ML20141G096: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 1: Line 1:
{{Adams package
{{Adams package
| number = ML20141G096
| number = ML20141G096
| title = Forwards 860401 Ltr to Util Clarifying That Draft SER Status Includes Cessar 80 Final Design Approval Through Amend 6,per 860212 Request
| title = Forwards 860401 Ltr to Util Clarifying That Draft SER Status Includes CESSAR 80 Final Design Approval Through Amend 6,per 860212 Request
| release date = 06/03/2020
| release date = 06/03/2020
| package contents = {{Adams package content
| package contents = {{Adams package content
| number = ML20141G099
| number = ML20141G099
| issue date = 02/12/1986
| issue date = 02/12/1986
| title = Requests Clarification That NRC Review of Ref Portion of Plant Application Closed to Extent That Util Commits to Cessar as Approved Through Final Design Approval & Amend 1
| title = Requests Clarification That NRC Review of Ref Portion of Plant Application Closed to Extent That Util Commits to CESSAR as Approved Through Final Design Approval & Amend 1
| author name = Scherer A
| author name = Scherer A
| author affiliation = ABB COMBUSTION ENGINEERING NUCLEAR FUEL (FORMERLY
| author affiliation = ABB COMBUSTION ENGINEERING NUCLEAR FUEL (FORMERLY
Line 21: Line 21:
| number = ML20141G092
| number = ML20141G092
| issue date = 04/14/1986
| issue date = 04/14/1986
| title = Forwards 860401 Ltr to Util Clarifying That Draft SER Status Includes Cessar 80 Final Design Approval Through Amend 6,per 860212 Request
| title = Forwards 860401 Ltr to Util Clarifying That Draft SER Status Includes CESSAR 80 Final Design Approval Through Amend 6,per 860212 Request
| author name = Miraglia F
| author name = Miraglia F
| author affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
| author affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)

Latest revision as of 10:39, 11 October 2023

Forwards 860401 Ltr to Util Clarifying That Draft SER Status Includes CESSAR 80 Final Design Approval Through Amend 6,per 860212 Request
Date released: 06/03/2020 Download: ML20141G096


Requests Clarification That NRC Review of Ref Portion of Plant Application Closed to Extent That Util Commits to CESSAR as Approved Through Final Design Approval & Amend 1
ML20141G099
Person / Time
Site: Satsop
Issue date: 02/12/1986
From: Scherer A
ABB COMBUSTION ENGINEERING NUCLEAR FUEL (FORMERLY
To: STELLO V
NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO)
References
Download: ML20141G099 (2)
Forwards 860401 Ltr to Util Clarifying That Draft SER Status Includes CESSAR 80 Final Design Approval Through Amend 6,per 860212 Request
ML20141G092
Person / Time
Site: Satsop
Issue date: 04/14/1986
From: Miraglia F
Office of Nuclear Reactor Regulation
To: SCHERER A E
ABB COMBUSTION ENGINEERING NUCLEAR FUEL (FORMERLY
References
Download: ML20141G092 (2)