM NAME RPatton* BWittick* LNist* WGleaves DATE 7/6/2023 07/01/2023 07/19/2023 7/19/2023 | | DATE 7/5/2023 07/03/2023 7/19/2023 07/03/2023 OFFICE NRR/DSS/SNRB/BC NRR/DSS/SCPB/BC NRR/VPO/VPOB/D NRR/VPO/VPOB/PM NAME RPatton* BWittick* LNist* WGleaves DATE 7/6/2023 07/01/2023 07/19/2023 7/19/2023 |
| *concurred by email}} | | *concurred by email}} |
Letter Sequence Approval |
---|
EPID:L-2023-LLA-0056, License Amendment No. 189 Tech Spec Limiting Conditions for Operability Req for Auto Depressurization System Stage 4 Flow Paths Prior to Initial Criticality (Approved, Closed) |
|
MONTHYEARML23013A2142023-01-13013 January 2023 License Amendment No. 189 Tech Spec Limiting Conditions for Operability Req for Auto Depressurization System Stage 4 Flow Paths Prior to Initial Criticality Project stage: Request ML23037A0822023-02-0808 February 2023 Amendment No. 190, Tech Spec Exceptions for In-Containment Refueling Water Storage Tank Operability Prior to Initial Criticality (Exigent Circumstances) LAR 23-004 Project stage: Request ML23055A0402023-02-24024 February 2023 VEGP, Unit 4, Potential License Amendment Request for Prior to Initial Criticality Overview Presentation Project stage: Request PMNS20230135, Notice of Meeting with Southern Nuclear Operating Company2023-02-24024 February 2023 Notice of Meeting with Southern Nuclear Operating Company Project stage: Request ML23065A0732023-03-17017 March 2023 March 2, 2023, Summary of Meeting with Southern Nuclear Operating Company - Vogtle Electric Generating Plant, Unit 4 Project stage: Request PMNS20230202, Notice of Meeting with Southern Nuclear Operating Company2023-04-10010 April 2023 Notice of Meeting with Southern Nuclear Operating Company Project stage: Request NL-23-0135, License Amendment Request: Timing of Technical Specifications Effectiveness Prior to Initial Criticality (LAR-23-005)2023-04-17017 April 2023 License Amendment Request: Timing of Technical Specifications Effectiveness Prior to Initial Criticality (LAR-23-005) Project stage: Request NL-23-0467, Response to Request for Additional Information Regarding License Amendment Request: Timing of Unit 4 Technical Specifications Effectiveness Prior to Initial Criticality (LAR-23-005S1)2023-06-0909 June 2023 Response to Request for Additional Information Regarding License Amendment Request: Timing of Unit 4 Technical Specifications Effectiveness Prior to Initial Criticality (LAR-23-005S1) Project stage: Response to RAI ML23160A1952023-06-0909 June 2023 ITAAC Closure Verification Evaluation Form (Vef) for ITAAC Number 2.2.03.08c.xiii (Index No. 198) for Vogtle Unit 4 Combined License (VOG4) Project stage: Request ML23166A0332023-07-0505 July 2023 LAR-23-005 Timing of TS Effectiveness Prior to Initial Criticality Audit Report Project stage: Request ML23158A2092023-07-19019 July 2023 LAR-23-005 U/4 Amd 189 Timing of TS Effectiveness Prior to Initial Criticality Amendment Attachment Project stage: Approval ML23158A2082023-07-19019 July 2023 LAR-23-005 U/4 Amd 189 Timing of TS Effectiveness Prior to Initial Criticality Amendment Project stage: Approval ML23158A2072023-07-19019 July 2023 LAR-23-005 U/4 Amendment 189 Timing of TS Effectiveness Prior to Initial Criticality - Cover Letter Project stage: Approval ML23158A2062023-07-19019 July 2023 LAR-23-005 U/4 Amd 189 Timing of TS Effectiveness Prior to Initial Criticality Safety Evaluation Project stage: Approval ML23158A2052023-07-19019 July 2023 License Amendment 189 Timing of U/4 TS Effectiveness Prior to Initial Criticality (LAR-23-005) Project stage: Request 2023-04-10
[Table View] |
|
---|
Category:Letter
MONTHYEARNL-24-0385, Request for Action Matrix Deviation Due to Recent Events Impacting the Unplanned Scram with Complications Performance Indicator2024-10-31031 October 2024 Request for Action Matrix Deviation Due to Recent Events Impacting the Unplanned Scram with Complications Performance Indicator IR 05000424/20240032024-10-30030 October 2024 – Integrated Inspection Report 05000424/2024003 and 05000425/2024003 NL-24-0392, Response to Requests for Additional Information Related to Proposed Alternative GEN-ISI-AL T-2024-0022024-10-28028 October 2024 Response to Requests for Additional Information Related to Proposed Alternative GEN-ISI-AL T-2024-002 NL-24-0386, License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Air Storage Tanks Response to Request for Additional Information2024-10-28028 October 2024 License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Air Storage Tanks Response to Request for Additional Information NL-24-0366, Core Operating Limits Report, Cycle 26, Version 12024-10-25025 October 2024 Core Operating Limits Report, Cycle 26, Version 1 ML24297A6482024-10-23023 October 2024 5 to the Updated Final Safety Analysis Report, Technical Specification Bases Changes, Technical Requirements Manual Changes, Summary Report and Revised NRC Commitments Report ML24269A2502024-09-26026 September 2024 Acknowledgement of the Withdrawal of the Requested Exemption and License Amendment Request to Remove Tier 1 and Tier 2* Requirements NL-24-0369, Withdrawal of License Amendment Request and Exemption Request: Remove Tier 1 and Tier 2 Requirements2024-09-25025 September 2024 Withdrawal of License Amendment Request and Exemption Request: Remove Tier 1 and Tier 2 Requirements NL-24-0350, Core Operating Limits Report, Cycle 24, Version 22024-09-25025 September 2024 Core Operating Limits Report, Cycle 24, Version 2 ML24243A0072024-09-10010 September 2024 – Correction of Amendment Nos. 223 and 206 Regarding Revision to Technical Specifications to Adopt TSTF-339-A, Relocate Technical Specification Parameters to the COLR Consistent with WCAP-14483 ML24102A2642024-09-0909 September 2024 – Exemption Request Regarding Final Safety Analysis Report Update Schedule (EPID L-2024-LLE-0013) - Letter NL-24-0337, Interim 10 CFR 21.21(a)(2) Report Regarding Operation Technology, Inc., ETAP Software Error in Transient Stability Program2024-09-0909 September 2024 Interim 10 CFR 21.21(a)(2) Report Regarding Operation Technology, Inc., ETAP Software Error in Transient Stability Program ML24249A2942024-09-0606 September 2024 Correction of Amendment Nos. 218 and 201 Regarding Revision to Technical Specifications to Use Online Monitoring Methodology 05200025/LER-2024-002, Manual Reactor Protection System and Automatic Safeguards Actuation Due to an Unexpected Change in Position of a Main Feedwater Pump Minimum Flow Control Valve2024-09-0505 September 2024 Manual Reactor Protection System and Automatic Safeguards Actuation Due to an Unexpected Change in Position of a Main Feedwater Pump Minimum Flow Control Valve IR 05000424/20240052024-08-26026 August 2024 Updated Inspection Plan for Vogtle Electric Generating Plant, Units 1 and 2 - Report 05000424/2024005 and 05000425/2024005 ML24235A1952024-08-22022 August 2024 Updated Inspection Plan for Vogtle Electric Generating Plant, Units 3 and 4 - Report 05200025/2024005 and 05200026/2024005 IR 05000424/20244012024-08-15015 August 2024 4 - Security Baseline Inspection Report 05000424-2024401, 05000425-2024401, 05200025-2024402, and 05200026-2024403 - Cover Letter NL-24-0299, Exemption Request: Final Safety Analysis Report Update Schedule, Response to Request for Additional Information2024-08-14014 August 2024 Exemption Request: Final Safety Analysis Report Update Schedule, Response to Request for Additional Information 05000425/LER-2024-001, Manual Actuation of the Reactor Protection System Due to a Rod Control Fuse Opening Causing a Misaligned Shutdown Rod2024-08-0909 August 2024 Manual Actuation of the Reactor Protection System Due to a Rod Control Fuse Opening Causing a Misaligned Shutdown Rod ML24218A1842024-08-0707 August 2024 Examination Report and Cover Letter 05200026/LER-2024-001, Manual Reactor Protection System Actuation Due to Procedure Not Optimally Sequenced to Reset the Rapid Power Reduction Signal2024-08-0606 August 2024 Manual Reactor Protection System Actuation Due to Procedure Not Optimally Sequenced to Reset the Rapid Power Reduction Signal ML24212A1442024-08-0101 August 2024 Integrated Inspection Report 05200025/2024002 and 05200026/2024002 IR 05000424/20240022024-07-29029 July 2024 Integrated Inspection Report 05000424/2024002 and 05000425/2024002 IR 05000424/20244042024-07-26026 July 2024 Material Control and Accounting Program Inspection Report 05000424/2024404 and 05000425/2024404 (Cover Letter) NL-24-0282, License Amendment Request and Exemption Request: Remove Tier 1 and Tier 2* Requirements2024-07-25025 July 2024 License Amendment Request and Exemption Request: Remove Tier 1 and Tier 2* Requirements NL-24-0126, – Units 3 and 4, License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Action a and SR 3.7.6.62024-07-25025 July 2024 – Units 3 and 4, License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Action a and SR 3.7.6.6 ML24204A0722024-07-23023 July 2024 Issuance of Amendment No. 225, Regarding LAR to Revise TS 3.7.9 for a one-time Change to Support Nuclear Service Cooling Water Transfer Pump Repairs - Emergency Circumstances NL-24-0286, Emergency Request to Revise Technical Specification 3.7.9 for a One-Time Change to Support a Unit 1 Nuclear Service Cooling Water Transfer Pump Repair2024-07-20020 July 2024 Emergency Request to Revise Technical Specification 3.7.9 for a One-Time Change to Support a Unit 1 Nuclear Service Cooling Water Transfer Pump Repair NL-24-0261, 10 CFR 50.46 ECCS Evaluation Model Annual Report for 20232024-07-19019 July 2024 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2023 ML24191A4562024-07-19019 July 2024 Request for Relief and Alternative Requirements for Squib (Explosively Actuated) Valves First Test Interval ML24194A0342024-07-12012 July 2024 Review of the Refueling Outage 1R24 Steam Generator Tube Inspection Report ML24191A3792024-07-10010 July 2024 – Initial Test Program and Operational Programs Inspection Report 05200026/2024011 NL-24-0227, Proposed Inservice Inspection Alternative GEN-ISI-AL T-2024-03 for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1)2024-07-0303 July 2024 Proposed Inservice Inspection Alternative GEN-ISI-AL T-2024-03 for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) NL-24-0234, Application to Revise Technical Specifications to Adopt TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown2024-06-28028 June 2024 Application to Revise Technical Specifications to Adopt TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown NL-24-0143, Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities in2024-06-27027 June 2024 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities in NL-24-0087, License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Air Storage Tanks2024-06-21021 June 2024 License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Air Storage Tanks NL-24-0201, Proposed Inservice Inspection Alternative GEN-ISI-ALT-2024-002 for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1)2024-06-18018 June 2024 Proposed Inservice Inspection Alternative GEN-ISI-ALT-2024-002 for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) NL-24-0243, Registration of Spent Fuel Cask Use2024-06-18018 June 2024 Registration of Spent Fuel Cask Use ML24163A0632024-06-12012 June 2024 2024 Licensed Operator Re-qualification Inspection Notification Letter Vogtle, Units 3 & 4 ML24155A1772024-06-0505 June 2024 Regulatory Audit in Support of Review of the LAR to Revise Emergency Diesel Generator Frequency and Voltage Ranges for Technical Specification 3.8.1, Surveillance Requirements NL-24-0202, SNC Response to Regulatory Issue Summary 2024-01: Preparation and Scheduling of Operator Licensing Examinations2024-05-24024 May 2024 SNC Response to Regulatory Issue Summary 2024-01: Preparation and Scheduling of Operator Licensing Examinations ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc ML24094A1402024-05-16016 May 2024 Staff Response to Request for Revision to NRC Staff Assessment of Updated Seismic Hazard Information and Latest Understanding of Seismic Hazards at the Vogtle Plant Site Following the NRC Process for the Ongoing Assessment of Natural Hazard ML24130A2412024-05-13013 May 2024 Integrated Inspection Report 05200025/2024001 and 05200026/2024001 ML24120A1812024-05-13013 May 2024 Request for Withholding Information from Public Disclosure Responses to NRC Request for Additional Information for Refueling Outage IR24 Steam Generator Tube Inspection Report – Enclosure 2 ML24101A2112024-05-11011 May 2024 Expedited Issuance of Amendment No. 198 Change to Technical Specification 5.5.13, Ventilation Filter Testing Program (VFTP) NL-24-0191, Annual Radiological Environmental Operating Reports for 20232024-05-10010 May 2024 Annual Radiological Environmental Operating Reports for 2023 ML24127A2372024-05-0909 May 2024 Initial Test Program and Operational Programs Inspection Report 05200026/2024010 NL-24-0194, Revised Request for Relief and Alternative Requirements for Squib Valves First Test Interval (V34-IST-ALT-03-R1)2024-05-0707 May 2024 Revised Request for Relief and Alternative Requirements for Squib Valves First Test Interval (V34-IST-ALT-03-R1) ML24120A2832024-04-30030 April 2024 Project Manager Reassignment 2024-09-09
[Table view] |
Text
July 19, 2023
Mr. R. Keith Brown, Director Regulatory Affairs Southern Nuclear Operating Company, Inc.
3535 Colonnade Parkway, Bin N-274-EC Birmingham, AL 35243
SUBJECT:
VOGTLE ELECTRIC GENERATING PLANT, UNIT 4 ISSUANCE OF AMENDMENT REGARDING LICENSE AMENDMENT REQUEST: TIMING OF UNIT 4 TECHNICAL SPECIFICATIONS EFFECTIVENESS PRIOR TO INITIAL CRITICALITY (EPID L-2023-LLA-0056)
Dear Mr. Brown:
The U.S. Nuclear Regulatory Commission (the Commission or NRC) has issued the enclosed Amendment No. 189 to Combined License (COL) No. NPF-92 for the Vogtle Electric Generating Plant (VEGP), Unit 4. The amendment consists of changes to a COL Condition and COL Appendix A, Technical Specifications (TS) in response to your application dated April 17, 2023, titled, Timing of Unit 4 Technical Specifications Effectiveness Prior to Initial Criticality, designated as License Amendment Request (LAR) 23 -005. Your application was supplemented by letter dated June 9, 2023, titled, Response to Request for Additional Information Regarding License Amendment Request: Timing of Unit 4 Technical Specifications Effectiveness Prior to Initial Criticality (LAR-23-005S1).
The amendment involves changes to VEGP, Unit 4, COL Condition 2.D.(9) specifically to temporarily delay the effectiveness of certain TS requirements prior to initial criticality of the reactor core while in operating Modes 4, 5, and 6, as well as changes to COL Appendix A, TS Limiting Condition for Operation 3.0.7 to apply these exceptions. The staff notes that SNC included in its LAR and LAR supplement changes to the TS Bases document, which is under SNC control, and that the NRC staff does not re view and the Safety Evaluation will not address those changes.
A copy of the related Safety Evaluation, which includes the evaluation of the changes, is also enclosed. A Notice of Issuance associated with the amendment will be published in the Federal Register.
In accordance with Title 10 of the Code of Federal Regulations, Part 2, Agency Rules of Practice and Procedure, a copy of this letter will be available electronically for public inspection
R. Brown
in the NRC Public Document Room or from the Publicly Available Records component of the NRCs Agencywide Documents Access and M anagement System (ADAMS). ADAMS is accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html.
Sincerely,
/RA/
William (Billy) Gleaves, Senior Project Manager Vogtle Project Office Office of Nuclear Reactor Regulation
Docket No.: 52-026
Enclosures:
- 1. Amendment No. 189 to VEGP Unit 4 COL NPF-92
- 2. Safety Evaluation
cc: ListServ
ML23158A205 (package)
OFFICE NRR/VPO/VPOB/PM NRR/VPO/VPOB/LA NRR/VPO/VPOB/PM NRR/DSS/STSB/BC NAME WGleaves RButler* CSantos* VCusumano*
DATE 7/5/2023 07/03/2023 7/19/2023 07/03/2023 OFFICE NRR/DSS/SNRB/BC NRR/DSS/SCPB/BC NRR/VPO/VPOB/D NRR/VPO/VPOB/PM NAME RPatton* BWittick* LNist* WGleaves DATE 7/6/2023 07/01/2023 07/19/2023 7/19/2023