10 CFR 26.719(c)(3): Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page with " CFR::10 CFR 26.719, FFD Reporting requirements : (3) If a false negative error occurs on a quality assurance check of validity screening tests, as required in § 26.137(b), the licensee or other entity shall notify the NRC within 24 hours after discovery of the error. {{Reporting criterion-Nav|reporting time=24 hours|corresponds with=10 CFR 26.719(c)(1)}}") |
StriderTol (talk | contribs) No edit summary |
||
Line 1: | Line 1: | ||
see also [[Blind Performance Test]] | |||
[[CFR::10 CFR 26.719, FFD Reporting requirements]] | [[CFR::10 CFR 26.719, FFD Reporting requirements]] |
Latest revision as of 07:14, 28 August 2024
see also Blind Performance Test
10 CFR 26.719, FFD Reporting requirements
- (3) If a false negative error occurs on a quality assurance check of validity screening tests, as required in § 26.137(b), the licensee or other entity shall notify the NRC within 24 hours after discovery of the error.