ML20072B744: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 26: Line 26:
August 4, 1994 Docket No. 50-366                                                              HL-4663 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Edwin I. IIatch Nuclear Plant - Unit 2 Request to Revise Technical Specifications for TraversingIncore Probe (TIP) Operability Requirements Gentlemen:
August 4, 1994 Docket No. 50-366                                                              HL-4663 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Edwin I. IIatch Nuclear Plant - Unit 2 Request to Revise Technical Specifications for TraversingIncore Probe (TIP) Operability Requirements Gentlemen:
In accordance with the provisions of 10 CFR 50.90, as required by 10 CFR 50.59(c)(1),
In accordance with the provisions of 10 CFR 50.90, as required by 10 CFR 50.59(c)(1),
Georgia Power Company (GPC) proposed a change to the Plant Hatch Unit 2 Technical Specifications, Appendix A to Operating License NPF-5 by letter dated July 19, 1994.
Georgia Power Company (GPC) proposed a change to the Plant Hatch Unit 2 Technical Specifications, Appendix A to Operating License NPF-5 by {{letter dated|date=July 19, 1994|text=letter dated July 19, 1994}}.
The proposal involved a change to the Plant flatch Unit 2 Specification for the Traversing In-Core Probe (TIP) system.
The proposal involved a change to the Plant flatch Unit 2 Specification for the Traversing In-Core Probe (TIP) system.
Specifically, the proposed change provides an action for the case when the Technical Specification 3.3.6.6 requirement is not met. The action allows the data normally supplied by the inoperable unit to be supplied by either substituting data from traverses of symmetric locations or utilizing normalized TIP readings calculated by a process computer code.
Specifically, the proposed change provides an action for the case when the Technical Specification 3.3.6.6 requirement is not met. The action allows the data normally supplied by the inoperable unit to be supplied by either substituting data from traverses of symmetric locations or utilizing normalized TIP readings calculated by a process computer code.
Based on discussions with members of the Nuclear Regulatory Commission stafT, the proposed change is revised to be effective for the remainder of Cycle 12 only. The description and justification of the proposed change, and the 10 CFR 50.92 evaluation provided in the July 19,1994 letter remain valid. The afTected Technical Specification page is enclosed.
Based on discussions with members of the Nuclear Regulatory Commission stafT, the proposed change is revised to be effective for the remainder of Cycle 12 only. The description and justification of the proposed change, and the 10 CFR 50.92 evaluation provided in the {{letter dated|date=July 19, 1994|text=July 19,1994 letter}} remain valid. The afTected Technical Specification page is enclosed.
9 9408160229          940804                                                                \  j DR      ADOCK 05000366 PDR
9 9408160229          940804                                                                \  j DR      ADOCK 05000366 PDR



Latest revision as of 23:16, 30 May 2023

Application for Amend to License NPF-5,revising TSs for Traversing Incore Probe Operability Requirements
ML20072B744
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 08/04/1994
From: Beckham J
GEORGIA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20072B746 List:
References
HL-4663, NUDOCS 9408160229
Download: ML20072B744 (2)


Text

. Gerxg a rtwer canr,any Edon I Hatch Ngtimtr Ply.t

- rei vue om n9 Oijsley CPGrg a 31613 T@Dhone '412 30 /- / /P1

n am1u m

J. T. Beckham, Jr. Cicorgitt Power we m.m.

o nem ' "

August 4, 1994 Docket No. 50-366 HL-4663 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Edwin I. IIatch Nuclear Plant - Unit 2 Request to Revise Technical Specifications for TraversingIncore Probe (TIP) Operability Requirements Gentlemen:

In accordance with the provisions of 10 CFR 50.90, as required by 10 CFR 50.59(c)(1),

Georgia Power Company (GPC) proposed a change to the Plant Hatch Unit 2 Technical Specifications, Appendix A to Operating License NPF-5 by letter dated July 19, 1994.

The proposal involved a change to the Plant flatch Unit 2 Specification for the Traversing In-Core Probe (TIP) system.

Specifically, the proposed change provides an action for the case when the Technical Specification 3.3.6.6 requirement is not met. The action allows the data normally supplied by the inoperable unit to be supplied by either substituting data from traverses of symmetric locations or utilizing normalized TIP readings calculated by a process computer code.

Based on discussions with members of the Nuclear Regulatory Commission stafT, the proposed change is revised to be effective for the remainder of Cycle 12 only. The description and justification of the proposed change, and the 10 CFR 50.92 evaluation provided in the July 19,1994 letter remain valid. The afTected Technical Specification page is enclosed.

9 9408160229 940804 \ j DR ADOCK 05000366 PDR

r l

. l

. l U.S. Nuclear Regulatory Commission Page Two August 4, 1994 Mr J. T. Beckham, Jr. states he is Vice President of Georgia Power Company and is authorized to execute this oath on behalf of Georgia Power Company, and to the best of his knowledge and belief, the facts set forth in this letter are true.

Sincerely,

/} l

/ J. T. Beckham, Jr.

b Sworn to and sub. scribed before me this _fIfb day of)y J ,1994.

7hnuf ikek Notary Pdlic

My Commission Expires:

SRM/cr

Enclosure:

Revised Page 3/4 3-57 cc: Georgia Power Compay Mr.11. L Sumner, Nuclear Plant General Manager NORMS LI.S. Nuclear Regulatory Commis.sion. Washington. D.C.

Mr. K. Jabbour, Licensing Project Manager - Hatch Mr. C. Grimes, Technical Specifications Branch L1,S. Nuclear Regulatory Commission. Region H Mr. S. D. Ebneter, Regional Administrator Mr. B. L Holbrook, Senior Resident Inspector - Hatch State of Georgia Mr. J. D. Tanner, Commissioner - Department of Natural Resources