| {{#Wiki_filter:ENCLOSURES TO THIS LETTER CONTAIN INFORMATION TO BE WITH H ELD FROM PUBLIC DISCLOSURE PURSUANT TO 10 CFR 2.390 | | {{#Wiki_filter:ENCLOSURES TO THIS LETTER CONTAIN INFORMATION TO BE WITH H ELD FROM PUBLIC DISCLOSURE PURSUANT TO 10 CFR 2.390 |
|
| |
|
| Jason Jennings Director - Site Regulatory Compliance, PSEG | | Jason Jennings Director - Site Regulatory Compliance, PSEG |
|
| |
|
| PO Box 236 o PSEG I NUCLEAR Hancocks Bridge, New Jersey 0 8038- 0221 | | PO Box 236 o PSEG I NUCLEAR Hancocks Bridge, New Jersey 0 8038- 0221 |
|
| |
|
| Technical Specification 6.9.1.9 LR-N24-0042 May 28 , 2024 | | Technical Specification 6.9.1.9 LR-N24-0042 May 28, 2024 |
|
| |
|
| U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington DC 20555- 0001 | | U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington DC 20555- 0001 |
|
| |
|
| Hope Creek Generating Station Renewed Facility Operating License No. NPF- 57 NRC Docket No. 50-354 | | Hope Creek Generating Station Renewed Facility Operating License No. NPF-57 NRC Docket No. 50-354 |
|
| |
|
| ==Subject:== | | ==Subject:== |
| Core Operating Limits Report, Reload 25, Cycle 26, Revision 23 PSEG Nuclear LLC submits the Core Operating Limits Report (COLR) for Hope Creek Generating Station (HCGS) Reload 25, Cycle 26, Revision 23 as required by Hope Creek Technical Specification 6.9.1.9. | | Core Operating Limits Report, Reload 25, Cycle 26, Revision 23 PSEG Nuclear LLC submits the Core Operating Limits Report (COLR) for Hope Creek Generating Station (HCGS) Reload 25, Cycle 26, Revision 23 as required by Hope Creek Technical Specification 6.9.1.9. |
| The following enclosures are included in this submittal: | | The following enclosures are included in this submittal: |
| * Enclosure 1 is the proprietary version in its entirety of the COLR. This enclosure contains information proprietary to Global Nuclear Fuel - Americas, LLC (GNF- A). GNF-A requests that Enclosure 1 be withheld from public disclosure per 10 CFR 2.390(a)(4) and 10 CFR 9.17(a)(4). | | * Enclosure 1 is the proprietary version in its entirety of the COLR. This enclosure contains information proprietary to Global Nuclear Fuel - Americas, LLC (GNF-A). GNF-A requests that Enclosure 1 be withheld from public disclosure per 10 CFR 2.390(a)(4) and 10 CFR 9.17(a)(4). |
| * Enclosure 2 is a non-proprietary version of the COLR. | | * Enclosure 2 is a non-proprietary version of the COLR. |
| * Enclosure 3 is the GNF-A affidavit requesting withholding of proprietary information from public disclosure. | | * Enclosure 3 is the GNF-A affidavit requesting withholding of proprietary information from public disclosure. |
Line 38: |
Line 38: |
| There are no commitments contained in this letter. | | There are no commitments contained in this letter. |
|
| |
|
| Should you have any questions regarding this submittal, please contact Bernadette Humphrey at 856-339- 1308. | | Should you have any questions regarding this submittal, please contact Bernadette Humphrey at 856-339-1308. |
|
| |
|
| Sincerely, | | Sincerely, |
|
| |
|
| Jason Jennings Director, Site Regulatory Compliance PSEG Nuclear LLC May 28, 2024 TS 6.9.1.9 Page 2 of 2 LR-N24-0042 | | Jason Jennings Director, Site Regulatory Compliance PSEG Nuclear LLC May 28, 2024 TS 6.9.1.9 Page 2 of 2 LR-N24-0042 |
|
| |
|
| - Core Operating Limits Report, Reload 25, Cycle 26, Revision 23 -
| | - Core Operating Limits Report, Reload 25, Cycle 26, Revision 23 - |
| Proprietary Information - Withhold per 10 CFR 2.390(a)(4) | | Proprietary Information - Withhold per 10 CFR 2.390(a)(4) |
| - Core Operating Limits Report, Reload 25, Cycle 26, Revision 23 -
| | - Core Operating Limits Report, Reload 25, Cycle 26, Revision 23 - |
| Non -Proprietary | | Non -Proprietary |
| - Affidavit to Support Withholding the Core Operating Limits Report for Hope Creek Generating Station Unit 1 per 10 CFR 2.390(a)(4)
| | - Affidavit to Support Withholding the Core Operating Limits Report for Hope Creek Generating Station Unit 1 per 10 CFR 2.390(a)(4) |
|
| |
|
| cc/wo Enclosure 1: | | cc/wo Enclosure 1: |
| USNRC Regional Administrator Region 1 USNRC NRR Project Manager - Hope Creek USNRC Senior Resident Inspector - Hope Creek NJ Department of Environmental Protection, Bureau of Nuclear Engineering Site Commitment Coordinator, Hope Creek Generating Station Corporate Commitment Coordinator, PSEG Nuclear}} | | USNRC Regional Administrator Region 1 USNRC NRR Project Manager - Hope Creek USNRC Senior Resident Inspector - Hope Creek NJ Department of Environmental Protection, Bureau of Nuclear Engineering Site Commitment Coordinator, Hope Creek Generating Station Corporate Commitment Coordinator, PSEG Nuclear}} |
|
---|
Category:Letter
MONTHYEARML24295A3742024-10-23023 October 2024 Project Manager Assignment IR 05000354/20240032024-10-23023 October 2024 Integrated Inspection Report 05000354/2024003 ML24291A0572024-10-17017 October 2024 License Amendment Request (LAR) – Hope Creek Technical Specification Conversion to NUREG-1433, Revision 5, Supplement 1 LR-N24-0063, Emergency Plan Document Revision Implemented September 18, 2024. Includes NC.EP-EP.ZZ-0903, Rev. 7, Opening of Emergency Operations Facility (EOF)2024-10-0707 October 2024 Emergency Plan Document Revision Implemented September 18, 2024. Includes NC.EP-EP.ZZ-0903, Rev. 7, Opening of Emergency Operations Facility (EOF) LR-N24-0059, 2024 Annual 10 CFR 50.46 Report2024-09-30030 September 2024 2024 Annual 10 CFR 50.46 Report LR-N24-0056, Response to Request for Additional Information Associated with License Amendment Request - Revise Hope Creek Generating Station Technical Specification to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle2024-09-26026 September 2024 Response to Request for Additional Information Associated with License Amendment Request - Revise Hope Creek Generating Station Technical Specification to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle IR 05000272/20244032024-09-25025 September 2024 And Salem Nuclear Generating Station, Units 1 and 2, Cybersecurity Inspection Report 05000354/2024403, 05000272/2024403, and 05000311/2024403 (Cover Letter Only) IR 05000272/20244022024-09-23023 September 2024 And Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2024402, 05000272/2024402, and 05000311/2024402 (Cover Letter Only) ML24255A8042024-09-11011 September 2024 Notification of Conduct of a Fire Protection Team Inspection LR-N24-0057, In-Service Inspection Activities2024-09-10010 September 2024 In-Service Inspection Activities 05000354/LER-2024-001-01, Invalid Primary Containment Integrated Leak Rate As-Found Test (ILRT) Supplement2024-09-0505 September 2024 Invalid Primary Containment Integrated Leak Rate As-Found Test (ILRT) Supplement ML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 IR 05000354/20240052024-08-29029 August 2024 Updated Inspection Plan for Hope Creek Generating Station (Report 05000354/2024005) LR-N24-0044, Relief Request VR-042024-08-0606 August 2024 Relief Request VR-04 IR 05000354/20240022024-07-30030 July 2024 Integrated Inspection Report 05000354/2024002 ML24200A0572024-07-18018 July 2024 Request for Withholding Information from Public Disclosure for License Amendment Request to Revise Technical Specification Lift Settings for Reactor Coolant System Safety/Relief Valves NUREG-1433, – Acceptance of License Amendment Request Concerning Technical Specification Conversion to NUREG-1433, Revision 52024-07-16016 July 2024 – Acceptance of License Amendment Request Concerning Technical Specification Conversion to NUREG-1433, Revision 5 ML24145A1772024-07-15015 July 2024 And Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 236, 349, and 331 Modify Exclusion Area Boundary ML24197A0552024-07-15015 July 2024 Requalification Program Inspection 05000354/LER-2024-001, Invalid Primary Containment Integrated Leak Rate As-Found Test (ILRT)2024-07-0202 July 2024 Invalid Primary Containment Integrated Leak Rate As-Found Test (ILRT) LR-N24-0030, License Amendment Request to Revise Technical Specification Lift Settings for Reactor Coolant System Safety/Relief Valves2024-06-28028 June 2024 License Amendment Request to Revise Technical Specification Lift Settings for Reactor Coolant System Safety/Relief Valves IR 05000272/20245012024-06-12012 June 2024 And Salem Nuclear Generating Station, Units 1 and 2 - Emergency Preparedness Biennial Exercise Inspection Report 05000354/2024501, 05000272/2024501 and 05000311/2024501 ML24150A1002024-05-28028 May 2024 Core Operating Limits Report, Reload 25, Cycle 26, Revision 23 ML24150A0032024-05-28028 May 2024 Request for Exemptions from 10 CFR 50.82(a)(8)(i)(A) and 10 CFR 50.75(h)(1)(iv) and Proposed Amendment to the Decommissioning Trust Agreement LR-N24-0041, Stations, Revisions to Emergency Plan Document Nc EP-EP-ZZ-01102, Rev. 28, Emergency Coordinator Response2024-05-22022 May 2024 Stations, Revisions to Emergency Plan Document Nc EP-EP-ZZ-01102, Rev. 28, Emergency Coordinator Response LR-N24-0004, License Amendment Request – Revise Technical Specification to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle2024-05-20020 May 2024 License Amendment Request – Revise Technical Specification to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle ML24142A4072024-05-20020 May 2024 License Amendment Request (LAR) - Hope Creek Technical Specification Conversion to NUREG-1433, Revision 5 IR 05000354/20240012024-05-0808 May 2024 Integrated Inspection Report 05000354/2024001 IR 05000354/20240102024-05-0707 May 2024 Information Request for Quadrennial Baseline Comprehensive Engineering Team Inspection; Notification to Perform Inspection 05000354/2024010 LR-N24-0035, 2023 Annual Radiological Environmental Operating Report (AREOR)2024-04-30030 April 2024 2023 Annual Radiological Environmental Operating Report (AREOR) LR-N24-0034, 2023 Annual Radioactive Effluent Release Report (ARERR)2024-04-30030 April 2024 2023 Annual Radioactive Effluent Release Report (ARERR) LR-N24-0024, Response to Request for Additional Information Associated with License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary2024-04-26026 April 2024 Response to Request for Additional Information Associated with License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary IR 05000354/20243012024-04-10010 April 2024 Initial Operator Licensing Examination Report 05000354/2024301 LR-N24-0011, Supplemental Information to License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary2024-04-0505 April 2024 Supplemental Information to License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary IR 05000272/20240112024-04-0101 April 2024 and Salem Nuclear Generating Station, Units 1 and 2 - Plant Modification and Annual Problem Identification and Resolution Inspection Report 05000354/2024011, 05000272/2024011, and 05000311/2024011 LR-N24-0028, and Salem Generating Station - Notice of Intent to Pursue Subsequent License Renewal2024-03-28028 March 2024 and Salem Generating Station - Notice of Intent to Pursue Subsequent License Renewal LR-N24-0021, and Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums2024-03-20020 March 2024 and Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums LR-N24-0027, Inadvertent Main Turbine Control Valve Closure Caused Reactor Scram2024-03-19019 March 2024 Inadvertent Main Turbine Control Valve Closure Caused Reactor Scram LR-N24-0020, Generation Station and Salem Generating Station, Units 1 & 2 - Annual Property Insurance Status Report2024-03-0707 March 2024 Generation Station and Salem Generating Station, Units 1 & 2 - Annual Property Insurance Status Report IR 05000354/20230062024-02-28028 February 2024 Annual Assessment Letter for Hope Creek Generating Station (Report 05000354/2023006) IR 05000272/20244012024-02-26026 February 2024 and Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2024401, 05000272/2024401 and 05000311/2024401 (Cover Letter Only) LR-N24-0010, Technical Specification 6.9.1.5.b: 2023 Annual Report of SRV Challenges2024-02-22022 February 2024 Technical Specification 6.9.1.5.b: 2023 Annual Report of SRV Challenges IR 05000354/20230042024-02-0101 February 2024 Integrated Inspection Report 05000354/2023004 ML24030A8752024-02-0101 February 2024 Operator Licensing Examination Approval ML24009A1022024-01-26026 January 2024 – Exemption from Select Requirements of 10 CF Part 73 (EPID L-2023-LLE-0045 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000354/20234012024-01-22022 January 2024 Material Control and Accounting Program Inspection Report 05000354/2023401 ML23341A1372024-01-16016 January 2024 Issuance of Amendment No. 235 Revise Trip and Standby Auto-Start Logic Associated with Safety Related Heating, Ventilation and Air Conditioning ML23335A1122023-12-15015 December 2023 Retest Schedule for Drywell to Suppression Chamber Vacuum Breakers ML23307A1532023-12-15015 December 2023 NRC Investigation Report No. 1-2023-001 ML23270C0072023-11-29029 November 2023 Notice of Proposed Amendment to Decommissioning Trust Agreement 2024-09-05
[Table view] |
Text
ENCLOSURES TO THIS LETTER CONTAIN INFORMATION TO BE WITH H ELD FROM PUBLIC DISCLOSURE PURSUANT TO 10 CFR 2.390
Jason Jennings Director - Site Regulatory Compliance, PSEG
PO Box 236 o PSEG I NUCLEAR Hancocks Bridge, New Jersey 0 8038- 0221
Technical Specification 6.9.1.9 LR-N24-0042 May 28, 2024
U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington DC 20555- 0001
Hope Creek Generating Station Renewed Facility Operating License No. NPF-57 NRC Docket No. 50-354
Subject:
Core Operating Limits Report, Reload 25, Cycle 26, Revision 23 PSEG Nuclear LLC submits the Core Operating Limits Report (COLR) for Hope Creek Generating Station (HCGS) Reload 25, Cycle 26, Revision 23 as required by Hope Creek Technical Specification 6.9.1.9.
The following enclosures are included in this submittal:
- Enclosure 1 is the proprietary version in its entirety of the COLR. This enclosure contains information proprietary to Global Nuclear Fuel - Americas, LLC (GNF-A). GNF-A requests that Enclosure 1 be withheld from public disclosure per 10 CFR 2.390(a)(4) and 10 CFR 9.17(a)(4).
- Enclosure 2 is a non-proprietary version of the COLR.
- Enclosure 3 is the GNF-A affidavit requesting withholding of proprietary information from public disclosure.
There are no commitments contained in this letter.
Should you have any questions regarding this submittal, please contact Bernadette Humphrey at 856-339-1308.
Sincerely,
Jason Jennings Director, Site Regulatory Compliance PSEG Nuclear LLC May 28, 2024 TS 6.9.1.9 Page 2 of 2 LR-N24-0042
- Core Operating Limits Report, Reload 25, Cycle 26, Revision 23 -
Proprietary Information - Withhold per 10 CFR 2.390(a)(4)
- Core Operating Limits Report, Reload 25, Cycle 26, Revision 23 -
Non -Proprietary
- Affidavit to Support Withholding the Core Operating Limits Report for Hope Creek Generating Station Unit 1 per 10 CFR 2.390(a)(4)
cc/wo Enclosure 1:
USNRC Regional Administrator Region 1 USNRC NRR Project Manager - Hope Creek USNRC Senior Resident Inspector - Hope Creek NJ Department of Environmental Protection, Bureau of Nuclear Engineering Site Commitment Coordinator, Hope Creek Generating Station Corporate Commitment Coordinator, PSEG Nuclear