ML20100A883: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
Line 30: Line 30:
==Dear Mr. Denton:==
==Dear Mr. Denton:==


In a letter dated June 19, 1984, South Carolina Electric and Gas Company (SCE&G) requested a revision to the Virgil C.              Summer Nuclear Station Technical Specifications.                SCE&G hereby requests that amendment be revised as indicated on the enclosed attachments to define allowable power levels for RCS flow rates less than 100% of Thermal Design flow.
In a {{letter dated|date=June 19, 1984|text=letter dated June 19, 1984}}, South Carolina Electric and Gas Company (SCE&G) requested a revision to the Virgil C.              Summer Nuclear Station Technical Specifications.                SCE&G hereby requests that amendment be revised as indicated on the enclosed attachments to define allowable power levels for RCS flow rates less than 100% of Thermal Design flow.
Attachment 1 contains the proposed amended pages to the Technical Specifications and Attachment 2 provides an explanation and justification for this proposed change.
Attachment 1 contains the proposed amended pages to the Technical Specifications and Attachment 2 provides an explanation and justification for this proposed change.
Attachment 3 provides the basis for the significant hazards consideration.
Attachment 3 provides the basis for the significant hazards consideration.

Revision as of 05:10, 24 September 2022

Application for Amend to License NPF-12,revising Tech Specs to Define All Allowable Power Levels for RCS Flow Rates Less than 100% of Thermal Design Flow
ML20100A883
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 11/29/1984
From: Dixon O
SOUTH CAROLINA ELECTRIC & GAS CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20100A886 List:
References
NUDOCS 8412040118
Download: ML20100A883 (2)


Text

-_

D D

SOUTH CAROLINA ELECTRIC & GAS COMPANY POST OFFICE 764 COLuweiA. SOUTH CAROUNA 29218

o. w. oixOu. an.

"'*""' November 29, 1984 NUCLEAR CrEnArioNS Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555

Subject:

Virgil C. Summer Nuclear Station Docket No. 50/395 Operating License No. NPF-12 Reactor Coolant System Flow

Dear Mr. Denton:

In a letter dated June 19, 1984, South Carolina Electric and Gas Company (SCE&G) requested a revision to the Virgil C. Summer Nuclear Station Technical Specifications. SCE&G hereby requests that amendment be revised as indicated on the enclosed attachments to define allowable power levels for RCS flow rates less than 100% of Thermal Design flow.

Attachment 1 contains the proposed amended pages to the Technical Specifications and Attachment 2 provides an explanation and justification for this proposed change.

Attachment 3 provides the basis for the significant hazards consideration.

This change has been reviewed and approved by the Plant Safety Review Committee and the Nuclear Safety Review Committee. A check in the amount of four thousand dollars ($4000.00) has previously been transmitted along with the June 19, 1984 submittal to process this amendment.

Should you have any questions, please contact us at your convenience.

Very truly yours, O. W. Dixon, Jr.

! AMM/OWD/gj Attachments: ,

cc: (see page #2) 8412040118 841129 PDR ADOCK 05000395 b6l p PDR l\

D Mr. Harold R. . Denton Reactor Coolant System Flow November 29, 1984 Page #2 cca V. C. Summer C. A. Price T. C. Nichols, Jr./O. W. Dixon, Jr. C. L. Ligon (NSRC)

E. H. Crews, Jr. K. E. Nodland E. C. Roberts R. A. Stough W. A. Williams, Jr. G. Percival D. A. Nauman C. W. Hehl J. P. O' Reilly J. B. Knotts, Jr.

Group Managers H. G. Shealy O. S. Bradham NPCF File