ENS 55843: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 9: Line 9:
| unit = 1
| unit = 1
| utype = W-3-LP, W-3-LP, M-4-LP
| utype = W-3-LP, W-3-LP, M-4-LP
| cfr = 10 CFR 50.72(b)(2)(iv)(B)
| cfr = 10 CFR 50.72(b)(2)(iv)(B), 10 CFR 50.72(b)(3)(iv)(A)
| emergency class = Non Emergency
| emergency class = Non Emergency
| notification date = 04/14/2022 11:18
| notification date = 04/14/2022 11:18
Line 22: Line 22:
The following additional information was obtained from the licensee in accordance with Headquarters Operations Officers Report Guidance:
The following additional information was obtained from the licensee in accordance with Headquarters Operations Officers Report Guidance:
There was no affect to Unit 2.  Unit 2 is operating at 100 percent power.
There was no affect to Unit 2.  Unit 2 is operating at 100 percent power.
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2022/20220415en.html#en55843
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2022/20220418en.html#en55843
}}{{unit info
}}{{unit info
| Unit = 1
| Unit = 1

Latest revision as of 16:02, 4 January 2024

ENS 55843 +/-
Where
North Anna Dominion icon.png
Virginia (NRC Region 2)
Reporting
10 CFR 50.72(b)(2)(iv)(B), RPS Actuation

10 CFR 50.72(b)(3)(iv)(A), System Actuation
Time - Person (Reporting Time:+-2.17 h-0.0904 days <br />-0.0129 weeks <br />-0.00297 months <br />)
Opened: Bob Page
11:18 Apr 14, 2022
NRC Officer: Kerby Scales
Last Updated: Apr 14, 2022
55843 - NRC Website
Loading map...